FDOT contract T3991 bid tabulation

SR 30 (US 98) FROM W OF ST JOE INLET BRIDGE TO ICWW BRIDGE. Let by Florida DOT on May 20, 2026, Gulf, District 3. 6 bids received; low bid $2,120,388 by C.W. Roberts Contracting, Inc..

Owner
Florida DOT
Letting
20 MAY 2026
Pay items
122
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1C.W. Roberts Contracting, Inc.$2,120,388Low
2American Sand & X-Cavation, Inc. DBA American Sand & Asphalt Paving$2,394,197+13%
3Roberts and Roberts, Inc.$2,747,821+30%
4Anderson Columbia Co., Inc.$2,793,821+32%
5Pigott Asphalt and Sitework LLC$2,972,815+40%
6Gulf Coast Utility Contractors, LLC$3,510,440+66%
FDOT contract T3991: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. C.W. Roberts Contracting, Inc.2. American Sand & X-Cavation, Inc. DBA American Sand & Asphalt Paving3. Roberts and Roberts, Inc.4. Anderson Columbia Co., Inc.5. Pigott Asphalt and Sitework LLC6. Gulf Coast Utility Contractors, LLC
0005Mobilization (0101-1)LS1$84,000$50,000$175,000$258,566$300,000$70,329
0010Mobilization (0101-1)LS1$4,000.00$50,000$4,000.00$10,000$50,000$25,000
0015Mobilization (0101-1)LS1$3,600.00$50,000$4,000.00$10,000$50,000$70,329
0020Maintenance of traffic (0102-1)DA1$73,500$25,000$52,000$135,380$126,000$54,638
0025Maintenance of traffic (0102-1)DA1$7,800.00$25,000$3,500.00$10,000$25,000$69,017
0030Maintenance of traffic (0102-1)DA1$3,500.00$25,000$20,000$10,000$25,000$20,130
0035Traffic control officer (0102-14)HR152$81.00$65.00$75.00$106.95$100.00$94.60
0040Work zone sign (0102-60)ED16,808$0.30$0.34$0.40$0.30$0.25$0.81
0045Business sign (0102-61)EACH6$105.21$121.00$126.50$12.87$150.00$268.40
0050Temporary barrier, F&I, low profile, concrete (0102-71-13)LF468$52.60$60.50$63.30$62.45$1.00$92.02
0055Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED29,345$0.10$0.11$0.20$0.18$0.01$1.67
0060Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD834$0.24$0.28$0.30$0.59$0.10$2.87
0065Portable changeable message sign, temporary (0102-99)ED797$14.35$16.50$17.30$35.65$7.00$94.34
0070Temporary signalization and maintenance, intersection (0102-104)ED470$13.55$14.30$16.10$15.45$5.00$15.54
0075Temporary traffic detection and maintenance, intersection (0102-107-1)ED470$14.52$14.30$17.30$15.45$5.00$15.54
0080Type III barricade (0102-115)ED992$0.96$1.10$1.20$0.89$1.00$2.90
0085Sediment barrier (0104-10-3)LF758$3.32$4.50$5.00$6.95$4.00$3.78
0090Inlet protection system (0104-18)EACH52$184.17$200.00$350.00$178.26$100.00$592.64
0095Litter removal (0107-1)ACRE138.22$143.47$75.00$172.50$59.42$10.00$166.44
0100Mowing (0107-2)ACRE74.14$143.47$75.00$172.50$59.42$50.00$170.67
0105Clearing & grubbing (0110-1-1)ACRE1$19,647$25,000$15,000$13,001$86,500$7,200.78
0110Clearing & grubbing (0110-1-1)ACRE1$20,054$25,000$15,000$14,727$25,000$2,990.73
0115Removal of existing concrete (0110-4-10)SY42$26.24$45.00$150.00$231.50$100.00$11.50
0120Regular excavation (0120-1)CY142$32.00$30.00$32.50$103.71$60.00$11.50
0125Borrow excavation, truck measure (0120-2-2)CY118.20$31.49$36.00$30.00$162.14$100.00$30.00
0130Type B stabilization (0160-4)SY368$17.13$20.00$25.00$35.85$12.00$25.58
0135Optional base, base group 01 (0285-701)SY322$24.93$24.00$28.50$82.23$30.00$14.50
0140Turnout base- optional materials (0286-1)SY565$21.65$49.00$35.00$46.77$30.00$13.77
0145Milling existing asphalt pavement, 3" avg depth (0327-70-4)SY1,455$4.20$6.00$5.00$2.04$4.00$11.50
0150Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY56,531$2.02$1.70$4.00$1.62$2.50$9.20
0155Milling existing asphalt pavement, 3/4" avg depth (0327-70-19)SY158$13.00$10.00$4.00$4.45$5.00$9.20
0160Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53)TN120$138.35$170.00$200.00$165.38$200.00$230.95
0165Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN4,846.30$134.15$142.00$155.00$146.44$185.00$242.00
0170Miscellaneous asphalt (0339-1)TN6.50$554.82$385.00$1,000.00$282.91$400.00$288.50
0175Inlets, curb, type P-4, partial (0425-1345)EACH1$12,672$8,900.00$31,000$22,943$12,000$9,142.19
0180Manhole, adjust (0425-5)EACH8$1,732.57$1,500.00$1,750.00$1,599.23$1,800.00$2,335.57
0185Pipe culvert,optional material,round, 12"S/CD (0430-175112)LF32$600.05$60.00$509.50$447.86$450.00$228.75
0190Pipe culvert,optional material,round, 15"S/CD (0430-175115)LF16$740.31$88.00$519.50$871.62$500.00$228.75
0195Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF24$668.39$100.00$872.70$579.37$750.00$240.00
0200Pipe culvert,optional material,round, 24"S/CD (0430-175124)LF24$676.41$130.00$866.50$600.82$850.00$270.00
0205Pipe culvert, opt material, round, 30"S/CD (0430-175130)LF32$660.20$250.00$377.30$308.86$350.00$306.00
0210Concrete curb & gutter, type F (0520-1-10)LF178$63.28$70.00$89.20$75.01$56.00$40.96
0215Concrete curb, ribbon curb (0520-2100)LF378$84.86$58.00$164.90$189.40$85.00$35.21
0220Shoulder gutter- concrete (0520-6)LF102$70.10$70.00$135.60$114.93$80.00$70.77
0225Concrete sidewalk and driveways, 6" thick (0522-2)SY182$126.30$118.00$196.70$156.84$150.00$149.25
0230Patterned pavement (0523-3)SY155$239.11$650.00$212.80$356.52$56.00$287.57
0235Detectable warnings (0527-2)SF267$30.61$35.00$45.00$38.03$40.00$36.94
0240Riprap- rubble, bank and shore (0530-3-3)TN573.70$102.75$200.00$225.00$145.76$175.00$160.54
0245Bedding stone (0530-74)TN201.10$101.32$180.00$241.40$168.75$160.00$119.24
0250Guardrail -roadway, general (0536-1-1)LF97$47.82$55.00$57.50$59.42$39.00$53.36
0255Guardrail transition to rigid barrier, F&I- index 536- 002, approach TL-3 (0536-8122)EACH1$2,199.38$2,529.47$2,644.50$2,732.71$10,000$8,051.99
0260Guardrail removal (0536-73)LF106$1.91$2.20$2.30$2.38$10.00$13.56
0265Guardrail end treatment- parallel approach terminal (0536-85-24)EACH2$2,085.07$2,398.00$2,507.00$2,590.67$3,200.00$5,463.85
0270Guardrail reset (0538-1)LF78$15.30$17.60$18.40$19.01$30.00$36.87
0275Performance turf, sod (0570-1-2)SY1,802$7.25$4.50$10.60$15.06$4.00$10.23
0280Raised pavement marker, type B (0706-1-3)EACH3,583$3.83$4.40$4.60$4.75$4.50$4.66
0285Painted pavement markings, standard, white, solid, 6" (0710-11101)GM2.56$1,909.92$2,200.00$2,300.00$2,376.77$1,600.00$2,355.30
0290Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF480$2.06$2.37$2.60$2.55$3.50$3.00
0295Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124)LF515$2.10$2.42$2.60$2.61$4.00$2.79
0300Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF57$4.78$5.50$5.80$5.94$10.00$6.05
0305Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM0.26$1,138.97$1,320.00$1,380.00$1,426.06$1,600.00$1,536.64
0310Painted pavement markings, standard, white, arrows (0710-11170)EACH48$40.65$46.75$48.90$50.50$45.00$53.92
0315Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM5.16$1,912.53$2,200.00$2,300.00$2,376.77$1,600.00$2,674.56
0320Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224)LF258$2.10$2.42$2.60$2.61$4.00$2.79
0325Painted pavement markings, standard, yellow, skip, 6" (0710-11231)GM0.10$1,208.11$1,320.00$1,380.00$1,426.06$2,500.00$2,118.95
0330Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241)GM0.11$1,024.73$1,320.00$1,380.00$1,426.06$2,500.00$1,540.63
0335Initial contingency amount, DO not bid (0999-25)LS1$43,120$43,120$43,120$43,120$43,120$43,120
0340Initial contingency amount, DO not bid (0999-25)LS1$6,880.41$6,880.41$6,880.41$6,880.41$6,880.41$6,880.41
0345Local agency initial amount (DO not bid) (0999-26)LS1$3,586.95$3,586.95$3,586.95$3,586.95$3,586.95$3,586.95
0350Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH28$463.88$533.50$557.80$576.37$550.00$760.01
0355Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH2$1,865.09$2,145.00$2,242.50$2,317.35$2,000.00$862.72
0360Single column ground sign assembly, remove (0700-1600)EACH19$23.91$27.50$28.80$29.71$60.00$69.62
0365Single column ground sign assembly, F&I cantilever mount, 12.0-20.0 SF (0700-1912)EACH1$3,347.58$3,850.00$4,025.00$4,159.34$3,500.00$3,450.84
0370Multi-column ground sign assembly, remove (0700-2600)EACH1$239.11$275.00$287.50$297.11$250.00$575.15
0375Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH1$191.29$220.00$230.00$237.68$250.00$287.57
0380Sign panel, relocate, UP to 12 SF (0700-3501)EACH4$95.65$110.00$115.00$118.84$150.00$86.27
0385Sign panel, remove, UP to 12 SF (0700-3601)EACH1$47.82$55.00$57.50$59.42$100.00$57.52
0390Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH1$71.73$82.50$86.30$89.13$150.00$230.06
0395Tubular marker, 36" yellow (0704-1-4)EACH35$167.38$192.50$201.30$207.97$200.00$205.41
0400Raised pavement marker, type B (0706-1-3)EACH1,402$3.83$4.40$4.60$4.75$5.00$4.72
0405Painted pavement markings, surface (0710-90)LS1$33,476$38,500$40,250$41,593$25,000$46,011
0410Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF2,173$3.35$3.85$4.10$4.16$5.00$4.05
0415Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF1,984$4.06$4.68$4.90$5.05$7.00$1.16
0420Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF511$4.93$5.67$6.00$6.12$10.00$6.08
0425Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.47$1,725.29$1,980.00$2,070.00$2,139.09$3,500.00$2,084.73
0430Thermoplastic, standard, message or symbol (0711-11160)EACH2$239.12$275.00$287.50$297.11$250.00$287.58
0435Thermoplastic, standard, arrow (0711-11170)EACH99$62.17$71.50$74.80$77.24$65.00$75.52
0440Thermoplastic, standard, yield line (0711-11180)LF12$19.13$22.00$23.00$23.77$9.00$23.96
0445Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF664$4.06$4.68$4.90$5.05$7.00$4.94
0450Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.07$2,207.23$2,750.00$2,875.00$2,970.96$5,000.00$3,096.92
0455Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF936$11.48$13.20$13.80$14.26$15.00$13.83
0460Thermoplastic, preformed, white, message (0711-14160)EACH16$95.65$110.00$115.00$118.84$175.00$115.03
0465Thermoplastic, preformed, white, arrow (0711-14170)EACH16$143.47$165.00$172.50$178.26$100.00$179.73
0470Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM5.71$4,637.17$5,335.00$5,577.50$5,763.66$6,000.00$5,588.30
0475Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102)GM0.17$5,965.09$6,820.00$7,130.00$7,367.98$7,500.00$7,146.75
0480Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM4.34$4,637.73$5,335.00$5,577.50$5,763.66$6,000.00$5,630.85
0485Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231)GM0.35$2,127.71$2,475.00$2,587.50$2,673.87$5,000.00$2,599.52
0490Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1)SF1,520$1.43$1.65$1.80$1.78$4.00$1.74
0495Permanent tape, white, solid, 6" for concrete bridges (0713-103101)GM0.20$28,131$33,000$34,500$35,652$40,000$34,678
0500Permanent tape, yellow, solid, for concrete bridges (0713-103201)GM0.20$28,131$33,000$34,500$35,652$40,000$34,678
0505Conduit, furnish & install, open trench (0630-2-11)LF225$14.52$18.70$17.30$20.20$20.00$20.73
0510Conduit, furnish & install, directional bore (0630-2-12)LF1,005$33.88$41.80$40.30$45.16$39.00$43.89
0515Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH22$871.14$1,540.00$1,035.00$1,663.74$1,500.00$1,628.70
0520Electrical power service, F&I, underground, meter by contractor (0639-1122)AS3$4,839.65$4,950.00$5,750.00$5,347.73$5,600.00$5,272.13
0525Electrical service wire, & install (0639-2-1)LF30$19.36$11.00$23.00$11.88$15.00$21.09
0530Prestressed concrete pole, type P-II service pole (0641-2-12)EACH3$2,807.97$2,420.00$3,336.20$2,614.44$2,400.00$2,626.48
0535Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12)LF3,468$4.84$3.30$5.80$3.57$3.00$3.53
0540Load center, F&I, secondary voltage (0715-7-11)EACH3$9,239.86$16,500$10,978$17,826$17,000$17,350
0545Light pole complete, F&I, STD pole STD foundation, wildlife sensitive luminaire, 25' mounting height, 8' arm length (0715-61811)EACH19$9,195.34$11,000$10,925$11,884$10,000$11,518
0550Pole cable distribution system, furnish and install, conventional (0715-500-1)EACH19$600.12$825.00$713.00$891.30$700.00$874.82
0555Conduit, furnish & install, open trench (0630-2-11)LF20$14.52$18.70$17.30$20.20$50.00$34.51
0560Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI1$2,903.79$5,500.00$3,450.00$5,941.92$11,000$6,038.99
0565Signal cable, remove- intersection (0632-7-6)PI1$338.78$880.00$402.50$950.71$1,500.00$1,207.79
0570Aluminum signals pole, furnish install pedestrian detector post (0646-1-12)EACH2$1,161.52$1,100.00$1,380.00$1,188.38$2,500.00$1,294.07
0575Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109)EACH18$451.06$825.00$535.90$891.30$600.00$878.69
0580Loop assembly- F&I, type A (0660-2101)AS7$1,258.31$1,540.00$1,495.00$1,663.74$1,750.00$1,651.48
0585Loop assembly, F&I, type B (0660-2102)AS4$1,064.72$1,870.00$1,265.00$2,020.25$1,800.00$2,027.38
0590Loop assembly, F&I, type F (0660-2106)AS8$1,451.90$2,090.00$1,725.00$2,257.93$2,000.00$2,221.49
0595Pedestrian detector, furnish & install, standard (0665-1-11)EACH2$459.77$495.00$546.30$534.77$500.00$661.41
0600ITS CCTV camera, non- pressurized, IP, high definition (0682-1173)EACH2$7,743.44$7,700.00$9,200.00$8,318.70$7,000.00$8,195.77
0605Sign panel, furnish & install overhead mount, 12-20 SF (0700-3202)EACH4$663.03$1,320.00$787.80$1,426.06$1,250.00$1,452.23
0610Sign panel, remove, 12-20 SF (0700-3602)EACH4$96.79$148.50$115.00$160.44$250.00$222.87
FDOT contract T3991: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of May 20, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy