FDOT contract T3991 bid tabulation
SR 30 (US 98) FROM W OF ST JOE INLET BRIDGE TO ICWW BRIDGE. Let by Florida DOT on May 20, 2026, Gulf, District 3. 6 bids received; low bid $2,120,388 by C.W. Roberts Contracting, Inc..
- Owner
- Florida DOT
- Letting
- 20 MAY 2026
- Pay items
- 122
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | C.W. Roberts Contracting, Inc. | $2,120,388 | Low |
| 2 | American Sand & X-Cavation, Inc. DBA American Sand & Asphalt Paving | $2,394,197 | +13% |
| 3 | Roberts and Roberts, Inc. | $2,747,821 | +30% |
| 4 | Anderson Columbia Co., Inc. | $2,793,821 | +32% |
| 5 | Pigott Asphalt and Sitework LLC | $2,972,815 | +40% |
| 6 | Gulf Coast Utility Contractors, LLC | $3,510,440 | +66% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. C.W. Roberts Contracting, Inc. | 2. American Sand & X-Cavation, Inc. DBA American Sand & Asphalt Paving | 3. Roberts and Roberts, Inc. | 4. Anderson Columbia Co., Inc. | 5. Pigott Asphalt and Sitework LLC | 6. Gulf Coast Utility Contractors, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $84,000 | $50,000 | $175,000 | $258,566 | $300,000 | $70,329 |
| 0010 | Mobilization (0101-1) | LS | 1 | $4,000.00 | $50,000 | $4,000.00 | $10,000 | $50,000 | $25,000 |
| 0015 | Mobilization (0101-1) | LS | 1 | $3,600.00 | $50,000 | $4,000.00 | $10,000 | $50,000 | $70,329 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $73,500 | $25,000 | $52,000 | $135,380 | $126,000 | $54,638 |
| 0025 | Maintenance of traffic (0102-1) | DA | 1 | $7,800.00 | $25,000 | $3,500.00 | $10,000 | $25,000 | $69,017 |
| 0030 | Maintenance of traffic (0102-1) | DA | 1 | $3,500.00 | $25,000 | $20,000 | $10,000 | $25,000 | $20,130 |
| 0035 | Traffic control officer (0102-14) | HR | 152 | $81.00 | $65.00 | $75.00 | $106.95 | $100.00 | $94.60 |
| 0040 | Work zone sign (0102-60) | ED | 16,808 | $0.30 | $0.34 | $0.40 | $0.30 | $0.25 | $0.81 |
| 0045 | Business sign (0102-61) | EACH | 6 | $105.21 | $121.00 | $126.50 | $12.87 | $150.00 | $268.40 |
| 0050 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 468 | $52.60 | $60.50 | $63.30 | $62.45 | $1.00 | $92.02 |
| 0055 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 29,345 | $0.10 | $0.11 | $0.20 | $0.18 | $0.01 | $1.67 |
| 0060 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 834 | $0.24 | $0.28 | $0.30 | $0.59 | $0.10 | $2.87 |
| 0065 | Portable changeable message sign, temporary (0102-99) | ED | 797 | $14.35 | $16.50 | $17.30 | $35.65 | $7.00 | $94.34 |
| 0070 | Temporary signalization and maintenance, intersection (0102-104) | ED | 470 | $13.55 | $14.30 | $16.10 | $15.45 | $5.00 | $15.54 |
| 0075 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 470 | $14.52 | $14.30 | $17.30 | $15.45 | $5.00 | $15.54 |
| 0080 | Type III barricade (0102-115) | ED | 992 | $0.96 | $1.10 | $1.20 | $0.89 | $1.00 | $2.90 |
| 0085 | Sediment barrier (0104-10-3) | LF | 758 | $3.32 | $4.50 | $5.00 | $6.95 | $4.00 | $3.78 |
| 0090 | Inlet protection system (0104-18) | EACH | 52 | $184.17 | $200.00 | $350.00 | $178.26 | $100.00 | $592.64 |
| 0095 | Litter removal (0107-1) | ACRE | 138.22 | $143.47 | $75.00 | $172.50 | $59.42 | $10.00 | $166.44 |
| 0100 | Mowing (0107-2) | ACRE | 74.14 | $143.47 | $75.00 | $172.50 | $59.42 | $50.00 | $170.67 |
| 0105 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $19,647 | $25,000 | $15,000 | $13,001 | $86,500 | $7,200.78 |
| 0110 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $20,054 | $25,000 | $15,000 | $14,727 | $25,000 | $2,990.73 |
| 0115 | Removal of existing concrete (0110-4-10) | SY | 42 | $26.24 | $45.00 | $150.00 | $231.50 | $100.00 | $11.50 |
| 0120 | Regular excavation (0120-1) | CY | 142 | $32.00 | $30.00 | $32.50 | $103.71 | $60.00 | $11.50 |
| 0125 | Borrow excavation, truck measure (0120-2-2) | CY | 118.20 | $31.49 | $36.00 | $30.00 | $162.14 | $100.00 | $30.00 |
| 0130 | Type B stabilization (0160-4) | SY | 368 | $17.13 | $20.00 | $25.00 | $35.85 | $12.00 | $25.58 |
| 0135 | Optional base, base group 01 (0285-701) | SY | 322 | $24.93 | $24.00 | $28.50 | $82.23 | $30.00 | $14.50 |
| 0140 | Turnout base- optional materials (0286-1) | SY | 565 | $21.65 | $49.00 | $35.00 | $46.77 | $30.00 | $13.77 |
| 0145 | Milling existing asphalt pavement, 3" avg depth (0327-70-4) | SY | 1,455 | $4.20 | $6.00 | $5.00 | $2.04 | $4.00 | $11.50 |
| 0150 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 56,531 | $2.02 | $1.70 | $4.00 | $1.62 | $2.50 | $9.20 |
| 0155 | Milling existing asphalt pavement, 3/4" avg depth (0327-70-19) | SY | 158 | $13.00 | $10.00 | $4.00 | $4.45 | $5.00 | $9.20 |
| 0160 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 120 | $138.35 | $170.00 | $200.00 | $165.38 | $200.00 | $230.95 |
| 0165 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 4,846.30 | $134.15 | $142.00 | $155.00 | $146.44 | $185.00 | $242.00 |
| 0170 | Miscellaneous asphalt (0339-1) | TN | 6.50 | $554.82 | $385.00 | $1,000.00 | $282.91 | $400.00 | $288.50 |
| 0175 | Inlets, curb, type P-4, partial (0425-1345) | EACH | 1 | $12,672 | $8,900.00 | $31,000 | $22,943 | $12,000 | $9,142.19 |
| 0180 | Manhole, adjust (0425-5) | EACH | 8 | $1,732.57 | $1,500.00 | $1,750.00 | $1,599.23 | $1,800.00 | $2,335.57 |
| 0185 | Pipe culvert,optional material,round, 12"S/CD (0430-175112) | LF | 32 | $600.05 | $60.00 | $509.50 | $447.86 | $450.00 | $228.75 |
| 0190 | Pipe culvert,optional material,round, 15"S/CD (0430-175115) | LF | 16 | $740.31 | $88.00 | $519.50 | $871.62 | $500.00 | $228.75 |
| 0195 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 24 | $668.39 | $100.00 | $872.70 | $579.37 | $750.00 | $240.00 |
| 0200 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 24 | $676.41 | $130.00 | $866.50 | $600.82 | $850.00 | $270.00 |
| 0205 | Pipe culvert, opt material, round, 30"S/CD (0430-175130) | LF | 32 | $660.20 | $250.00 | $377.30 | $308.86 | $350.00 | $306.00 |
| 0210 | Concrete curb & gutter, type F (0520-1-10) | LF | 178 | $63.28 | $70.00 | $89.20 | $75.01 | $56.00 | $40.96 |
| 0215 | Concrete curb, ribbon curb (0520-2100) | LF | 378 | $84.86 | $58.00 | $164.90 | $189.40 | $85.00 | $35.21 |
| 0220 | Shoulder gutter- concrete (0520-6) | LF | 102 | $70.10 | $70.00 | $135.60 | $114.93 | $80.00 | $70.77 |
| 0225 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 182 | $126.30 | $118.00 | $196.70 | $156.84 | $150.00 | $149.25 |
| 0230 | Patterned pavement (0523-3) | SY | 155 | $239.11 | $650.00 | $212.80 | $356.52 | $56.00 | $287.57 |
| 0235 | Detectable warnings (0527-2) | SF | 267 | $30.61 | $35.00 | $45.00 | $38.03 | $40.00 | $36.94 |
| 0240 | Riprap- rubble, bank and shore (0530-3-3) | TN | 573.70 | $102.75 | $200.00 | $225.00 | $145.76 | $175.00 | $160.54 |
| 0245 | Bedding stone (0530-74) | TN | 201.10 | $101.32 | $180.00 | $241.40 | $168.75 | $160.00 | $119.24 |
| 0250 | Guardrail -roadway, general (0536-1-1) | LF | 97 | $47.82 | $55.00 | $57.50 | $59.42 | $39.00 | $53.36 |
| 0255 | Guardrail transition to rigid barrier, F&I- index 536- 002, approach TL-3 (0536-8122) | EACH | 1 | $2,199.38 | $2,529.47 | $2,644.50 | $2,732.71 | $10,000 | $8,051.99 |
| 0260 | Guardrail removal (0536-73) | LF | 106 | $1.91 | $2.20 | $2.30 | $2.38 | $10.00 | $13.56 |
| 0265 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 2 | $2,085.07 | $2,398.00 | $2,507.00 | $2,590.67 | $3,200.00 | $5,463.85 |
| 0270 | Guardrail reset (0538-1) | LF | 78 | $15.30 | $17.60 | $18.40 | $19.01 | $30.00 | $36.87 |
| 0275 | Performance turf, sod (0570-1-2) | SY | 1,802 | $7.25 | $4.50 | $10.60 | $15.06 | $4.00 | $10.23 |
| 0280 | Raised pavement marker, type B (0706-1-3) | EACH | 3,583 | $3.83 | $4.40 | $4.60 | $4.75 | $4.50 | $4.66 |
| 0285 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 2.56 | $1,909.92 | $2,200.00 | $2,300.00 | $2,376.77 | $1,600.00 | $2,355.30 |
| 0290 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 480 | $2.06 | $2.37 | $2.60 | $2.55 | $3.50 | $3.00 |
| 0295 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 515 | $2.10 | $2.42 | $2.60 | $2.61 | $4.00 | $2.79 |
| 0300 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 57 | $4.78 | $5.50 | $5.80 | $5.94 | $10.00 | $6.05 |
| 0305 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.26 | $1,138.97 | $1,320.00 | $1,380.00 | $1,426.06 | $1,600.00 | $1,536.64 |
| 0310 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 48 | $40.65 | $46.75 | $48.90 | $50.50 | $45.00 | $53.92 |
| 0315 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 5.16 | $1,912.53 | $2,200.00 | $2,300.00 | $2,376.77 | $1,600.00 | $2,674.56 |
| 0320 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 258 | $2.10 | $2.42 | $2.60 | $2.61 | $4.00 | $2.79 |
| 0325 | Painted pavement markings, standard, yellow, skip, 6" (0710-11231) | GM | 0.10 | $1,208.11 | $1,320.00 | $1,380.00 | $1,426.06 | $2,500.00 | $2,118.95 |
| 0330 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.11 | $1,024.73 | $1,320.00 | $1,380.00 | $1,426.06 | $2,500.00 | $1,540.63 |
| 0335 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $43,120 | $43,120 | $43,120 | $43,120 | $43,120 | $43,120 |
| 0340 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $6,880.41 | $6,880.41 | $6,880.41 | $6,880.41 | $6,880.41 | $6,880.41 |
| 0345 | Local agency initial amount (DO not bid) (0999-26) | LS | 1 | $3,586.95 | $3,586.95 | $3,586.95 | $3,586.95 | $3,586.95 | $3,586.95 |
| 0350 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 28 | $463.88 | $533.50 | $557.80 | $576.37 | $550.00 | $760.01 |
| 0355 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 2 | $1,865.09 | $2,145.00 | $2,242.50 | $2,317.35 | $2,000.00 | $862.72 |
| 0360 | Single column ground sign assembly, remove (0700-1600) | EACH | 19 | $23.91 | $27.50 | $28.80 | $29.71 | $60.00 | $69.62 |
| 0365 | Single column ground sign assembly, F&I cantilever mount, 12.0-20.0 SF (0700-1912) | EACH | 1 | $3,347.58 | $3,850.00 | $4,025.00 | $4,159.34 | $3,500.00 | $3,450.84 |
| 0370 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 1 | $239.11 | $275.00 | $287.50 | $297.11 | $250.00 | $575.15 |
| 0375 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 1 | $191.29 | $220.00 | $230.00 | $237.68 | $250.00 | $287.57 |
| 0380 | Sign panel, relocate, UP to 12 SF (0700-3501) | EACH | 4 | $95.65 | $110.00 | $115.00 | $118.84 | $150.00 | $86.27 |
| 0385 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 1 | $47.82 | $55.00 | $57.50 | $59.42 | $100.00 | $57.52 |
| 0390 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 1 | $71.73 | $82.50 | $86.30 | $89.13 | $150.00 | $230.06 |
| 0395 | Tubular marker, 36" yellow (0704-1-4) | EACH | 35 | $167.38 | $192.50 | $201.30 | $207.97 | $200.00 | $205.41 |
| 0400 | Raised pavement marker, type B (0706-1-3) | EACH | 1,402 | $3.83 | $4.40 | $4.60 | $4.75 | $5.00 | $4.72 |
| 0405 | Painted pavement markings, surface (0710-90) | LS | 1 | $33,476 | $38,500 | $40,250 | $41,593 | $25,000 | $46,011 |
| 0410 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 2,173 | $3.35 | $3.85 | $4.10 | $4.16 | $5.00 | $4.05 |
| 0415 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 1,984 | $4.06 | $4.68 | $4.90 | $5.05 | $7.00 | $1.16 |
| 0420 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 511 | $4.93 | $5.67 | $6.00 | $6.12 | $10.00 | $6.08 |
| 0425 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.47 | $1,725.29 | $1,980.00 | $2,070.00 | $2,139.09 | $3,500.00 | $2,084.73 |
| 0430 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 2 | $239.12 | $275.00 | $287.50 | $297.11 | $250.00 | $287.58 |
| 0435 | Thermoplastic, standard, arrow (0711-11170) | EACH | 99 | $62.17 | $71.50 | $74.80 | $77.24 | $65.00 | $75.52 |
| 0440 | Thermoplastic, standard, yield line (0711-11180) | LF | 12 | $19.13 | $22.00 | $23.00 | $23.77 | $9.00 | $23.96 |
| 0445 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 664 | $4.06 | $4.68 | $4.90 | $5.05 | $7.00 | $4.94 |
| 0450 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.07 | $2,207.23 | $2,750.00 | $2,875.00 | $2,970.96 | $5,000.00 | $3,096.92 |
| 0455 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 936 | $11.48 | $13.20 | $13.80 | $14.26 | $15.00 | $13.83 |
| 0460 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 16 | $95.65 | $110.00 | $115.00 | $118.84 | $175.00 | $115.03 |
| 0465 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 16 | $143.47 | $165.00 | $172.50 | $178.26 | $100.00 | $179.73 |
| 0470 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 5.71 | $4,637.17 | $5,335.00 | $5,577.50 | $5,763.66 | $6,000.00 | $5,588.30 |
| 0475 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.17 | $5,965.09 | $6,820.00 | $7,130.00 | $7,367.98 | $7,500.00 | $7,146.75 |
| 0480 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 4.34 | $4,637.73 | $5,335.00 | $5,577.50 | $5,763.66 | $6,000.00 | $5,630.85 |
| 0485 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 0.35 | $2,127.71 | $2,475.00 | $2,587.50 | $2,673.87 | $5,000.00 | $2,599.52 |
| 0490 | Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1) | SF | 1,520 | $1.43 | $1.65 | $1.80 | $1.78 | $4.00 | $1.74 |
| 0495 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.20 | $28,131 | $33,000 | $34,500 | $35,652 | $40,000 | $34,678 |
| 0500 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.20 | $28,131 | $33,000 | $34,500 | $35,652 | $40,000 | $34,678 |
| 0505 | Conduit, furnish & install, open trench (0630-2-11) | LF | 225 | $14.52 | $18.70 | $17.30 | $20.20 | $20.00 | $20.73 |
| 0510 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 1,005 | $33.88 | $41.80 | $40.30 | $45.16 | $39.00 | $43.89 |
| 0515 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 22 | $871.14 | $1,540.00 | $1,035.00 | $1,663.74 | $1,500.00 | $1,628.70 |
| 0520 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 3 | $4,839.65 | $4,950.00 | $5,750.00 | $5,347.73 | $5,600.00 | $5,272.13 |
| 0525 | Electrical service wire, & install (0639-2-1) | LF | 30 | $19.36 | $11.00 | $23.00 | $11.88 | $15.00 | $21.09 |
| 0530 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 3 | $2,807.97 | $2,420.00 | $3,336.20 | $2,614.44 | $2,400.00 | $2,626.48 |
| 0535 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 3,468 | $4.84 | $3.30 | $5.80 | $3.57 | $3.00 | $3.53 |
| 0540 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 3 | $9,239.86 | $16,500 | $10,978 | $17,826 | $17,000 | $17,350 |
| 0545 | Light pole complete, F&I, STD pole STD foundation, wildlife sensitive luminaire, 25' mounting height, 8' arm length (0715-61811) | EACH | 19 | $9,195.34 | $11,000 | $10,925 | $11,884 | $10,000 | $11,518 |
| 0550 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 19 | $600.12 | $825.00 | $713.00 | $891.30 | $700.00 | $874.82 |
| 0555 | Conduit, furnish & install, open trench (0630-2-11) | LF | 20 | $14.52 | $18.70 | $17.30 | $20.20 | $50.00 | $34.51 |
| 0560 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 1 | $2,903.79 | $5,500.00 | $3,450.00 | $5,941.92 | $11,000 | $6,038.99 |
| 0565 | Signal cable, remove- intersection (0632-7-6) | PI | 1 | $338.78 | $880.00 | $402.50 | $950.71 | $1,500.00 | $1,207.79 |
| 0570 | Aluminum signals pole, furnish install pedestrian detector post (0646-1-12) | EACH | 2 | $1,161.52 | $1,100.00 | $1,380.00 | $1,188.38 | $2,500.00 | $1,294.07 |
| 0575 | Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109) | EACH | 18 | $451.06 | $825.00 | $535.90 | $891.30 | $600.00 | $878.69 |
| 0580 | Loop assembly- F&I, type A (0660-2101) | AS | 7 | $1,258.31 | $1,540.00 | $1,495.00 | $1,663.74 | $1,750.00 | $1,651.48 |
| 0585 | Loop assembly, F&I, type B (0660-2102) | AS | 4 | $1,064.72 | $1,870.00 | $1,265.00 | $2,020.25 | $1,800.00 | $2,027.38 |
| 0590 | Loop assembly, F&I, type F (0660-2106) | AS | 8 | $1,451.90 | $2,090.00 | $1,725.00 | $2,257.93 | $2,000.00 | $2,221.49 |
| 0595 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 2 | $459.77 | $495.00 | $546.30 | $534.77 | $500.00 | $661.41 |
| 0600 | ITS CCTV camera, non- pressurized, IP, high definition (0682-1173) | EACH | 2 | $7,743.44 | $7,700.00 | $9,200.00 | $8,318.70 | $7,000.00 | $8,195.77 |
| 0605 | Sign panel, furnish & install overhead mount, 12-20 SF (0700-3202) | EACH | 4 | $663.03 | $1,320.00 | $787.80 | $1,426.06 | $1,250.00 | $1,452.23 |
| 0610 | Sign panel, remove, 12-20 SF (0700-3602) | EACH | 4 | $96.79 | $148.50 | $115.00 | $160.44 | $250.00 | $222.87 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of May 20, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.