FDOT contract T3A03 bid tabulation
SR 10 (US 90) FROM DUVAL ST TO W OF QUINCY CREEK. Let by Florida DOT on July 29, 2026, Gadsden, District 3. 5 bids received; low bid $1,539,585 by Anderson Columbia Co., Inc..
- Owner
- Florida DOT
- Letting
- 29 JUL 2026
- Pay items
- 76
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Anderson Columbia Co., Inc. | $1,539,585 | Low |
| 2 | C.W. Roberts Contracting, Inc. | $1,550,435 | +1.0% |
| 3 | Peavy & Son Construction Co., Inc. | $1,556,489 | +1.0% |
| 4 | Pigott Asphalt and Sitework LLC | $1,587,594 | +3.0% |
| 5 | Capital Asphalt Inc | $1,672,075 | +9.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Anderson Columbia Co., Inc. | 2. C.W. Roberts Contracting, Inc. | 3. Peavy & Son Construction Co., Inc. | 4. Pigott Asphalt and Sitework LLC | 5. Capital Asphalt Inc |
|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $67,925 | $120,000 | $50,000 | $100,000 | $80,000 |
| 0010 | Mobilization (0101-1) | LS | 1 | $10,000 | $10,000 | $50,000 | $25,000 | $5,000.00 |
| 0015 | Maintenance of traffic (0102-1) | DA | 1 | $65,000 | $56,000 | $35,000 | $56,000 | $50,000 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $1,000.00 | $7,000.00 | $40,000 | $32,000 | $5,000.00 |
| 0025 | Commercial material for temporary driveway maintenance (0102-3) | CY | 38.70 | $50.25 | $53.00 | $100.00 | $40.00 | $100.00 |
| 0030 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $1.12 | $8,300.00 | $1,000.00 | $11,500 | $10,000 |
| 0035 | Traffic control officer (0102-14) | HR | 20 | $89.71 | $100.00 | $120.00 | $250.00 | $100.00 |
| 0040 | Work zone sign (0102-60) | ED | 8,958 | $0.34 | $0.35 | $0.32 | $0.30 | $0.50 |
| 0045 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 200 | $2.00 | $55.00 | $52.50 | $1.00 | $53.00 |
| 0050 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 14,839 | $0.13 | $0.15 | $0.13 | $0.01 | $0.25 |
| 0055 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 13,000 | $0.09 | $0.10 | $0.10 | $0.10 | $0.25 |
| 0060 | Arrow board / advance warning arrow panel (0102-76) | ED | 298 | $5.61 | $5.45 | $6.00 | $0.01 | $5.25 |
| 0065 | Temporary raised/retroreflective pavement marker, type B (0102-78-2) | EACH | 843 | $6.73 | $4.90 | $5.50 | $4.50 | $4.75 |
| 0070 | Portable changeable message sign, temporary (0102-99) | ED | 356 | $16.82 | $16.00 | $15.75 | $1.00 | $15.75 |
| 0075 | Type III barricade (0102-115) | ED | 408 | $0.56 | $0.55 | $0.55 | $0.30 | $1.00 |
| 0080 | Removable tape, white, 24" stop bar (0102-913-23) | LF | 270 | $6.73 | $22.00 | $21.00 | $1.00 | $21.00 |
| 0085 | Removable tape, white, 12" crosswalk (0102-913-24) | LF | 1,440 | $2.80 | $11.00 | $10.50 | $0.50 | $10.50 |
| 0090 | Sediment barrier (0104-10-3) | LF | 1,710 | $2.84 | $2.20 | $3.00 | $1.50 | $5.00 |
| 0095 | Inlet protection system (0104-18) | EACH | 41 | $168.21 | $160.00 | $100.00 | $125.00 | $200.00 |
| 0100 | Litter removal (0107-1) | ACRE | 41.80 | $196.25 | $190.00 | $50.00 | $10.00 | $50.00 |
| 0105 | Mowing (0107-2) | ACRE | 32.50 | $50.47 | $190.00 | $75.00 | $50.00 | $100.00 |
| 0110 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $19,754 | $12,000 | $7,500.00 | $17,000 | $20,000 |
| 0115 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $13,874 | $1,600.00 | $7,500.00 | $5,500.00 | $15,000 |
| 0120 | Removal of existing concrete (0110-4-10) | SY | 368 | $50.47 | $67.00 | $25.00 | $37.00 | $38.00 |
| 0125 | Regular excavation (0120-1) | CY | 201.40 | $45.14 | $90.00 | $7.00 | $26.00 | $50.00 |
| 0130 | Borrow excavation, truck measure (0120-2-2) | CY | 618 | $31.14 | $25.00 | $20.00 | $30.00 | $35.00 |
| 0135 | Type B stabilization (0160-4) | SY | 49 | $136.56 | $31.00 | $20.00 | $30.00 | $100.00 |
| 0140 | Optional base, base group 02 (0285-702) | SY | 116 | $65.17 | $22.00 | $30.00 | $32.00 | $75.00 |
| 0145 | Optional base, base group 11 (0285-711) | SY | 92 | $195.00 | $90.00 | $75.00 | $104.55 | $100.00 |
| 0150 | Turnout base- optional materials (0286-1) | SY | 110 | $46.26 | $23.00 | $50.00 | $40.00 | $100.00 |
| 0155 | Milling existing asphalt pavement, 2" avg depth (0327-70-5) | SY | 39,378 | $1.25 | $1.35 | $1.00 | $2.50 | $2.50 |
| 0160 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 1,826 | $16.14 | $8.75 | $1.00 | $2.50 | $10.00 |
| 0165 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 91.20 | $340.78 | $220.00 | $160.00 | $200.00 | $225.00 |
| 0170 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 4,503.20 | $147.01 | $140.00 | $160.00 | $154.78 | $160.00 |
| 0175 | Inlets, curb, type P-1, <10' (0425-1311) | EACH | 1 | $10,820 | $13,000 | $7,500.00 | $10,500 | $12,500 |
| 0180 | Manholes, P-7, <10' (0425-2-41) | EACH | 1 | $7,046.41 | $11,000 | $8,000.00 | $10,500 | $12,500 |
| 0185 | Manhole, adjust (0425-5) | EACH | 3 | $2,252.84 | $1,700.00 | $1,100.00 | $1,700.00 | $1,200.00 |
| 0190 | Manhole, adjust, utilities (0425-5-1) | EACH | 8 | $2,252.84 | $1,700.00 | $1,600.00 | $1,700.00 | $1,200.00 |
| 0195 | Valve boxes, adjust (0425-6) | EACH | 13 | $1,290.72 | $880.00 | $1,000.00 | $825.00 | $850.00 |
| 0200 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 88 | $213.06 | $140.00 | $85.00 | $165.00 | $250.00 |
| 0205 | Pipe handrail - guiderail, aluminum (0515-1-2) | LF | 409 | $65.05 | $63.00 | $65.00 | $62.00 | $60.00 |
| 0210 | Concrete curb & gutter, type F (0520-1-10) | LF | 650 | $58.97 | $66.00 | $75.00 | $62.50 | $65.00 |
| 0215 | Valley gutter- concrete (0520-3) | LF | 58 | $113.10 | $110.00 | $100.00 | $62.50 | $75.00 |
| 0220 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 1,127 | $85.10 | $100.00 | $95.00 | $97.00 | $105.00 |
| 0225 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 302 | $113.73 | $110.00 | $110.00 | $107.50 | $115.00 |
| 0230 | Detectable warnings (0527-2) | SF | 328 | $36.03 | $35.00 | $27.00 | $27.00 | $26.00 |
| 0235 | Performance turf, sod (0570-1-2) | SY | 2,531 | $3.93 | $3.80 | $6.00 | $5.00 | $5.00 |
| 0240 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 2.12 | $336.41 | $2,200.00 | $2,100.00 | $1,600.00 | $2,100.00 |
| 0245 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 1,522 | $0.56 | $2.20 | $21.00 | $1.80 | $2.25 |
| 0250 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 110 | $0.56 | $3.30 | $3.15 | $1.25 | $3.25 |
| 0255 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 145 | $1.68 | $4.35 | $4.20 | $3.50 | $4.25 |
| 0260 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 2.07 | $1,682.09 | $1,100.00 | $1,050.00 | $1,000.00 | $1,050.00 |
| 0265 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 54 | $22.43 | $55.00 | $52.50 | $50.00 | $52.50 |
| 0270 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 2.05 | $1,962.44 | $2,200.00 | $2,100.00 | $1,600.00 | $2,100.00 |
| 0275 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 109 | $0.56 | $3.30 | $3.15 | $1.00 | $3.25 |
| 0280 | Painted pavement markings, standard, yellow, skip, 6" (0710-11231) | GM | 1.58 | $1,401.74 | $1,100.00 | $1,050.00 | $1,100.00 | $1,050.00 |
| 0285 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.36 | $963.91 | $1,100.00 | $1,050.00 | $1,100.00 | $1,050.00 |
| 0290 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $39,896 | $39,896 | $39,896 | $39,896 | $39,896 |
| 0295 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $10,104 | $10,104 | $10,104 | $10,104 | $10,104 |
| 0300 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 15 | $493.41 | $480.00 | $604.00 | $475.00 | $460.00 |
| 0305 | Single column ground sign assembly, relocate (0700-1500) | EACH | 1 | $224.28 | $220.00 | $84.00 | $250.00 | $210.00 |
| 0310 | Single column ground sign assembly, remove (0700-1600) | EACH | 13 | $50.47 | $49.00 | $53.00 | $50.00 | $47.00 |
| 0315 | Sign panel, relocate, UP to 12 SF (0700-3501) | EACH | 15 | $28.04 | $27.00 | $63.00 | $30.00 | $26.00 |
| 0320 | Raised pavement marker, type B (0706-1-3) | EACH | 843 | $6.73 | $4.90 | $4.75 | $4.50 | $4.75 |
| 0325 | Painted pavement markings, surface (0710-90) | LS | 1 | $17,886 | $16,000 | $15,750 | $16,500 | $15,750 |
| 0330 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 1,522 | $5.61 | $6.55 | $6.30 | $3.50 | $6.25 |
| 0335 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 110 | $6.73 | $9.30 | $8.93 | $6.00 | $9.00 |
| 0340 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 145 | $8.97 | $13.00 | $12.60 | $9.00 | $12.50 |
| 0345 | Thermoplastic, standard, arrow (0711-11170) | EACH | 54 | $112.14 | $110.00 | $105.00 | $90.00 | $105.00 |
| 0350 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 109 | $6.73 | $9.30 | $8.93 | $6.00 | $9.00 |
| 0355 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.36 | $2,915.66 | $3,900.00 | $3,675.00 | $3,200.00 | $3,675.00 |
| 0360 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 2.12 | $6,504.07 | $5,700.00 | $5,460.00 | $5,500.00 | $5,450.00 |
| 0365 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 2.07 | $2,915.62 | $2,400.00 | $2,310.00 | $2,200.00 | $2,300.00 |
| 0370 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 2.05 | $6,504.07 | $5,700.00 | $5,460.00 | $5,500.00 | $5,450.00 |
| 0375 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 1.58 | $2,915.62 | $2,400.00 | $2,310.00 | $2,200.00 | $2,300.00 |
| 0380 | Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1) | SF | 320 | $4.49 | $3.30 | $3.15 | $4.00 | $3.25 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of July 29, 2026. Compiled by Mirage Metrics.