FDOT contract T7592 bid tabulation
SR 39 (US 301 / GALL BLVD) FROM S OF WIRE RD TO N OF WIRE RD. Let by Florida DOT on September 24, 2025, Pasco, District 7. 6 bids received; low bid $1,732,500 by Cone & Graham, Inc..
- Owner
- Florida DOT
- Letting
- 24 SEP 2025
- Pay items
- 107
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Cone & Graham, Inc. | $1,732,500 | Low |
| 2 | Burgess Civil, LLC | $1,875,123 | +8.0% |
| 3 | Blacktip Services Incorporated | $2,082,242 | +20% |
| 4 | Preferred Materials Inc. | $2,162,934 | +25% |
| 5 | Pigott Asphalt and Sitework LLC | $2,184,777 | +26% |
| 6 | Ajax Paving Industries of Florida LLC | $2,394,246 | +38% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Cone & Graham, Inc. | 2. Burgess Civil, LLC | 3. Blacktip Services Incorporated | 4. Preferred Materials Inc. | 5. Pigott Asphalt and Sitework LLC | 6. Ajax Paving Industries of Florida LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $170,000 | $180,000 | $254,439 | $265,000 | $396,000 | $239,300 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $124,100 | $90,000 | $78,614 | $229,000 | $189,500 | $239,300 |
| 0015 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $15,000 | $11,799 | $25,750 | $25,407 | $16,500 | $20,000 |
| 0020 | Traffic control officer (0102-14) | HR | 56 | $90.00 | $65.00 | $85.00 | $84.31 | $125.00 | $117.80 |
| 0025 | Work zone sign (0102-60) | ED | 7,165 | $0.21 | $0.21 | $0.30 | $0.22 | $0.25 | $0.30 |
| 0030 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 10,260 | $0.09 | $0.12 | $0.15 | $0.13 | $0.10 | $0.15 |
| 0035 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 65,344 | $0.04 | $0.04 | $0.10 | $0.04 | $0.10 | $0.10 |
| 0040 | Arrow board / advance warning arrow panel (0102-76) | ED | 80 | $5.00 | $6.00 | $7.00 | $6.32 | $7.50 | $8.00 |
| 0045 | Portable changeable message sign, temporary (0102-99) | ED | 525 | $10.00 | $9.00 | $12.00 | $9.48 | $12.00 | $13.40 |
| 0050 | Type III barricade (0102-115) | ED | 480 | $0.35 | $0.30 | $0.50 | $0.32 | $1.00 | $0.50 |
| 0055 | Sediment barrier (0104-10-3) | LF | 80 | $3.00 | $3.50 | $10.00 | $5.25 | $12.00 | $12.00 |
| 0060 | Inlet protection system (0104-18) | EACH | 3 | $175.00 | $150.00 | $70.00 | $231.89 | $250.00 | $200.00 |
| 0065 | Litter removal (0107-1) | ACRE | 18.84 | $430.00 | $75.49 | $55.00 | $449.32 | $20.00 | $480.00 |
| 0070 | Mowing (0107-2) | ACRE | 15.18 | $550.00 | $155.03 | $55.00 | $580.31 | $10.00 | $625.00 |
| 0075 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $50,000 | $177,246 | $90,000 | $44,821 | $15,000 | $95,000 |
| 0080 | Removal of existing concrete (0110-4-10) | SY | 134 | $24.00 | $95.24 | $205.00 | $51.85 | $65.00 | $95.00 |
| 0085 | Regular excavation (0120-1) | CY | 702 | $24.50 | $31.27 | $96.00 | $26.79 | $36.00 | $90.00 |
| 0090 | Embankment (0120-6) | CY | 473 | $52.00 | $26.99 | $76.00 | $77.08 | $26.50 | $200.00 |
| 0095 | Type B stabilization (0160-4) | SY | 1,313 | $23.00 | $21.87 | $22.00 | $41.95 | $20.00 | $39.50 |
| 0100 | Optional base, base group 01 (0285-701) | SY | 304 | $28.00 | $7.78 | $24.00 | $38.57 | $36.00 | $76.15 |
| 0105 | Optional base, base group 02 (0285-702) | SY | 75 | $143.00 | $174.00 | $60.00 | $107.33 | $69.00 | $127.50 |
| 0110 | Optional base, base group 09 (0285-709) | SY | 1,149 | $69.00 | $32.26 | $75.00 | $109.00 | $86.25 | $72.50 |
| 0115 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 1,481 | $7.95 | $6.68 | $10.00 | $11.10 | $7.50 | $7.00 |
| 0120 | Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11) | SY | 5,407 | $5.75 | $6.41 | $7.65 | $6.15 | $6.00 | $5.70 |
| 0125 | Milling existing asphalt pavement, 1 3/4" avg depth (0327-70-13) | SY | 345 | $7.95 | $30.45 | $7.00 | $35.10 | $15.00 | $11.40 |
| 0130 | Superpave asphaltic conc, traffic B (0334-1-12) | TN | 16.70 | $225.00 | $800.56 | $1,063.00 | $835.00 | $300.00 | $440.00 |
| 0135 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 817.90 | $175.41 | $193.97 | $268.00 | $231.65 | $200.00 | $210.00 |
| 0140 | Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25) | TN | 277.20 | $292.50 | $249.17 | $384.00 | $385.20 | $300.00 | $362.00 |
| 0145 | Inlets, DT bot, type C,<10' (0425-1521) | EACH | 1 | $12,725 | $10,298 | $10,754 | $11,413 | $12,500 | $17,100 |
| 0150 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 13 | $386.00 | $445.33 | $821.00 | $320.01 | $400.00 | $995.00 |
| 0155 | Concrete curb & gutter, type E (0520-1-7) | LF | 481 | $27.75 | $47.60 | $50.00 | $48.35 | $90.00 | $93.20 |
| 0160 | Concrete curb, type B (0520-2-2) | LF | 67 | $25.95 | $48.13 | $50.00 | $71.89 | $75.00 | $81.00 |
| 0165 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 82 | $138.95 | $112.75 | $90.00 | $150.54 | $150.00 | $199.00 |
| 0170 | Bus boarding pad- concrete (0522-3) | SY | 6 | $125.00 | $184.86 | $90.00 | $177.05 | $500.00 | $217.00 |
| 0175 | Bus shelter pad- concrete (0522-4) | SY | 15 | $125.00 | $163.94 | $90.00 | $165.16 | $500.00 | $113.00 |
| 0180 | Detectable warnings (0527-2) | SF | 82 | $65.00 | $25.00 | $30.00 | $29.86 | $50.00 | $30.00 |
| 0185 | Performance turf, sod (0570-1-2) | SY | 3,302 | $8.00 | $13.61 | $9.00 | $5.59 | $5.00 | $9.80 |
| 0190 | Raised pavement marker, type B (0706-1-3) | EACH | 229 | $5.00 | $5.00 | $6.00 | $5.27 | $5.00 | $5.60 |
| 0195 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 0.51 | $3,000.00 | $3,000.00 | $1,800.00 | $1,580.82 | $3,000.00 | $3,365.00 |
| 0200 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 94 | $2.00 | $2.00 | $3.00 | $2.11 | $5.00 | $2.25 |
| 0205 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 0.16 | $550.00 | $550.00 | $1,200.00 | $1,053.88 | $1,000.00 | $617.00 |
| 0210 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.20 | $755.13 | $755.13 | $1,200.00 | $1,080.92 | $1,000.00 | $869.00 |
| 0215 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 0.42 | $2,949.64 | $2,949.64 | $1,800.00 | $1,592.18 | $3,000.00 | $3,365.00 |
| 0220 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,000 | $50,000 | $50,000 | $50,000 | $50,000 | $50,000 |
| 0225 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 8 | $742.00 | $850.00 | $720.00 | $781.98 | $750.00 | $673.00 |
| 0230 | Single column ground sign assembly, relocate (0700-1500) | EACH | 2 | $440.00 | $600.00 | $240.00 | $463.71 | $500.00 | $225.00 |
| 0235 | Single column ground sign assembly, remove (0700-1600) | EACH | 5 | $110.00 | $75.00 | $48.00 | $115.93 | $100.00 | $45.00 |
| 0240 | Multi-column ground sign assembly, F&I ground mount, 30.0 SF (0700-2113) | EACH | 2 | $9,625.00 | $8,500.00 | $11,400 | $10,144 | $8,850.00 | $10,700 |
| 0245 | Object marker, type 1 (0705-10-1) | EACH | 2 | $175.00 | $325.00 | $240.00 | $184.43 | $350.00 | $225.00 |
| 0250 | Delineator, flexible tubular (0705-11-1) | EACH | 4 | $245.00 | $125.00 | $120.00 | $258.20 | $150.00 | $112.20 |
| 0255 | Raised pavement marker, type B (0706-1-3) | EACH | 249 | $5.00 | $5.00 | $6.00 | $5.27 | $5.00 | $5.60 |
| 0258 | Painted pavement markings, surface (0710-90) | LS | 1 | $20,021 | $20,021 | $10,000 | $8,431.04 | $15,000 | $22,460 |
| 0260 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 21 | $5.00 | $5.00 | $7.00 | $6.32 | $18.00 | $5.60 |
| 0265 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 354 | $3.55 | $3.55 | $7.00 | $6.32 | $6.00 | $4.00 |
| 0270 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 64 | $5.33 | $5.33 | $10.00 | $8.43 | $7.50 | $6.00 |
| 0275 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 101 | $7.10 | $7.10 | $12.00 | $10.54 | $10.00 | $8.00 |
| 0280 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.22 | $2,408.26 | $2,408.26 | $6,000.00 | $4,592.61 | $5,000.00 | $2,805.00 |
| 0285 | Thermoplastic, standard, arrow (0711-11170) | EACH | 14 | $64.00 | $5.00 | $96.00 | $84.31 | $150.00 | $72.00 |
| 0290 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 86 | $4.85 | $4.85 | $9.00 | $8.43 | $8.00 | $5.50 |
| 0295 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.04 | $2,380.95 | $2,380.95 | $7,200.00 | $6,022.14 | $5,000.00 | $2,805.00 |
| 0300 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 376 | $16.20 | $16.20 | $21.00 | $17.92 | $25.00 | $18.20 |
| 0305 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.60 | $5,568.00 | $5,568.00 | $8,400.00 | $7,377.17 | $10,000 | $6,246.00 |
| 0310 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.04 | $5,861.84 | $5,861.84 | $12,000 | $11,093 | $12,000 | $8,330.00 |
| 0315 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 0.15 | $1,373.68 | $1,373.68 | $2,640.00 | $2,288.03 | $5,000.00 | $1,562.00 |
| 0320 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.42 | $5,091.75 | $5,091.75 | $8,400.00 | $7,342.20 | $10,000 | $5,740.00 |
| 0325 | Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1) | SF | 32 | $5.00 | $5.00 | $12.00 | $115.93 | $150.00 | $5.60 |
| 0330 | Conduit, furnish & install, open trench (0630-2-11) | LF | 116 | $16.00 | $22.28 | $13.00 | $16.86 | $20.00 | $40.30 |
| 0335 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 396 | $24.00 | $24.77 | $44.00 | $25.29 | $40.00 | $37.60 |
| 0340 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 10 | $2,167.00 | $1,141.33 | $2,288.00 | $2,283.76 | $1,800.00 | $2,135.00 |
| 0345 | Electrical power service, F&I, underground, meter furnished by power company (0639-1121) | AS | 1 | $5,218.00 | $6,646.20 | $3,784.00 | $5,499.14 | $7,300.00 | $4,800.00 |
| 0350 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 1 | $2,447.00 | $2,886.95 | $4,027.00 | $2,578.84 | $2,650.00 | $2,345.00 |
| 0355 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $2,508.00 | $3,613.02 | $4,304.00 | $2,643.13 | $2,500.00 | $3,120.00 |
| 0360 | Lighting conductors, F&I, insulated, no. 10 or < (0715-1-11) | LF | 96 | $1.40 | $2.69 | $19.00 | $1.48 | $3.00 | $4.40 |
| 0365 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 2,110 | $2.75 | $3.42 | $20.00 | $2.90 | $3.00 | $2.70 |
| 0370 | Luminaire & bracket arm- galv steel, furnish & install new luminaire and arm on new/existing pole (0715-5-32) | EACH | 2 | $1,904.00 | $2,927.78 | $6,463.00 | $2,006.59 | $4,000.00 | $4,000.00 |
| 0375 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 1 | $13,644 | $16,896 | $21,755 | $14,379 | $22,000 | $20,455 |
| 0380 | Light pole complete, F&I, standard pole standard foundation, 30' mounting height, 0' arm length (0715-61100) | EACH | 1 | $9,459.00 | $7,660.89 | $8,706.00 | $9,968.65 | $13,500 | $12,660 |
| 0385 | Light pole complete, F&I, standard pole standard foundation, 35' mounting height, 0' arm length (0715-61200) | EACH | 2 | $9,639.00 | $7,974.70 | $8,909.00 | $10,158 | $13,400 | $12,900 |
| 0390 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 8' arm length (0715-61311) | EACH | 1 | $9,820.00 | $8,042.37 | $8,919.00 | $10,349 | $13,500 | $12,950 |
| 0395 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 6 | $816.00 | $907.63 | $1,561.00 | $859.97 | $950.00 | $805.00 |
| 0400 | Conduit, furnish & install, open trench (0630-2-11) | LF | 155 | $36.00 | $22.28 | $13.00 | $37.94 | $30.00 | $65.00 |
| 0405 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 318 | $31.50 | $29.23 | $44.00 | $33.20 | $40.00 | $53.00 |
| 0410 | Conduit, furnish & install, aboveground (0630-2-14) | LF | 15 | $42.00 | $50.06 | $13.00 | $44.26 | $40.00 | $70.00 |
| 0415 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 1 | $15,353 | $17,208 | $19,765 | $16,180 | $16,500 | $17,610 |
| 0420 | Span wire assembly, F&I, two point, box or drop box (0634-4153) | PI | 1 | $8,266.00 | $10,065 | $12,508 | $8,711.37 | $13,500 | $12,600 |
| 0425 | Pull & splice box, F&I, 17" X 30" cover size (0635-2-14) | EACH | 19 | $2,003.00 | $1,695.47 | $2,627.00 | $2,110.92 | $1,850.00 | $1,740.00 |
| 0430 | Electrical power service, F&I, underground, meter furnished by power company (0639-1121) | AS | 1 | $5,192.00 | $6,641.33 | $3,784.00 | $5,471.74 | $7,500.00 | $3,690.00 |
| 0435 | Electrical service wire, & install (0639-2-1) | LF | 40 | $7.80 | $12.23 | $39.00 | $8.22 | $20.00 | $10.00 |
| 0440 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 1 | $2,447.00 | $3,995.12 | $4,027.00 | $2,578.84 | $2,500.00 | $1,940.00 |
| 0445 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $2,401.00 | $3,535.50 | $4,304.00 | $2,530.37 | $2,500.00 | $3,115.00 |
| 0450 | Aluminum signals pole, (0646-1-11) | EACH | 6 | $2,845.00 | $2,355.10 | $3,980.00 | $2,998.29 | $3,000.00 | $2,896.00 |
| 0455 | Steel strain pole, F&I, type PS- X (0649-1-17) | EACH | 4 | $67,413 | $76,438 | $34,594 | $71,045 | $77,000 | $79,575 |
| 0460 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 10 | $1,877.00 | $1,911.23 | $3,003.00 | $1,978.13 | $2,300.00 | $2,278.00 |
| 0465 | Vehicular traffic signal, furnish & install aluminum, 5 section cluster, 1 way (0650-1-19) | AS | 2 | $2,784.00 | $2,883.74 | $4,404.00 | $2,934.00 | $3,300.00 | $3,305.00 |
| 0470 | Vehicular traffic signal, furnish & install 3 section, 1 way (0650-1-44) | AS | 1 | $8,759.00 | $8,936.01 | $10,922 | $9,230.93 | $9,500.00 | $10,100 |
| 0475 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 6 | $900.00 | $851.15 | $2,230.00 | $948.49 | $1,200.00 | $970.00 |
| 0480 | Vehicle detection system- furnish & install cabinet equipment (0660-4-11) | EACH | 1 | $27,778 | $28,498 | $31,142 | $29,275 | $26,500 | $30,000 |
| 0485 | Vehicle detection system- furnish & install above ground equipment (0660-4-12) | EACH | 2 | $6,061.00 | $10,616 | $11,581 | $6,387.57 | $10,900 | $7,605.00 |
| 0490 | Signal priority and preemption system, F&I, optical, cabinet electronics (0663-1111) | EACH | 1 | $8,286.00 | $8,688.22 | $9,471.00 | $8,732.45 | $9,000.00 | $6,406.00 |
| 0495 | Signal priority and preemption system, F&I, optical, detector (0663-1112) | EACH | 4 | $2,309.00 | $5,064.53 | $5,630.00 | $2,433.41 | $3,000.00 | $3,422.00 |
| 0500 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 6 | $293.00 | $285.62 | $520.00 | $308.79 | $950.00 | $465.00 |
| 0505 | Traffic controller assembly, F&I, NEMA W/standard lock, 1 preemption (0670-5161) | AS | 1 | $47,002 | $53,146 | $54,520 | $49,534 | $57,000 | $57,840 |
| 0510 | ITS CCTV camera, pressurized, high definition (0682-1163) | EACH | 1 | $6,795.00 | $8,615.47 | $5,943.00 | $7,161.11 | $6,000.00 | $9,560.00 |
| 0515 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 1 | $21,304 | $18,304 | $24,597 | $22,452 | $23,000 | $29,985 |
| 0520 | Cellular modem, furnish and install (0684-8-1) | EACH | 1 | $763.00 | $11,993 | $9,491.00 | $804.11 | $1,850.00 | $6,890.00 |
| 0525 | Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13) | EACH | 1 | $12,708 | $16,623 | $11,644 | $13,393 | $14,000 | $11,555 |
| 0530 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 4 | $5,677.00 | $3,194.23 | $6,657.00 | $5,982.88 | $5,600.00 | $6,340.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of September 24, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.