FDOT contract T7592 bid tabulation

SR 39 (US 301 / GALL BLVD) FROM S OF WIRE RD TO N OF WIRE RD. Let by Florida DOT on September 24, 2025, Pasco, District 7. 6 bids received; low bid $1,732,500 by Cone & Graham, Inc..

Owner
Florida DOT
Letting
24 SEP 2025
Pay items
107
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Cone & Graham, Inc.$1,732,500Low
2Burgess Civil, LLC$1,875,123+8.0%
3Blacktip Services Incorporated$2,082,242+20%
4Preferred Materials Inc.$2,162,934+25%
5Pigott Asphalt and Sitework LLC$2,184,777+26%
6Ajax Paving Industries of Florida LLC$2,394,246+38%
FDOT contract T7592: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Cone & Graham, Inc.2. Burgess Civil, LLC3. Blacktip Services Incorporated4. Preferred Materials Inc.5. Pigott Asphalt and Sitework LLC6. Ajax Paving Industries of Florida LLC
0005Mobilization (0101-1)LS1$170,000$180,000$254,439$265,000$396,000$239,300
0010Maintenance of traffic (0102-1)DA1$124,100$90,000$78,614$229,000$189,500$239,300
0015Pedestrian or bicycle special detour (0102-4-1)SY1$15,000$11,799$25,750$25,407$16,500$20,000
0020Traffic control officer (0102-14)HR56$90.00$65.00$85.00$84.31$125.00$117.80
0025Work zone sign (0102-60)ED7,165$0.21$0.21$0.30$0.22$0.25$0.30
0030Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED10,260$0.09$0.12$0.15$0.13$0.10$0.15
0035Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD65,344$0.04$0.04$0.10$0.04$0.10$0.10
0040Arrow board / advance warning arrow panel (0102-76)ED80$5.00$6.00$7.00$6.32$7.50$8.00
0045Portable changeable message sign, temporary (0102-99)ED525$10.00$9.00$12.00$9.48$12.00$13.40
0050Type III barricade (0102-115)ED480$0.35$0.30$0.50$0.32$1.00$0.50
0055Sediment barrier (0104-10-3)LF80$3.00$3.50$10.00$5.25$12.00$12.00
0060Inlet protection system (0104-18)EACH3$175.00$150.00$70.00$231.89$250.00$200.00
0065Litter removal (0107-1)ACRE18.84$430.00$75.49$55.00$449.32$20.00$480.00
0070Mowing (0107-2)ACRE15.18$550.00$155.03$55.00$580.31$10.00$625.00
0075Clearing & grubbing (0110-1-1)ACRE1$50,000$177,246$90,000$44,821$15,000$95,000
0080Removal of existing concrete (0110-4-10)SY134$24.00$95.24$205.00$51.85$65.00$95.00
0085Regular excavation (0120-1)CY702$24.50$31.27$96.00$26.79$36.00$90.00
0090Embankment (0120-6)CY473$52.00$26.99$76.00$77.08$26.50$200.00
0095Type B stabilization (0160-4)SY1,313$23.00$21.87$22.00$41.95$20.00$39.50
0100Optional base, base group 01 (0285-701)SY304$28.00$7.78$24.00$38.57$36.00$76.15
0105Optional base, base group 02 (0285-702)SY75$143.00$174.00$60.00$107.33$69.00$127.50
0110Optional base, base group 09 (0285-709)SY1,149$69.00$32.26$75.00$109.00$86.25$72.50
0115Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY1,481$7.95$6.68$10.00$11.10$7.50$7.00
0120Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11)SY5,407$5.75$6.41$7.65$6.15$6.00$5.70
0125Milling existing asphalt pavement, 1 3/4" avg depth (0327-70-13)SY345$7.95$30.45$7.00$35.10$15.00$11.40
0130Superpave asphaltic conc, traffic B (0334-1-12)TN16.70$225.00$800.56$1,063.00$835.00$300.00$440.00
0135Superpave asphaltic conc, traffic C (0334-1-13)TN817.90$175.41$193.97$268.00$231.65$200.00$210.00
0140Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25)TN277.20$292.50$249.17$384.00$385.20$300.00$362.00
0145Inlets, DT bot, type C,<10' (0425-1521)EACH1$12,725$10,298$10,754$11,413$12,500$17,100
0150Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF13$386.00$445.33$821.00$320.01$400.00$995.00
0155Concrete curb & gutter, type E (0520-1-7)LF481$27.75$47.60$50.00$48.35$90.00$93.20
0160Concrete curb, type B (0520-2-2)LF67$25.95$48.13$50.00$71.89$75.00$81.00
0165Concrete sidewalk and driveways, 6" thick (0522-2)SY82$138.95$112.75$90.00$150.54$150.00$199.00
0170Bus boarding pad- concrete (0522-3)SY6$125.00$184.86$90.00$177.05$500.00$217.00
0175Bus shelter pad- concrete (0522-4)SY15$125.00$163.94$90.00$165.16$500.00$113.00
0180Detectable warnings (0527-2)SF82$65.00$25.00$30.00$29.86$50.00$30.00
0185Performance turf, sod (0570-1-2)SY3,302$8.00$13.61$9.00$5.59$5.00$9.80
0190Raised pavement marker, type B (0706-1-3)EACH229$5.00$5.00$6.00$5.27$5.00$5.60
0195Painted pavement markings, standard, white, solid, 6" (0710-11101)GM0.51$3,000.00$3,000.00$1,800.00$1,580.82$3,000.00$3,365.00
0200Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF94$2.00$2.00$3.00$2.11$5.00$2.25
0205Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM0.16$550.00$550.00$1,200.00$1,053.88$1,000.00$617.00
0210Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM0.20$755.13$755.13$1,200.00$1,080.92$1,000.00$869.00
0215Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM0.42$2,949.64$2,949.64$1,800.00$1,592.18$3,000.00$3,365.00
0220Initial contingency amount, DO not bid (0999-25)LS1$50,000$50,000$50,000$50,000$50,000$50,000
0225Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH8$742.00$850.00$720.00$781.98$750.00$673.00
0230Single column ground sign assembly, relocate (0700-1500)EACH2$440.00$600.00$240.00$463.71$500.00$225.00
0235Single column ground sign assembly, remove (0700-1600)EACH5$110.00$75.00$48.00$115.93$100.00$45.00
0240Multi-column ground sign assembly, F&I ground mount, 30.0 SF (0700-2113)EACH2$9,625.00$8,500.00$11,400$10,144$8,850.00$10,700
0245Object marker, type 1 (0705-10-1)EACH2$175.00$325.00$240.00$184.43$350.00$225.00
0250Delineator, flexible tubular (0705-11-1)EACH4$245.00$125.00$120.00$258.20$150.00$112.20
0255Raised pavement marker, type B (0706-1-3)EACH249$5.00$5.00$6.00$5.27$5.00$5.60
0258Painted pavement markings, surface (0710-90)LS1$20,021$20,021$10,000$8,431.04$15,000$22,460
0260Painted pavement markings, durable paint, yellow, island nose (0710-12290)SF21$5.00$5.00$7.00$6.32$18.00$5.60
0265Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF354$3.55$3.55$7.00$6.32$6.00$4.00
0270Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF64$5.33$5.33$10.00$8.43$7.50$6.00
0275Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF101$7.10$7.10$12.00$10.54$10.00$8.00
0280Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.22$2,408.26$2,408.26$6,000.00$4,592.61$5,000.00$2,805.00
0285Thermoplastic, standard, arrow (0711-11170)EACH14$64.00$5.00$96.00$84.31$150.00$72.00
0290Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF86$4.85$4.85$9.00$8.43$8.00$5.50
0295Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.04$2,380.95$2,380.95$7,200.00$6,022.14$5,000.00$2,805.00
0300Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF376$16.20$16.20$21.00$17.92$25.00$18.20
0305Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM0.60$5,568.00$5,568.00$8,400.00$7,377.17$10,000$6,246.00
0310Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102)GM0.04$5,861.84$5,861.84$12,000$11,093$12,000$8,330.00
0315Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM0.15$1,373.68$1,373.68$2,640.00$2,288.03$5,000.00$1,562.00
0320Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM0.42$5,091.75$5,091.75$8,400.00$7,342.20$10,000$5,740.00
0325Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1)SF32$5.00$5.00$12.00$115.93$150.00$5.60
0330Conduit, furnish & install, open trench (0630-2-11)LF116$16.00$22.28$13.00$16.86$20.00$40.30
0335Conduit, furnish & install, directional bore (0630-2-12)LF396$24.00$24.77$44.00$25.29$40.00$37.60
0340Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH10$2,167.00$1,141.33$2,288.00$2,283.76$1,800.00$2,135.00
0345Electrical power service, F&I, underground, meter furnished by power company (0639-1121)AS1$5,218.00$6,646.20$3,784.00$5,499.14$7,300.00$4,800.00
0350Electrical service disconnect, F&I, pole mount (0639-3-11)EACH1$2,447.00$2,886.95$4,027.00$2,578.84$2,650.00$2,345.00
0355Prestressed concrete pole, type P-II service pole (0641-2-12)EACH1$2,508.00$3,613.02$4,304.00$2,643.13$2,500.00$3,120.00
0360Lighting conductors, F&I, insulated, no. 10 or < (0715-1-11)LF96$1.40$2.69$19.00$1.48$3.00$4.40
0365Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12)LF2,110$2.75$3.42$20.00$2.90$3.00$2.70
0370Luminaire & bracket arm- galv steel, furnish & install new luminaire and arm on new/existing pole (0715-5-32)EACH2$1,904.00$2,927.78$6,463.00$2,006.59$4,000.00$4,000.00
0375Load center, F&I, secondary voltage (0715-7-11)EACH1$13,644$16,896$21,755$14,379$22,000$20,455
0380Light pole complete, F&I, standard pole standard foundation, 30' mounting height, 0' arm length (0715-61100)EACH1$9,459.00$7,660.89$8,706.00$9,968.65$13,500$12,660
0385Light pole complete, F&I, standard pole standard foundation, 35' mounting height, 0' arm length (0715-61200)EACH2$9,639.00$7,974.70$8,909.00$10,158$13,400$12,900
0390Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 8' arm length (0715-61311)EACH1$9,820.00$8,042.37$8,919.00$10,349$13,500$12,950
0395Pole cable distribution system, furnish and install, conventional (0715-500-1)EACH6$816.00$907.63$1,561.00$859.97$950.00$805.00
0400Conduit, furnish & install, open trench (0630-2-11)LF155$36.00$22.28$13.00$37.94$30.00$65.00
0405Conduit, furnish & install, directional bore (0630-2-12)LF318$31.50$29.23$44.00$33.20$40.00$53.00
0410Conduit, furnish & install, aboveground (0630-2-14)LF15$42.00$50.06$13.00$44.26$40.00$70.00
0415Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI1$15,353$17,208$19,765$16,180$16,500$17,610
0420Span wire assembly, F&I, two point, box or drop box (0634-4153)PI1$8,266.00$10,065$12,508$8,711.37$13,500$12,600
0425Pull & splice box, F&I, 17" X 30" cover size (0635-2-14)EACH19$2,003.00$1,695.47$2,627.00$2,110.92$1,850.00$1,740.00
0430Electrical power service, F&I, underground, meter furnished by power company (0639-1121)AS1$5,192.00$6,641.33$3,784.00$5,471.74$7,500.00$3,690.00
0435Electrical service wire, & install (0639-2-1)LF40$7.80$12.23$39.00$8.22$20.00$10.00
0440Electrical service disconnect, F&I, pole mount (0639-3-11)EACH1$2,447.00$3,995.12$4,027.00$2,578.84$2,500.00$1,940.00
0445Prestressed concrete pole, type P-II service pole (0641-2-12)EACH1$2,401.00$3,535.50$4,304.00$2,530.37$2,500.00$3,115.00
0450Aluminum signals pole, (0646-1-11)EACH6$2,845.00$2,355.10$3,980.00$2,998.29$3,000.00$2,896.00
0455Steel strain pole, F&I, type PS- X (0649-1-17)EACH4$67,413$76,438$34,594$71,045$77,000$79,575
0460Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS10$1,877.00$1,911.23$3,003.00$1,978.13$2,300.00$2,278.00
0465Vehicular traffic signal, furnish & install aluminum, 5 section cluster, 1 way (0650-1-19)AS2$2,784.00$2,883.74$4,404.00$2,934.00$3,300.00$3,305.00
0470Vehicular traffic signal, furnish & install 3 section, 1 way (0650-1-44)AS1$8,759.00$8,936.01$10,922$9,230.93$9,500.00$10,100
0475Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS6$900.00$851.15$2,230.00$948.49$1,200.00$970.00
0480Vehicle detection system- furnish & install cabinet equipment (0660-4-11)EACH1$27,778$28,498$31,142$29,275$26,500$30,000
0485Vehicle detection system- furnish & install above ground equipment (0660-4-12)EACH2$6,061.00$10,616$11,581$6,387.57$10,900$7,605.00
0490Signal priority and preemption system, F&I, optical, cabinet electronics (0663-1111)EACH1$8,286.00$8,688.22$9,471.00$8,732.45$9,000.00$6,406.00
0495Signal priority and preemption system, F&I, optical, detector (0663-1112)EACH4$2,309.00$5,064.53$5,630.00$2,433.41$3,000.00$3,422.00
0500Pedestrian detector, furnish & install, standard (0665-1-11)EACH6$293.00$285.62$520.00$308.79$950.00$465.00
0505Traffic controller assembly, F&I, NEMA W/standard lock, 1 preemption (0670-5161)AS1$47,002$53,146$54,520$49,534$57,000$57,840
0510ITS CCTV camera, pressurized, high definition (0682-1163)EACH1$6,795.00$8,615.47$5,943.00$7,161.11$6,000.00$9,560.00
0515Managed field ethernet switch, furnish & install (0684-1-1)EACH1$21,304$18,304$24,597$22,452$23,000$29,985
0520Cellular modem, furnish and install (0684-8-1)EACH1$763.00$11,993$9,491.00$804.11$1,850.00$6,890.00
0525Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13)EACH1$12,708$16,623$11,644$13,393$14,000$11,555
0530Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH4$5,677.00$3,194.23$6,657.00$5,982.88$5,600.00$6,340.00
FDOT contract T7592: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of September 24, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy