FDOT contract T3A04 bid tabulation
SR 61 (US 319) FROM TIMBERWOLF CROSSING TO GEORGIA STATE LINE. Let by Florida DOT on July 29, 2026, Leon, District 3. 5 bids received; low bid $8,418,258 by C.W. Roberts Contracting, Inc..
- Owner
- Florida DOT
- Letting
- 29 JUL 2026
- Pay items
- 85
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | C.W. Roberts Contracting, Inc. | $8,418,258 | Low |
| 2 | Capital Asphalt Inc | $9,583,101 | +14% |
| 3 | Anderson Columbia Co., Inc. | $9,612,975 | +14% |
| 4 | Pigott Asphalt and Sitework LLC | $9,680,932 | +15% |
| 5 | Peavy & Son Construction Co., Inc. | $9,866,946 | +17% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. C.W. Roberts Contracting, Inc. | 2. Capital Asphalt Inc | 3. Anderson Columbia Co., Inc. | 4. Pigott Asphalt and Sitework LLC | 5. Peavy & Son Construction Co., Inc. |
|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $295,000 | $480,000 | $653,327 | $486,500 | $350,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $193,000 | $285,000 | $226,299 | $300,000 | $175,000 |
| 0015 | Special detour- temporary pavement (0102-2200) | SY | 1 | $12,000 | $15,000 | $5,000.00 | $46,352 | $25,000 |
| 0020 | Special detour- temporary earthwork/base (0102-2300) | CY | 1 | $17,500 | $30,000 | $5,000.00 | $27,485 | $7,200.00 |
| 0025 | Work zone sign (0102-60) | ED | 13,841 | $0.25 | $0.30 | $0.27 | $0.29 | $0.27 |
| 0030 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 684 | $52.00 | $53.00 | $2.00 | $50.00 | $53.00 |
| 0035 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 104,308 | $0.05 | $0.10 | $0.10 | $0.01 | $0.10 |
| 0040 | Arrow board / advance warning arrow panel (0102-76) | ED | 283 | $5.50 | $5.25 | $5.35 | $5.00 | $5.25 |
| 0045 | Temporary raised/retroreflective pavement marker, type D (0102-78-1) | EACH | 5,024 | $4.15 | $4.75 | $4.28 | $4.50 | $4.20 |
| 0050 | Portable changeable message sign, temporary (0102-99) | ED | 1,288 | $11.00 | $10.50 | $10.69 | $5.00 | $10.50 |
| 0055 | Portable regulatory, sign (0102-150-1) | ED | 630 | $2.05 | $5.25 | $5.35 | $5.30 | $5.25 |
| 0060 | Radar speed display unit (0102-150-2) | ED | 630 | $2.05 | $5.25 | $5.35 | $5.30 | $5.25 |
| 0065 | Sediment barrier (0104-10-3) | LF | 1,351 | $1.75 | $4.00 | $2.14 | $3.00 | $3.00 |
| 0070 | Inlet protection system (0104-18) | EACH | 21 | $170.00 | $250.00 | $213.83 | $150.00 | $100.00 |
| 0075 | Litter removal (0107-1) | ACRE | 2,438.92 | $46.00 | $15.00 | $48.12 | $1.00 | $50.00 |
| 0080 | Mowing (0107-2) | ACRE | 2,153.83 | $35.00 | $35.00 | $37.42 | $1.00 | $70.00 |
| 0085 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $135,000 | $25,000 | $87,818 | $186,500 | $10,000 |
| 0090 | Regular excavation (0120-1) | CY | 1,236.60 | $34.00 | $20.00 | $15.66 | $25.00 | $6.00 |
| 0095 | Borrow excavation, truck measure (0120-2-2) | CY | 2,172.60 | $20.00 | $30.00 | $22.23 | $1.00 | $20.00 |
| 0100 | Subsoil excavation (0120-4) | CY | 810.20 | $25.00 | $30.00 | $16.79 | $30.00 | $22.00 |
| 0105 | Type B stabilization (0160-4) | SY | 1,489 | $13.50 | $20.00 | $10.60 | $12.00 | $4.00 |
| 0110 | Optional base, base group 02 (0285-702) | SY | 333 | $22.00 | $45.00 | $32.18 | $35.00 | $20.00 |
| 0115 | Optional base, base group 06 (0285-706) | SY | 1,349 | $32.00 | $55.00 | $48.71 | $50.00 | $20.00 |
| 0120 | Optional base, base group 10 (0285-710) | SY | 346 | $63.00 | $75.00 | $74.59 | $68.00 | $35.00 |
| 0125 | Milling existing asphalt pavement, 2" avg depth (0327-70-5) | SY | 19,172 | $2.50 | $2.50 | $2.00 | $2.20 | $1.00 |
| 0130 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 41,521 | $2.15 | $2.50 | $1.50 | $2.20 | $1.00 |
| 0135 | Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11) | SY | 276,244 | $1.05 | $1.50 | $0.75 | $1.30 | $1.50 |
| 0140 | Milling existing asphalt pavement, 1 3/4" avg depth (0327-70-13) | SY | 2,440 | $1.95 | $10.00 | $2.00 | $3.50 | $1.25 |
| 0145 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 22,986.30 | $115.00 | $140.00 | $154.35 | $150.00 | $160.00 |
| 0150 | Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25) | TN | 11,098.20 | $185.00 | $180.00 | $171.38 | $179.26 | $200.00 |
| 0155 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 5,889.20 | $145.00 | $145.00 | $150.58 | $150.00 | $160.00 |
| 0160 | Miscellaneous asphalt (0339-1) | TN | 2,556.30 | $165.00 | $260.00 | $221.51 | $227.00 | $140.00 |
| 0165 | Replace grate (0425-82) | EACH | 1 | $2,520.00 | $3,000.00 | $1,965.28 | $2,500.00 | $2,500.00 |
| 0170 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 23 | $190.00 | $260.00 | $198.91 | $450.00 | $80.00 |
| 0175 | Mitered end section, optional round, 18" CD (0430-982125) | EACH | 4 | $1,700.00 | $4,200.00 | $4,462.22 | $2,500.00 | $2,500.00 |
| 0180 | Mitered end section, optional round, 18" SD (0430-984125) | EACH | 2 | $1,700.00 | $3,200.00 | $4,183.64 | $2,500.00 | $2,100.00 |
| 0185 | Mitered end sect, replace slab- construction use (0430-991) | EACH | 3 | $1,400.00 | $2,600.00 | $2,559.41 | $3,500.00 | $2,200.00 |
| 0190 | Chemical grout repair, pipe, test, 30" (0432-3-5) | EACH | 2 | $3,380.00 | $1,500.00 | $2,709.01 | $8,500.00 | $6,000.00 |
| 0195 | Guardrail -roadway, general (0536-1-1) | LF | 28 | $28.00 | $28.00 | $28.87 | $35.00 | $29.00 |
| 0200 | Guardrail removal (0536-73) | LF | 132 | $1.05 | $1.50 | $1.07 | $5.00 | $1.05 |
| 0205 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 3 | $2,070.00 | $2,100.00 | $2,138.30 | $2,250.00 | $2,100.00 |
| 0210 | Guardrail end treatment- double face trailing (0536-85-29) | EACH | 1 | $2,080.00 | $2,100.00 | $2,142.61 | $2,500.00 | $2,105.00 |
| 0215 | Performance turf, sod (0570-1-2) | SY | 51,771 | $2.85 | $3.25 | $2.94 | $4.00 | $6.00 |
| 0220 | Performance turf, sod and shoulder treatment index (0570-1-3) | SY | 1,501 | $2.85 | $10.00 | $6.37 | $10.00 | $7.00 |
| 0225 | Conduit, furnish & install, open trench (0630-2-11) | LF | 73 | $23.00 | $31.00 | $32.08 | $23.10 | $21.00 |
| 0230 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 3 | $1,550.00 | $1,600.00 | $1,662.53 | $1,575.00 | $1,800.00 |
| 0235 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 5 | $3,320.00 | $3,650.00 | $3,742.02 | $3,360.00 | $3,000.00 |
| 0240 | Traffic monitoring site inductive loop assembly, & install, 1 loop (0695-6-11) | EACH | 10 | $1,240.00 | $2,100.00 | $2,138.30 | $1,260.00 | $2,000.00 |
| 0245 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 18.90 | $1,240.00 | $1,250.00 | $1,282.98 | $1,260.00 | $2,100.00 |
| 0250 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.10 | $1,600.00 | $2,100.00 | $1,603.72 | $1,800.00 | $1,575.00 |
| 0255 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 16.13 | $778.00 | $1,000.00 | $801.86 | $1,000.00 | $788.00 |
| 0260 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.20 | $773.00 | $2,100.00 | $801.86 | $1,800.00 | $788.00 |
| 0265 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 5 | $46.50 | $65.00 | $48.12 | $63.00 | $48.00 |
| 0270 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 12.23 | $1,240.00 | $1,250.00 | $1,282.98 | $1,260.00 | $1,260.00 |
| 0275 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $88,490 | $88,490 | $88,490 | $88,490 | $88,490 |
| 0280 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 27.25 | $1,870.00 | $2,175.00 | $2,253.08 | $1,600.00 | $2,100.00 |
| 0285 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 126 | $435.00 | $440.00 | $449.04 | $440.00 | $630.00 |
| 0290 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 4 | $2,020.00 | $2,050.00 | $2,084.84 | $2,000.00 | $2,363.00 |
| 0295 | Single column ground sign assembly, relocate (0700-1500) | EACH | 2 | $104.00 | $105.00 | $106.91 | $100.00 | $90.00 |
| 0300 | Single column ground sign assembly, remove (0700-1600) | EACH | 15 | $26.00 | $26.00 | $26.73 | $30.00 | $58.00 |
| 0305 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 5 | $119.00 | $120.00 | $122.95 | $120.00 | $210.00 |
| 0310 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 115 | $46.50 | $47.00 | $48.12 | $55.00 | $63.00 |
| 0315 | Tubular marker, 36" yellow (0704-1-4) | EACH | 2 | $104.00 | $105.00 | $106.91 | $110.00 | $315.00 |
| 0320 | Object marker, type 1 (0705-10-1) | EACH | 7 | $218.00 | $220.00 | $224.52 | $220.00 | $237.00 |
| 0325 | Raised pavement marker, type B (0706-1-3) | EACH | 4,521 | $4.15 | $4.75 | $4.28 | $4.50 | $4.20 |
| 0330 | Painted pavement markings, surface (0710-90) | LS | 1 | $100,000 | $80,000 | $105,846 | $78,750 | $104,000 |
| 0335 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 710 | $5.95 | $8.50 | $6.15 | $8.40 | $6.04 |
| 0340 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 309 | $7.05 | $10.50 | $7.29 | $9.00 | $7.20 |
| 0345 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.93 | $3,240.00 | $3,700.00 | $3,330.40 | $3,675.00 | $3,270.00 |
| 0350 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 8 | $199.00 | $135.00 | $205.27 | $136.50 | $201.00 |
| 0355 | Thermoplastic, standard, arrow (0711-11170) | EACH | 258 | $81.00 | $110.00 | $83.39 | $107.00 | $82.00 |
| 0360 | Thermoplastic, standard, yield line (0711-11180) | LF | 830 | $12.50 | $10.50 | $12.83 | $8.00 | $12.60 |
| 0365 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.29 | $3,230.00 | $3,700.00 | $3,330.40 | $3,675.00 | $3,270.00 |
| 0370 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 13 | $155.00 | $158.00 | $160.38 | $157.00 | $158.00 |
| 0375 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 13 | $155.00 | $115.00 | $160.38 | $115.00 | $158.00 |
| 0380 | Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101) | GM | 17.99 | $5,520.00 | $4,400.00 | $5,693.21 | $4,400.00 | $5,592.00 |
| 0385 | Thermoplastic, standard-open graded asphalt surfaces, solid, 8" (0711-15102) | GM | 0.10 | $8,390.00 | $6,300.00 | $8,392.81 | $5,000.00 | $8,245.00 |
| 0390 | Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131) | GM | 16.13 | $1,790.00 | $3,675.00 | $1,844.28 | $3,675.00 | $1,812.00 |
| 0395 | Thermoplastic, standard-open graded asphalt surfaces, 6", 6-10 dotted managed lane marking (0711-15171) | GM | 0.17 | $6,350.00 | $3,675.00 | $6,628.71 | $3,675.00 | $6,510.00 |
| 0400 | Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201) | GM | 12.03 | $5,540.00 | $4,400.00 | $5,719.94 | $4,400.00 | $5,618.00 |
| 0405 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 2.30 | $4,450.00 | $4,400.00 | $4,597.33 | $4,400.00 | $4,515.00 |
| 0410 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.48 | $6,970.00 | $6,300.00 | $7,190.02 | $5,000.00 | $7,062.00 |
| 0415 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 0.92 | $1,710.00 | $3,675.00 | $1,764.09 | $3,200.00 | $1,733.00 |
| 0420 | Thermoplastic, standard other surfaces, white, 6", 6-10 dotted managed lane marking (0711-16171) | GM | 0.02 | $1,800.00 | $3,675.00 | $1,764.09 | $4,000.00 | $1,733.00 |
| 0425 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 4.86 | $4,480.00 | $4,400.00 | $4,613.37 | $4,400.00 | $4,530.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of July 29, 2026. Compiled by Mirage Metrics.