| 0005 | Mobilization (0101-1) | LS | 1 | $1,219,637 | $480,000 | $300,000 | $545,650 |
| 0010 | Mobilization (0101-1) | LS | 1 | $30,310 | $20,000 | $235,000 | $260,000 |
| 0015 | Maintenance of traffic (0102-1) | DA | 1 | $181,482 | $442,000 | $200,000 | $450,000 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $30,448 | $29,500 | $97,000 | $170,000 |
| 0025 | Special detour- temporary pavement (0102-2200) | SY | 1 | $108,210 | $244,029 | $70,000 | $73,000 |
| 0030 | Special detour- temporary earthwork/base (0102-2300) | CY | 1 | $73,490 | $136,351 | $159,435 | $130,000 |
| 0035 | Traffic control officer (0102-14) | HR | 1,375 | $11.22 | $81.50 | $86.50 | $67.00 |
| 0040 | Work zone sign (0102-60) | ED | 40,294 | $0.15 | $0.36 | $0.40 | $0.40 |
| 0045 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 312 | $60.60 | $78.00 | $55.00 | $84.00 |
| 0050 | Temporary barrier, relocate, low profile concrete (0102-71-23) | LF | 504 | $12.00 | $26.00 | $10.40 | $28.00 |
| 0055 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 242,075 | $0.05 | $0.10 | $0.12 | $0.10 |
| 0060 | Arrow board / advance warning arrow panel (0102-76) | ED | 360 | $10.00 | $10.40 | $11.50 | $11.00 |
| 0065 | Portable changeable message sign, temporary (0102-99) | ED | 3,484 | $15.00 | $18.72 | $20.75 | $20.00 |
| 0070 | Temporary signalization and maintenance, intersection (0102-104) | ED | 567 | $12.00 | $20.80 | $23.00 | $22.00 |
| 0075 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 567 | $12.00 | $20.80 | $23.00 | $22.00 |
| 0080 | Type III barricade (0102-115) | ED | 540 | $0.56 | $0.52 | $0.58 | $0.55 |
| 0085 | Temporary raised rumble per day, includes all sets and relocations (0102-909) | DA | 447 | $15.00 | $41.60 | $46.00 | $45.00 |
| 0090 | Removable tape, white, solid 6" (0102-913-21) | GM | 0.63 | $8,412.22 | $15,600 | $17,300 | $17,000 |
| 0095 | Removable tape, yellow, solid, (0102-913-31) | GM | 0.57 | $8,412.22 | $15,600 | $17,300 | $17,000 |
| 0100 | Sediment barrier (0104-10-3) | LF | 18 | $3.37 | $100.00 | $12.00 | $16.00 |
| 0105 | Inlet protection system (0104-18) | EACH | 11 | $224.33 | $250.00 | $275.00 | $230.00 |
| 0110 | Litter removal (0107-1) | ACRE | 3,351.24 | $5.00 | $49.00 | $56.00 | $55.00 |
| 0115 | Mowing (0107-2) | ACRE | 3,351.24 | $5.00 | $49.00 | $56.00 | $55.00 |
| 0120 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $13,120 | $16,622 | $20,000 | $53,000 |
| 0125 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $36,626 | $41,678 | $14,350 | $65,000 |
| 0130 | Removal of existing concrete (0110-4-10) | SY | 108 | $37.98 | $20.00 | $22.00 | $43.00 |
| 0135 | Borrow excavation, truck measure (0120-2-2) | CY | 42 | $112.16 | $28.00 | $55.50 | $93.00 |
| 0140 | Regular excavation (3-R projects only) (0120-71) | LS | 1 | $15,535 | $5,300.00 | $7,000.00 | $100,000 |
| 0145 | Optional base, base group 01 (0285-701) | SY | 4,078 | $27.14 | $38.50 | $15.50 | $25.00 |
| 0150 | Optional base, base group 04 (0285-704) | SY | 441 | $43.32 | $56.00 | $59.40 | $48.00 |
| 0155 | Optional base, base group 11 (0285-711) | SY | 1,097 | $71.36 | $64.00 | $78.00 | $71.00 |
| 0160 | Turnout construction- asphalt/driveway base- asphalt material (0286-2) | TN | 41.40 | $188.42 | $265.00 | $248.00 | $200.00 |
| 0165 | Milling existing asphalt pavement, 2" avg depth (0327-70-5) | SY | 315,073 | $1.72 | $1.70 | $1.38 | $1.51 |
| 0170 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 4,895 | $2.41 | $3.00 | $2.35 | $2.00 |
| 0175 | Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11) | SY | 12,831 | $1.83 | $2.35 | $2.43 | $1.75 |
| 0180 | Milling existing asphalt pavement, 1 3/4" avg depth (0327-70-13) | SY | 4,289 | $2.74 | $3.15 | $2.69 | $2.00 |
| 0185 | Milling existing asphalt pavement, 1/2" avg depth (0327-70-16) | SY | 133,804 | $0.77 | $0.80 | $1.26 | $1.52 |
| 0190 | Superpave asphaltic concrete, traffic B, PG76-22 (0334-1-52) | TN | 26,215.60 | $141.78 | $136.15 | $140.20 | $141.00 |
| 0195 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 1,331.10 | $180.62 | $138.50 | $150.93 | $162.75 |
| 0200 | Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25) | TN | 514.80 | $230.56 | $235.00 | $254.35 | $250.00 |
| 0205 | Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81) | TN | 37,090.50 | $131.97 | $147.40 | $150.63 | $152.25 |
| 0210 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 714.40 | $170.05 | $153.00 | $166.19 | $203.00 |
| 0215 | Concrete class IV, culverts (0400-4-1) | CY | 224.70 | $2,368.77 | $1,570.63 | $2,085.00 | $2,800.00 |
| 0220 | Reinforcing steel- roadway (0415-1-1) | LB | 41,675 | $1.15 | $2.46 | $2.00 | $1.35 |
| 0225 | Pipe culvert, optional material, round, 18"SD (0430-174118) | LF | 16 | $156.95 | $156.25 | $160.00 | $440.00 |
| 0230 | Pipe culvert, optional material, round, 36"SD (0430-174136) | LF | 134 | $252.20 | $357.50 | $168.00 | $430.00 |
| 0235 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 288 | $166.74 | $169.33 | $121.00 | $460.00 |
| 0240 | Straight concrete endwalls, double, 0 degrees, round (0430-524200) | EACH | 2 | $14,169 | $10,250 | $17,985 | $13,000 |
| 0245 | Mitered end section, optional round, 8" SD (0430-984120) | EACH | 1 | $1,536.79 | $750.00 | $1,075.00 | $1,000.00 |
| 0250 | Mitered end section, optional round, 18" SD (0430-984125) | EACH | 1 | $2,339.78 | $1,500.00 | $1,965.00 | $2,400.00 |
| 0255 | Mitered end section , optional round, 36" side drain (0430-984138) | EACH | 4 | $8,351.71 | $2,938.00 | $4,677.00 | $5,100.00 |
| 0260 | Concrete curb & gutter, type E (0520-1-7) | LF | 112 | $59.65 | $55.00 | $43.00 | $77.00 |
| 0265 | Concrete curb, type D (0520-2-4) | LF | 28 | $61.94 | $55.00 | $45.00 | $77.00 |
| 0270 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 23 | $92.92 | $162.00 | $125.00 | $230.00 |
| 0275 | Concrete ditch pavement, non reinforced, 4" (0524-1-2) | SY | 132 | $108.98 | $165.00 | $100.00 | $150.00 |
| 0280 | Riprap, rubble, F&I, ditch lining (0530-3-4) | TN | 14.80 | $265.04 | $150.00 | $150.00 | $280.00 |
| 0285 | Bedding stone (0530-74) | TN | 15.90 | $246.70 | $150.00 | $114.00 | $260.00 |
| 0290 | Performance turf, sod (0570-1-2) | SY | 72,387 | $3.67 | $3.13 | $2.90 | $4.45 |
| 0295 | Performance turf, sod and shoulder treatment index (0570-1-3) | SY | 2,876 | $4.97 | $10.00 | $6.15 | $9.05 |
| 0300 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 2 | $5,608.14 | $5,200.00 | $5,766.00 | $5,600.00 |
| 0305 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 2 | $3,364.89 | $3,120.00 | $3,460.00 | $3,400.00 |
| 0310 | Raised pavement marker, type B (0706-1-3) | EACH | 21,193 | $5.61 | $4.42 | $4.90 | $4.75 |
| 0315 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 90.99 | $1,345.95 | $1,040.00 | $1,153.00 | $1,100.00 |
| 0320 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.10 | $2,018.93 | $10,400 | $11,532 | $11,000 |
| 0325 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 380 | $1.68 | $3.12 | $3.40 | $3.35 |
| 0330 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 969 | $1.79 | $4.16 | $4.60 | $4.45 |
| 0335 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 1,554 | $2.52 | $5.20 | $5.75 | $5.60 |
| 0340 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 1.39 | $403.79 | $832.00 | $922.00 | $890.00 |
| 0345 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.85 | $689.80 | $1,560.00 | $1,729.00 | $1,700.00 |
| 0350 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 41 | $61.69 | $62.40 | $69.00 | $67.00 |
| 0355 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 98 | $38.14 | $52.00 | $57.00 | $56.00 |
| 0360 | Painted pavement markings, standard, white, yield line (0710-11180) | LF | 88 | $11.22 | $4.16 | $4.60 | $4.45 |
| 0365 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 82.34 | $1,345.95 | $1,040.00 | $1,153.00 | $1,100.00 |
| 0370 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 818 | $1.79 | $3.12 | $3.45 | $3.35 |
| 0375 | Painted pavement markings, standard, yellow, skip, 6" (0710-11231) | GM | 50.68 | $409.39 | $832.00 | $922.00 | $890.00 |
| 0380 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.67 | $695.41 | $1,560.00 | $1,729.00 | $1,700.00 |
| 0385 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $130,836 | $130,836 | $130,836 | $130,836 |
| 0390 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $19,164 | $19,164 | $19,164 | $19,164 |
| 0395 | Raised rumble strip set- permanent (0546-71-1) | EACH | 4 | $326.62 | $260.00 | $288.00 | $280.00 |
| 0400 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 61.10 | $2,484.70 | $1,560.00 | $2,050.00 | $1,700.00 |
| 0405 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 47 | $532.77 | $494.00 | $547.00 | $530.00 |
| 0410 | Single column ground sign assembly, remove (0700-1600) | EACH | 38 | $50.47 | $46.80 | $51.00 | $50.00 |
| 0415 | Object marker, type 1 (0705-10-1) | EACH | 6 | $448.65 | $416.00 | $461.00 | $450.00 |
| 0420 | Raised pavement marker, type B (0706-1-3) | EACH | 6,612 | $5.61 | $4.42 | $4.90 | $4.75 |
| 0425 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 76 | $7.07 | $12.48 | $13.80 | $13.00 |
| 0430 | Painted pavement markings, surface (0710-90) | LS | 1 | $168,244 | $123,692 | $137,160 | $130,000 |
| 0435 | Painted pavement markings, surface (0710-90) | LS | 1 | $22,433 | $8,735.17 | $9,686.00 | $9,400.00 |
| 0440 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 190 | $4.49 | $4.16 | $4.60 | $4.45 |
| 0445 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 818 | $5.61 | $6.24 | $6.90 | $6.70 |
| 0450 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 897 | $10.09 | $8.32 | $9.20 | $8.95 |
| 0455 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.54 | $2,804.07 | $3,120.00 | $3,460.00 | $3,300.00 |
| 0460 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 10 | $196.29 | $88.40 | $98.00 | $95.00 |
| 0465 | Thermoplastic, standard, arrow (0711-11170) | EACH | 46 | $95.34 | $72.80 | $80.00 | $78.00 |
| 0470 | Thermoplastic, standard, yield line (0711-11180) | LF | 44 | $11.22 | $20.80 | $23.00 | $22.00 |
| 0475 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 409 | $5.61 | $6.24 | $6.90 | $6.70 |
| 0480 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.29 | $2,804.07 | $3,120.00 | $3,460.00 | $3,300.00 |
| 0485 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 134 | $16.82 | $15.60 | $17.30 | $17.00 |
| 0490 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 13 | $286.02 | $135.20 | $150.00 | $150.00 |
| 0495 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 13 | $213.11 | $119.60 | $132.00 | $130.00 |
| 0500 | Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101) | GM | 1.06 | $4,823.00 | $4,368.00 | $4,843.00 | $4,700.00 |
| 0505 | Thermoplastic, standard-open graded asphalt surfaces, solid, 8" (0711-15102) | GM | 0.03 | $17,161 | $8,320.00 | $9,225.00 | $6,200.00 |
| 0510 | Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131) | GM | 0.70 | $1,738.52 | $3,120.00 | $3,459.00 | $3,300.00 |
| 0515 | Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201) | GM | 0.43 | $4,823.00 | $4,368.00 | $4,843.00 | $4,600.00 |
| 0520 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 44.63 | $4,037.86 | $4,160.00 | $4,612.00 | $4,500.00 |
| 0525 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.07 | $17,161 | $8,320.00 | $9,225.00 | $8,700.00 |
| 0530 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 26.84 | $4,037.86 | $4,160.00 | $4,612.00 | $4,500.00 |
| 0535 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 12.67 | $1,458.12 | $2,288.00 | $2,537.00 | $2,500.00 |
| 0540 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.06 | $67,298 | $41,600 | $46,129 | $44,000 |
| 0545 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.06 | $67,298 | $41,600 | $46,129 | $44,000 |
| 0550 | Conduit, furnish & install, open trench (0630-2-11) | LF | 3 | $112.16 | $104.00 | $115.00 | $110.00 |
| 0555 | Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109) | EACH | 8 | $785.14 | $728.00 | $807.00 | $780.00 |