FDOT contract T6610 bid tabulation

SR A1A (COLLINS AVE / INDIAN CREEK DR) AND SR 112 FROM 44... Let by Florida DOT on January 29, 2025, Miami-Dade, District 6. 3 bids received; low bid $9,176,266 by Florida Engineering & Development Corp.

Owner
Florida DOT
Letting
29 JAN 2025
Pay items
149
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Florida Engineering & Development Corp$9,176,266Low
2Strongcore Group, LLC$10,160,694+11%
3Southern Road & Bridge, LLC$13,510,695+47%
FDOT contract T6610: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Florida Engineering & Development Corp2. Strongcore Group, LLC3. Southern Road & Bridge, LLC
0005Conc class IV, bulkhead (0400-4-8)CY3.90$13,560$10,300$9,500.00
0010Restore spalled areas, latex modified mortar- acrylic (0401-70-3)CF1,087.60$904.00$1,530.00$1,180.00
0015Epoxy material for crack injection- structures rehab (0411-1)GA3$282.50$545.00$50.00
0020Cracks inject & seal- structures rehab (0411-2)LF61$2,034.00$363.00$248.00
0025Penetrant sealer (0413-149)GA251$226.00$132.00$110.00
0030Cleaning & sealing concrete surfaces - penetrant sealer or methacrylates (0413-154)SF38,789$3.39$3.10$18.00
0035Bridge deck expansion joint, rehabilitation, poured joint backer rod (0458-1-21)LF401$113.00$77.00$125.00
0040Polymer nosing for bridge expansion joint (0458-2)CF32$904.00$1,050.00$1,850.00
0045Struct steel- rehab, carbon (0460-1-1)LB2,433$67.80$69.50$135.00
0050Structural steel rehab- bolts, nuts, washers & plates (0460-1-13)LB426$36.16$56.50$150.00
0055Structural steel repair- welds (0460-94)LF6$565.00$3,080.00$325.00
0060Coating existing structural steel 870055 (0561-1)TN1$650,000$282,800$1,250,000
0065Mobilization (0101-1)LS1$450,000$850,000$650,000
0070Mobilization (0101-1)LS1$450,000$850,000$650,000
0075Maintenance of traffic (0102-1)DA1$400,000$272,400$500,000
0080Maintenance of traffic (0102-1)DA1$400,000$44,100$500,000
0085Traffic control officer (0102-14)HR1,792$108.82$90.00$85.00
0090Work zone sign (0102-60)ED29,180$0.24$0.30$0.30
0095Temporary barrier, F&I, low profile, concrete (0102-71-13)LF131$76.07$116.00$125.00
0100Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED31,690$0.14$0.20$0.20
0105Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD10,560$0.07$0.10$0.15
0110Arrow board / advance warning arrow panel (0102-76)ED510$5.93$6.90$7.00
0115Portable changeable message sign, temporary (0102-99)ED1,276$11.87$14.00$15.00
0120Temporary signalization and maintenance, intersection (0102-104)ED2,520$13.56$14.50$29.00
0125Temporary traffic detection and maintenance, intersection (0102-107-1)ED2,520$13.56$14.50$3.00
0130Type III barricade (0102-115)ED1,900$0.32$0.40$0.50
0135Floating turbidity barrier (0104-11)LF278$80.00$274.00$12.00
0140Inlet protection system (0104-18)EACH23$97.98$279.00$125.00
0145Litter removal (0107-1)ACRE42.77$245.51$412.00$75.00
0150Mowing (0107-2)ACRE22.36$561.58$3,090.00$75.00
0155Monitor existing structures- inspection and settlement monitoring (0108-1)LS1$8,000.00$9,630.00$78,000
0160Clearing & grubbing (0110-1-1)ACRE1$310,000$133,200$185,000
0165Removal of existing concrete (0110-4-10)SY3,237$68.21$58.00$65.00
0170Tree protection barrier (0110-21)LF318$7.55$23.00$25.00
0175Regular excavation (0120-1)CY42$131.02$1,000.00$145.00
0180Embankment (0120-6)CY3$175.12$7,330.00$650.00
0185Optional base, base group 15 (0285-715)SY1,402$175.00$231.00$145.00
0190Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY35,466$5.09$5.50$14.00
0195Superpave asphaltic conc, traffic C (0334-1-13)TN1,043.20$314.23$457.00$295.00
0200Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN3,009.80$264.42$289.00$405.00
0205Inlets, curb, type P-5, <10' (0425-1351)EACH1$14,475$32,500$14,000
0210Inlets, curb, type J-6, <10' (0425-1461)EACH1$16,197$35,700$14,000
0215Manhole, adjust (0425-5)EACH21$1,250.00$2,840.00$2,500.00
0220Pipe culvert,optional material,round, 24"S/CD (0430-175124)LF24$750.00$1,820.00$900.00
0225Concrete curb & gutter, type F variable gutter pan with reinforcing, projects 443931-1- 52-01, etc. (0520-1-22)LF3,011$92.18$96.50$145.00
0230Concrete curb & gutter, type F with special gutter profile, variable gutter pan with reinforcing, project 443931-1-52- 01 (0520-1-23)LF281$94.25$134.00$145.00
0235Concrete curb, type D (0520-2-4)LF162$73.93$59.50$145.00
0240Concrete curb, type D with reinforcing (0520-2114)LF119$71.48$61.50$150.00
0245Concrete traffic separator, special- variable width (0520-70)SY145$268.33$197.00$285.00
0250Concrete sidewalk and driveways, 4" thick (0522-1)SY1,280$94.80$113.00$120.00
0255Concrete sidewalk and driveways, 6" thick (0522-2)SY1,123$121.17$119.00$140.00
0260Pavers, architectural, (0526-1-2)SY5$242.98$1,000.00$950.00
0265Detectable warnings (0527-2)SF626$46.96$34.50$80.00
0270Performance turf, sod (0570-1-2)SY286$12.46$159.00$12.00
0275Conduit, furnish & install, directional bore (0630-2-12)LF5$45.20$49.00$285.00
0280Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH1$2,203.50$3,000.00$2,900.00
0285Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130)LS1$1,000.00$1,000.00$1,000.00
0290Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1)EACH6$2,034.00$2,210.00$3,400.00
0295Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12)EACH6$1,808.00$1,960.00$3,400.00
0300Traffic monitoring site cabinet, F&I, type 3, 2 pane back, pedestal mount (0695-7162)EACH1$16,950$18,400$19,500
0305Traffic monitoring site cabinet, remove existing cabinet (0695-7600)EACH1$1,356.00$1,470.00$1,400.00
0310Painted pavement markings, standard, white, solid, 6" (0710-11101)GM3.16$1,915.35$2,080.00$2,025.00
0315Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102)GM0.18$2,028.36$2,170.00$2,160.00
0320Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF2,067$1.13$1.20$1.35
0325Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124)LF996$1.70$1.80$2.70
0330Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF665$2.26$2.50$4.05
0335Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM1.63$745.80$813.00$1,080.00
0340Painted pavement marking, standard,white, 3'-9' skip drop line and approach to toll 12" wide, (0710-11133)GM0.10$2,141.30$2,330.00$2,160.00
0345Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM0.48$745.79$819.00$1,080.00
0350Painted pavement markings, standard, white, message or symbol (0710-11160)EACH40$67.80$73.50$114.75
0355Painted pavement markings, standard, white, arrows (0710-11170)EACH54$45.20$49.00$60.75
0360Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM1.42$1,915.35$2,090.00$2,025.00
0365Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224)LF51$1.69$1.80$2.70
0370Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241)GM0.01$746.36$736.00$1,080.00
0375Painted pavement markings, standard, blue, solid for parking lot- accessible markings, 6" (0710-11421)LF95$1.02$1.10$6.75
0380Initial contingency amount, DO not bid (0999-25)LS1$51,097$51,097$51,097
0385Initial contingency amount, DO not bid (0999-25)LS1$31,020$31,020$31,020
0390Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH102$559.35$608.00$648.00
0395Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH3$2,655.50$2,890.00$2,970.00
0400Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113)EACH1$3,107.50$3,380.00$4,050.00
0405Single column ground sign assembly, F&I barrier less than 12 SF (0700-1311)EACH2$2,141.35$2,330.00$4,050.00
0410Single column ground sign assembly, remove (0700-1600)EACH60$11.30$12.50$47.25
0415Sign panel, relocate, UP to 12 SF (0700-3501)EACH23$423.75$460.00$101.25
0420Sign panel, remove, UP to 12 SF (0700-3601)EACH9$79.10$86.00$27.00
0425Tubular marker, durable, 36" white post (0704-1-1)EACH29$107.35$117.00$303.75
0430Delineator, flexible tubular (0705-11-1)EACH10$101.70$12.50$135.00
0435Raised pavement marker, type B (0706-1-3)EACH1,142$5.65$6.10$6.75
0440Painted pavement markings, durable paint, yellow, island nose (0710-12290)SF1,373$2.26$2.50$6.75
0445Painted pavement markings, surface (0710-90)LS1$31,351$34,100$43,875
0450Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF2,067$2.71$3.00$6.75
0455Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF982$4.07$4.40$9.45
0460Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF655$5.42$5.90$12.15
0465Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.48$1,789.92$1,970.00$6,075.00
0470Thermoplastic, standard, message or symbol (0711-11160)EACH40$135.60$147.00$303.75
0475Thermoplastic, standard, arrow (0711-11170)EACH54$90.40$98.00$121.50
0480Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF51$4.07$4.40$9.45
0485Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.01$1,789.09$1,770.00$6,075.00
0490Thermoplastic, standard, blue, solid,6" (0711-11421)LF95$0.68$0.70$13.50
0495Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF1,943$20.34$22.00$27.00
0500Thermoplastic, preformed, white, message (0711-14160)EACH24$293.80$319.00$472.50
0505Thermoplastic, preformed, white, arrow (0711-14170)EACH10$169.50$184.00$168.75
0510Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM3.16$7,159.68$7,770.00$7,020.00
0515Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102)GM0.18$7,457.98$7,970.00$8,100.00
0520Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM1.63$1,789.92$1,950.00$4,725.00
0525Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133)GM0.10$3,579.80$3,890.00$9,450.00
0530Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM1.42$7,159.68$7,800.00$7,020.00
0535Green-colored pavement markings, bike lane (0714-10)SF1,782$11.30$12.50$13.50
0540Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH5$2,203.50$2,200.00$2,600.00
0545Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211)EACH5$2,034.00$2,000.00$3,025.00
0550Pole cable distribution system, furnish and install, conventional (0715-500-1)EACH5$847.50$800.00$4,700.00
0555Conduit, furnish & install, directional bore (0630-2-12)LF4,176$45.20$40.00$98.00
0560Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI7$13,560$12,300$22,500
0565Signal cable, remove- intersection (0632-7-6)PI7$565.00$520.00$2,800.00
0570Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH182$2,203.50$2,200.00$2,600.00
0575Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH7$3,955.00$3,750.00$4,200.00
0580Pull & splice box, install (0635-2-30)EACH6$904.00$985.00$1,850.00
0585Electrical power service, F&I, underground, meter by contractor (0639-1122)AS7$8,475.00$7,700.00$11,325
0590Electrical service wire, & install (0639-2-1)LF2,384$6.78$6.50$17.00
0595Prestressed concrete pole, type P-II service pole (0641-2-12)EACH7$2,825.00$2,550.00$6,100.00
0600Aluminum signals pole, (0646-1-11)EACH27$2,260.00$2,050.00$4,200.00
0605Aluminum signals pole, remove (0646-1-60)EACH13$282.50$255.00$1,050.00
0610Steel mast arm assembly, and install, single arm 50' (0649-21-6)EACH1$141,250$127,500$148,500
0615Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS6$2,034.00$1,900.00$2,650.00
0620Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109)EACH2$734.50$670.00$2,000.00
0625Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS25$2,034.00$1,850.00$1,605.00
0630Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12)AS2$2,486.00$2,300.00$3,000.00
0635Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60)AS3$282.50$260.00$350.00
0640Midblock crosswalk: rectangular rapid flashing beacon, remove complete sign assembly (0654-2-60)AS2$1,695.00$1,540.00$48,500
0645Loop detector inductive, F&I, type 10 (0660-1110)EACH10$282.50$260.00$800.00
0650Loop assembly, F&I, type F (0660-2106)AS13$2,260.00$2,100.00$3,500.00
0655Vehicle detection system- furnish & install cabinet equipment (0660-4-11)EACH1$6,215.00$5,700.00$14,000
0660Vehicle detection system- furnish & install above ground equipment (0660-4-12)EACH1$4,520.00$4,200.00$7,700.00
0665Pedestrian detector, furnish & install, standard (0665-1-11)EACH22$565.00$520.00$710.00
0670Pedestrian detector, furnish & install, accessible (0665-1-12)EACH12$2,825.00$2,600.00$3,700.00
0675Pedestrian detector, remove- pole/pedestal to remain (0665-1-60)EACH8$56.50$55.00$178.00
0680Traffic controller assembly, furnish & install model 2070 (0670-5140)AS1$56,500$52,000$95,000
0685Traffic controller assembly, remove controller with (0670-5600)AS1$1,130.00$1,050.00$4,200.00
0690Network device, cellular (0684-90102)EACH1$3,390.00$3,100.00$4,300.00
0695Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH5$1,356.00$1,230.00$2,500.00
0700Sign panel, remove, UP to 12 SF (0700-3601)EACH7$361.60$260.00$700.00
0705Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH1$4,520.00$4,100.00$7,425.00
0710Relocate trees and palms, >=14' of clear trunk (0581-1-2)EACH14$5,650.00$6,140.00$8,650.00
0715Irrigation system- modify existing system (0590-70-5)LS1$48,025$85,000$185,000
0720Local agency initial amount (DO not bid) (0999-26)LS1$16,300$16,300$16,300
0725Local agency initial amount (DO not bid) (0999-26)LS1$6,704.00$6,704.00$6,704.00
0730Utility pipe,remove & dispose, 8- 19.9" (1050-16004)LF331$226.00$168.00$625.00
0735Utility structure, below ground, adjust/modify (1060-15)EACH21$1,813.18$1,630.00$3,500.00
0740Utility fixture, valve/meter box, install- box furnished by utility (1080-21300)EACH25$534.72$1,940.00$2,250.00
0745Utility fixture, valve assembly, adjust/modify (1080-24500)EACH73$955.16$1,500.00$1,850.00
FDOT contract T6610: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of January 29, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy