FDOT contract T1920 bid tabulation

SR 684 FROM SR 789 (GULF DR) TO W OF 123 ST W. Let by Florida DOT on March 25, 2026, Manatee, District 1. 6 bids received; low bid $123,000,000 by Sema Construction, Inc..

Owner
Florida DOT
Letting
25 MAR 2026
Pay items
317
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Sema Construction, Inc.$123,000,000Low
2Webber, LLC$125,214,101+2.0%
3Superior Construction Company Southeast, LLC$129,085,398+5.0%
4Vecellio & Grogan, Inc.$129,936,044+6.0%
5Orion Marine Construction, Inc.$139,522,100+13%
6Prince Contracting, LLC.$168,902,684+37%
FDOT contract T1920: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Sema Construction, Inc.2. Webber, LLC3. Superior Construction Company Southeast, LLC4. Vecellio & Grogan, Inc.5. Orion Marine Construction, Inc.6. Prince Contracting, LLC.
0005Temporary work structure, project number 430204-2-52-01 BR. no. 130168 (0103-1-26)LS1$20,261,708$23,575,000$16,432,758$16,600,000$10,893,595$18,500,000
0010Removal of existing structures/bridges BR. no. 130168 (0110-3)SF1$5,040,700$9,000,000$3,570,000$5,400,000$6,033,050$13,000,000
0015Concrete class NS, gravity index 400-011 (0400-0-11)CY41.60$1,500.00$1,349.49$1,900.00$1,420.00$1,877.53$1,600.00
0020Concrete, class I (seal) (0400-1-30)CY991.90$1,100.00$3,589.69$2,200.00$400.00$5,135.80$3,200.00
0025Concrete class II, approach slabs (0400-2-10)CY166.60$900.00$577.21$1,400.00$1,820.00$1,518.02$720.00
0030Concrete class IV, superstructure (0400-4-4)CY6,006.80$1,700.00$966.96$1,300.00$1,231.00$1,757.33$1,800.00
0035Concrete class IV, bridge substructure (0400-4-5)CY225.60$2,800.00$1,940.21$3,000.00$3,575.00$7,610.49$3,000.00
0040Conc class IV, bulkhead (0400-4-8)CY148.80$1,800.00$2,347.73$3,000.00$3,415.00$3,421.15$1,850.00
0045Conc class IV, retaining walls (0400-4-11)CY239.70$1,200.00$1,272.26$2,000.00$2,100.00$1,750.87$1,800.00
0050Concrete class IV, mass, substructure (0400-4-25)CY10,023$1,500.00$1,191.98$1,100.00$1,905.00$1,930.53$2,800.00
0055Bridge deck grooving (0400-7-1)SY14,515$5.00$3.58$5.00$4.80$5.72$4.80
0060Bridge deck planing (0400-9-1)SY14,515$5.00$2.96$5.00$7.65$5.72$4.20
0065Composite neoprene pads (0400-147)CF131.40$1,400.00$1,880.79$1,100.00$1,890.00$2,565.38$1,500.00
0070Reinforcing steel- retaining wall (0415-1-3)LB32,656$1.30$1.87$1.50$2.00$1.96$2.15
0075Reinforcing steel - bridge superstructure (0415-1-4)LB1,140,271$1.30$1.22$1.50$1.60$1.59$1.50
0080Reinforcing steel- bridge substructure (0415-1-5)LB3,129,841$1.40$1.29$1.50$1.75$1.91$1.70
0085Reinforcing steel- bulkhead (0415-1-8)LB2,003$1.50$1.72$1.50$2.00$1.92$2.15
0090Reinforcing steel- approach slabs (0415-1-9)LB32,692$1.50$1.22$1.50$1.60$1.52$1.25
0095Fiber reinforced polymer bars, #5 bar (0415-10-5)LF7,974$6.00$3.02$2.00$4.80$3.07$10.00
0100Prest beams: florida-I beam 36" (0450-2-36)LF1,555$550.00$414.86$296.00$410.00$472.50$360.00
0105Prest beams: florida-I beam 63" (0450-2-63)LF1,234$650.00$472.58$338.00$475.00$436.22$420.00
0110Prest beams: florida-I beam 84" (0450-2-84)LF15,971$750.00$590.62$460.00$570.00$490.21$530.00
0115Preformed pile holes, 36" to 43" drill/punch size (0455-15-16)LF17,274$120.00$262.05$55.00$350.00$396.30$210.00
0120Pile inspection, driven pile (0455-20-1)EACH334$200.00$700.00$2,000.00$820.00$495.39$1,000.00
0125Prestressed concrete piling, SQ (0455-34-6)LF31,919$290.00$267.18$300.00$428.00$313.50$450.00
0130Pile redrive (0455-115)EACH188$1,600.00$2,860.84$2,700.00$2,350.00$1,955.05$8,900.00
0135Sheet piling steel, temporary- critical (0455-133-2)SF12,773$88.00$60.99$60.00$66.00$118.10$85.00
0140Sheet piling steel, F&I (0455-133-3)SF20,783$68.00$35.00$60.00$55.00$88.30$84.00
0145Soldier pile wall, permanent, with cast-in-place concrete fascia (0455-133208)SF1,369$210.00$216.50$450.00$185.00$569.82$410.00
0150Load test (dynamic), data collection and analysis (0455-137)EACH522$1,400.00$1,500.00$2,250.00$1,600.00$667.89$500.00
0155Load test (dynamic), test (0455-137-2)EACH20$2,100.00$2,500.00$1,400.00$2,100.00$6,934.57$5,200.00
0160Test piles-prestressed concrete,30" SQ (0455-143-6)LF2,280$520.00$435.21$750.00$590.00$509.35$550.00
0165Bridge deck expansion joint, construction, F&I poured joint with backer rod (0458-1-11)LF280$34.00$102.87$190.00$150.00$206.19$72.50
0170Bridge deck expansion joint, construction, F&I strip seal (0458-1-12)LF395$430.00$490.45$600.00$650.00$1,210.04$860.00
0175Piles, polyethylene sheeting (0459-71)SY158$20.00$100.00$5.00$42.00$11.44$55.00
0180Movable bridge- preventative maintenance & routine repair BR. no. 130168 (0465-20)DA1$500,000$250,000$208,800$356,000$567,286$247,000
0185Movable bridge operator (0465-21)DA638$850.00$700.00$980.00$1,170.00$1,401.69$630.00
0190Polymeric fender system, 41-200 kip-FT BR. no. 130168 (0471-3-2)LS1$1,500,000$1,588,005$1,650,000$2,102,500$5,104,701$4,000,000
0195Navigation lights- fixed bridge, system BR. no. 130168 (0510-1)LS1$60,000$55,982$11,400$68,000$94,351$65,000
0200Pedestrian / bicycle railing, aluminum, custom infill panels (0515-2720)LF8,195$160.00$112.00$109.00$132.00$145.89$180.00
0205Concrete traffic railing- 36" single-slope (0521-5-13)LF5,985$110.00$110.25$100.00$145.00$150.48$210.00
0210Concrete parapet, retaining wall system mounted W/sidewalk, curb (0521-6-34)LF1,457$480.00$326.31$380.00$182.00$522.72$165.00
0215Concrete slope pavement,non reinforced, 4" (0524-2-2)SY49$240.00$185.20$575.00$430.00$290.42$310.00
0220Riprap- rubble, bank and shore (0530-3-3)TN1,360.10$190.00$150.00$160.00$175.00$244.42$185.00
0225Gabion, mattress 1 foot and greater thickness (0530-5-12)SY219$310.00$299.70$400.00$600.00$411.93$320.00
0230Bedding stone (0530-74)TN361.20$230.00$150.00$260.00$240.00$208.96$220.00
0235Retaining wall system, permanent, excluding barrier (0548-12)SF19,440$100.00$65.13$120.00$147.00$106.29$150.00
0240Retaining wall system,temporary, excluding barrier (0548-13)SF4,653$27.00$23.73$30.00$30.00$32.95$65.00
0245Conduit, furnish & install, embedded concrete barriers and traffic railings (0630-2-16)LF20,944$11.00$10.24$13.00$12.45$19.49$25.00
0250Junction box, furnish & install, embedded (0635-3-13)EACH121$950.00$916.97$635.00$1,115.00$1,148.69$1,400.00
0255Mobilization (0101-1)LS1$12,000,000$12,000,000$12,900,000$13,070,000$13,917,700$16,800,000
0260Maintenance of traffic (0102-1)DA1$750,000$5,000,000$300,000$340,000$2,223,439$4,500,000
0265Special detour- temporary pavement (0102-2200)SY1$400,000$176,485$275,000$310,000$436,350$325,000
0270Special detour- temporary earthwork/base (0102-2300)CY1$600,000$129,115$255,000$121,300$386,982$150,000
0275Commercial material for temporary driveway maintenance (0102-3)CY6.40$350.00$4,879.91$500.00$121.00$40,786$400.00
0280Pedestrian or bicycle special detour (0102-4-1)SY1$41,900$103,688$80,000$135,700$95,837$20,000
0285Traffic control officer (0102-14)HR160$120.00$120.00$150.00$120.00$135.88$95.00
0290Work zone sign (0102-60)ED140,310$0.22$0.19$0.18$0.25$0.36$0.20
0295Temporary barrier, F&I, low profile, concrete (0102-71-13)LF1,874$45.00$41.00$38.00$49.75$54.35$45.00
0300Temporary barrier, F&I, anchored (0102-71-15)LF4,582$69.00$38.00$30.00$46.00$50.06$45.00
0305Temporary barrier, F&I, free standing (0102-71-16)LF320$35.00$32.00$22.00$29.00$31.47$40.00
0310Temporary barrier, relocate, low profile concrete (0102-71-23)LF452$19.00$17.00$12.00$16.00$17.16$20.00
0315Temporary barrier, relocate, anchored (0102-71-25)LF333$19.00$17.00$15.00$20.00$21.45$28.00
0320Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED113,952$0.10$0.09$0.09$0.12$0.21$0.10
0325Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD446,976$0.05$0.03$0.25$0.04$0.13$0.05
0330Temporary separator, F&I remove (0102-75-1)LF296$24.00$22.00$22.00$28.00$31.22$22.20
0335Arrow board / advance warning arrow panel (0102-76)ED384$6.00$5.00$100.00$6.50$7.15$5.15
0340Temporary crash cushion, redirective option (0102-89-1)LO7$2,100.00$900.00$2,600.00$6,800.00$1,559.03$2,125.00
0345Portable changeable message sign, temporary (0102-99)ED6,270$10.00$9.00$9.00$12.00$16.09$9.30
0350Temporary signalization and maintenance, intersection (0102-104)ED1,200$59.00$56.96$57.00$69.00$23.23$63.20
0355Temporary traffic detection and maintenance, intersection (0102-107-1)ED1,200$21.00$19.81$20.00$24.00$17.42$22.00
0360Type III barricade (0102-115)ED13,760$0.25$0.25$0.25$0.30$0.41$0.25
0365Sediment barrier (0104-10-3)LF5,358$1.30$1.29$5.00$3.55$1.94$5.00
0370Floating turbidity barrier (0104-11)LF26,796$10.00$14.81$14.00$10.25$8.84$30.00
0375Soil tracking prevention device (0104-15)EACH2$9,600.00$5,274.85$15,000$4,775.00$7,912.55$15,000
0380Inlet protection system (0104-18)EACH10$320.00$139.95$250.00$203.00$209.93$400.00
0385Litter removal (0107-1)ACRE252.64$50.00$47.17$141.00$50.00$47.31$46.50
0390Mowing (0107-2)ACRE167.72$100.00$55.55$109.00$60.00$304.48$160.00
0395Monitor existing structures- inspection and settlement monitoring (0108-1)LS1$32,600$15,618$46,050$36,000$620,124$50,100
0400Monitor existing structures- vibration monitoring (0108-2)LS1$30,800$22,135$105,450$250,000$362,209$140,000
0405Clearing & grubbing (0110-1-1)ACRE1$750,000$2,000,000$20,830,000$485,000$789,146$3,352,466
0410Removal of existing concrete (0110-4-10)SY2,919$37.00$39.05$25.00$36.40$48.93$60.00
0415Delivery of salvageable to fdot (0110-86)LS1$50,000$24,815$40,000$34,000$11,827$25,000
0420Regular excavation (0120-1)CY19,386$20.00$11.40$26.00$10.30$34.95$30.00
0425Embankment (0120-6)CY22,176$30.00$59.24$35.00$49.90$40.05$25.00
0430Type B stabilization (0160-4)SY9,965$34.00$14.42$25.00$24.25$23.10$30.00
0435Optional base, base group 06 (0285-706)SY9,079$30.00$20.62$40.00$37.60$35.80$35.00
0440Milling existing asphalt pavement, 1" avg depth (0327-70-1)SY183$16.00$42.19$15.50$20.60$19.63$17.00
0445Milling existing asphalt pavement, 2" avg depth (0327-70-5)SY4,279$16.00$2.91$15.50$14.55$13.86$17.00
0450Superpave asphaltic conc, traffic B (0334-1-12)TN978.70$450.00$385.00$410.00$303.00$288.71$435.00
0455Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81)TN1,102.60$270.00$250.00$265.00$366.00$348.77$295.00
0460Miscellaneous asphalt (0339-1)TN257.20$550.00$362.00$500.00$488.00$464.25$410.00
0465Inlets, curb, type 9, <10' (0425-1201)EACH1$8,600.00$6,283.82$10,200$9,700.00$9,492.92$12,000
0470Inlets, curb, type P-5, <10' (0425-1351)EACH8$7,500.00$9,490.62$12,300$17,400$16,514$13,000
0475Inlets, curb, type J-5, <10' (0425-1451)EACH3$10,300$8,215.28$23,400$26,000$24,829$25,000
0480Inlets, DT bot, type C,<10' (0425-1521)EACH2$11,300$6,390.18$10,500$10,000$9,550.67$10,000
0485Inlets, ditch bottom, type C modified- back of sidewalk, <10' (0425-1531)EACH1$7,100.00$8,169.56$9,660.00$4,570.00$4,353.81$15,000
0490Inlets, DT bot, type D, modify (0425-1549)EACH2$11,300$6,430.10$13,000$7,300.00$6,952.24$10,000
0495Inlets, DT bot, type E, modify (0425-1559)EACH2$8,400.00$7,085.96$9,700.00$9,000.00$8,615.23$10,000
0500Inlets, DT bot, type H, modify (0425-1589)EACH2$17,900$8,505.56$16,600$14,300$13,627$25,000
0505Inlets, gutter, type V, <10' (0425-1711)EACH1$7,500.00$8,219.37$8,300.00$7,100.00$6,779.01$12,500
0510Inlets, gutter, type V, partial (0425-1715)EACH1$6,700.00$5,860.02$4,780.00$7,700.00$7,333.34$18,000
0515Inlets, adjacent barrier, J bottom, < 10' (0425-1923)EACH14$14,800$9,771.49$14,500$11,500$10,948$22,000
0520Inlets, adjacent barrier, J bottom, >10' (0425-1924)EACH1$18,100$9,769.48$16,300$19,300$18,362$40,000
0525Manholes, P-7, <10' (0425-2-41)EACH7$6,300.00$5,980.54$12,900$16,600$15,822$15,000
0530Manholes, P-7, partial (0425-2-43)EACH3$5,800.00$5,980.80$3,500.00$6,100.00$5,774.28$8,500.00
0535Manholes, J-7, <10' (0425-2-71)EACH11$8,700.00$5,980.97$18,600$18,600$17,669$18,000
0540Manholes, J-8, >10' (0425-2-92)EACH1$11,000$5,978.92$11,900$20,000$19,055$40,000
0545Pipe culvert,optional material,round, 15"S/CD (0430-175115)LF38$270.00$196.09$135.00$334.00$317.59$500.00
0550Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF1,453$270.00$113.17$180.00$206.00$196.33$475.00
0555Pipe culvert,optional material,round, 24"S/CD (0430-175124)LF342$210.00$118.74$240.00$245.00$233.28$475.00
0560Pipe culvert, opt material, round, 30"S/CD (0430-175130)LF928$350.00$174.67$225.00$309.00$294.49$475.00
0565Pipe culvert,optional material,other-elip/arch, (0430-175218)LF388$230.00$136.25$215.00$260.00$247.14$475.00
0570Pipe culvert,optional material,other shape-elip/arch, 24"S/CD (0430-175224)LF17$360.00$276.87$515.00$594.00$565.88$700.00
0575Pipe culvert, opt material, shape - elip/arch, 30"S/CD (0430-175230)LF221$270.00$225.04$330.00$446.00$424.99$600.00
0580Pipe culvert,optional material,round, jack & bore, 42", storm and cross drain (0430-185142)LF53$2,000.00$2,393.83$3,400.00$425.00$404.20$3,600.00
0585Mitered end section, optional round, 18" CD (0430-982125)EACH4$4,100.00$2,333.94$3,900.00$4,330.00$4,122.84$4,000.00
0590Mitered end section, optional round, 30" CD (0430-982133)EACH1$4,600.00$3,953.90$6,000.00$8,850.00$8,430.46$7,500.00
0595Mitered end section, optional - elliptical / arch, 24" CD (0430-982629)EACH1$4,100.00$2,569.28$5,500.00$4,875.00$4,642.53$5,500.00
0600Pipe handrail - guiderail, aluminum (0515-1-2)LF9$110.00$222.00$222.00$270.00$116.03$65.00
0605Pedestrian / bicycle railing, aluminum, custom infill panels (0515-2720)LF42$62.00$112.00$109.00$132.00$65.98$135.00
0610Bollards (0519-78)EACH6$4,700.00$4,119.87$925.00$1,140.00$831.05$1,200.00
0615Concrete curb & gutter, type E (0520-1-7)LF501$51.00$34.51$50.00$42.00$71.27$60.00
0620Concrete curb & gutter, type F (0520-1-10)LF2,767$45.00$64.74$50.00$42.00$54.54$60.00
0625Valley gutter- concrete (0520-3)LF166$52.00$85.50$75.00$56.50$135.15$60.00
0630Shoulder concrete barrier, 38" or 44" height (0521-72-40)LF864$420.00$325.07$450.00$375.00$358.53$325.00
0635Shoulder concrete barrier, curb and gutter barrier (0521-72-43)LF59$440.00$496.31$460.00$610.00$579.17$520.00
0640Concrete sidewalk and driveways, 4" thick (0522-1)SY1,681$70.00$75.95$67.00$59.00$103.45$58.00
0645Concrete sidewalk and driveways, 6" thick (0522-2)SY3,013$86.00$223.52$68.00$85.00$115.82$88.00
0650Concrete ditch pavt, non reinforced, 3" (0524-1-1)SY49$84.00$69.37$225.00$138.00$519.06$140.00
0655Detectable warnings (0527-2)SF341$53.00$31.05$32.00$39.00$66.59$35.00
0660Guardrail -roadway, general/low speed TL-2 (0536-1-0)LF592$19.00$21.00$23.70$25.00$23.30$19.00
0665Guardrail transition to rigid barrier, F&I- index 536- 001, approach TL-2 (0536-8111)EACH2$2,600.00$2,700.00$26.15$3,015.00$2,784.17$3,000.00
0670Guardrail transition to rigid barrier, F&I- index 536- 001, trailing (0536-8113)EACH2$1,800.00$1,950.00$1,510.00$2,055.00$1,900.01$2,000.00
0675Guardrail removal (0536-73)LF619$2.10$3.00$3.20$3.40$3.11$5.00
0680Guardrail end treatment- trailing anchorage (0536-85-20)EACH5$1,900.00$1,600.00$1,815.00$2,055.00$1,900.01$2,200.00
0685Guardrail end treatment- parallel approach terminal (0536-85-24)EACH5$3,300.00$4,000.00$3,435.00$4,085.00$3,773.10$3,800.00
0690Performance turf, sod (0570-1-2)SY14,086$8.00$3.78$8.00$6.00$7.49$7.00
0695Performance turf, sod and shoulder treatment index (0570-1-3)SY68$37.00$3.78$50.00$7.00$27.46$42.00
0700Plastic erosion mat, turf reinforced mat, type 1 (0571-1-11)SY376$14.00$13.70$50.00$9.50$44.35$15.00
0705Conduit, furnish & install, open trench (0630-2-11)LF621$18.00$17.57$18.00$21.35$19.93$20.00
0710Raised pavement marker, type B (0706-1-3)EACH6,222$5.00$5.00$3.80$4.70$4.48$5.25
0715Painted pavement markings, standard, white, solid, 6" (0710-11101)GM6.33$1,700.00$1,600.00$2,000.00$2,500.00$2,357.94$1,800.00
0720Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF1,590$2.10$2.00$1.60$2.00$1.89$2.25
0725Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF580$4.20$4.00$1.80$2.00$2.12$4.25
0730Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM0.23$1,800.00$1,000.00$650.00$800.00$766.22$1,200.00
0735Painted pavement markings, standard, white, message or symbol (0710-11160)EACH12$88.00$85.00$45.00$55.00$53.05$100.00
0740Painted pavement markings, standard, white, arrows (0710-11170)EACH44$47.00$45.00$45.00$55.00$53.05$50.00
0745Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM6.53$1,700.00$1,600.00$2,000.00$2,500.00$2,357.93$1,800.00
0750Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224)LF399$3.10$3.00$1.70$2.00$2.00$5.00
0755Painted pavement markings, standard, yellow, skip, 6" (0710-11231)GM0.36$1,800.00$1,000.00$500.00$610.00$602.43$1,200.00
0760Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241)GM0.31$2,000.00$1,000.00$650.00$780.00$771.20$1,200.00
0765Partnering, DO not bid (0999-16)LS1$6,000.00$6,000.00$6,000.00$6,000.00$6,000.00$6,000.00
0770Disputes review board, meeting- DO not bid (0999-20-1)DA40$4,440.00$4,440.00$4,440.00$4,440.00$4,440.00$4,440.00
0775Disputes review board, hearing- DO not bid (0999-20-2)EACH2$5,750.00$5,750.00$5,750.00$5,750.00$5,750.00$5,750.00
0780Initial contingency amount, DO not bid (0999-25)LS1$135,000$135,000$135,000$135,000$135,000$135,000
0785Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH47$640.00$600.00$752.00$975.00$1,438.98$1,000.00
0790Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH1$2,800.00$2,600.00$2,250.00$2,900.00$2,599.26$2,800.00
0795Single column ground sign assembly, F&I barrier less than 12 SF (0700-1211)EACH3$2,700.00$2,500.00$3,150.00$3,275.00$4,692.33$3,200.00
0800Single column ground sign assembly, F&I barrier 12.0-20.0 SF (0700-1212)EACH1$3,700.00$3,500.00$3,750.00$3,860.00$5,232.66$3,800.00
0805Single column ground sign assembly, relocate (0700-1500)EACH7$640.00$600.00$600.00$725.00$915.71$700.00
0810Single column ground sign assembly, remove (0700-1600)EACH45$53.00$50.00$150.00$870.00$142.19$825.00
0815Single column ground sign assembly, F&I cantilever mount, 12.0-20.0 SF (0700-1912)EACH1$4,200.00$4,000.00$4,850.00$3,500.00$4,385.19$3,500.00
0820Multi-column ground sign assembly, remove (0700-2600)EACH1$2,700.00$2,500.00$1,150.00$125.00$1,052.22$120.00
0825Sign panel, remove, 12-20 SF (0700-3602)EACH2$53.00$50.00$350.00$265.00$113.76$265.00
0830Tubular marker, 36" white post (0704-1-3)EACH2$320.00$300.00$298.00$600.00$204.76$325.00
0835Object marker, type 1 (0705-10-1)EACH8$370.00$350.00$501.00$785.00$369.70$750.00
0840Object marker, type 4 (0705-10-4)EACH3$370.00$350.00$359.00$795.00$335.57$750.00
0845Raised pavement marker, type B (0706-1-3)EACH500$5.00$5.00$3.80$4.70$5.53$5.25
0850Painted pavement markings, durable paint, yellow, island nose (0710-12290)SF28$10.00$10.00$5.00$6.10$5.89$11.00
0855Painted pavement markings, surface (0710-90)LS1$12,500$12,000$17,635$21,700$20,788$13,000
0860Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102)GM0.05$8,000.00$7,500.00$7,991.00$8,375.00$10,021$8,300.00
0865Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF894$5.00$5.00$3.50$4.30$4.13$5.25
0870Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF193$9.50$9.00$7.00$8.60$8.25$9.50
0875Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.17$5,000.00$4,500.00$2,750.00$3,265.00$3,319.76$4,800.00
0880Thermoplastic, standard, message or symbol (0711-11160)EACH5$310.00$300.00$87.00$107.00$102.56$320.00
0885Thermoplastic, standard, arrow (0711-11170)EACH19$120.00$120.00$56.00$69.00$66.01$125.00
0890Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF294$7.50$7.00$5.25$6.50$6.19$7.50
0895Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.05$6,000.00$4,500.00$2,750.00$3,320.00$3,813.73$4,600.00
0900Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF254$26.00$25.00$20.00$24.50$23.58$26.00
0905Thermoplastic, preformed, white, message (0711-14160)EACH11$260.00$250.00$350.00$430.00$412.58$260.00
0910Thermoplastic, preformed, white, arrow (0711-14170)EACH11$130.00$125.00$250.00$305.00$294.70$130.00
0915Thermoplastic, preformed, white with black contrast on concrete pavement, message symbol (0711-14560)EACH6$520.00$500.00$750.00$923.00$884.09$520.00
0920Thermoplastic, preformed, white with black contrast, arrow on concrete surface (0711-14570)EACH6$210.00$200.00$750.00$923.00$884.09$210.00
0925Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM1.24$7,300.00$7,000.00$6,500.00$8,000.00$7,662.10$7,300.00
0930Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM0.03$5,000.00$4,500.00$1,625.00$1,540.00$2,210.38$5,500.00
0935Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM1.03$7,300.00$7,000.00$6,500.00$8,000.00$7,662.11$7,300.00
0940Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231)GM0.21$7,500.00$4,500.00$1,377.00$1,590.00$1,646.71$5,000.00
0945Permanent tape, white, solid, 6" for concrete bridges (0713-103101)GM2.22$41,600$40,000$45,630$56,150$54,006$41,500
0950Permanent tape, yellow, solid, for concrete bridges (0713-103201)GM1.20$41,500$40,000$45,630$56,150$54,101$41,500
0955Conduit, furnish & install, open trench (0630-2-11)LF4,887$14.00$13.19$8.65$16.00$10.55$15.00
0960Conduit, furnish & install, directional bore (0630-2-12)LF466$34.00$33.08$28.40$40.00$35.48$37.00
0965Conduit, furnish & install, embedded concrete barriers and traffic railings (0630-2-16)LF1,116$11.00$10.20$12.95$12.40$15.50$11.35
0970Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH48$1,400.00$1,337.23$565.00$1,625.00$1,172.90$1,500.00
0975Junction box, furnish & install, embedded (0635-3-13)EACH16$950.00$916.78$635.00$1,110.00$913.56$1,025.00
0980Electrical power service, F&I, underground, meter by contractor (0639-1122)AS4$7,700.00$7,413.89$4,220.00$9,000.00$5,216.15$8,300.00
0985Electrical service wire, & install (0639-2-1)LF271$15.00$14.64$10.00$17.80$14.15$16.50
0990Electrical service disconnect, F&I, pole mount (0639-3-11)EACH4$2,000.00$1,928.86$2,020.00$2,340.00$3,129.69$2,200.00
0995Prestressed concrete pole, type P-II service pole (0641-2-12)EACH4$1,800.00$1,698.17$2,350.00$2,060.00$2,982.34$1,900.00
1000Lighting conductors, F&I, insulated, no. 10 or < (0715-1-11)LF9,028$1.10$1.01$0.90$1.20$1.12$1.15
1005Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12)LF54,665$2.20$2.08$1.30$2.50$1.57$2.35
1010Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13)LF14,659$3.10$2.99$3.40$3.60$4.14$3.35
1015Lighting conductors, remove & dispose, contractor owns (0715-1-60)LF9,351$0.70$0.68$0.75$0.85$1.00$0.80
1020Load center, F&I, secondary voltage (0715-7-11)EACH4$18,500$17,844$15,885$21,700$22,214$20,000
1025Load center, remove, voltage (0715-7-41)EACH4$640.00$618.93$750.00$755.00$943.03$700.00
1030Luminaire, F&I, under deck, wall mount (0715-11125)EACH7$1,100.00$1,083.55$825.00$1,315.00$1,237.73$1,250.00
1035Luminaire, F&I, under deck, (0715-11128)EACH34$3,900.00$3,713.63$3,710.00$4,515.00$4,697.48$4,150.00
1040Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211)EACH2$1,500.00$1,472.65$3,210.00$1,790.00$4,013.78$1,650.00
1045Light pole complete, F&I, standard pole standard foundation, 30' mounting height, 0' arm length (0715-61100)EACH1$17,600$10,563$9,420.00$12,840$11,723$11,500
1050Light pole complete, F&I, standard pole standard foundation, 35' mounting height, 15' arm length (0715-61252)EACH1$14,400$8,415.29$8,125.00$10,230$10,085$9,400.00
1055Light pole complete, F&I, STD pole STD foundation, wildlife sensitive luminaire, 25' mounting height, 8' arm length (0715-61811)EACH1$19,300$12,957$9,675.00$15,750$11,782$14,500
1060Light pole complete, F&I, standard pole special foundation, 35' mounting height, 15' arm length (0715-62252)EACH2$16,500$11,360$10,500$13,810$12,996$13,000
1065Light pole complete, F&I, STD pole special foundation, sensitive luminaire, 25' mounting height, 8' arm length (0715-62811)EACH2$16,500$11,300$11,840$13,735$14,193$13,000
1070Light pole complete, F&I, utility conflict pole standard foundation, 35' mounting height, 16' arm length (0715-65266)EACH1$17,000$10,205$8,850.00$12,410$10,650$12,000
1075Light pole complete, F&I, utility conflict pole special foundation, 35' mounting height, 16' arm length (0715-66266)EACH1$19,200$12,127$11,450$14,740$14,098$14,000
1080Light pole complete, remove pole and foundation (0715-69000)EACH21$930.00$897.20$795.00$1,090.00$943.03$1,000.00
1085Pole cable distribution system, furnish and install, conventional (0715-500-1)EACH25$690.00$664.36$525.00$810.00$642.44$750.00
1090Pole cable distribution system, wall mount (0715-500-3)EACH84$620.00$592.84$485.00$720.00$583.50$660.00
1095Light pole complete- special design, F&I, pole top mount- aluminum, 25' (0715-516125)EACH90$8,900.00$8,578.07$7,525.00$10,430$9,153.32$9,600.00
1100Light pole complete- special design, F&I, pole top mount- aluminum, 30' (0715-516130)EACH8$10,800$10,349$7,575.00$12,580$9,224.05$11,500
1105Conduit, furnish & install, open trench (0630-2-11)LF45$24.00$23.35$24.00$28.50$20.79$26.00
1110Conduit, furnish & install, directional bore (0630-2-12)LF60$50.00$48.09$48.00$58.50$63.52$55.00
1115Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI1$6,100.00$5,848.53$5,850.00$7,110.00$10,105$6,500.00
1120Signal cable, remove- intersection (0632-7-6)PI1$800.00$771.73$772.00$940.00$923.88$860.00
1125Pull & splice box, F&I, 17" X 30" cover size (0635-2-14)EACH4$1,600.00$1,569.08$1,570.00$1,910.00$2,194.23$1,750.00
1130Aluminum signals pole, (0646-1-11)EACH3$2,500.00$2,448.07$2,450.00$2,975.00$3,175.85$2,720.00
1135Aluminum signals pole, remove (0646-1-60)EACH2$200.00$189.34$190.00$230.00$473.50$215.00
1140Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS1$1,800.00$1,735.15$1,735.00$2,110.00$1,847.78$1,950.00
1145Vehicular traffic signal, furnish & install aluminum, 5 section cluster, 1 way (0650-1-19)AS1$3,000.00$2,852.21$2,855.00$3,465.00$3,002.62$3,200.00
1150Vehicular traffic signal, remove- poles to remain (0650-1-60)AS2$360.00$343.90$344.00$420.00$329.14$400.00
1155Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS3$950.00$915.33$915.00$1,115.00$1,056.69$1,050.00
1160Midblock crosswalk: rectangular rapid flashing beacon, furnish & install- complete sign assembly- back back (0654-2-22)AS2$10,000$9,663.91$9,665.00$11,750$14,436$11,000
1165Loop detector inductive, remove- cabinet to remain (0660-1600)EACH5$81.00$77.83$78.00$95.00$92.39$87.00
1170Vehicle detection system- microwave, furnish & install cabinet equipment (0660-3-11)EACH1$9,700.00$9,342.08$9,344.00$11,360$12,126$10,500
1175Vehicle detection system- microwave, furnish & install, above ground equipment (0660-3-12)EACH3$10,300$9,893.82$9,894.00$12,025$16,399$11,000
1180Pedestrian detector, furnish & install, accessible (0665-1-12)EACH3$2,400.00$2,295.62$2,300.00$2,800.00$6,813.65$2,600.00
1185Traffic controller, modify (0671-2-40)EACH1$5,600.00$5,395.75$5,400.00$6,560.00$1,050.92$6,000.00
1190Traffic signal controller cabinet, adjust/modify (0676-1500)EACH1$5,800.00$5,566.18$5,600.00$6,800.00$4,388.46$6,200.00
1195Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH3$1,100.00$795.40$795.00$1,000.00$946.98$900.00
1200Sign panel, remove, UP to 12 SF (0700-3601)EACH3$73.00$181.62$182.00$220.00$51.97$210.00
1205Enhanced highway sign AC powered, remove - overhead mount (0700-141903)EACH1$990.00$955.99$956.00$1,165.00$11,375$1,100.00
1210Manholes, repair (0425-2110)EACH1$13,000$4,350.00$25,900$14,300$13,627$4,500.00
1215Manhole, adjust, utilities (0425-5-1)EACH2$2,200.00$7,125.00$2,000.00$2,400.00$2,275.07$10,000
1220Valve boxes, adjust (0425-6)EACH4$2,100.00$690.00$811.00$2,305.00$2,194.23$1,000.00
1225Pipe filling and plugging- place out of service (0430-830)CY2.50$4,000.00$85.00$2,000.00$4,440.00$4,226.78$1,900.00
1230Initial contingency amount, DO not bid (0999-25)LS1$15,000$15,000$15,000$15,000$15,000$15,000
1235Utility pipe,remove & dispose, 0 1.9" (1050-16001)LF15$110.00$12.00$98.00$121.00$115.49$210.00
1240Utility pipe,remove & dispose, 2- 4.9" (1050-16002)LF20$70.00$62.00$102.00$78.00$73.91$160.00
1245Utility pipe,remove & dispose, 5- 7.9" (1050-16003)LF792$33.00$38.00$93.00$37.00$34.65$225.00
1250Utility pipe,remove & dispose, 8- 19.9" (1050-16004)LF1,203$44.00$45.00$107.00$48.50$46.19$350.00
1255Utility pipe,remove & dispose, 49.9" (1050-16005)LF2,381$53.00$68.00$95.00$58.25$55.43$400.00
1260Utility pipe,remove & stockpile/salvage, 20-49.9" (1050-17005)LF65$81.00$245.00$500.00$89.75$85.46$730.00
1265Utility pipe- poly vinyl chloride, furnish & install, water/sewer, (1050-31206)LF552$140.00$163.00$250.00$153.00$145.51$230.00
1270Utility pipe- poly vinyl chloride, furnish & install, water/sewer, 20" (1050-31220)LF43$790.00$320.00$1,000.00$515.00$490.81$700.00
1275Utility pipe- high density polyethylene, furnish & install, water/sewer, 8" (1050-42208)LF287$230.00$128.00$230.00$250.00$236.75$140.00
1280Utility pipe- ductile iron/cast iron, furnish & install, water/sewer, 4" (1050-51204)LF20$1,200.00$325.00$933.00$1,195.00$1,138.69$615.00
1285Utility pipe- ductile iron/cast iron, furnish & install, water/sewer, 6" (1050-51206)LF63$550.00$258.00$880.00$600.00$573.96$400.00
1290Utility pipe- ductile iron/cast iron, furnish & install, water/sewer, 16" (1050-51216)LF45$610.00$295.00$1,300.00$544.00$518.53$1,025.00
1295Utility pipe- ductile iron/cast iron, furnish & install, water/sewer, 20" (1050-51220)LF90$630.00$325.00$978.00$640.00$610.92$925.00
1300Utility pipe- steel, furnish & install, casing, 12" (1050-61112)LF23$250.00$280.00$1,600.00$278.00$265.62$360.00
1305Utility fittings, install (1055-13)EACH6$9,000.00$1,200.00$30,000$24,250$28,871$9,700.00
1310Utility fittings for PVC pipe, furnish and install, elbow, 8" (1055-31108)EACH2$2,400.00$625.00$1,640.00$2,700.00$2,575.33$1,900.00
1315Utility fittings for PVC pipe, furnish and install, elbow, 20" (1055-31120)EACH4$8,100.00$1,400.00$7,330.00$8,960.00$8,534.39$10,500
1320Utility fittings for PVC pipe, furnish and install, reducer, 8" (1055-31308)EACH2$2,300.00$4,200.00$2,040.00$2,580.00$2,459.85$1,600.00
1325Utility fittings, ductile iron, furnish & install elbow, (1055-51116)EACH3$6,400.00$2,547.00$3,750.00$7,090.00$6,755.91$4,000.00
1330Utility fittings, ductile iron, furnish & install elbow, (1055-51120)EACH4$8,900.00$2,225.00$5,140.00$9,810.00$9,342.79$6,650.00
1335Utility fittings, ductile iron, furnish & install Y, 16" (1055-51616)EACH1$7,900.00$3,025.00$10,400$8,720.00$8,303.42$11,000
1340Utility structure, below ground, F&I, water/sewer, 0 - 80 FT3, 0 - 6' (1060-11211)EACH1$28,600$9,500.00$17,000$31,530$30,026$16,500
1345Utility structure, below ground, adjust/modify (1060-15)EACH2$12,100$1,625.00$18,720$13,340$12,703$7,000.00
1350Utility structure, below ground, remove&dispose contractor takes ownership (1060-16)EACH3$2,300.00$5,858.00$2,860.00$2,580.00$2,459.84$2,800.00
1355Utility fixture, valve/meter box, remove (1080-21600)EACH1$2,000.00$650.00$2,840.00$2,170.00$2,067.19$800.00
1360Utility fixture, valve assembly, furnish and install, 6" (1080-24106)EACH2$4,600.00$2,700.00$2,840.00$5,080.00$4,838.85$4,500.00
1365Utility fixture, valve assembly, remove (1080-24600)EACH22$540.00$830.00$387.00$600.00$572.81$800.00
1370Utility fixture, vac/air furnish & install 6" (1080-26106)EACH1$14,300$68,000$8,150.00$15,765$15,013$10,000
1375Utility fixture, vac/air remove (1080-26600)EACH1$2,000.00$2,300.00$1,691.00$2,170.00$2,067.19$1,250.00
1380Fire hydrant, F&I, standard, 2 hose, 6" (1644-112-06)EACH1$14,400$9,500.00$13,820$15,890$15,129$15,000
1385Fire hydrant, remove (1644-900)EACH1$3,400.00$1,500.00$1,447.00$3,810.00$3,626.25$1,500.00
1390Itsfm subsurface documentation- project length (0611-1-1)MI0.90$5,000.00$4,573.27$4,574.00$5,560.00$5,370.08$5,100.00
1395Itsfm location documentation- intersection (0611-2-1)EACH1$3,700.00$3,602.33$3,600.00$4,380.00$3,984.26$4,000.00
1400Itsfm location documentation- ITS site (0611-2-2)EACH2$4,800.00$4,573.27$4,574.00$5,560.00$2,944.89$5,100.00
1405Conduit, furnish & install, open trench (0630-2-11)LF998$19.00$18.35$18.50$22.30$20.79$21.00
1410Conduit, furnish & install, directional bore (0630-2-12)LF528$34.00$32.24$32.50$39.00$35.80$36.00
1415Conduit, furnish & install, aboveground (0630-2-14)LF10$32.00$30.32$30.00$37.00$40.42$34.00
1420Fiber optic cable, F&I, underground,2-12 fibers (0633-1121)LF907$5.50$5.09$5.00$6.20$5.66$5.75
1425Fiber optic cable, F&I, underground,49-96 fibers (0633-1123)LF4,898$6.00$5.56$5.50$6.80$6.18$6.25
1430Fiber optic connection, install, splice (0633-2-31)EACH118$66.00$63.32$63.50$77.00$70.45$71.00
1435Fiber optic connection hardware, F&I, splice (0633-3-11)EACH3$2,000.00$1,924.81$1,930.00$2,340.00$2,136.49$2,200.00
1440Fiber optic connection hardware, F&I, splice tray (0633-3-12)EACH3$80.00$77.39$77.50$94.00$78.53$86.00
1445Fiber optic connection hardware, F&I, preterminated connector assembly (0633-3-13)EACH3$800.00$766.90$767.00$930.00$860.37$860.00
1450Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16)EACH3$1,600.00$1,583.06$1,584.00$1,920.00$1,761.16$1,800.00
1455Fiber optic cable locator (0633-6)DA1,200$170.00$162.98$163.00$198.00$167.45$185.00
1460Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH5$2,400.00$2,334.53$2,335.00$2,835.00$3,233.60$2,600.00
1465Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13)EACH3$6,500.00$6,264.80$6,265.00$7,610.00$5,716.54$7,000.00
1470Pull & splice box, F&I, 17" X 30" cover size (0635-2-14)EACH2$1,900.00$1,852.66$1,853.00$2,250.00$2,194.23$2,100.00
1475Electrical power service, F&I, underground, meter by contractor (0639-1122)AS2$7,700.00$7,413.89$7,414.00$9,010.00$4,792.66$8,500.00
1480Electrical power service, remove underground (0639-1620)AS1$750.00$719.83$720.00$875.00$952.75$800.00
1485Electrical service wire, & install (0639-2-1)LF144$10.00$9.89$10.00$12.00$14.44$11.00
1490Electrical service disconnect, F&I, pole mount (0639-3-11)EACH2$2,000.00$1,929.39$1,930.00$2,345.00$3,349.08$2,150.00
1495Prestressed concrete pole, type P-II service pole (0641-2-12)EACH2$2,100.00$1,978.69$1,979.00$2,400.00$2,598.43$2,200.00
1500Prestressed concrete pole, complete pole removal- pole 30' and greater (0641-2-80)EACH1$11,100$10,660$10,660$12,955$4,388.46$12,000
1505Concrete CCTV pole, furnish & install without lowering 63' (0641-3263)EACH2$21,800$20,945$20,945$25,450$35,223$23,500
1510Concrete CCTV pole, complete pole removal (0641-3800)EACH1$10,600$10,213$10,213$12,410$16,745$11,500
1515Vehicle detection system- microwave, furnish & install cabinet equipment (0660-3-11)EACH1$6,600.00$6,331.91$6,332.00$7,700.00$9,238.86$7,100.00
1520Vehicle detection system- microwave, furnish & install, above ground equipment (0660-3-12)EACH1$9,600.00$9,209.17$9,210.00$11,190$13,050$10,500
1525Vehicle detection system- avi, bluetooth, furnish & install, cabinet equipment (0660-6121)EACH1$1,800.00$1,743.41$1,744.00$2,120.00$1,559.06$2,000.00
1530Vehicle detection system- avi, bluetooth, furnish & install, above ground equipment (0660-6122)EACH1$12,700$12,182$12,181$14,800$14,724$14,000
1535Vehicle detection system- avi, remove complete system (0660-6600)EACH2$380.00$361.32$361.00$440.00$548.56$425.00
1540Traffic data detection system- lidar, remove complete system (0660-11-60)EACH1$1,600.00$1,496.72$1,496.00$1,820.00$1,443.58$1,700.00
1545ITS cabinet, furnish & install, pole mount with sunshield, 24" W X 46" H X 22" D (0676-2122)EACH2$11,700$11,225$11,225$13,640$15,706$12,500
1550ITS cabinet- remove (0676-2600)EACH1$780.00$746.44$747.00$907.00$1,039.38$850.00
1555ITS CCTV camera, pressurized, high definition (0682-1163)EACH2$7,100.00$6,852.16$6,852.00$8,325.00$12,126$7,650.00
1560ITS CCTV camera, remove & disposal (0682-1600)EACH1$510.00$489.22$489.00$595.00$433.07$550.00
1565Managed field ethernet switch, furnish & install (0684-1-1)EACH2$5,800.00$5,559.32$5,559.00$6,755.00$12,126$6,200.00
1570Device server, furnish & install (0684-2-1)EACH1$1,400.00$1,389.25$1,389.00$1,690.00$1,559.06$1,600.00
1575Wireless communication system device, remove (0684-6-6)EACH2$410.00$392.38$392.00$475.00$392.66$450.00
1580Uninterruptible power supply, furnish and install, line interactive (0685-1-11)EACH2$4,600.00$4,446.51$4,446.00$5,405.00$6,293.97$5,200.00
1585Connected vehicle roadside equipment, rsu (0924-681-1)EACH1$17,700$17,016$17,015$20,675$23,328$20,000
FDOT contract T1920: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of March 25, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy