FDOT contract T1920 bid tabulation
SR 684 FROM SR 789 (GULF DR) TO W OF 123 ST W. Let by Florida DOT on March 25, 2026, Manatee, District 1. 6 bids received; low bid $123,000,000 by Sema Construction, Inc..
- Owner
- Florida DOT
- Letting
- 25 MAR 2026
- Pay items
- 317
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Sema Construction, Inc. | $123,000,000 | Low |
| 2 | Webber, LLC | $125,214,101 | +2.0% |
| 3 | Superior Construction Company Southeast, LLC | $129,085,398 | +5.0% |
| 4 | Vecellio & Grogan, Inc. | $129,936,044 | +6.0% |
| 5 | Orion Marine Construction, Inc. | $139,522,100 | +13% |
| 6 | Prince Contracting, LLC. | $168,902,684 | +37% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Sema Construction, Inc. | 2. Webber, LLC | 3. Superior Construction Company Southeast, LLC | 4. Vecellio & Grogan, Inc. | 5. Orion Marine Construction, Inc. | 6. Prince Contracting, LLC. |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Temporary work structure, project number 430204-2-52-01 BR. no. 130168 (0103-1-26) | LS | 1 | $20,261,708 | $23,575,000 | $16,432,758 | $16,600,000 | $10,893,595 | $18,500,000 |
| 0010 | Removal of existing structures/bridges BR. no. 130168 (0110-3) | SF | 1 | $5,040,700 | $9,000,000 | $3,570,000 | $5,400,000 | $6,033,050 | $13,000,000 |
| 0015 | Concrete class NS, gravity index 400-011 (0400-0-11) | CY | 41.60 | $1,500.00 | $1,349.49 | $1,900.00 | $1,420.00 | $1,877.53 | $1,600.00 |
| 0020 | Concrete, class I (seal) (0400-1-30) | CY | 991.90 | $1,100.00 | $3,589.69 | $2,200.00 | $400.00 | $5,135.80 | $3,200.00 |
| 0025 | Concrete class II, approach slabs (0400-2-10) | CY | 166.60 | $900.00 | $577.21 | $1,400.00 | $1,820.00 | $1,518.02 | $720.00 |
| 0030 | Concrete class IV, superstructure (0400-4-4) | CY | 6,006.80 | $1,700.00 | $966.96 | $1,300.00 | $1,231.00 | $1,757.33 | $1,800.00 |
| 0035 | Concrete class IV, bridge substructure (0400-4-5) | CY | 225.60 | $2,800.00 | $1,940.21 | $3,000.00 | $3,575.00 | $7,610.49 | $3,000.00 |
| 0040 | Conc class IV, bulkhead (0400-4-8) | CY | 148.80 | $1,800.00 | $2,347.73 | $3,000.00 | $3,415.00 | $3,421.15 | $1,850.00 |
| 0045 | Conc class IV, retaining walls (0400-4-11) | CY | 239.70 | $1,200.00 | $1,272.26 | $2,000.00 | $2,100.00 | $1,750.87 | $1,800.00 |
| 0050 | Concrete class IV, mass, substructure (0400-4-25) | CY | 10,023 | $1,500.00 | $1,191.98 | $1,100.00 | $1,905.00 | $1,930.53 | $2,800.00 |
| 0055 | Bridge deck grooving (0400-7-1) | SY | 14,515 | $5.00 | $3.58 | $5.00 | $4.80 | $5.72 | $4.80 |
| 0060 | Bridge deck planing (0400-9-1) | SY | 14,515 | $5.00 | $2.96 | $5.00 | $7.65 | $5.72 | $4.20 |
| 0065 | Composite neoprene pads (0400-147) | CF | 131.40 | $1,400.00 | $1,880.79 | $1,100.00 | $1,890.00 | $2,565.38 | $1,500.00 |
| 0070 | Reinforcing steel- retaining wall (0415-1-3) | LB | 32,656 | $1.30 | $1.87 | $1.50 | $2.00 | $1.96 | $2.15 |
| 0075 | Reinforcing steel - bridge superstructure (0415-1-4) | LB | 1,140,271 | $1.30 | $1.22 | $1.50 | $1.60 | $1.59 | $1.50 |
| 0080 | Reinforcing steel- bridge substructure (0415-1-5) | LB | 3,129,841 | $1.40 | $1.29 | $1.50 | $1.75 | $1.91 | $1.70 |
| 0085 | Reinforcing steel- bulkhead (0415-1-8) | LB | 2,003 | $1.50 | $1.72 | $1.50 | $2.00 | $1.92 | $2.15 |
| 0090 | Reinforcing steel- approach slabs (0415-1-9) | LB | 32,692 | $1.50 | $1.22 | $1.50 | $1.60 | $1.52 | $1.25 |
| 0095 | Fiber reinforced polymer bars, #5 bar (0415-10-5) | LF | 7,974 | $6.00 | $3.02 | $2.00 | $4.80 | $3.07 | $10.00 |
| 0100 | Prest beams: florida-I beam 36" (0450-2-36) | LF | 1,555 | $550.00 | $414.86 | $296.00 | $410.00 | $472.50 | $360.00 |
| 0105 | Prest beams: florida-I beam 63" (0450-2-63) | LF | 1,234 | $650.00 | $472.58 | $338.00 | $475.00 | $436.22 | $420.00 |
| 0110 | Prest beams: florida-I beam 84" (0450-2-84) | LF | 15,971 | $750.00 | $590.62 | $460.00 | $570.00 | $490.21 | $530.00 |
| 0115 | Preformed pile holes, 36" to 43" drill/punch size (0455-15-16) | LF | 17,274 | $120.00 | $262.05 | $55.00 | $350.00 | $396.30 | $210.00 |
| 0120 | Pile inspection, driven pile (0455-20-1) | EACH | 334 | $200.00 | $700.00 | $2,000.00 | $820.00 | $495.39 | $1,000.00 |
| 0125 | Prestressed concrete piling, SQ (0455-34-6) | LF | 31,919 | $290.00 | $267.18 | $300.00 | $428.00 | $313.50 | $450.00 |
| 0130 | Pile redrive (0455-115) | EACH | 188 | $1,600.00 | $2,860.84 | $2,700.00 | $2,350.00 | $1,955.05 | $8,900.00 |
| 0135 | Sheet piling steel, temporary- critical (0455-133-2) | SF | 12,773 | $88.00 | $60.99 | $60.00 | $66.00 | $118.10 | $85.00 |
| 0140 | Sheet piling steel, F&I (0455-133-3) | SF | 20,783 | $68.00 | $35.00 | $60.00 | $55.00 | $88.30 | $84.00 |
| 0145 | Soldier pile wall, permanent, with cast-in-place concrete fascia (0455-133208) | SF | 1,369 | $210.00 | $216.50 | $450.00 | $185.00 | $569.82 | $410.00 |
| 0150 | Load test (dynamic), data collection and analysis (0455-137) | EACH | 522 | $1,400.00 | $1,500.00 | $2,250.00 | $1,600.00 | $667.89 | $500.00 |
| 0155 | Load test (dynamic), test (0455-137-2) | EACH | 20 | $2,100.00 | $2,500.00 | $1,400.00 | $2,100.00 | $6,934.57 | $5,200.00 |
| 0160 | Test piles-prestressed concrete,30" SQ (0455-143-6) | LF | 2,280 | $520.00 | $435.21 | $750.00 | $590.00 | $509.35 | $550.00 |
| 0165 | Bridge deck expansion joint, construction, F&I poured joint with backer rod (0458-1-11) | LF | 280 | $34.00 | $102.87 | $190.00 | $150.00 | $206.19 | $72.50 |
| 0170 | Bridge deck expansion joint, construction, F&I strip seal (0458-1-12) | LF | 395 | $430.00 | $490.45 | $600.00 | $650.00 | $1,210.04 | $860.00 |
| 0175 | Piles, polyethylene sheeting (0459-71) | SY | 158 | $20.00 | $100.00 | $5.00 | $42.00 | $11.44 | $55.00 |
| 0180 | Movable bridge- preventative maintenance & routine repair BR. no. 130168 (0465-20) | DA | 1 | $500,000 | $250,000 | $208,800 | $356,000 | $567,286 | $247,000 |
| 0185 | Movable bridge operator (0465-21) | DA | 638 | $850.00 | $700.00 | $980.00 | $1,170.00 | $1,401.69 | $630.00 |
| 0190 | Polymeric fender system, 41-200 kip-FT BR. no. 130168 (0471-3-2) | LS | 1 | $1,500,000 | $1,588,005 | $1,650,000 | $2,102,500 | $5,104,701 | $4,000,000 |
| 0195 | Navigation lights- fixed bridge, system BR. no. 130168 (0510-1) | LS | 1 | $60,000 | $55,982 | $11,400 | $68,000 | $94,351 | $65,000 |
| 0200 | Pedestrian / bicycle railing, aluminum, custom infill panels (0515-2720) | LF | 8,195 | $160.00 | $112.00 | $109.00 | $132.00 | $145.89 | $180.00 |
| 0205 | Concrete traffic railing- 36" single-slope (0521-5-13) | LF | 5,985 | $110.00 | $110.25 | $100.00 | $145.00 | $150.48 | $210.00 |
| 0210 | Concrete parapet, retaining wall system mounted W/sidewalk, curb (0521-6-34) | LF | 1,457 | $480.00 | $326.31 | $380.00 | $182.00 | $522.72 | $165.00 |
| 0215 | Concrete slope pavement,non reinforced, 4" (0524-2-2) | SY | 49 | $240.00 | $185.20 | $575.00 | $430.00 | $290.42 | $310.00 |
| 0220 | Riprap- rubble, bank and shore (0530-3-3) | TN | 1,360.10 | $190.00 | $150.00 | $160.00 | $175.00 | $244.42 | $185.00 |
| 0225 | Gabion, mattress 1 foot and greater thickness (0530-5-12) | SY | 219 | $310.00 | $299.70 | $400.00 | $600.00 | $411.93 | $320.00 |
| 0230 | Bedding stone (0530-74) | TN | 361.20 | $230.00 | $150.00 | $260.00 | $240.00 | $208.96 | $220.00 |
| 0235 | Retaining wall system, permanent, excluding barrier (0548-12) | SF | 19,440 | $100.00 | $65.13 | $120.00 | $147.00 | $106.29 | $150.00 |
| 0240 | Retaining wall system,temporary, excluding barrier (0548-13) | SF | 4,653 | $27.00 | $23.73 | $30.00 | $30.00 | $32.95 | $65.00 |
| 0245 | Conduit, furnish & install, embedded concrete barriers and traffic railings (0630-2-16) | LF | 20,944 | $11.00 | $10.24 | $13.00 | $12.45 | $19.49 | $25.00 |
| 0250 | Junction box, furnish & install, embedded (0635-3-13) | EACH | 121 | $950.00 | $916.97 | $635.00 | $1,115.00 | $1,148.69 | $1,400.00 |
| 0255 | Mobilization (0101-1) | LS | 1 | $12,000,000 | $12,000,000 | $12,900,000 | $13,070,000 | $13,917,700 | $16,800,000 |
| 0260 | Maintenance of traffic (0102-1) | DA | 1 | $750,000 | $5,000,000 | $300,000 | $340,000 | $2,223,439 | $4,500,000 |
| 0265 | Special detour- temporary pavement (0102-2200) | SY | 1 | $400,000 | $176,485 | $275,000 | $310,000 | $436,350 | $325,000 |
| 0270 | Special detour- temporary earthwork/base (0102-2300) | CY | 1 | $600,000 | $129,115 | $255,000 | $121,300 | $386,982 | $150,000 |
| 0275 | Commercial material for temporary driveway maintenance (0102-3) | CY | 6.40 | $350.00 | $4,879.91 | $500.00 | $121.00 | $40,786 | $400.00 |
| 0280 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $41,900 | $103,688 | $80,000 | $135,700 | $95,837 | $20,000 |
| 0285 | Traffic control officer (0102-14) | HR | 160 | $120.00 | $120.00 | $150.00 | $120.00 | $135.88 | $95.00 |
| 0290 | Work zone sign (0102-60) | ED | 140,310 | $0.22 | $0.19 | $0.18 | $0.25 | $0.36 | $0.20 |
| 0295 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 1,874 | $45.00 | $41.00 | $38.00 | $49.75 | $54.35 | $45.00 |
| 0300 | Temporary barrier, F&I, anchored (0102-71-15) | LF | 4,582 | $69.00 | $38.00 | $30.00 | $46.00 | $50.06 | $45.00 |
| 0305 | Temporary barrier, F&I, free standing (0102-71-16) | LF | 320 | $35.00 | $32.00 | $22.00 | $29.00 | $31.47 | $40.00 |
| 0310 | Temporary barrier, relocate, low profile concrete (0102-71-23) | LF | 452 | $19.00 | $17.00 | $12.00 | $16.00 | $17.16 | $20.00 |
| 0315 | Temporary barrier, relocate, anchored (0102-71-25) | LF | 333 | $19.00 | $17.00 | $15.00 | $20.00 | $21.45 | $28.00 |
| 0320 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 113,952 | $0.10 | $0.09 | $0.09 | $0.12 | $0.21 | $0.10 |
| 0325 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 446,976 | $0.05 | $0.03 | $0.25 | $0.04 | $0.13 | $0.05 |
| 0330 | Temporary separator, F&I remove (0102-75-1) | LF | 296 | $24.00 | $22.00 | $22.00 | $28.00 | $31.22 | $22.20 |
| 0335 | Arrow board / advance warning arrow panel (0102-76) | ED | 384 | $6.00 | $5.00 | $100.00 | $6.50 | $7.15 | $5.15 |
| 0340 | Temporary crash cushion, redirective option (0102-89-1) | LO | 7 | $2,100.00 | $900.00 | $2,600.00 | $6,800.00 | $1,559.03 | $2,125.00 |
| 0345 | Portable changeable message sign, temporary (0102-99) | ED | 6,270 | $10.00 | $9.00 | $9.00 | $12.00 | $16.09 | $9.30 |
| 0350 | Temporary signalization and maintenance, intersection (0102-104) | ED | 1,200 | $59.00 | $56.96 | $57.00 | $69.00 | $23.23 | $63.20 |
| 0355 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 1,200 | $21.00 | $19.81 | $20.00 | $24.00 | $17.42 | $22.00 |
| 0360 | Type III barricade (0102-115) | ED | 13,760 | $0.25 | $0.25 | $0.25 | $0.30 | $0.41 | $0.25 |
| 0365 | Sediment barrier (0104-10-3) | LF | 5,358 | $1.30 | $1.29 | $5.00 | $3.55 | $1.94 | $5.00 |
| 0370 | Floating turbidity barrier (0104-11) | LF | 26,796 | $10.00 | $14.81 | $14.00 | $10.25 | $8.84 | $30.00 |
| 0375 | Soil tracking prevention device (0104-15) | EACH | 2 | $9,600.00 | $5,274.85 | $15,000 | $4,775.00 | $7,912.55 | $15,000 |
| 0380 | Inlet protection system (0104-18) | EACH | 10 | $320.00 | $139.95 | $250.00 | $203.00 | $209.93 | $400.00 |
| 0385 | Litter removal (0107-1) | ACRE | 252.64 | $50.00 | $47.17 | $141.00 | $50.00 | $47.31 | $46.50 |
| 0390 | Mowing (0107-2) | ACRE | 167.72 | $100.00 | $55.55 | $109.00 | $60.00 | $304.48 | $160.00 |
| 0395 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $32,600 | $15,618 | $46,050 | $36,000 | $620,124 | $50,100 |
| 0400 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $30,800 | $22,135 | $105,450 | $250,000 | $362,209 | $140,000 |
| 0405 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $750,000 | $2,000,000 | $20,830,000 | $485,000 | $789,146 | $3,352,466 |
| 0410 | Removal of existing concrete (0110-4-10) | SY | 2,919 | $37.00 | $39.05 | $25.00 | $36.40 | $48.93 | $60.00 |
| 0415 | Delivery of salvageable to fdot (0110-86) | LS | 1 | $50,000 | $24,815 | $40,000 | $34,000 | $11,827 | $25,000 |
| 0420 | Regular excavation (0120-1) | CY | 19,386 | $20.00 | $11.40 | $26.00 | $10.30 | $34.95 | $30.00 |
| 0425 | Embankment (0120-6) | CY | 22,176 | $30.00 | $59.24 | $35.00 | $49.90 | $40.05 | $25.00 |
| 0430 | Type B stabilization (0160-4) | SY | 9,965 | $34.00 | $14.42 | $25.00 | $24.25 | $23.10 | $30.00 |
| 0435 | Optional base, base group 06 (0285-706) | SY | 9,079 | $30.00 | $20.62 | $40.00 | $37.60 | $35.80 | $35.00 |
| 0440 | Milling existing asphalt pavement, 1" avg depth (0327-70-1) | SY | 183 | $16.00 | $42.19 | $15.50 | $20.60 | $19.63 | $17.00 |
| 0445 | Milling existing asphalt pavement, 2" avg depth (0327-70-5) | SY | 4,279 | $16.00 | $2.91 | $15.50 | $14.55 | $13.86 | $17.00 |
| 0450 | Superpave asphaltic conc, traffic B (0334-1-12) | TN | 978.70 | $450.00 | $385.00 | $410.00 | $303.00 | $288.71 | $435.00 |
| 0455 | Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81) | TN | 1,102.60 | $270.00 | $250.00 | $265.00 | $366.00 | $348.77 | $295.00 |
| 0460 | Miscellaneous asphalt (0339-1) | TN | 257.20 | $550.00 | $362.00 | $500.00 | $488.00 | $464.25 | $410.00 |
| 0465 | Inlets, curb, type 9, <10' (0425-1201) | EACH | 1 | $8,600.00 | $6,283.82 | $10,200 | $9,700.00 | $9,492.92 | $12,000 |
| 0470 | Inlets, curb, type P-5, <10' (0425-1351) | EACH | 8 | $7,500.00 | $9,490.62 | $12,300 | $17,400 | $16,514 | $13,000 |
| 0475 | Inlets, curb, type J-5, <10' (0425-1451) | EACH | 3 | $10,300 | $8,215.28 | $23,400 | $26,000 | $24,829 | $25,000 |
| 0480 | Inlets, DT bot, type C,<10' (0425-1521) | EACH | 2 | $11,300 | $6,390.18 | $10,500 | $10,000 | $9,550.67 | $10,000 |
| 0485 | Inlets, ditch bottom, type C modified- back of sidewalk, <10' (0425-1531) | EACH | 1 | $7,100.00 | $8,169.56 | $9,660.00 | $4,570.00 | $4,353.81 | $15,000 |
| 0490 | Inlets, DT bot, type D, modify (0425-1549) | EACH | 2 | $11,300 | $6,430.10 | $13,000 | $7,300.00 | $6,952.24 | $10,000 |
| 0495 | Inlets, DT bot, type E, modify (0425-1559) | EACH | 2 | $8,400.00 | $7,085.96 | $9,700.00 | $9,000.00 | $8,615.23 | $10,000 |
| 0500 | Inlets, DT bot, type H, modify (0425-1589) | EACH | 2 | $17,900 | $8,505.56 | $16,600 | $14,300 | $13,627 | $25,000 |
| 0505 | Inlets, gutter, type V, <10' (0425-1711) | EACH | 1 | $7,500.00 | $8,219.37 | $8,300.00 | $7,100.00 | $6,779.01 | $12,500 |
| 0510 | Inlets, gutter, type V, partial (0425-1715) | EACH | 1 | $6,700.00 | $5,860.02 | $4,780.00 | $7,700.00 | $7,333.34 | $18,000 |
| 0515 | Inlets, adjacent barrier, J bottom, < 10' (0425-1923) | EACH | 14 | $14,800 | $9,771.49 | $14,500 | $11,500 | $10,948 | $22,000 |
| 0520 | Inlets, adjacent barrier, J bottom, >10' (0425-1924) | EACH | 1 | $18,100 | $9,769.48 | $16,300 | $19,300 | $18,362 | $40,000 |
| 0525 | Manholes, P-7, <10' (0425-2-41) | EACH | 7 | $6,300.00 | $5,980.54 | $12,900 | $16,600 | $15,822 | $15,000 |
| 0530 | Manholes, P-7, partial (0425-2-43) | EACH | 3 | $5,800.00 | $5,980.80 | $3,500.00 | $6,100.00 | $5,774.28 | $8,500.00 |
| 0535 | Manholes, J-7, <10' (0425-2-71) | EACH | 11 | $8,700.00 | $5,980.97 | $18,600 | $18,600 | $17,669 | $18,000 |
| 0540 | Manholes, J-8, >10' (0425-2-92) | EACH | 1 | $11,000 | $5,978.92 | $11,900 | $20,000 | $19,055 | $40,000 |
| 0545 | Pipe culvert,optional material,round, 15"S/CD (0430-175115) | LF | 38 | $270.00 | $196.09 | $135.00 | $334.00 | $317.59 | $500.00 |
| 0550 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 1,453 | $270.00 | $113.17 | $180.00 | $206.00 | $196.33 | $475.00 |
| 0555 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 342 | $210.00 | $118.74 | $240.00 | $245.00 | $233.28 | $475.00 |
| 0560 | Pipe culvert, opt material, round, 30"S/CD (0430-175130) | LF | 928 | $350.00 | $174.67 | $225.00 | $309.00 | $294.49 | $475.00 |
| 0565 | Pipe culvert,optional material,other-elip/arch, (0430-175218) | LF | 388 | $230.00 | $136.25 | $215.00 | $260.00 | $247.14 | $475.00 |
| 0570 | Pipe culvert,optional material,other shape-elip/arch, 24"S/CD (0430-175224) | LF | 17 | $360.00 | $276.87 | $515.00 | $594.00 | $565.88 | $700.00 |
| 0575 | Pipe culvert, opt material, shape - elip/arch, 30"S/CD (0430-175230) | LF | 221 | $270.00 | $225.04 | $330.00 | $446.00 | $424.99 | $600.00 |
| 0580 | Pipe culvert,optional material,round, jack & bore, 42", storm and cross drain (0430-185142) | LF | 53 | $2,000.00 | $2,393.83 | $3,400.00 | $425.00 | $404.20 | $3,600.00 |
| 0585 | Mitered end section, optional round, 18" CD (0430-982125) | EACH | 4 | $4,100.00 | $2,333.94 | $3,900.00 | $4,330.00 | $4,122.84 | $4,000.00 |
| 0590 | Mitered end section, optional round, 30" CD (0430-982133) | EACH | 1 | $4,600.00 | $3,953.90 | $6,000.00 | $8,850.00 | $8,430.46 | $7,500.00 |
| 0595 | Mitered end section, optional - elliptical / arch, 24" CD (0430-982629) | EACH | 1 | $4,100.00 | $2,569.28 | $5,500.00 | $4,875.00 | $4,642.53 | $5,500.00 |
| 0600 | Pipe handrail - guiderail, aluminum (0515-1-2) | LF | 9 | $110.00 | $222.00 | $222.00 | $270.00 | $116.03 | $65.00 |
| 0605 | Pedestrian / bicycle railing, aluminum, custom infill panels (0515-2720) | LF | 42 | $62.00 | $112.00 | $109.00 | $132.00 | $65.98 | $135.00 |
| 0610 | Bollards (0519-78) | EACH | 6 | $4,700.00 | $4,119.87 | $925.00 | $1,140.00 | $831.05 | $1,200.00 |
| 0615 | Concrete curb & gutter, type E (0520-1-7) | LF | 501 | $51.00 | $34.51 | $50.00 | $42.00 | $71.27 | $60.00 |
| 0620 | Concrete curb & gutter, type F (0520-1-10) | LF | 2,767 | $45.00 | $64.74 | $50.00 | $42.00 | $54.54 | $60.00 |
| 0625 | Valley gutter- concrete (0520-3) | LF | 166 | $52.00 | $85.50 | $75.00 | $56.50 | $135.15 | $60.00 |
| 0630 | Shoulder concrete barrier, 38" or 44" height (0521-72-40) | LF | 864 | $420.00 | $325.07 | $450.00 | $375.00 | $358.53 | $325.00 |
| 0635 | Shoulder concrete barrier, curb and gutter barrier (0521-72-43) | LF | 59 | $440.00 | $496.31 | $460.00 | $610.00 | $579.17 | $520.00 |
| 0640 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 1,681 | $70.00 | $75.95 | $67.00 | $59.00 | $103.45 | $58.00 |
| 0645 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 3,013 | $86.00 | $223.52 | $68.00 | $85.00 | $115.82 | $88.00 |
| 0650 | Concrete ditch pavt, non reinforced, 3" (0524-1-1) | SY | 49 | $84.00 | $69.37 | $225.00 | $138.00 | $519.06 | $140.00 |
| 0655 | Detectable warnings (0527-2) | SF | 341 | $53.00 | $31.05 | $32.00 | $39.00 | $66.59 | $35.00 |
| 0660 | Guardrail -roadway, general/low speed TL-2 (0536-1-0) | LF | 592 | $19.00 | $21.00 | $23.70 | $25.00 | $23.30 | $19.00 |
| 0665 | Guardrail transition to rigid barrier, F&I- index 536- 001, approach TL-2 (0536-8111) | EACH | 2 | $2,600.00 | $2,700.00 | $26.15 | $3,015.00 | $2,784.17 | $3,000.00 |
| 0670 | Guardrail transition to rigid barrier, F&I- index 536- 001, trailing (0536-8113) | EACH | 2 | $1,800.00 | $1,950.00 | $1,510.00 | $2,055.00 | $1,900.01 | $2,000.00 |
| 0675 | Guardrail removal (0536-73) | LF | 619 | $2.10 | $3.00 | $3.20 | $3.40 | $3.11 | $5.00 |
| 0680 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 5 | $1,900.00 | $1,600.00 | $1,815.00 | $2,055.00 | $1,900.01 | $2,200.00 |
| 0685 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 5 | $3,300.00 | $4,000.00 | $3,435.00 | $4,085.00 | $3,773.10 | $3,800.00 |
| 0690 | Performance turf, sod (0570-1-2) | SY | 14,086 | $8.00 | $3.78 | $8.00 | $6.00 | $7.49 | $7.00 |
| 0695 | Performance turf, sod and shoulder treatment index (0570-1-3) | SY | 68 | $37.00 | $3.78 | $50.00 | $7.00 | $27.46 | $42.00 |
| 0700 | Plastic erosion mat, turf reinforced mat, type 1 (0571-1-11) | SY | 376 | $14.00 | $13.70 | $50.00 | $9.50 | $44.35 | $15.00 |
| 0705 | Conduit, furnish & install, open trench (0630-2-11) | LF | 621 | $18.00 | $17.57 | $18.00 | $21.35 | $19.93 | $20.00 |
| 0710 | Raised pavement marker, type B (0706-1-3) | EACH | 6,222 | $5.00 | $5.00 | $3.80 | $4.70 | $4.48 | $5.25 |
| 0715 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 6.33 | $1,700.00 | $1,600.00 | $2,000.00 | $2,500.00 | $2,357.94 | $1,800.00 |
| 0720 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 1,590 | $2.10 | $2.00 | $1.60 | $2.00 | $1.89 | $2.25 |
| 0725 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 580 | $4.20 | $4.00 | $1.80 | $2.00 | $2.12 | $4.25 |
| 0730 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.23 | $1,800.00 | $1,000.00 | $650.00 | $800.00 | $766.22 | $1,200.00 |
| 0735 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 12 | $88.00 | $85.00 | $45.00 | $55.00 | $53.05 | $100.00 |
| 0740 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 44 | $47.00 | $45.00 | $45.00 | $55.00 | $53.05 | $50.00 |
| 0745 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 6.53 | $1,700.00 | $1,600.00 | $2,000.00 | $2,500.00 | $2,357.93 | $1,800.00 |
| 0750 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 399 | $3.10 | $3.00 | $1.70 | $2.00 | $2.00 | $5.00 |
| 0755 | Painted pavement markings, standard, yellow, skip, 6" (0710-11231) | GM | 0.36 | $1,800.00 | $1,000.00 | $500.00 | $610.00 | $602.43 | $1,200.00 |
| 0760 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.31 | $2,000.00 | $1,000.00 | $650.00 | $780.00 | $771.20 | $1,200.00 |
| 0765 | Partnering, DO not bid (0999-16) | LS | 1 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 |
| 0770 | Disputes review board, meeting- DO not bid (0999-20-1) | DA | 40 | $4,440.00 | $4,440.00 | $4,440.00 | $4,440.00 | $4,440.00 | $4,440.00 |
| 0775 | Disputes review board, hearing- DO not bid (0999-20-2) | EACH | 2 | $5,750.00 | $5,750.00 | $5,750.00 | $5,750.00 | $5,750.00 | $5,750.00 |
| 0780 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $135,000 | $135,000 | $135,000 | $135,000 | $135,000 | $135,000 |
| 0785 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 47 | $640.00 | $600.00 | $752.00 | $975.00 | $1,438.98 | $1,000.00 |
| 0790 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 1 | $2,800.00 | $2,600.00 | $2,250.00 | $2,900.00 | $2,599.26 | $2,800.00 |
| 0795 | Single column ground sign assembly, F&I barrier less than 12 SF (0700-1211) | EACH | 3 | $2,700.00 | $2,500.00 | $3,150.00 | $3,275.00 | $4,692.33 | $3,200.00 |
| 0800 | Single column ground sign assembly, F&I barrier 12.0-20.0 SF (0700-1212) | EACH | 1 | $3,700.00 | $3,500.00 | $3,750.00 | $3,860.00 | $5,232.66 | $3,800.00 |
| 0805 | Single column ground sign assembly, relocate (0700-1500) | EACH | 7 | $640.00 | $600.00 | $600.00 | $725.00 | $915.71 | $700.00 |
| 0810 | Single column ground sign assembly, remove (0700-1600) | EACH | 45 | $53.00 | $50.00 | $150.00 | $870.00 | $142.19 | $825.00 |
| 0815 | Single column ground sign assembly, F&I cantilever mount, 12.0-20.0 SF (0700-1912) | EACH | 1 | $4,200.00 | $4,000.00 | $4,850.00 | $3,500.00 | $4,385.19 | $3,500.00 |
| 0820 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 1 | $2,700.00 | $2,500.00 | $1,150.00 | $125.00 | $1,052.22 | $120.00 |
| 0825 | Sign panel, remove, 12-20 SF (0700-3602) | EACH | 2 | $53.00 | $50.00 | $350.00 | $265.00 | $113.76 | $265.00 |
| 0830 | Tubular marker, 36" white post (0704-1-3) | EACH | 2 | $320.00 | $300.00 | $298.00 | $600.00 | $204.76 | $325.00 |
| 0835 | Object marker, type 1 (0705-10-1) | EACH | 8 | $370.00 | $350.00 | $501.00 | $785.00 | $369.70 | $750.00 |
| 0840 | Object marker, type 4 (0705-10-4) | EACH | 3 | $370.00 | $350.00 | $359.00 | $795.00 | $335.57 | $750.00 |
| 0845 | Raised pavement marker, type B (0706-1-3) | EACH | 500 | $5.00 | $5.00 | $3.80 | $4.70 | $5.53 | $5.25 |
| 0850 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 28 | $10.00 | $10.00 | $5.00 | $6.10 | $5.89 | $11.00 |
| 0855 | Painted pavement markings, surface (0710-90) | LS | 1 | $12,500 | $12,000 | $17,635 | $21,700 | $20,788 | $13,000 |
| 0860 | Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102) | GM | 0.05 | $8,000.00 | $7,500.00 | $7,991.00 | $8,375.00 | $10,021 | $8,300.00 |
| 0865 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 894 | $5.00 | $5.00 | $3.50 | $4.30 | $4.13 | $5.25 |
| 0870 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 193 | $9.50 | $9.00 | $7.00 | $8.60 | $8.25 | $9.50 |
| 0875 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.17 | $5,000.00 | $4,500.00 | $2,750.00 | $3,265.00 | $3,319.76 | $4,800.00 |
| 0880 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 5 | $310.00 | $300.00 | $87.00 | $107.00 | $102.56 | $320.00 |
| 0885 | Thermoplastic, standard, arrow (0711-11170) | EACH | 19 | $120.00 | $120.00 | $56.00 | $69.00 | $66.01 | $125.00 |
| 0890 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 294 | $7.50 | $7.00 | $5.25 | $6.50 | $6.19 | $7.50 |
| 0895 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.05 | $6,000.00 | $4,500.00 | $2,750.00 | $3,320.00 | $3,813.73 | $4,600.00 |
| 0900 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 254 | $26.00 | $25.00 | $20.00 | $24.50 | $23.58 | $26.00 |
| 0905 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 11 | $260.00 | $250.00 | $350.00 | $430.00 | $412.58 | $260.00 |
| 0910 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 11 | $130.00 | $125.00 | $250.00 | $305.00 | $294.70 | $130.00 |
| 0915 | Thermoplastic, preformed, white with black contrast on concrete pavement, message symbol (0711-14560) | EACH | 6 | $520.00 | $500.00 | $750.00 | $923.00 | $884.09 | $520.00 |
| 0920 | Thermoplastic, preformed, white with black contrast, arrow on concrete surface (0711-14570) | EACH | 6 | $210.00 | $200.00 | $750.00 | $923.00 | $884.09 | $210.00 |
| 0925 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 1.24 | $7,300.00 | $7,000.00 | $6,500.00 | $8,000.00 | $7,662.10 | $7,300.00 |
| 0930 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 0.03 | $5,000.00 | $4,500.00 | $1,625.00 | $1,540.00 | $2,210.38 | $5,500.00 |
| 0935 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 1.03 | $7,300.00 | $7,000.00 | $6,500.00 | $8,000.00 | $7,662.11 | $7,300.00 |
| 0940 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 0.21 | $7,500.00 | $4,500.00 | $1,377.00 | $1,590.00 | $1,646.71 | $5,000.00 |
| 0945 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 2.22 | $41,600 | $40,000 | $45,630 | $56,150 | $54,006 | $41,500 |
| 0950 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 1.20 | $41,500 | $40,000 | $45,630 | $56,150 | $54,101 | $41,500 |
| 0955 | Conduit, furnish & install, open trench (0630-2-11) | LF | 4,887 | $14.00 | $13.19 | $8.65 | $16.00 | $10.55 | $15.00 |
| 0960 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 466 | $34.00 | $33.08 | $28.40 | $40.00 | $35.48 | $37.00 |
| 0965 | Conduit, furnish & install, embedded concrete barriers and traffic railings (0630-2-16) | LF | 1,116 | $11.00 | $10.20 | $12.95 | $12.40 | $15.50 | $11.35 |
| 0970 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 48 | $1,400.00 | $1,337.23 | $565.00 | $1,625.00 | $1,172.90 | $1,500.00 |
| 0975 | Junction box, furnish & install, embedded (0635-3-13) | EACH | 16 | $950.00 | $916.78 | $635.00 | $1,110.00 | $913.56 | $1,025.00 |
| 0980 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 4 | $7,700.00 | $7,413.89 | $4,220.00 | $9,000.00 | $5,216.15 | $8,300.00 |
| 0985 | Electrical service wire, & install (0639-2-1) | LF | 271 | $15.00 | $14.64 | $10.00 | $17.80 | $14.15 | $16.50 |
| 0990 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 4 | $2,000.00 | $1,928.86 | $2,020.00 | $2,340.00 | $3,129.69 | $2,200.00 |
| 0995 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 4 | $1,800.00 | $1,698.17 | $2,350.00 | $2,060.00 | $2,982.34 | $1,900.00 |
| 1000 | Lighting conductors, F&I, insulated, no. 10 or < (0715-1-11) | LF | 9,028 | $1.10 | $1.01 | $0.90 | $1.20 | $1.12 | $1.15 |
| 1005 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 54,665 | $2.20 | $2.08 | $1.30 | $2.50 | $1.57 | $2.35 |
| 1010 | Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13) | LF | 14,659 | $3.10 | $2.99 | $3.40 | $3.60 | $4.14 | $3.35 |
| 1015 | Lighting conductors, remove & dispose, contractor owns (0715-1-60) | LF | 9,351 | $0.70 | $0.68 | $0.75 | $0.85 | $1.00 | $0.80 |
| 1020 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 4 | $18,500 | $17,844 | $15,885 | $21,700 | $22,214 | $20,000 |
| 1025 | Load center, remove, voltage (0715-7-41) | EACH | 4 | $640.00 | $618.93 | $750.00 | $755.00 | $943.03 | $700.00 |
| 1030 | Luminaire, F&I, under deck, wall mount (0715-11125) | EACH | 7 | $1,100.00 | $1,083.55 | $825.00 | $1,315.00 | $1,237.73 | $1,250.00 |
| 1035 | Luminaire, F&I, under deck, (0715-11128) | EACH | 34 | $3,900.00 | $3,713.63 | $3,710.00 | $4,515.00 | $4,697.48 | $4,150.00 |
| 1040 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211) | EACH | 2 | $1,500.00 | $1,472.65 | $3,210.00 | $1,790.00 | $4,013.78 | $1,650.00 |
| 1045 | Light pole complete, F&I, standard pole standard foundation, 30' mounting height, 0' arm length (0715-61100) | EACH | 1 | $17,600 | $10,563 | $9,420.00 | $12,840 | $11,723 | $11,500 |
| 1050 | Light pole complete, F&I, standard pole standard foundation, 35' mounting height, 15' arm length (0715-61252) | EACH | 1 | $14,400 | $8,415.29 | $8,125.00 | $10,230 | $10,085 | $9,400.00 |
| 1055 | Light pole complete, F&I, STD pole STD foundation, wildlife sensitive luminaire, 25' mounting height, 8' arm length (0715-61811) | EACH | 1 | $19,300 | $12,957 | $9,675.00 | $15,750 | $11,782 | $14,500 |
| 1060 | Light pole complete, F&I, standard pole special foundation, 35' mounting height, 15' arm length (0715-62252) | EACH | 2 | $16,500 | $11,360 | $10,500 | $13,810 | $12,996 | $13,000 |
| 1065 | Light pole complete, F&I, STD pole special foundation, sensitive luminaire, 25' mounting height, 8' arm length (0715-62811) | EACH | 2 | $16,500 | $11,300 | $11,840 | $13,735 | $14,193 | $13,000 |
| 1070 | Light pole complete, F&I, utility conflict pole standard foundation, 35' mounting height, 16' arm length (0715-65266) | EACH | 1 | $17,000 | $10,205 | $8,850.00 | $12,410 | $10,650 | $12,000 |
| 1075 | Light pole complete, F&I, utility conflict pole special foundation, 35' mounting height, 16' arm length (0715-66266) | EACH | 1 | $19,200 | $12,127 | $11,450 | $14,740 | $14,098 | $14,000 |
| 1080 | Light pole complete, remove pole and foundation (0715-69000) | EACH | 21 | $930.00 | $897.20 | $795.00 | $1,090.00 | $943.03 | $1,000.00 |
| 1085 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 25 | $690.00 | $664.36 | $525.00 | $810.00 | $642.44 | $750.00 |
| 1090 | Pole cable distribution system, wall mount (0715-500-3) | EACH | 84 | $620.00 | $592.84 | $485.00 | $720.00 | $583.50 | $660.00 |
| 1095 | Light pole complete- special design, F&I, pole top mount- aluminum, 25' (0715-516125) | EACH | 90 | $8,900.00 | $8,578.07 | $7,525.00 | $10,430 | $9,153.32 | $9,600.00 |
| 1100 | Light pole complete- special design, F&I, pole top mount- aluminum, 30' (0715-516130) | EACH | 8 | $10,800 | $10,349 | $7,575.00 | $12,580 | $9,224.05 | $11,500 |
| 1105 | Conduit, furnish & install, open trench (0630-2-11) | LF | 45 | $24.00 | $23.35 | $24.00 | $28.50 | $20.79 | $26.00 |
| 1110 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 60 | $50.00 | $48.09 | $48.00 | $58.50 | $63.52 | $55.00 |
| 1115 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 1 | $6,100.00 | $5,848.53 | $5,850.00 | $7,110.00 | $10,105 | $6,500.00 |
| 1120 | Signal cable, remove- intersection (0632-7-6) | PI | 1 | $800.00 | $771.73 | $772.00 | $940.00 | $923.88 | $860.00 |
| 1125 | Pull & splice box, F&I, 17" X 30" cover size (0635-2-14) | EACH | 4 | $1,600.00 | $1,569.08 | $1,570.00 | $1,910.00 | $2,194.23 | $1,750.00 |
| 1130 | Aluminum signals pole, (0646-1-11) | EACH | 3 | $2,500.00 | $2,448.07 | $2,450.00 | $2,975.00 | $3,175.85 | $2,720.00 |
| 1135 | Aluminum signals pole, remove (0646-1-60) | EACH | 2 | $200.00 | $189.34 | $190.00 | $230.00 | $473.50 | $215.00 |
| 1140 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 1 | $1,800.00 | $1,735.15 | $1,735.00 | $2,110.00 | $1,847.78 | $1,950.00 |
| 1145 | Vehicular traffic signal, furnish & install aluminum, 5 section cluster, 1 way (0650-1-19) | AS | 1 | $3,000.00 | $2,852.21 | $2,855.00 | $3,465.00 | $3,002.62 | $3,200.00 |
| 1150 | Vehicular traffic signal, remove- poles to remain (0650-1-60) | AS | 2 | $360.00 | $343.90 | $344.00 | $420.00 | $329.14 | $400.00 |
| 1155 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 3 | $950.00 | $915.33 | $915.00 | $1,115.00 | $1,056.69 | $1,050.00 |
| 1160 | Midblock crosswalk: rectangular rapid flashing beacon, furnish & install- complete sign assembly- back back (0654-2-22) | AS | 2 | $10,000 | $9,663.91 | $9,665.00 | $11,750 | $14,436 | $11,000 |
| 1165 | Loop detector inductive, remove- cabinet to remain (0660-1600) | EACH | 5 | $81.00 | $77.83 | $78.00 | $95.00 | $92.39 | $87.00 |
| 1170 | Vehicle detection system- microwave, furnish & install cabinet equipment (0660-3-11) | EACH | 1 | $9,700.00 | $9,342.08 | $9,344.00 | $11,360 | $12,126 | $10,500 |
| 1175 | Vehicle detection system- microwave, furnish & install, above ground equipment (0660-3-12) | EACH | 3 | $10,300 | $9,893.82 | $9,894.00 | $12,025 | $16,399 | $11,000 |
| 1180 | Pedestrian detector, furnish & install, accessible (0665-1-12) | EACH | 3 | $2,400.00 | $2,295.62 | $2,300.00 | $2,800.00 | $6,813.65 | $2,600.00 |
| 1185 | Traffic controller, modify (0671-2-40) | EACH | 1 | $5,600.00 | $5,395.75 | $5,400.00 | $6,560.00 | $1,050.92 | $6,000.00 |
| 1190 | Traffic signal controller cabinet, adjust/modify (0676-1500) | EACH | 1 | $5,800.00 | $5,566.18 | $5,600.00 | $6,800.00 | $4,388.46 | $6,200.00 |
| 1195 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 3 | $1,100.00 | $795.40 | $795.00 | $1,000.00 | $946.98 | $900.00 |
| 1200 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 3 | $73.00 | $181.62 | $182.00 | $220.00 | $51.97 | $210.00 |
| 1205 | Enhanced highway sign AC powered, remove - overhead mount (0700-141903) | EACH | 1 | $990.00 | $955.99 | $956.00 | $1,165.00 | $11,375 | $1,100.00 |
| 1210 | Manholes, repair (0425-2110) | EACH | 1 | $13,000 | $4,350.00 | $25,900 | $14,300 | $13,627 | $4,500.00 |
| 1215 | Manhole, adjust, utilities (0425-5-1) | EACH | 2 | $2,200.00 | $7,125.00 | $2,000.00 | $2,400.00 | $2,275.07 | $10,000 |
| 1220 | Valve boxes, adjust (0425-6) | EACH | 4 | $2,100.00 | $690.00 | $811.00 | $2,305.00 | $2,194.23 | $1,000.00 |
| 1225 | Pipe filling and plugging- place out of service (0430-830) | CY | 2.50 | $4,000.00 | $85.00 | $2,000.00 | $4,440.00 | $4,226.78 | $1,900.00 |
| 1230 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $15,000 | $15,000 | $15,000 | $15,000 | $15,000 | $15,000 |
| 1235 | Utility pipe,remove & dispose, 0 1.9" (1050-16001) | LF | 15 | $110.00 | $12.00 | $98.00 | $121.00 | $115.49 | $210.00 |
| 1240 | Utility pipe,remove & dispose, 2- 4.9" (1050-16002) | LF | 20 | $70.00 | $62.00 | $102.00 | $78.00 | $73.91 | $160.00 |
| 1245 | Utility pipe,remove & dispose, 5- 7.9" (1050-16003) | LF | 792 | $33.00 | $38.00 | $93.00 | $37.00 | $34.65 | $225.00 |
| 1250 | Utility pipe,remove & dispose, 8- 19.9" (1050-16004) | LF | 1,203 | $44.00 | $45.00 | $107.00 | $48.50 | $46.19 | $350.00 |
| 1255 | Utility pipe,remove & dispose, 49.9" (1050-16005) | LF | 2,381 | $53.00 | $68.00 | $95.00 | $58.25 | $55.43 | $400.00 |
| 1260 | Utility pipe,remove & stockpile/salvage, 20-49.9" (1050-17005) | LF | 65 | $81.00 | $245.00 | $500.00 | $89.75 | $85.46 | $730.00 |
| 1265 | Utility pipe- poly vinyl chloride, furnish & install, water/sewer, (1050-31206) | LF | 552 | $140.00 | $163.00 | $250.00 | $153.00 | $145.51 | $230.00 |
| 1270 | Utility pipe- poly vinyl chloride, furnish & install, water/sewer, 20" (1050-31220) | LF | 43 | $790.00 | $320.00 | $1,000.00 | $515.00 | $490.81 | $700.00 |
| 1275 | Utility pipe- high density polyethylene, furnish & install, water/sewer, 8" (1050-42208) | LF | 287 | $230.00 | $128.00 | $230.00 | $250.00 | $236.75 | $140.00 |
| 1280 | Utility pipe- ductile iron/cast iron, furnish & install, water/sewer, 4" (1050-51204) | LF | 20 | $1,200.00 | $325.00 | $933.00 | $1,195.00 | $1,138.69 | $615.00 |
| 1285 | Utility pipe- ductile iron/cast iron, furnish & install, water/sewer, 6" (1050-51206) | LF | 63 | $550.00 | $258.00 | $880.00 | $600.00 | $573.96 | $400.00 |
| 1290 | Utility pipe- ductile iron/cast iron, furnish & install, water/sewer, 16" (1050-51216) | LF | 45 | $610.00 | $295.00 | $1,300.00 | $544.00 | $518.53 | $1,025.00 |
| 1295 | Utility pipe- ductile iron/cast iron, furnish & install, water/sewer, 20" (1050-51220) | LF | 90 | $630.00 | $325.00 | $978.00 | $640.00 | $610.92 | $925.00 |
| 1300 | Utility pipe- steel, furnish & install, casing, 12" (1050-61112) | LF | 23 | $250.00 | $280.00 | $1,600.00 | $278.00 | $265.62 | $360.00 |
| 1305 | Utility fittings, install (1055-13) | EACH | 6 | $9,000.00 | $1,200.00 | $30,000 | $24,250 | $28,871 | $9,700.00 |
| 1310 | Utility fittings for PVC pipe, furnish and install, elbow, 8" (1055-31108) | EACH | 2 | $2,400.00 | $625.00 | $1,640.00 | $2,700.00 | $2,575.33 | $1,900.00 |
| 1315 | Utility fittings for PVC pipe, furnish and install, elbow, 20" (1055-31120) | EACH | 4 | $8,100.00 | $1,400.00 | $7,330.00 | $8,960.00 | $8,534.39 | $10,500 |
| 1320 | Utility fittings for PVC pipe, furnish and install, reducer, 8" (1055-31308) | EACH | 2 | $2,300.00 | $4,200.00 | $2,040.00 | $2,580.00 | $2,459.85 | $1,600.00 |
| 1325 | Utility fittings, ductile iron, furnish & install elbow, (1055-51116) | EACH | 3 | $6,400.00 | $2,547.00 | $3,750.00 | $7,090.00 | $6,755.91 | $4,000.00 |
| 1330 | Utility fittings, ductile iron, furnish & install elbow, (1055-51120) | EACH | 4 | $8,900.00 | $2,225.00 | $5,140.00 | $9,810.00 | $9,342.79 | $6,650.00 |
| 1335 | Utility fittings, ductile iron, furnish & install Y, 16" (1055-51616) | EACH | 1 | $7,900.00 | $3,025.00 | $10,400 | $8,720.00 | $8,303.42 | $11,000 |
| 1340 | Utility structure, below ground, F&I, water/sewer, 0 - 80 FT3, 0 - 6' (1060-11211) | EACH | 1 | $28,600 | $9,500.00 | $17,000 | $31,530 | $30,026 | $16,500 |
| 1345 | Utility structure, below ground, adjust/modify (1060-15) | EACH | 2 | $12,100 | $1,625.00 | $18,720 | $13,340 | $12,703 | $7,000.00 |
| 1350 | Utility structure, below ground, remove&dispose contractor takes ownership (1060-16) | EACH | 3 | $2,300.00 | $5,858.00 | $2,860.00 | $2,580.00 | $2,459.84 | $2,800.00 |
| 1355 | Utility fixture, valve/meter box, remove (1080-21600) | EACH | 1 | $2,000.00 | $650.00 | $2,840.00 | $2,170.00 | $2,067.19 | $800.00 |
| 1360 | Utility fixture, valve assembly, furnish and install, 6" (1080-24106) | EACH | 2 | $4,600.00 | $2,700.00 | $2,840.00 | $5,080.00 | $4,838.85 | $4,500.00 |
| 1365 | Utility fixture, valve assembly, remove (1080-24600) | EACH | 22 | $540.00 | $830.00 | $387.00 | $600.00 | $572.81 | $800.00 |
| 1370 | Utility fixture, vac/air furnish & install 6" (1080-26106) | EACH | 1 | $14,300 | $68,000 | $8,150.00 | $15,765 | $15,013 | $10,000 |
| 1375 | Utility fixture, vac/air remove (1080-26600) | EACH | 1 | $2,000.00 | $2,300.00 | $1,691.00 | $2,170.00 | $2,067.19 | $1,250.00 |
| 1380 | Fire hydrant, F&I, standard, 2 hose, 6" (1644-112-06) | EACH | 1 | $14,400 | $9,500.00 | $13,820 | $15,890 | $15,129 | $15,000 |
| 1385 | Fire hydrant, remove (1644-900) | EACH | 1 | $3,400.00 | $1,500.00 | $1,447.00 | $3,810.00 | $3,626.25 | $1,500.00 |
| 1390 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 0.90 | $5,000.00 | $4,573.27 | $4,574.00 | $5,560.00 | $5,370.08 | $5,100.00 |
| 1395 | Itsfm location documentation- intersection (0611-2-1) | EACH | 1 | $3,700.00 | $3,602.33 | $3,600.00 | $4,380.00 | $3,984.26 | $4,000.00 |
| 1400 | Itsfm location documentation- ITS site (0611-2-2) | EACH | 2 | $4,800.00 | $4,573.27 | $4,574.00 | $5,560.00 | $2,944.89 | $5,100.00 |
| 1405 | Conduit, furnish & install, open trench (0630-2-11) | LF | 998 | $19.00 | $18.35 | $18.50 | $22.30 | $20.79 | $21.00 |
| 1410 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 528 | $34.00 | $32.24 | $32.50 | $39.00 | $35.80 | $36.00 |
| 1415 | Conduit, furnish & install, aboveground (0630-2-14) | LF | 10 | $32.00 | $30.32 | $30.00 | $37.00 | $40.42 | $34.00 |
| 1420 | Fiber optic cable, F&I, underground,2-12 fibers (0633-1121) | LF | 907 | $5.50 | $5.09 | $5.00 | $6.20 | $5.66 | $5.75 |
| 1425 | Fiber optic cable, F&I, underground,49-96 fibers (0633-1123) | LF | 4,898 | $6.00 | $5.56 | $5.50 | $6.80 | $6.18 | $6.25 |
| 1430 | Fiber optic connection, install, splice (0633-2-31) | EACH | 118 | $66.00 | $63.32 | $63.50 | $77.00 | $70.45 | $71.00 |
| 1435 | Fiber optic connection hardware, F&I, splice (0633-3-11) | EACH | 3 | $2,000.00 | $1,924.81 | $1,930.00 | $2,340.00 | $2,136.49 | $2,200.00 |
| 1440 | Fiber optic connection hardware, F&I, splice tray (0633-3-12) | EACH | 3 | $80.00 | $77.39 | $77.50 | $94.00 | $78.53 | $86.00 |
| 1445 | Fiber optic connection hardware, F&I, preterminated connector assembly (0633-3-13) | EACH | 3 | $800.00 | $766.90 | $767.00 | $930.00 | $860.37 | $860.00 |
| 1450 | Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16) | EACH | 3 | $1,600.00 | $1,583.06 | $1,584.00 | $1,920.00 | $1,761.16 | $1,800.00 |
| 1455 | Fiber optic cable locator (0633-6) | DA | 1,200 | $170.00 | $162.98 | $163.00 | $198.00 | $167.45 | $185.00 |
| 1460 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 5 | $2,400.00 | $2,334.53 | $2,335.00 | $2,835.00 | $3,233.60 | $2,600.00 |
| 1465 | Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13) | EACH | 3 | $6,500.00 | $6,264.80 | $6,265.00 | $7,610.00 | $5,716.54 | $7,000.00 |
| 1470 | Pull & splice box, F&I, 17" X 30" cover size (0635-2-14) | EACH | 2 | $1,900.00 | $1,852.66 | $1,853.00 | $2,250.00 | $2,194.23 | $2,100.00 |
| 1475 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 2 | $7,700.00 | $7,413.89 | $7,414.00 | $9,010.00 | $4,792.66 | $8,500.00 |
| 1480 | Electrical power service, remove underground (0639-1620) | AS | 1 | $750.00 | $719.83 | $720.00 | $875.00 | $952.75 | $800.00 |
| 1485 | Electrical service wire, & install (0639-2-1) | LF | 144 | $10.00 | $9.89 | $10.00 | $12.00 | $14.44 | $11.00 |
| 1490 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 2 | $2,000.00 | $1,929.39 | $1,930.00 | $2,345.00 | $3,349.08 | $2,150.00 |
| 1495 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 2 | $2,100.00 | $1,978.69 | $1,979.00 | $2,400.00 | $2,598.43 | $2,200.00 |
| 1500 | Prestressed concrete pole, complete pole removal- pole 30' and greater (0641-2-80) | EACH | 1 | $11,100 | $10,660 | $10,660 | $12,955 | $4,388.46 | $12,000 |
| 1505 | Concrete CCTV pole, furnish & install without lowering 63' (0641-3263) | EACH | 2 | $21,800 | $20,945 | $20,945 | $25,450 | $35,223 | $23,500 |
| 1510 | Concrete CCTV pole, complete pole removal (0641-3800) | EACH | 1 | $10,600 | $10,213 | $10,213 | $12,410 | $16,745 | $11,500 |
| 1515 | Vehicle detection system- microwave, furnish & install cabinet equipment (0660-3-11) | EACH | 1 | $6,600.00 | $6,331.91 | $6,332.00 | $7,700.00 | $9,238.86 | $7,100.00 |
| 1520 | Vehicle detection system- microwave, furnish & install, above ground equipment (0660-3-12) | EACH | 1 | $9,600.00 | $9,209.17 | $9,210.00 | $11,190 | $13,050 | $10,500 |
| 1525 | Vehicle detection system- avi, bluetooth, furnish & install, cabinet equipment (0660-6121) | EACH | 1 | $1,800.00 | $1,743.41 | $1,744.00 | $2,120.00 | $1,559.06 | $2,000.00 |
| 1530 | Vehicle detection system- avi, bluetooth, furnish & install, above ground equipment (0660-6122) | EACH | 1 | $12,700 | $12,182 | $12,181 | $14,800 | $14,724 | $14,000 |
| 1535 | Vehicle detection system- avi, remove complete system (0660-6600) | EACH | 2 | $380.00 | $361.32 | $361.00 | $440.00 | $548.56 | $425.00 |
| 1540 | Traffic data detection system- lidar, remove complete system (0660-11-60) | EACH | 1 | $1,600.00 | $1,496.72 | $1,496.00 | $1,820.00 | $1,443.58 | $1,700.00 |
| 1545 | ITS cabinet, furnish & install, pole mount with sunshield, 24" W X 46" H X 22" D (0676-2122) | EACH | 2 | $11,700 | $11,225 | $11,225 | $13,640 | $15,706 | $12,500 |
| 1550 | ITS cabinet- remove (0676-2600) | EACH | 1 | $780.00 | $746.44 | $747.00 | $907.00 | $1,039.38 | $850.00 |
| 1555 | ITS CCTV camera, pressurized, high definition (0682-1163) | EACH | 2 | $7,100.00 | $6,852.16 | $6,852.00 | $8,325.00 | $12,126 | $7,650.00 |
| 1560 | ITS CCTV camera, remove & disposal (0682-1600) | EACH | 1 | $510.00 | $489.22 | $489.00 | $595.00 | $433.07 | $550.00 |
| 1565 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 2 | $5,800.00 | $5,559.32 | $5,559.00 | $6,755.00 | $12,126 | $6,200.00 |
| 1570 | Device server, furnish & install (0684-2-1) | EACH | 1 | $1,400.00 | $1,389.25 | $1,389.00 | $1,690.00 | $1,559.06 | $1,600.00 |
| 1575 | Wireless communication system device, remove (0684-6-6) | EACH | 2 | $410.00 | $392.38 | $392.00 | $475.00 | $392.66 | $450.00 |
| 1580 | Uninterruptible power supply, furnish and install, line interactive (0685-1-11) | EACH | 2 | $4,600.00 | $4,446.51 | $4,446.00 | $5,405.00 | $6,293.97 | $5,200.00 |
| 1585 | Connected vehicle roadside equipment, rsu (0924-681-1) | EACH | 1 | $17,700 | $17,016 | $17,015 | $20,675 | $23,328 | $20,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of March 25, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.