FDOT contract T4729 bid tabulation
SR A1A (JIMMY BUFFETT MEMORIAL HWY) OVER SEBASTIAN INLET. Let by Florida DOT on December 3, 2025, Indian River, District 4. 8 bids received; low bid $101,965,262 by Webber, LLC.
- Owner
- Florida DOT
- Letting
- 03 DEC 2025
- Pay items
- 212
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Webber, LLC | $101,965,262 | Low |
| 2 | Orion Marine Construction, Inc. | $114,287,000 | +12% |
| 3 | Vecellio & Grogan, Inc. | $117,763,123 | +15% |
| 4 | Sema Construction, Inc. | $137,600,000 | +35% |
| 5 | Skanska USA Civil Southeast Inc. | $137,740,000 | +35% |
| 6 | Cone & Graham, Inc. | $146,589,038 | +44% |
| 7 | Superior Construction Company Southeast, LLC | $153,624,888 | +51% |
| 8 | Walsh Construction Company II LLC DBA Archer Western | $183,663,755 | +80% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Webber, LLC | 2. Orion Marine Construction, Inc. | 3. Vecellio & Grogan, Inc. | 4. Sema Construction, Inc. | 5. Skanska USA Civil Southeast Inc. | 6. Cone & Graham, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Removal of existing structures/bridges (0110-3) | SF | 1 | $4,266,603 | $3,668,052 | $4,730,000 | $5,400,000 | $7,000,000 | $5,706,554 |
| 0010 | Concrete class NS, steps (0400-0-13) | CY | 30 | $1,960.00 | $1,388.68 | $2,300.00 | $900.00 | $1,725.00 | $1,804.37 |
| 0015 | Concrete, class I (seal) (0400-1-30) | CY | 98.10 | $13,670 | $7,817.46 | $330.00 | $7,000.00 | $10,000 | $2,188.05 |
| 0020 | Concrete class II, approach slabs (0400-2-10) | CY | 182.50 | $547.00 | $1,984.99 | $2,590.00 | $2,000.00 | $1,500.00 | $1,021.85 |
| 0025 | Concrete class IV, superstructure (0400-4-4) | CY | 3,283 | $975.00 | $1,539.05 | $2,020.00 | $2,800.00 | $1,000.00 | $1,896.72 |
| 0030 | Concrete class IV, bridge substructure (0400-4-5) | CY | 239.10 | $2,200.00 | $2,936.12 | $6,025.00 | $3,000.00 | $1,600.00 | $3,483.76 |
| 0035 | Conc class IV, retaining walls (0400-4-11) | CY | 273 | $345.00 | $2,202.87 | $2,190.00 | $1,800.00 | $2,100.00 | $3,428.35 |
| 0040 | Concrete class IV, mass, substructure (0400-4-25) | CY | 3,498.80 | $2,000.00 | $2,083.16 | $2,385.00 | $3,200.00 | $2,750.00 | $5,500.00 |
| 0045 | Bridge deck grooving (0400-7-1) | SY | 8,419 | $3.50 | $5.51 | $8.00 | $7.00 | $15.00 | $10.05 |
| 0050 | Bridge deck planing (0400-9-1) | SY | 8,419 | $5.65 | $5.51 | $8.00 | $5.00 | $11.00 | $12.60 |
| 0055 | Cleaning & coating concrete surface, class 5 (0400-143) | SF | 81,790 | $1.30 | $1.90 | $1.65 | $2.00 | $2.00 | $1.95 |
| 0060 | Composite neoprene pads (0400-147) | CF | 78 | $1,690.00 | $1,430.64 | $4,850.00 | $2,200.00 | $2,500.00 | $1,667.38 |
| 0065 | Plain neoprene bearing pads (0400-148) | CF | 8.20 | $1,440.00 | $1,854.02 | $3,100.00 | $4,700.00 | $3,500.00 | $3,249.56 |
| 0070 | Reinforcing steel- retaining wall (0415-1-3) | LB | 49,217 | $1.90 | $1.52 | $2.20 | $2.00 | $3.00 | $2.55 |
| 0075 | Reinforcing steel - bridge superstructure (0415-1-4) | LB | 833,580 | $1.45 | $1.71 | $2.20 | $2.00 | $3.00 | $2.06 |
| 0080 | Reinforcing steel- bridge substructure (0415-1-5) | LB | 968,613 | $1.70 | $1.91 | $2.20 | $2.00 | $2.50 | $2.29 |
| 0085 | Reinforcing steel- approach slabs (0415-1-9) | LB | 35,550 | $1.45 | $1.72 | $2.20 | $2.00 | $2.75 | $1.89 |
| 0090 | Fiber reinforced polymer bars, #4 bar (0415-10-4) | LF | 6,513 | $1.70 | $3.17 | $4.90 | $5.00 | $5.00 | $3.04 |
| 0095 | Fiber reinforced polymer bars, #5 bar (0415-10-5) | LF | 31,727 | $1.65 | $2.98 | $10.40 | $8.00 | $5.25 | $2.96 |
| 0100 | Prest beams: florida-I beam 96" (0450-2-96) | LF | 11,179 | $460.00 | $658.74 | $769.00 | $1,500.00 | $500.00 | $1,823.17 |
| 0105 | Prestressed beam: florida slab beam, beam depth 18" CFRP/SS, width 52-54" (0450-8-72) | LF | 1,224 | $720.00 | $714.52 | $918.00 | $1,400.00 | $600.00 | $643.26 |
| 0110 | Preformed pile holes, 22" to 26" drill/punch size (0455-15-13) | LF | 2,690 | $18.90 | $84.64 | $277.00 | $70.00 | $30.00 | $186.51 |
| 0115 | Preformed pile holes, 24" to 29" drill/punch size (0455-15-14) | LF | 594 | $300.00 | $252.00 | $293.00 | $70.00 | $45.00 | $706.10 |
| 0120 | Preformed pile holes, 36" to 43" drill/punch size (0455-15-16) | LF | 12,587 | $175.00 | $148.07 | $228.00 | $70.00 | $55.00 | $300.29 |
| 0125 | Preformed pile holes casing, to 29" drill/punch size (0455-15-24) | LF | 714 | $218.00 | $501.51 | $412.00 | $760.00 | $900.00 | $1,526.07 |
| 0130 | Preformed pile holes casing, to 43" drill/punch size (0455-15-26) | LF | 14,507 | $147.00 | $318.56 | $183.00 | $620.00 | $1,000.00 | $558.56 |
| 0135 | Pre-planned pile splice, concrete square, 24" (0455-17124) | EACH | 59 | $3,260.00 | $8,197.75 | $8,900.00 | $5,300.00 | $10,000 | $7,649.68 |
| 0140 | Pile inspection, driven pile (0455-20-1) | EACH | 468 | $500.00 | $547.81 | $446.00 | $530.00 | $400.00 | $660.28 |
| 0145 | Prestressed concrete piling, SQ. (0455-34-2) | LF | 13,359 | $129.00 | $159.77 | $360.00 | $150.00 | $185.00 | $106.26 |
| 0150 | Prestressed concrete piling, SQ (0455-34-5) | LF | 27,870 | $174.00 | $231.66 | $210.00 | $300.00 | $270.00 | $263.81 |
| 0155 | Prestressed concrete piling, SQ W/FRP or stainless steel strand and reinforcing (0455-34-23) | LF | 890 | $365.00 | $345.91 | $616.00 | $500.00 | $410.00 | $313.80 |
| 0160 | Steel piling, HP 14 X 73 (0455-35-5) | LF | 3,894 | $180.00 | $254.67 | $421.00 | $200.00 | $250.00 | $236.43 |
| 0165 | Pile redrive (0455-115) | EACH | 147 | $2,830.00 | $1,530.79 | $3,500.00 | $3,000.00 | $3,000.00 | $2,212.13 |
| 0170 | Sheet piling steel, F&I (0455-133-3) | SF | 14,100 | $45.00 | $60.95 | $68.00 | $95.00 | $45.00 | $86.70 |
| 0175 | Soldier pile wall, temporary- critical, steel H-piles with timber lagging (0455-133-10) | SF | 15,003 | $35.00 | $228.94 | $169.00 | $110.00 | $125.00 | $114.96 |
| 0180 | Load test (dynamic), data collection and analysis (0455-137) | EACH | 373 | $2,610.00 | $1,055.76 | $550.00 | $2,800.00 | $3,250.00 | $1,204.73 |
| 0185 | Load test (dynamic), test (0455-137-2) | EACH | 21 | $696.00 | $638.66 | $2,500.00 | $1,500.00 | $4,250.00 | $4,893.48 |
| 0190 | Test piles-prestressed concrete,24" SQ (0455-143-5) | LF | 1,510 | $307.00 | $258.07 | $371.00 | $1,200.00 | $400.00 | $299.87 |
| 0195 | Test piles-prestressed concrete,18" SQ W/ FRP or stainless steel strand and reinforcing (0455-143-23) | LF | 520 | $502.00 | $341.31 | $632.00 | $900.00 | $650.00 | $627.14 |
| 0200 | Bridge deck expansion joint, construction, F&I poured joint with backer rod (0458-1-11) | LF | 60 | $118.00 | $140.66 | $71.00 | $180.00 | $50.00 | $347.73 |
| 0205 | Bridge deck expansion joint, construction, F&I strip seal (0458-1-12) | LF | 293 | $626.00 | $865.62 | $2,260.00 | $630.00 | $1,450.00 | $705.34 |
| 0210 | Piles, polyethylene sheeting (0459-71) | SY | 339 | $43.00 | $32.66 | $33.00 | $50.00 | $40.00 | $11.21 |
| 0215 | Fender system,plastic marine lumber,reinforced (0471-1-1) | MB | 30.80 | $36,520 | $59,275 | $87,290 | $48,900 | $30,000 | $66,756 |
| 0220 | Fender system,plastic marine lumber, non-reinforced (0471-1-2) | MB | 11.40 | $51,300 | $34,456 | $46,050 | $61,500 | $27,500 | $69,009 |
| 0225 | Navigation lights- fixed bridge, system (0510-1) | LS | 1 | $100,800 | $79,006 | $121,855 | $114,300 | $150,000 | $106,284 |
| 0230 | Navigation lights- fixed bridge, system, solar (0510-1-1) | LS | 1 | $98,200 | $45,396 | $118,880 | $111,300 | $150,000 | $199,892 |
| 0235 | Pedestrian/ bicycle railing, aluminum only,42" type 1 (0515-2311) | LF | 913 | $87.00 | $111.99 | $119.00 | $91.00 | $125.00 | $131.59 |
| 0240 | Pedestrian/ bicycle railing, aluminum, modified, 30" type 1 (0515-2703) | LF | 3,254 | $60.00 | $109.08 | $83.00 | $63.00 | $65.00 | $90.75 |
| 0245 | Concrete traffic railing- 36" single-slope (0521-5-13) | LF | 3,218 | $219.00 | $257.75 | $145.00 | $89.00 | $325.00 | $222.49 |
| 0250 | Concrete parapet, pedestrian/bicycle, modified, 18" height (0521-6-56) | LF | 3,254 | $73.75 | $127.18 | $94.00 | $67.00 | $135.00 | $76.22 |
| 0255 | Riprap- rubble, bank and shore (0530-3-3) | TN | 1,435.40 | $105.00 | $236.35 | $275.00 | $180.00 | $500.00 | $129.53 |
| 0260 | Gabion, mattress 1 foot and greater thickness (0530-5-12) | SY | 2,945 | $245.00 | $190.74 | $229.00 | $260.00 | $300.00 | $372.74 |
| 0265 | Bedding stone (0530-74) | TN | 533.80 | $80.00 | $220.88 | $468.00 | $350.00 | $500.00 | $161.55 |
| 0270 | Flight diverters (0550-73100) | EACH | 122 | $214.00 | $872.46 | $295.00 | $220.00 | $350.00 | $323.68 |
| 0275 | Conduit, furnish & install, embedded concrete barriers and traffic railings (0630-2-16) | LF | 15,665 | $23.50 | $20.23 | $28.50 | $27.00 | $27.00 | $24.81 |
| 0280 | Junction box, furnish & install, embedded (0635-3-13) | EACH | 228 | $1,410.00 | $1,030.85 | $1,700.00 | $1,600.00 | $3,000.00 | $1,739.98 |
| 0285 | Mobilization (0101-1) | LS | 1 | $10,100,000 | $11,428,700 | $11,700,000 | $13,500,000 | $13,335,030 | $14,515,890 |
| 0290 | Maintenance of traffic (0102-1) | DA | 1 | $8,118,240 | $603,736 | $2,100,000 | $950,000 | $3,500,000 | $1,200,000 |
| 0295 | Special detour- temporary pavement (0102-2200) | SY | 1 | $2,408,930 | $721,294 | $484,915 | $650,000 | $1,500,000 | $950,000 |
| 0300 | Special detour- temporary earthwork/base (0102-2300) | CY | 1 | $2,623,798 | $281,033 | $572,255 | $1,200,000 | $2,000,000 | $1,200,000 |
| 0305 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $111,840 | $214,332 | $13,200 | $50,000 | $100,000 | $25,694 |
| 0310 | Work zone sign (0102-60) | ED | 75,678 | $0.20 | $0.26 | $0.24 | $0.30 | $0.35 | $0.25 |
| 0312 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 349 | $41.00 | $49.63 | $45.00 | $42.00 | $75.00 | $51.04 |
| 0315 | Temporary barrier, F&I, anchored (0102-71-15) | LF | 7,206 | $36.75 | $56.53 | $47.00 | $45.00 | $80.00 | $51.04 |
| 0320 | Temporary barrier, F&I, free standing (0102-71-16) | LF | 4,300 | $22.50 | $44.12 | $40.00 | $23.00 | $75.00 | $45.37 |
| 0322 | Temporary barrier, relocate, low profile concrete (0102-71-23) | LF | 227 | $18.00 | $35.85 | $32.00 | $19.00 | $50.00 | $20.42 |
| 0325 | Temporary barrier, relocate, anchored (0102-71-25) | LF | 6,384 | $16.20 | $28.95 | $23.00 | $18.00 | $55.00 | $20.42 |
| 0330 | Temporary barrier, relocate, free standing (0102-71-26) | LF | 2,032 | $8.50 | $19.30 | $17.00 | $9.00 | $50.00 | $19.28 |
| 0335 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 410,370 | $0.10 | $0.10 | $0.09 | $0.10 | $0.15 | $0.20 |
| 0340 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 550,499 | $0.05 | $0.06 | $0.05 | $0.05 | $0.10 | $0.15 |
| 0345 | Temporary crash cushion, redirective option (0102-89-1) | LO | 10 | $1,090.00 | $1,309.80 | $1,200.00 | $2,000.00 | $3,000.00 | $1,268.89 |
| 0350 | Portable changeable message sign, temporary (0102-99) | ED | 3,430 | $8.95 | $12.41 | $11.00 | $9.00 | $15.00 | $10.15 |
| 0355 | Type III barricade (0102-115) | ED | 12,960 | $0.25 | $0.21 | $0.19 | $0.50 | $0.25 | $0.28 |
| 0360 | Removable tape, white, solid 6" (0102-913-21) | GM | 0.58 | $19,000 | $20,893 | $18,565 | $20,000 | $25,000 | $19,463 |
| 0365 | Removable tape, yellow, solid, (0102-913-31) | GM | 0.58 | $19,000 | $20,893 | $18,565 | $20,000 | $25,000 | $19,463 |
| 0370 | Sediment barrier (0104-10-3) | LF | 15,137 | $2.40 | $3.17 | $4.50 | $2.00 | $3.00 | $2.27 |
| 0375 | Floating turbidity barrier (0104-11) | LF | 2,387 | $11.00 | $24.13 | $18.00 | $10.00 | $90.00 | $24.86 |
| 0380 | Staked turbidity barrier- nylon reinforced PVC (0104-12) | LF | 21,656 | $6.30 | $8.96 | $12.00 | $8.00 | $12.00 | $2.84 |
| 0385 | Soil tracking prevention device (0104-15) | EACH | 5 | $10,020 | $10,903 | $7,750.00 | $9,000.00 | $3,250.00 | $14,198 |
| 0390 | Inlet protection system (0104-18) | EACH | 78 | $138.00 | $241.28 | $245.00 | $180.00 | $250.00 | $394.03 |
| 0395 | Litter removal (0107-1) | ACRE | 522.69 | $2.60 | $28.14 | $42.00 | $50.00 | $50.00 | $255.20 |
| 0400 | Mowing (0107-2) | ACRE | 405.84 | $5.10 | $105.52 | $79.00 | $85.00 | $60.00 | $396.97 |
| 0405 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $594,800 | $21,508 | $12,100 | $30,900 | $500,000 | $125,000 |
| 0410 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $129,100 | $148,903 | $121,000 | $92,000 | $275,000 | $125,000 |
| 0415 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $10,642,305 | $6,470,952 | $1,205,000 | $1,905,281 | $1,150,000 | $3,000,000 |
| 0420 | Removal of existing concrete (0110-4-10) | SY | 2,590 | $29.10 | $37.99 | $33.00 | $35.00 | $35.00 | $60.00 |
| 0425 | Transport existing material reef establishment (0110-84) | LS | 1 | $87,500 | $991,434 | $2,717,000 | $500,000 | $2,000,000 | $694,437 |
| 0430 | Regular excavation (0120-1) | CY | 43,106.40 | $13.60 | $24.90 | $49.25 | $40.00 | $35.00 | $24.75 |
| 0435 | Embankment (0120-6) | CY | 90,163.40 | $30.50 | $73.16 | $58.25 | $60.00 | $85.00 | $38.24 |
| 0440 | Type B stabilization (0160-4) | SY | 43,232 | $6.95 | $16.88 | $3.40 | $12.00 | $35.00 | $12.73 |
| 0445 | Optional base, base group 01 (0285-701) | SY | 3,632 | $9.65 | $23.92 | $12.15 | $20.00 | $40.00 | $21.07 |
| 0450 | Optional base, base group 04 (0285-704) | SY | 10,672 | $11.20 | $27.79 | $15.50 | $24.00 | $55.00 | $28.06 |
| 0455 | Optional base, base group 06 (0285-706) | SY | 24,197 | $14.10 | $31.30 | $15.90 | $27.00 | $50.00 | $34.75 |
| 0460 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 2,236 | $15.80 | $14.97 | $10.05 | $16.00 | $15.00 | $15.88 |
| 0465 | Superpave asphaltic conc, traffic B (0334-1-12) | TN | 3,779 | $220.00 | $270.03 | $183.70 | $250.00 | $250.00 | $249.52 |
| 0470 | Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81) | TN | 2,070.50 | $242.00 | $294.49 | $202.70 | $270.00 | $275.00 | $274.19 |
| 0475 | Miscellaneous asphalt (0339-1) | TN | 53 | $540.00 | $758.65 | $502.00 | $1,200.00 | $750.00 | $612.47 |
| 0480 | Concrete class NS, gravity index 400-011 (0400-0-11) | CY | 39.90 | $840.00 | $404.62 | $2,053.72 | $1,300.00 | $1,500.00 | $728.35 |
| 0485 | Inlets, curb, type P-1, <10' (0425-1311) | EACH | 17 | $8,390.00 | $22,108 | $14,200 | $8,800.00 | $15,000 | $14,518 |
| 0490 | Inlets, curb, type P-2, <10' (0425-1321) | EACH | 4 | $8,320.00 | $22,288 | $14,700 | $9,200.00 | $17,000 | $15,312 |
| 0495 | Inlets, DT bot, type D, <10' (0425-1541) | EACH | 6 | $8,620.00 | $8,213.30 | $11,300 | $8,700.00 | $12,000 | $7,939.40 |
| 0500 | Inlets, ditch bottom, type D, J bot, <10' (0425-1543) | EACH | 1 | $10,950 | $13,180 | $15,300 | $10,200 | $14,000 | $12,476 |
| 0505 | Inlets, DT bot, type F, <10' (0425-1561) | EACH | 9 | $8,240.00 | $9,141.83 | $11,800 | $9,000.00 | $13,000 | $9,073.60 |
| 0510 | Inlets, adjacent barrier, <=10' (0425-1921) | EACH | 8 | $10,050 | $13,070 | $13,500 | $13,900 | $15,000 | $13,951 |
| 0515 | Inlets, adjacent barrier, >10' (0425-1922) | EACH | 2 | $11,320 | $22,454 | $20,600 | $16,700 | $17,000 | $17,240 |
| 0520 | Inlets, adjacent barrier, J bottom, < 10' (0425-1923) | EACH | 14 | $10,980 | $20,217 | $21,200 | $16,800 | $16,000 | $18,374 |
| 0525 | Inlets, adjacent barrier, J bottom, >10' (0425-1924) | EACH | 2 | $12,240 | $35,425 | $31,200 | $21,000 | $19,000 | $22,684 |
| 0530 | Manholes, P-7, <10' (0425-2-41) | EACH | 15 | $6,480.00 | $9,445.72 | $10,000 | $6,700.00 | $11,000 | $9,073.60 |
| 0535 | Manholes, J-7, <10' (0425-2-71) | EACH | 4 | $8,040.00 | $15,644 | $20,600 | $10,600 | $18,000 | $15,652 |
| 0540 | Manholes, J-7, >10' control structure (0425-2-75) | EACH | 2 | $16,490 | $44,097 | $46,800 | $23,700 | $40,000 | $34,026 |
| 0545 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 3,948 | $117.00 | $125.21 | $178.80 | $280.00 | $350.00 | $266.54 |
| 0550 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 2,937 | $132.00 | $194.15 | $221.20 | $280.00 | $260.00 | $272.21 |
| 0555 | Pipe culvert, opt material, round, 36"S/CD (0430-175136) | LF | 75 | $234.00 | $417.84 | $412.00 | $250.00 | $750.00 | $663.51 |
| 0560 | Pipe culvert, opt material, shape - elip/arch, 30"S/CD (0430-175230) | LF | 192 | $171.00 | $554.31 | $386.00 | $340.00 | $525.00 | $374.29 |
| 0565 | Straight concrete endwalls, single, 15 degrees, elliptical (0430-524112) | EACH | 1 | $9,650.00 | $33,061 | $10,600 | $6,400.00 | $5,000.00 | $7,032.04 |
| 0570 | Straight concrete endwalls, single, 15 degrees, elliptical (0430-530112) | EACH | 1 | $10,460 | $46,708 | $11,300 | $6,400.00 | $6,000.00 | $7,258.88 |
| 0575 | U-endwall, with baffles & index 261/430-011,1:3 slope, 24 (0430-613229) | EACH | 1 | $6,420.00 | $9,637.06 | $13,200 | $5,700.00 | $5,000.00 | $6,805.20 |
| 0580 | Pipe filling and plugging- place out of service (0430-830) | CY | 25.70 | $496.00 | $928.53 | $1,130.00 | $910.00 | $1,500.00 | $964.07 |
| 0585 | Manatee grate for 30" pipe, unhinged (0430-886-30) | EACH | 1 | $4,500.00 | $10,889 | $7,180.00 | $4,400.00 | $7,500.00 | $6,238.10 |
| 0590 | French drain, 24" (0443-70-4) | LF | 794 | $210.00 | $301.97 | $370.50 | $200.00 | $350.00 | $444.61 |
| 0595 | Pedestrian/ bicycle railing, aluminum only,42" type 1 (0515-2311) | LF | 893 | $87.00 | $111.99 | $120.00 | $91.00 | $125.00 | $123.24 |
| 0600 | Pedestrian/ bicycle railing, aluminum, modified, 30" type 1 (0515-2703) | LF | 3,728 | $60.00 | $109.08 | $83.00 | $63.00 | $85.00 | $85.07 |
| 0605 | Concrete curb & gutter, type E (0520-1-7) | LF | 2,725 | $69.50 | $74.56 | $43.65 | $63.00 | $100.00 | $58.28 |
| 0610 | Concrete curb, type D (0520-2-4) | LF | 3,324 | $35.00 | $63.31 | $22.05 | $58.00 | $50.00 | $54.07 |
| 0615 | Concrete parapet, retaining wall system mounted W/sidewalk, modified, 18" height (0521-6-57) | LF | 3,563 | $200.00 | $566.97 | $283.00 | $550.00 | $410.00 | $525.46 |
| 0620 | Concrete parapet, retaining wall system mounted W/sidewalk, special (0521-6-58) | LF | 165 | $201.00 | $886.33 | $810.00 | $1,000.00 | $900.00 | $636.93 |
| 0625 | Concrete barrier, with slab, 36" single slope (0521-8-7) | LF | 740 | $267.00 | $492.40 | $913.00 | $460.00 | $1,500.00 | $658.64 |
| 0630 | Shoulder concrete barrier, 38" or 44" height (0521-72-40) | LF | 3,694 | $436.00 | $422.88 | $380.00 | $370.00 | $800.00 | $505.19 |
| 0635 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 233 | $106.00 | $177.27 | $89.50 | $82.00 | $150.00 | $108.54 |
| 0640 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 1,282 | $95.00 | $168.82 | $117.20 | $110.00 | $200.00 | $126.34 |
| 0645 | Concrete ditch pavt, non reinforced, 3" (0524-1-1) | SY | 10 | $350.00 | $513.51 | $495.50 | $440.00 | $300.00 | $295.70 |
| 0650 | Detectable warnings (0527-2) | SF | 200 | $40.00 | $77.38 | $49.40 | $43.00 | $150.00 | $48.39 |
| 0655 | Riprap- rubble, bank and shore (0530-3-3) | TN | 741.30 | $100.00 | $285.82 | $388.00 | $180.00 | $250.00 | $328.92 |
| 0660 | Riprap, rubble, F&I, ditch lining (0530-3-4) | TN | 2 | $1,200.00 | $3,870.30 | $388.00 | $3,200.00 | $350.00 | $328.92 |
| 0665 | Bedding stone (0530-74) | TN | 277.40 | $90.00 | $254.81 | $388.00 | $1,200.00 | $350.00 | $317.58 |
| 0666 | Guardrail transition to rigid barrier, F&I- index 536- 001, approach TL-3 (0536-8112) | EACH | 1 | $4,200.00 | $6,492.69 | $5,300.00 | $4,500.00 | $8,000.00 | $3,402.60 |
| 0668 | Guardrail transition to rigid barrier, F&I- index 536- 001, trailing (0536-8113) | EACH | 3 | $2,850.00 | $3,429.95 | $3,600.00 | $3,000.00 | $7,000.00 | $1,247.62 |
| 0670 | Bumper guards, concrete (0542-70) | EACH | 31 | $450.00 | $783.63 | $370.00 | $160.00 | $175.00 | $194.43 |
| 0675 | Crash cushion, TL-3, narrow (0544-3-1) | EACH | 2 | $30,750 | $29,670 | $38,800 | $32,700 | $100,000 | $32,381 |
| 0680 | Retaining wall system, permanent, excluding barrier (0548-12) | SF | 79,332 | $59.25 | $83.01 | $63.00 | $87.00 | $75.00 | $69.54 |
| 0685 | Retaining wall system,temporary, excluding barrier (0548-13) | SF | 33,967 | $17.20 | $71.92 | $39.00 | $61.00 | $15.00 | $57.15 |
| 0690 | Fencing, type B, 6.1-7.0', (0550-10230) | LF | 564 | $18.00 | $62.04 | $25.00 | $19.00 | $55.00 | $25.52 |
| 0695 | Fence gate, type B, double, 12.1- 18.0' opening (0550-60223) | EACH | 1 | $1,200.00 | $6,342.16 | $1,800.00 | $1,300.00 | $5,000.00 | $1,701.30 |
| 0705 | Performance turf, sod (0570-1-2) | SY | 34,416 | $4.95 | $13.07 | $5.30 | $5.00 | $5.00 | $4.11 |
| 0710 | Conduit, furnish & install, open trench (0630-2-11) | LF | 16 | $45.00 | $19.36 | $60.00 | $57.00 | $100.00 | $43.38 |
| 0715 | Conduit, furnish & install, embedded concrete barriers and traffic railings (0630-2-16) | LF | 19,583 | $21.00 | $18.18 | $28.45 | $27.00 | $50.00 | $23.25 |
| 0720 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 1 | $2,000.00 | $1,223.52 | $2,400.00 | $2,300.00 | $6,000.00 | $2,105.08 |
| 0725 | Junction box, furnish & install, embedded (0635-3-13) | EACH | 305 | $1,350.00 | $1,002.32 | $1,700.00 | $1,600.00 | $1,750.00 | $1,630.98 |
| 0730 | Aluminum pole- index 695-001, furnish & install, 20' (0646-2120) | EACH | 1 | $6,000.00 | $4,776.56 | $7,430.00 | $7,000.00 | $12,000 | $4,923.56 |
| 0735 | Aluminum pole- index 695-001, remove (0646-2600) | EACH | 1 | $450.00 | $483.89 | $570.00 | $530.00 | $1,000.00 | $759.91 |
| 0740 | Traffic monitoring site cabinet, furnish & install, type 3, pole mount (0695-7133) | EACH | 1 | $10,200 | $5,416.67 | $9,400.00 | $8,800.00 | $15,000 | $9,759.79 |
| 0745 | Traffic monitoring site cabinet, remove existing cabinet (0695-7600) | EACH | 1 | $1,150.00 | $553.00 | $1,400.00 | $1,400.00 | $2,250.00 | $1,012.84 |
| 0750 | Traffic monitoring site communications modem furnish install (0695-8-11) | EACH | 1 | $3,450.00 | $5,416.67 | $8,000.00 | $7,600.00 | $13,000 | $10,173 |
| 0755 | Traffic monitoring site non- motorized axle sensor, furnish & install (0695-12-1) | EACH | 1 | $3,450.00 | $17,859 | $4,400.00 | $4,100.00 | $7,500.00 | $9,703.08 |
| 0760 | Traffic monitoring site non- motorized solar power unit, furnish & install (0695-15-1) | EACH | 1 | $10,500 | $9,965.11 | $13,400 | $12,600 | $22,000 | $8,878.52 |
| 0765 | Traffic monitoring site surge suppressor, furnish & install (0695-16-1) | EACH | 1 | $1,560.00 | $1,036.87 | $2,100.00 | $2,000.00 | $3,500.00 | $1,506.22 |
| 0767 | Raised pavement marker, type B (0706-1-3) | EACH | 11,370 | $7.15 | $6.89 | $6.00 | $5.50 | $6.00 | $4.54 |
| 0770 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 5.40 | $4,200.00 | $4,136.96 | $3,739.00 | $3,300.00 | $1,500.00 | $1,556.12 |
| 0775 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 90 | $4.10 | $3.45 | $3.00 | $6.00 | $3.00 | $1.70 |
| 0780 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.15 | $1,360.00 | $1,289.22 | $1,090.00 | $1,200.00 | $850.00 | $754.24 |
| 0785 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 14 | $95.00 | $103.40 | $93.00 | $90.00 | $100.00 | $51.04 |
| 0790 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 5.41 | $4,200.00 | $4,140.02 | $3,735.00 | $3,300.00 | $1,550.00 | $1,556.12 |
| 0795 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 268 | $4.90 | $3.10 | $2.80 | $2.50 | $5.00 | $1.13 |
| 0800 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.04 | $1,330.00 | $1,240.75 | $840.00 | $1,500.00 | $1,200.00 | $754.24 |
| 0805 | Partnering, DO not bid (0999-16) | LS | 1 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 |
| 0810 | Disputes review board, meeting- DO not bid (0999-20-1) | DA | 58 | $4,800.00 | $4,800.00 | $4,800.00 | $4,800.00 | $4,800.00 | $4,800.00 |
| 0815 | Disputes review board, hearing- DO not bid (0999-20-2) | EACH | 2 | $5,750.00 | $5,750.00 | $5,750.00 | $5,750.00 | $5,750.00 | $5,750.00 |
| 0820 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $150,000 | $150,000 | $150,000 | $150,000 | $150,000 | $150,000 |
| 0825 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 2.78 | $2,500.00 | $25,052 | $6,636.00 | $6,300.00 | $4,000.00 | $2,478.84 |
| 0830 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 34 | $650.00 | $1,296.01 | $1,055.00 | $1,500.00 | $1,500.00 | $561.43 |
| 0835 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 7 | $2,150.00 | $2,688.53 | $3,735.00 | $5,700.00 | $3,500.00 | $2,154.98 |
| 0840 | Single column ground sign assembly, F&I barrier less than 12 SF (0700-1211) | EACH | 14 | $2,650.00 | $5,266.75 | $6,230.00 | $3,100.00 | $5,000.00 | $2,495.24 |
| 0845 | Single column ground sign assembly, F&I barrier 12.0-20.0 SF (0700-1212) | EACH | 6 | $3,000.00 | $5,659.69 | $6,480.00 | $4,800.00 | $6,000.00 | $3,969.70 |
| 0850 | Single column ground sign assembly, F&I barrier less than 12 SF (0700-1311) | EACH | 4 | $3,500.00 | $5,956.12 | $6,850.00 | $8,300.00 | $7,000.00 | $3,969.70 |
| 0855 | Single column ground sign assembly, remove (0700-1600) | EACH | 48 | $98.25 | $172.34 | $120.00 | $960.00 | $200.00 | $28.36 |
| 0860 | Multi-column ground sign assembly, F&I ground mount, than 12 SF (0700-2111) | EACH | 1 | $4,500.00 | $6,321.48 | $11,835 | $9,000.00 | $10,000 | $5,444.16 |
| 0865 | Multi-column ground sign assembly, F&I ground mount, 1-200.0 SF (0700-2116) | EACH | 2 | $19,250 | $32,683 | $18,690 | $40,200 | $45,000 | $14,745 |
| 0870 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 5 | $1,350.00 | $1,034.05 | $3,100.00 | $3,700.00 | $3,500.00 | $1,361.04 |
| 0875 | Retroreflective sign strip- furnish and install, 2' (0700-13-12) | EACH | 3 | $115.00 | $434.30 | $185.00 | $120.00 | $250.00 | $107.75 |
| 0880 | Raised pavement marker, type B (0706-1-3) | EACH | 462 | $7.15 | $6.89 | $6.00 | $6.00 | $15.00 | $4.54 |
| 0885 | Painted pavement markings, surface (0710-90) | LS | 1 | $61,000 | $196,220 | $175,000 | $156,700 | $100,000 | $16,905 |
| 0890 | Thermoplastic, standard, solid, 6" for parking spaces (0711-11121) | LF | 6,230 | $3.45 | $3.45 | $3.00 | $2.80 | $3.00 | $1.25 |
| 0895 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.25 | $4,100.00 | $3,474.60 | $3,015.00 | $4,000.00 | $3,000.00 | $567.00 |
| 0900 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 14 | $241.00 | $339.17 | $305.00 | $270.00 | $500.00 | $141.78 |
| 0905 | Thermoplastic, standard, arrow (0711-11170) | EACH | 71 | $112.00 | $110.30 | $100.00 | $88.00 | $100.00 | $107.75 |
| 0910 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 452 | $7.90 | $6.89 | $6.00 | $7.00 | $6.00 | $3.40 |
| 0915 | Thermoplastic, standard, blue, solid,6" (0711-11421) | LF | 388 | $8.05 | $3.38 | $3.00 | $4.00 | $15.00 | $1.42 |
| 0920 | Thermoplastic, preformed, white, solid, 12" for crosswalk (0711-14123) | LF | 535 | $9.05 | $12.96 | $12.00 | $10.00 | $25.00 | $12.48 |
| 0925 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 256 | $18.00 | $25.92 | $23.00 | $21.00 | $35.00 | $19.28 |
| 0930 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 4 | $347.00 | $482.56 | $436.00 | $390.00 | $500.00 | $226.84 |
| 0935 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 4 | $365.00 | $344.68 | $311.00 | $280.00 | $400.00 | $226.84 |
| 0940 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 3.65 | $5,000.00 | $12,415 | $11,190 | $9,900.00 | $10,000 | $6,918.62 |
| 0945 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 0.11 | $17,000 | $3,265.44 | $2,705.00 | $4,000.00 | $3,500.00 | $2,722.08 |
| 0950 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 2.19 | $4,800.00 | $12,437 | $11,190 | $9,900.00 | $12,000 | $6,918.62 |
| 0955 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 1.17 | $45,000 | $64,800 | $58,500 | $51,700 | $60,000 | $25,905 |
| 0960 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.59 | $45,000 | $65,354 | $58,070 | $55,000 | $60,000 | $25,905 |
| 0965 | Green-colored pavement markings, bike lane (0714-10) | SF | 1,402 | $16.00 | $12.41 | $11.00 | $10.00 | $50.00 | $9.53 |
| 0970 | Bollards (0519-78) | EACH | 84 | $5,500.00 | $930.84 | $8,408.00 | $7,900.00 | $5,000.00 | $7,384.78 |
| 0975 | Conduit, furnish & install, open trench (0630-2-11) | LF | 2,281 | $18.00 | $14.23 | $25.50 | $24.00 | $60.00 | $15.88 |
| 0980 | Conduit, furnish & install, mount (0630-2-15) | LF | 255 | $70.25 | $49.31 | $86.00 | $81.00 | $85.00 | $57.84 |
| 0985 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 23 | $2,500.00 | $1,361.64 | $3,310.00 | $3,100.00 | $5,500.00 | $2,284.28 |
| 0990 | Junction box, furnish & install, mounted (0635-3-12) | EACH | 20 | $1,000.00 | $653.89 | $1,280.00 | $1,200.00 | $2,000.00 | $1,630.98 |
| 0995 | Electrical power service, F&I, overhead, meter furnished by power company (0639-1111) | AS | 3 | $12,500 | $6,031.21 | $16,920 | $15,900 | $27,500 | $7,651.31 |
| 1000 | Electrical service wire, & install (0639-2-1) | LF | 71 | $35.00 | $16.16 | $33.00 | $31.00 | $65.00 | $11.34 |
| 1005 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 3 | $8,000.00 | $3,307.93 | $9,750.00 | $9,100.00 | $16,000 | $1,494.88 |
| 1010 | Electrical service disconnect, F&I, cabinet (0639-3-12) | EACH | 3 | $5,000.00 | $3,769.51 | $6,150.00 | $5,800.00 | $10,000 | $3,376.51 |
| 1015 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 17,437 | $3.10 | $2.08 | $4.45 | $4.20 | $8.00 | $2.61 |
| 1020 | Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13) | LF | 213 | $7.15 | $6.31 | $9.00 | $8.50 | $12.00 | $4.99 |
| 1025 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 3 | $45,350 | $30,764 | $55,100 | $51,600 | $90,000 | $30,677 |
| 1030 | Luminaire, F&I, under deck, wall mount (0715-11125) | EACH | 4 | $3,635.00 | $3,654.12 | $4,395.00 | $4,100.00 | $7,000.00 | $1,625.31 |
| 1035 | Luminaire, remove (0715-11500) | EACH | 8 | $405.00 | $115.39 | $490.00 | $460.00 | $1,000.00 | $337.99 |
| 1040 | Light pole complete, remove pole and foundation (0715-69000) | EACH | 9 | $1,750.00 | $1,461.65 | $2,225.00 | $2,100.00 | $3,500.00 | $544.42 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of December 3, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.