FDOT contract T2A68 bid tabulation
CR 357 OVER SHIRED CREEK, BRIDGE NO 300043. Let by Florida DOT on May 20, 2026, Dixie, District 2. 4 bids received; low bid $8,739,218 by Anderson Columbia Co., Inc..
- Owner
- Florida DOT
- Letting
- 20 MAY 2026
- Pay items
- 73
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Anderson Columbia Co., Inc. | $8,739,218 | Low |
| 2 | Vecellio & Grogan, Inc. | $12,123,571 | +39% |
| 3 | Commercial Industrial Corp. | $12,180,269 | +39% |
| 4 | Superior Construction Company Southeast, LLC | $14,447,636 | +65% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Anderson Columbia Co., Inc. | 2. Vecellio & Grogan, Inc. | 3. Commercial Industrial Corp. | 4. Superior Construction Company Southeast, LLC |
|---|---|---|---|---|---|---|---|
| 0005 | Temporary work structure, project number 437402-1-52-01 (0103-1-27) | LS | 1 | $335,000 | $394,000 | $250,000 | $500,000 |
| 0010 | Removal of existing structures/bridges (0110-3) | SF | 1 | $235,000 | $412,000 | $1,200,000 | $530,000 |
| 0015 | Removal of existing structures/bridges (0110-3) | SF | 1 | $45,000 | $86,000 | $175,000 | $580,000 |
| 0020 | Excavation for structures (0125-1) | CY | 153.90 | $110.00 | $73.00 | $510.00 | $75.00 |
| 0025 | Concrete class II, approach slabs (0400-2-10) | CY | 96.60 | $1,050.00 | $1,084.00 | $1,100.00 | $1,075.00 |
| 0030 | Concrete class IV, cast in place topping with shrinkage admixture (0400-4-47) | CY | 336.80 | $2,490.00 | $2,354.00 | $2,500.00 | $3,360.00 |
| 0035 | Bridge deck grooving (0400-7-1) | SY | 1,332 | $10.00 | $8.30 | $28.00 | $13.75 |
| 0040 | Bridge deck planing (0400-9-1) | SY | 1,140 | $14.00 | $10.65 | $25.00 | $14.75 |
| 0045 | Plain neoprene bearing pads (0400-148) | CF | 24.50 | $1,100.00 | $2,600.00 | $1,885.00 | $1,510.00 |
| 0050 | Precast bent caps (0404-1) | CY | 213.30 | $6,500.00 | $6,993.00 | $6,000.00 | $7,380.00 |
| 0055 | Reinforcing steel - bridge superstructure (0415-1-4) | LB | 41,090 | $2.00 | $2.90 | $1.80 | $2.25 |
| 0060 | Reinforcing steel- approach slabs (0415-1-9) | LB | 19,754 | $2.00 | $3.60 | $1.80 | $1.50 |
| 0065 | Stainless reinforcing steel, substructure (0415-2-5) | LB | 2,088 | $28.00 | $12.20 | $4.00 | $11.30 |
| 0070 | Fiber reinforced polymer bars, #4 bar (0415-10-4) | LF | 112 | $2.00 | $3.20 | $4.75 | $0.01 |
| 0075 | Fiber reinforced polymer bars, #5 bar (0415-10-5) | LF | 56,074 | $2.65 | $3.45 | $3.76 | $2.00 |
| 0080 | Fiber reinforced polymer bars, #6 bar (0415-10-6) | LF | 3,603 | $2.00 | $3.20 | $3.32 | $2.00 |
| 0085 | Fiber reinforced polymer bars, #8 bar (0415-10-8) | LF | 5,010 | $2.00 | $3.20 | $3.90 | $0.01 |
| 0090 | Prestressed beam: florida slab beam, beam depth 12" CFRP/SS, width 55-57" (0450-8-53) | LF | 2,096 | $425.00 | $551.50 | $680.00 | $415.00 |
| 0095 | Prestressed beam: florida slab beam, beam depth 18" CFRP/SS, width 55-57" (0450-8-73) | LF | 352 | $450.00 | $557.00 | $725.00 | $505.00 |
| 0100 | Preformed pile holes, 22" to 26" drill/punch size (0455-15-13) | LF | 1,186 | $90.00 | $339.00 | $158.00 | $200.00 |
| 0105 | Preformed pile holes casing, to 26" drill/punch size (0455-15-23) | LF | 1,186 | $370.00 | $334.00 | $158.00 | $422.00 |
| 0110 | Preformed pile holes grouting, 22" to 26" drill/punch size (0455-15-33) | LF | 1,186 | $96.00 | $135.00 | $158.00 | $59.00 |
| 0115 | Pile inspection, driven pile (0455-20-1) | EACH | 60 | $600.00 | $619.00 | $555.00 | $1,000.00 |
| 0117 | Prestressed concrete piling, SQ W/FRP or stainless steel strand and reinforcing (0455-34-23) | LF | 2,002 | $300.00 | $515.00 | $520.00 | $500.00 |
| 0125 | Pile redrive (0455-115) | EACH | 46 | $1,200.00 | $430.00 | $1,238.00 | $540.00 |
| 0130 | Load test (dynamic), data collection and analysis (0455-137) | EACH | 106 | $900.00 | $2,510.00 | $1,664.00 | $935.00 |
| 0135 | Load test (dynamic), test (0455-137-2) | EACH | 12 | $2,400.00 | $2,000.00 | $2,080.00 | $163.00 |
| 0137 | Test piles-prestressed concrete,18" SQ W/ FRP or stainless steel strand and reinforcing (0455-143-23) | LF | 624 | $375.00 | $600.00 | $585.00 | $645.00 |
| 0145 | Bridge deck expansion joint, construction, F&I poured joint with backer rod (0458-1-11) | LF | 172 | $100.00 | $68.00 | $75.00 | $65.00 |
| 0150 | Metal traffic railing, thrie retrofit (0460-71-1) | LF | 1,000 | $215.00 | $245.00 | $425.00 | $200.00 |
| 0155 | Riprap, sand-cement bags (0530-1100) | CY | 52 | $1,200.00 | $1,550.00 | $778.00 | $850.00 |
| 0160 | Riprap- rubble, bank and shore (0530-3-3) | TN | 3,515 | $175.00 | $234.00 | $184.00 | $190.00 |
| 0165 | Bedding stone (0530-74) | TN | 859 | $175.00 | $625.00 | $165.00 | $400.00 |
| 0170 | Mobilization (0101-1) | LS | 1 | $420,000 | $1,000,000 | $850,000 | $1,127,930 |
| 0175 | Mobilization (0101-1) | LS | 1 | $205,000 | $200,000 | $300,000 | $326,695 |
| 0180 | Maintenance of traffic (0102-1) | DA | 1 | $30,000 | $33,000 | $120,000 | $17,000 |
| 0185 | Work zone sign (0102-60) | ED | 6,480 | $0.39 | $0.45 | $0.55 | $0.35 |
| 0190 | Type III barricade (0102-115) | ED | 1,080 | $0.39 | $0.45 | $1.39 | $0.35 |
| 0195 | Sediment barrier (0104-10-3) | LF | 2,451 | $4.55 | $7.50 | $2.90 | $15.00 |
| 0200 | Floating turbidity barrier (0104-11) | LF | 1,769 | $23.00 | $15.00 | $35.00 | $30.00 |
| 0205 | Staked turbidity barrier- nylon reinforced PVC (0104-12) | LF | 483 | $12.00 | $6.30 | $21.00 | $25.00 |
| 0210 | Soil tracking prevention device (0104-15) | EACH | 4 | $1,200.00 | $6,000.00 | $2,210.00 | $3,735.00 |
| 0215 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $35,000 | $67,900 | $150,000 | $1,200,000 |
| 0220 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $25,000 | $56,700 | $85,000 | $1,075,205 |
| 0225 | Regular excavation (0120-1) | CY | 557.40 | $40.00 | $26.00 | $25.00 | $40.50 |
| 0230 | Embankment (0120-6) | CY | 1,935.80 | $25.00 | $28.00 | $45.00 | $51.00 |
| 0235 | Type B stabilization (0160-4) | SY | 4,860 | $6.50 | $14.55 | $8.50 | $21.00 |
| 0240 | Optional base, base group 01 (0285-701) | SY | 449 | $75.00 | $82.00 | $25.00 | $92.00 |
| 0245 | Optional base, base group 06 (0285-706) | SY | 3,690 | $54.50 | $84.80 | $35.00 | $71.00 |
| 0250 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 304 | $250.00 | $434.00 | $415.00 | $340.00 |
| 0255 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 321.30 | $240.00 | $443.00 | $400.00 | $340.00 |
| 0260 | Miscellaneous asphalt (0339-1) | TN | 34 | $400.00 | $761.00 | $472.00 | $985.00 |
| 0265 | Shoulder gutter- concrete (0520-6) | LF | 1,365 | $75.00 | $80.50 | $85.00 | $70.00 |
| 0270 | Riprap, rubble, F&I, ditch lining (0530-3-4) | TN | 11.30 | $450.00 | $1,690.00 | $88.00 | $5,000.00 |
| 0275 | Guardrail -roadway, general (0536-1-1) | LF | 1,344 | $27.00 | $30.00 | $30.50 | $23.00 |
| 0280 | Guardrail transition to rigid barrier, F&I- index 536- 001, approach TL-3 (0536-8112) | EACH | 8 | $3,550.00 | $4,025.00 | $4,754.00 | $2,500.00 |
| 0285 | Guardrail removal (0536-73) | LF | 1,208 | $5.00 | $1.25 | $3.12 | $2.00 |
| 0290 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 8 | $3,300.00 | $3,715.00 | $4,800.00 | $2,375.00 |
| 0295 | Performance turf, sod (0570-1-2) | SY | 4,006 | $4.50 | $8.50 | $5.70 | $14.00 |
| 0300 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $123.00 | $123.00 | $123.00 | $123.00 |
| 0305 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $123.00 | $123.00 | $123.00 | $123.00 |
| 0310 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 10 | $500.00 | $576.00 | $8,320.00 | $465.00 |
| 0315 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 1 | $2,000.00 | $2,365.00 | $3,882.00 | $1,911.00 |
| 0320 | Object marker, type 2 (0705-10-2) | EACH | 71 | $65.00 | $68.00 | $208.00 | $55.00 |
| 0325 | Object marker, type 3 (0705-10-3) | EACH | 8 | $285.00 | $322.00 | $625.00 | $260.00 |
| 0330 | Raised pavement marker, type B (0706-1-3) | EACH | 118 | $5.50 | $6.00 | $7.00 | $5.00 |
| 0335 | Painted pavement markings, surface (0710-90) | LS | 1 | $3,300.00 | $3,640.00 | $4,160.00 | $3,000.00 |
| 0340 | Painted pavement markings, surface (0710-90) | LS | 1 | $1,100.00 | $1,215.00 | $1,387.00 | $1,000.00 |
| 0345 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 77 | $16.50 | $18.00 | $21.00 | $15.00 |
| 0350 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.53 | $8,300.00 | $9,105.00 | $10,400 | $7,500.00 |
| 0355 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.53 | $8,200.00 | $9,105.00 | $10,400 | $7,500.00 |
| 0360 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.20 | $60,000 | $66,765 | $76,300 | $55,000 |
| 0365 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.20 | $60,000 | $66,765 | $76,300 | $55,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of May 20, 2026. Compiled by Mirage Metrics.