FDOT contract T3937 bid tabulation
CR 278 (PEACOCK BRIDGE RD) OVER CHIPOLA RIVER, BRIDGE NO 530026. Let by Florida DOT on September 30, 2026, Jackson, District 3. 4 bids received; low bid $7,547,559 by Murphree Bridge Corporation.
- Owner
- Florida DOT
- Letting
- 30 SEP 2026
- Pay items
- 89
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Murphree Bridge Corporation | $7,547,559 | Low |
| 2 | Anderson Columbia Co., Inc. | $9,343,927 | +24% |
| 3 | RJ Gorman Contracting LLC | $9,561,904 | +27% |
| 4 | Superior Construction Company Southeast, LLC | $10,159,071 | +35% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Murphree Bridge Corporation | 2. Anderson Columbia Co., Inc. | 3. RJ Gorman Contracting LLC | 4. Superior Construction Company Southeast, LLC |
|---|---|---|---|---|---|---|---|
| 0005 | Removal of existing structures/bridges (0110-3) | SF | 1 | $376,000 | $650,000 | $378,173 | $450,000 |
| 0010 | Conc class II, bridge superstructure (0400-2-4) | CY | 455.90 | $1,560.00 | $945.00 | $1,345.90 | $1,300.00 |
| 0015 | Concrete class II, approach slabs (0400-2-10) | CY | 95.30 | $1,100.00 | $650.00 | $1,034.00 | $900.00 |
| 0020 | Concrete class IV, bridge substructure (0400-4-5) | CY | 141.80 | $2,750.00 | $1,600.00 | $3,238.71 | $2,000.00 |
| 0025 | Bridge deck grooving (0400-7-1) | SY | 1,573 | $8.80 | $12.00 | $12.44 | $4.00 |
| 0030 | Bridge deck planing (0400-9-1) | SY | 1,573 | $8.80 | $12.00 | $9.72 | $4.00 |
| 0035 | Composite neoprene pads (0400-147) | CF | 9.60 | $1,500.00 | $2,000.00 | $1,729.95 | $2,000.00 |
| 0040 | Reinforcing steel - bridge superstructure (0415-1-4) | LB | 78,205 | $2.00 | $1.90 | $1.64 | $1.60 |
| 0045 | Reinforcing steel- bridge substructure (0415-1-5) | LB | 25,286 | $2.00 | $1.80 | $1.64 | $1.60 |
| 0050 | Reinforcing steel- approach slabs (0415-1-9) | LB | 17,916 | $2.00 | $1.70 | $1.64 | $1.60 |
| 0055 | Prest beams: florida-I beam 45" (0450-2-45) | LF | 1,999 | $425.00 | $475.00 | $444.90 | $547.00 |
| 0060 | Drilled shaft, 42" dia (0455-88-4) | LF | 831 | $680.00 | $1,785.00 | $894.36 | $1,850.00 |
| 0065 | Drilled shaft casing, 42" diameter (0455-107-4) | LF | 218 | $350.00 | $505.00 | $3,186.10 | $266.00 |
| 0070 | Core-pilot hole, drilled shaft excavation (0455-111) | LF | 836 | $21.00 | $120.00 | $157.56 | $110.00 |
| 0075 | Excavation unclassified shaft, 42" dia (0455-122-4) | LF | 710 | $565.00 | $625.00 | $967.53 | $630.00 |
| 0080 | Thermal integrity testing, UP 4' shaft diameter (0455-147-1) | EACH | 12 | $5,150.00 | $3,500.00 | $9,660.59 | $3,000.00 |
| 0085 | Bridge deck expansion joint, construction, F&I poured joint with backer rod (0458-1-11) | LF | 83 | $110.00 | $90.00 | $94.21 | $55.00 |
| 0090 | Concrete traffic railing- 36" single-slope (0521-5-13) | LF | 820 | $140.00 | $160.00 | $158.18 | $130.00 |
| 0095 | Riprap, sand-cement bags (0530-1100) | CY | 41.70 | $1,200.00 | $955.00 | $800.19 | $995.00 |
| 0100 | Riprap- rubble, bank and shore (0530-3-3) | TN | 2,294.70 | $120.00 | $145.00 | $133.54 | $109.00 |
| 0105 | Bedding stone (0530-74) | TN | 854.30 | $125.00 | $165.00 | $176.94 | $115.00 |
| 0110 | Conduit, furnish & install, embedded concrete barriers and traffic railings (0630-2-16) | LF | 2,460 | $4.85 | $12.00 | $13.87 | $15.00 |
| 0115 | Junction box, furnish & install, embedded (0635-3-13) | EACH | 6 | $2,000.00 | $800.00 | $816.42 | $1,800.00 |
| 0120 | Mobilization (0101-1) | LS | 1 | $886,604 | $950,000 | $802,780 | $1,015,905 |
| 0125 | Maintenance of traffic (0102-1) | DA | 1 | $60,000 | $50,000 | $72,664 | $200,000 |
| 0130 | Special detour- temporary pavement (0102-2200) | SY | 1 | $165,838 | $90,000 | $134,441 | $175,000 |
| 0135 | Special detour- temporary earthwork/base (0102-2300) | CY | 1 | $74,770 | $125,000 | $114,592 | $100,000 |
| 0140 | Commercial material for temporary driveway maintenance (0102-3) | CY | 41.20 | $75.00 | $18.00 | $180.59 | $125.00 |
| 0145 | Work zone sign (0102-60) | ED | 8,412 | $0.36 | $0.41 | $0.50 | $0.40 |
| 0150 | Temporary barrier, F&I, anchored (0102-71-15) | LF | 1,100 | $50.00 | $56.00 | $68.97 | $40.00 |
| 0155 | Temporary barrier, relocate, anchored (0102-71-25) | LF | 200 | $25.00 | $27.50 | $34.48 | $20.00 |
| 0160 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 26,582 | $0.13 | $0.15 | $0.18 | $0.15 |
| 0165 | Temporary crash cushion, redirective option (0102-89-1) | LO | 6 | $1,250.00 | $2,500.00 | $1,724.08 | $1,000.00 |
| 0170 | Portable changeable message sign, temporary (0102-99) | ED | 998 | $17.00 | $19.35 | $23.45 | $17.00 |
| 0175 | Type III barricade (0102-115) | ED | 220 | $1.00 | $1.14 | $1.38 | $1.00 |
| 0180 | Radar speed display unit (0102-150-2) | ED | 200 | $15.00 | $17.00 | $20.69 | $15.00 |
| 0185 | Sediment barrier (0104-10-3) | LF | 5,016 | $2.00 | $3.50 | $2.46 | $10.00 |
| 0190 | Floating turbidity barrier (0104-11) | LF | 320 | $12.00 | $35.00 | $23.86 | $25.00 |
| 0195 | Staked turbidity barrier- nylon reinforced PVC (0104-12) | LF | 711 | $5.00 | $12.00 | $16.48 | $20.00 |
| 0200 | Soil tracking prevention device (0104-15) | EACH | 3 | $4,500.00 | $3,000.00 | $3,102.36 | $6,630.00 |
| 0205 | Inlet protection system (0104-18) | EACH | 4 | $250.00 | $300.00 | $230.02 | $110.00 |
| 0210 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $10,750 | $30,000 | $3,792.98 | $7,600.00 |
| 0215 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $13,000 | $30,000 | $18,620 | $48,320 |
| 0220 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $20,000 | $150,000 | $54,169 | $1,035,644 |
| 0225 | Removal of existing concrete (0110-4-10) | SY | 130 | $40.00 | $50.00 | $28.95 | $45.00 |
| 0230 | Regular excavation (0120-1) | CY | 17,362 | $8.00 | $14.50 | $14.33 | $9.00 |
| 0235 | Subsoil excavation (0120-4) | CY | 320 | $15.00 | $32.00 | $17.79 | $16.50 |
| 0240 | Embankment (0120-6) | CY | 44,042 | $10.00 | $22.50 | $19.43 | $11.00 |
| 0245 | Geosynthetic reinforced soil slope (0145-1) | SF | 1,883 | $4.50 | $5.00 | $2.64 | $4.75 |
| 0250 | Geosynthetic reinforced foundation over soft soil (0145-2) | SY | 1,612 | $12.00 | $6.00 | $6.11 | $12.50 |
| 0255 | Type B stabilization (0160-4) | SY | 13,187 | $8.00 | $5.00 | $8.47 | $8.50 |
| 0260 | Optional base, base group 01 (0285-701) | SY | 3,115 | $20.00 | $8.00 | $20.80 | $22.00 |
| 0265 | Optional base, base group 06 (0285-706) | SY | 8,221 | $24.00 | $18.00 | $23.65 | $26.50 |
| 0270 | Turnout base- optional materials (0286-1) | SY | 66 | $45.00 | $32.00 | $38.16 | $50.00 |
| 0275 | Milling existing asphalt pavement, 1 1/4" avg depth (0327-70-12) | SY | 3,934 | $4.50 | $6.00 | $4.69 | $4.50 |
| 0280 | Superpave asphaltic concrete, traffic B, PG76-22 (0334-1-52) | TN | 851.10 | $168.00 | $150.00 | $234.47 | $175.00 |
| 0285 | Asphalt concrete friction course,traffic B, FC-9.5, PG 76-22 (0337-7-80) | TN | 1,031.40 | $172.00 | $150.00 | $241.37 | $180.00 |
| 0290 | Miscellaneous asphalt (0339-1) | TN | 51.40 | $400.00 | $330.00 | $413.78 | $420.00 |
| 0295 | Inlets, DT bot, type C,<10' (0425-1521) | EACH | 1 | $6,500.00 | $6,500.00 | $6,015.94 | $7,300.00 |
| 0300 | Inlets, gutter, type S, <10' (0425-1701) | EACH | 7 | $12,800 | $7,500.00 | $9,537.93 | $13,900 |
| 0305 | Pipe culvert optional material, round, 18", gutter drain (0430-173118) | LF | 185 | $130.00 | $115.00 | $121.42 | $130.00 |
| 0310 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 88 | $70.00 | $155.00 | $84.35 | $70.00 |
| 0315 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 37 | $160.00 | $125.00 | $208.74 | $160.00 |
| 0320 | Straight concrete endwalls, single, 0 degrees, round (0430-524100) | EACH | 2 | $6,100.00 | $6,000.00 | $4,053.68 | $6,100.00 |
| 0325 | Mitered end section, optional round, 18" CD (0430-982125) | EACH | 6 | $2,800.00 | $3,000.00 | $2,211.66 | $2,800.00 |
| 0330 | Shoulder gutter- concrete (0520-6) | LF | 1,021 | $38.00 | $65.00 | $48.28 | $42.00 |
| 0335 | Concrete ditch pavt, non reinforced, 3" (0524-1-1) | SY | 9 | $400.00 | $285.00 | $306.51 | $195.00 |
| 0340 | Riprap, rubble, F&I, ditch lining (0530-3-4) | TN | 31.60 | $300.00 | $240.00 | $175.57 | $145.00 |
| 0345 | Bedding stone (0530-74) | TN | 18.70 | $350.00 | $225.00 | $318.44 | $475.00 |
| 0350 | Guardrail -roadway, general (0536-1-1) | LF | 1,334 | $28.00 | $32.00 | $38.62 | $22.50 |
| 0355 | Guardrail transition to rigid barrier, F&I- index 536- 001, approach TL-3 (0536-8112) | EACH | 4 | $3,650.00 | $4,100.00 | $5,034.32 | $3,750.00 |
| 0360 | Guardrail removal (0536-73) | LF | 1,859 | $2.00 | $3.50 | $2.76 | $2.75 |
| 0365 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 4 | $3,500.00 | $4,000.00 | $4,827.42 | $2,800.00 |
| 0370 | Performance turf (0570-1-1) | SY | 11,583 | $1.50 | $1.71 | $1.10 | $3.75 |
| 0375 | Performance turf, sod (0570-1-2) | SY | 19,325 | $3.50 | $3.98 | $4.48 | $5.50 |
| 0380 | Raised pavement marker, type B (0706-1-3) | EACH | 1,027 | $5.00 | $5.50 | $6.90 | $5.00 |
| 0385 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 3.66 | $1,500.00 | $2,200.00 | $2,068.89 | $1,500.00 |
| 0390 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 24 | $1.00 | $3.42 | $1.38 | $1.00 |
| 0395 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 3.69 | $1,500.00 | $2,105.00 | $2,068.89 | $1,500.00 |
| 0400 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 2 | $580.01 | $700.00 | $799.98 | $600.00 |
| 0405 | Single column ground sign assembly, relocate (0700-1500) | EACH | 5 | $75.00 | $100.00 | $275.85 | $75.00 |
| 0410 | Single column ground sign assembly, remove (0700-1600) | EACH | 6 | $50.00 | $100.00 | $68.97 | $50.00 |
| 0415 | Raised pavement marker, type B (0706-1-3) | EACH | 216 | $6.00 | $5.50 | $8.28 | $6.00 |
| 0420 | Painted pavement markings, surface (0710-90) | LS | 1 | $4,880.00 | $6,000.00 | $6,730.79 | $4,880.00 |
| 0425 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 33 | $10.00 | $17.00 | $13.79 | $10.00 |
| 0430 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 1.48 | $6,000.00 | $5,500.00 | $8,275.57 | $6,000.00 |
| 0435 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 1.51 | $6,000.00 | $5,500.00 | $8,275.57 | $6,000.00 |
| 0440 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.13 | $31,500 | $50,000 | $43,447 | $31,500 |
| 0445 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.13 | $31,500 | $50,000 | $43,447 | $31,500 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of September 30, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.