FDOT contract T7599 bid tabulation

SR 45 (US 41) FROM S OF COUNTY LINE RD TO S OF POWELL RD. Let by Florida DOT on July 29, 2026, Hernando, District 7. 4 bids received; low bid $7,926,652 by C.W. Roberts Contracting, Inc..

Owner
Florida DOT
Letting
29 JUL 2026
Pay items
142
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1C.W. Roberts Contracting, Inc.$7,926,652Low
2Superior Asphalt, Inc.$8,119,001+2.0%
3Preferred Materials Inc.$8,626,077+9.0%
4Ajax Paving Industries of Florida LLC$9,595,574+21%
FDOT contract T7599: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. C.W. Roberts Contracting, Inc.2. Superior Asphalt, Inc.3. Preferred Materials Inc.4. Ajax Paving Industries of Florida LLC
0005Mobilization (0101-1)LS1$505,800$328,361$463,000$506,933
0010Maintenance of traffic 220 DA (0102-1)DA1$345,000$370,298$436,100$652,619
0015Pedestrian or bicycle special detour 1200 SY (0102-4-1)SY1$40,000$55,034$10,008$75,945
0020Traffic control officer (0102-14)HR864$90.00$105.08$83.87$110.60
0025Work zone sign (0102-60)ED54,570$0.25$0.22$0.21$0.21
0030Temporary barrier, F&I, low profile, concrete (0102-71-13)LF600$38.05$38.72$36.69$42.89
0035Temporary barrier, relocate, low profile concrete (0102-71-23)LF600$17.40$17.70$16.77$19.61
0040Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED126,832$0.13$0.11$0.10$0.11
0045Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD19,880$0.05$0.06$0.05$0.05
0050Arrow board / advance warning arrow panel (0102-76)ED440$6.55$5.53$5.24$5.27
0055Temporary raised/retroreflective pavement marker, type B (0102-78-2)EACH3,622$4.60$4.71$4.19$4.21
0060Portable changeable message sign, temporary (0102-99)ED3,274$11.00$9.95$9.44$9.48
0065Temporary signalization and maintenance, intersection (0102-104)ED880$25.44$21.02$28.61$20.01
0070Temporary traffic detection and maintenance, intersection (0102-107-1)ED880$15.06$27.66$28.62$26.33
0075Existing ITS maintenance (0102-112)DA220$171.00$155.97$85.94$148.52
0080Type III barricade (0102-115)ED2,712$0.38$0.25$0.24$0.24
0085Portable regulatory, sign (0102-150-1)ED880$6.50$5.53$5.24$5.27
0090Radar speed display unit (0102-150-2)ED880$6.50$5.53$5.24$5.27
0095Temporary raised rumble per day, includes all sets and relocations (0102-909)DA220$41.00$71.90$68.14$68.47
0100Sediment barrier (0104-10-3)LF1,319$1.25$1.64$1.89$4.67
0105Inlet protection system (0104-18)EACH80$130.00$138.27$157.25$131.67
0110Litter removal (0107-1)ACRE433.38$30.00$29.98$31.45$29.92
0115Mowing (0107-2)ACRE393.50$80.00$78.82$78.63$78.68
0120Clearing & grubbing (0110-1-1)ACRE1$51,344$17,986$169,875$53,644
0125Removal of existing concrete (0110-4-10)SY631$38.00$28.49$41.70$71.10
0130Regular excavation (0120-1)CY1,500$11.00$31.19$21.65$48.66
0135Embankment (0120-6)CY500$21.00$35.18$33.20$46.81
0140Type B stabilization (0160-4)SY2,228$16.00$13.28$32.12$20.23
0145Optional base, base group 09 (0285-709)SY2,099$44.75$64.85$56.08$63.81
0150Milling existing asphalt pavement, 4 1/2" avg depth (0327-70-3)SY21,559$2.84$0.90$4.30$6.30
0155Milling existing asphalt pavement, 3" avg depth (0327-70-4)SY48,943$1.00$1.04$2.94$4.87
0160Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY43,898$5.00$3.69$3.51$6.94
0165Milling existing asphalt pavement, 4" avg depth (0327-70-7)SY38,773$3.97$2.06$3.60$5.97
0170Milling existing asphalt pavement, 5" avg depth (0327-70-10)SY8,565$2.59$3.06$4.57$11.68
0175Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11)SY1,857$3.86$2.59$5.79$6.59
0180Milling existing asphalt pavement, 3 3/4" avg depth (0327-70-20)SY9,150$4.05$2.03$4.74$6.01
0185Superpave asphaltic conc, traffic C (0334-1-13)TN17,038.90$109.50$144.65$123.40$143.31
0190Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25)TN441.70$309.00$285.63$309.39$332.79
0195Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN12,706.80$177.00$164.09$180.99$176.89
0200Pipe culvert, optional material, round, 18"SD (0430-174118)LF675$89.00$147.67$200.29$189.28
0205Pipe culvert, optional material, round, 24"SD (0430-174124)LF210$111.00$150.99$278.71$226.46
0210Pipe culvert, optional material, other shape - ellip/arch, 15"SD (0430-174215)LF98$107.25$167.03$191.99$197.50
0215Pipe culvert, optional material, other shape - ellip/arch, 18"SD (0430-174218)LF362$113.35$167.03$235.69$234.28
0220Mitered end section, optional round, 18" SD (0430-984125)EACH22$2,024.00$1,858.34$3,231.00$1,944.60
0225Mitered end section, optional round, 24" SD (0430-984129)EACH4$2,591.00$2,024.27$3,795.73$2,172.27
0230Mitered end section, optional other - ellip/arch, 15" SD (0430-984623)EACH4$2,065.00$2,013.21$3,073.01$1,867.96
0235Mitered end sect, optional - elliptical / arch, 18" SD (0430-984625)EACH8$2,226.00$2,101.71$3,369.35$1,969.40
0240Chemical grout repair, pipe, test, 18" (0432-3-2)EACH1$6,553.00$663.69$3,721.59$2,106.70
0245Chemical grout repair, pipe, test, 24" (0432-3-4)EACH1$9,913.00$1,050.85$4,245.75$2,370.03
0250Chemical grout repair, pipe, test, 30" (0432-3-5)EACH1$10,320$1,106.16$4,481.63$2,370.03
0255Chemical grout repair, pipe, test, 36" (0432-3-6)EACH1$12,045$1,327.39$4,481.63$2,633.37
0260Concrete curb & gutter, type F (0520-1-10)LF863$39.00$41.92$41.63$57.64
0265Concrete sidewalk and driveways, 4" thick (0522-1)SY305$83.00$129.15$81.07$101.62
0270Concrete sidewalk and driveways, 6" thick (0522-2)SY115$124.50$149.16$112.38$153.63
0275Detectable warnings (0527-2)SF74$43.65$45.35$49.29$22.12
0280Performance turf, sod (0570-1-2)SY3,406$6.30$6.72$8.75$7.35
0285Shoulder drop off soil (0570-13-1)CY439.90$27.80$35.18$50.54$26.33
0290Conduit, furnish & install, open trench (0630-2-11)LF48$60.99$17.14$26.02$16.33
0295Conduit, furnish & install, directional bore (0630-2-12)LF201$53.30$40.93$57.72$38.97
0300Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH8$1,913.00$1,947.95$1,487.44$1,854.95
0305Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1)EACH8$3,544.00$3,152.55$2,522.61$3,002.04
0310Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12)EACH8$3,342.00$2,943.49$3,311.72$2,802.96
0315Painted pavement markings, standard, white, solid, 6" (0710-11101)GM12.36$2,010.50$2,046.40$1,467.19$1,474.69
0320Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102)GM0.75$2,111.50$2,157.01$1,566.24$1,580.02
0325Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF4,375$1.10$1.10$1.05$1.05
0330Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124)LF2,220$1.65$1.66$1.31$1.32
0335Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF1,320$2.20$2.21$1.57$1.58
0340Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM5.63$652.00$663.69$733.31$737.34
0345Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM0.81$752.50$774.31$725.67$737.34
0350Painted pavement markings, standard, white, message or symbol (0710-11160)EACH14$43.50$44.25$68.14$68.47
0355Painted pavement markings, standard, white, arrows (0710-11170)EACH168$43.50$44.25$36.69$36.87
0360Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM9.59$2,010.50$2,046.40$1,467.21$1,474.69
0365Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224)LF796$1.65$1.66$1.31$1.32
0370Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241)GM0.83$761.00$774.31$733.83$737.34
0375Initial contingency amount, DO not bid (0999-25)LS1$95,000$95,000$95,000$95,000
0385Ground-in rumble strips, 8" sinusoidal (0546-72-3)GM9.85$2,083.00$2,238.29$2,963.06$1,637.50
0390Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH109$543.56$580.74$524.17$526.67
0395Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH15$2,174.00$2,322.93$2,096.67$2,106.70
0400Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113)EACH2$2,664.00$2,654.79$2,568.43$2,580.70
0405Single column ground sign assembly, F&I ground mount, SF sheeting area for back to back signs (0700-1114)EACH2$3,044.00$2,765.40$2,935.34$2,949.37
0410Single column ground sign assembly, relocate (0700-1500)EACH1$234.00$553.08$225.39$226.47
0415Single column ground sign assembly, remove (0700-1600)EACH83$11.00$11.06$10.48$10.53
0420Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH2$299.00$331.85$288.30$289.67
0425Sign panel, remove, UP to 12 SF (0700-3601)EACH4$21.74$11.06$20.97$21.07
0430Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH73$92.41$99.56$89.11$89.53
0435Tubular marker, 36" white post (0704-1-3)EACH29$130.45$193.58$125.80$126.40
0440Object marker, type 1 (0705-10-1)EACH6$217.50$276.53$209.67$210.67
0445Raised pavement marker, type B (0706-1-3)EACH3,622$4.35$4.43$4.19$4.21
0450Painted pavement markings, surface (0710-90)LS1$78,000$78,670$59,650$59,935
0455Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102)GM0.75$5,793.00$5,917.95$6,787.03$6,846.76
0460Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF4,375$3.25$3.31$4.19$4.21
0465Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF2,220$4.65$4.71$5.24$5.27
0470Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF1,372$6.00$6.09$6.29$6.32
0475Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.81$1,505.00$1,548.63$3,110.01$3,160.04
0480Thermoplastic, standard, message or symbol (0711-11160)EACH14$217.50$221.23$262.08$263.34
0485Thermoplastic, standard, arrow (0711-11170)EACH168$98.00$99.56$83.87$84.27
0490Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF796$4.60$4.71$5.24$5.27
0495Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.83$1,522.00$1,548.63$3,145.00$3,160.04
0500Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF3,459$16.30$16.59$15.73$15.80
0505Thermoplastic, preformed, white, message (0711-14160)EACH7$206.55$210.17$235.87$237.00
0510Thermoplastic, preformed, white, arrow (0711-14170)EACH7$81.55$82.97$131.04$131.67
0515Thermoplastic, preformed, 12" white on asphalt pavement, railroad dynamic envelope (0711-14193)LF537$6.55$6.64$15.73$15.80
0520Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM11.64$5,452.00$5,548.49$5,240.77$5,266.74
0525Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM5.63$1,390.50$1,415.89$2,618.98$2,633.37
0530Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM9.59$5,451.00$5,548.49$5,240.03$5,266.74
0535Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 12' arm length (0715-61342)EACH1$11,605$12,086$8,959.42$11,509
0540Light pole complete, remove pole and foundation (0715-69000)EACH1$2,976.50$2,525.36$1,249.60$2,404.79
0545Light pole complete, remove pole, foundation remains (0715-69001)EACH1$1,622.00$516.57$684.05$491.91
0550Itsfm location documentation- intersection (0611-2-1)EACH3$2,106.00$3,201.23$3,473.02$3,048.39
0555Conduit, furnish & install, open trench (0630-2-11)LF689$25.70$17.14$14.97$16.33
0560Conduit, furnish & install, directional bore (0630-2-12)LF621$51.09$40.93$38.80$38.97
0565Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI4$8,270.83$11,750$9,357.01$11,189
0570Fiber optic cable locator (0633-6)DA220$154.92$149.33$140.61$142.20
0575Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH22$1,913.00$1,947.95$1,491.55$1,854.95
0580Aluminum signals pole, (0646-1-11)EACH7$2,701.50$3,467.81$2,840.94$3,302.24
0585Aluminum signals pole, remove (0646-1-60)EACH4$1,150.00$1,151.51$1,126.96$1,096.53
0590Vehicular traffic signal, furnish & install aluminum, 1 section, 2-4 way (0650-1-12)AS3$3,073.00$3,420.25$2,002.14$3,256.95
0595Vehicular traffic signal, furnish & install aluminum, 2 section, 1-2 ways (0650-1-13)AS2$2,065.50$1,650.39$1,492.03$1,571.59
0600Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS15$2,383.00$2,358.34$2,050.18$2,245.74
0605Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16)AS1$2,670.00$3,362.72$2,770.09$3,202.18
0610Vehicular traffic signal, furnish & install aluminum, 5 section cluster, 1 way (0650-1-19)AS1$4,223.40$4,328.40$3,464.69$4,121.75
0615Vehicular traffic signal, remove- poles to remain (0650-1-60)AS20$323.00$26.27$367.26$25.02
0620Vehicular traffic signal, relocate- includes removal reinstallation (0650-1-70)AS2$1,446.00$1,412.56$1,224.32$1,345.12
0625Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109)EACH11$796.00$658.16$498.64$626.74
0630Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS6$1,055.00$1,043.11$1,068.07$993.31
0635Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12)AS1$2,065.53$2,293.07$2,043.44$2,183.59
0640Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60)AS1$193.50$127.21$362.03$121.13
0645Loop detector inductive, F&I, type 10 (0660-1110)EACH9$407.70$349.82$619.38$333.12
0650Loop assembly, F&I, type B (0660-2102)AS4$2,498.00$1,664.77$2,301.10$1,585.29
0655Loop assembly, F&I, type F (0660-2106)AS16$1,543.00$2,058.56$2,512.95$1,960.28
0660Vehicle detection system- avi, bluetooth, furnish & install, cabinet equipment (0660-6121)EACH3$1,293.65$1,202.39$2,027.64$1,144.99
0665Vehicle detection system- avi, bluetooth, furnish & install, above ground equipment (0660-6122)EACH3$15,250$11,942$15,420$11,372
0670Pedestrian detector, furnish & install, accessible (0665-1-12)EACH8$2,257.00$2,222.27$1,646.09$2,116.18
0675Traffic controller assembly, modify only - no components added (0670-5710)AS3$1,274.00$2,430.23$2,503.16$2,314.20
0680Traffic controller without cabinet, atc, F&I in existing NEMA cabinet (0671-2-15)EACH1$8,398.00$9,683.31$13,135$9,221.00
0685Traffic controller, remove- cabinet to remain (0671-2-60)EACH1$1,235.50$254.42$651.38$242.27
0690ITS CCTV camera, pressurized, high definition (0682-1163)EACH3$11,550$12,137$9,269.16$11,557
0695Cellular modem, furnish and install (0684-8-1)EACH1$8,985.00$8,528.48$6,068.86$8,121.31
0700Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH3$1,230.00$1,942.41$1,192.85$1,849.68
0705Sign panel, remove, UP to 12 SF (0700-3601)EACH3$315.00$100.66$339.19$95.85
0710Sign panel, remove, 12-20 SF (0700-3602)EACH12$394.00$150.99$315.81$143.78
0715Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH12$8,249.00$6,757.53$6,762.09$6,434.90
FDOT contract T7599: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of July 29, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy