| 0005 | Mobilization (0101-1) | LS | 1 | $505,800 | $328,361 | $463,000 | $506,933 |
| 0010 | Maintenance of traffic 220 DA (0102-1) | DA | 1 | $345,000 | $370,298 | $436,100 | $652,619 |
| 0015 | Pedestrian or bicycle special detour 1200 SY (0102-4-1) | SY | 1 | $40,000 | $55,034 | $10,008 | $75,945 |
| 0020 | Traffic control officer (0102-14) | HR | 864 | $90.00 | $105.08 | $83.87 | $110.60 |
| 0025 | Work zone sign (0102-60) | ED | 54,570 | $0.25 | $0.22 | $0.21 | $0.21 |
| 0030 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 600 | $38.05 | $38.72 | $36.69 | $42.89 |
| 0035 | Temporary barrier, relocate, low profile concrete (0102-71-23) | LF | 600 | $17.40 | $17.70 | $16.77 | $19.61 |
| 0040 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 126,832 | $0.13 | $0.11 | $0.10 | $0.11 |
| 0045 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 19,880 | $0.05 | $0.06 | $0.05 | $0.05 |
| 0050 | Arrow board / advance warning arrow panel (0102-76) | ED | 440 | $6.55 | $5.53 | $5.24 | $5.27 |
| 0055 | Temporary raised/retroreflective pavement marker, type B (0102-78-2) | EACH | 3,622 | $4.60 | $4.71 | $4.19 | $4.21 |
| 0060 | Portable changeable message sign, temporary (0102-99) | ED | 3,274 | $11.00 | $9.95 | $9.44 | $9.48 |
| 0065 | Temporary signalization and maintenance, intersection (0102-104) | ED | 880 | $25.44 | $21.02 | $28.61 | $20.01 |
| 0070 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 880 | $15.06 | $27.66 | $28.62 | $26.33 |
| 0075 | Existing ITS maintenance (0102-112) | DA | 220 | $171.00 | $155.97 | $85.94 | $148.52 |
| 0080 | Type III barricade (0102-115) | ED | 2,712 | $0.38 | $0.25 | $0.24 | $0.24 |
| 0085 | Portable regulatory, sign (0102-150-1) | ED | 880 | $6.50 | $5.53 | $5.24 | $5.27 |
| 0090 | Radar speed display unit (0102-150-2) | ED | 880 | $6.50 | $5.53 | $5.24 | $5.27 |
| 0095 | Temporary raised rumble per day, includes all sets and relocations (0102-909) | DA | 220 | $41.00 | $71.90 | $68.14 | $68.47 |
| 0100 | Sediment barrier (0104-10-3) | LF | 1,319 | $1.25 | $1.64 | $1.89 | $4.67 |
| 0105 | Inlet protection system (0104-18) | EACH | 80 | $130.00 | $138.27 | $157.25 | $131.67 |
| 0110 | Litter removal (0107-1) | ACRE | 433.38 | $30.00 | $29.98 | $31.45 | $29.92 |
| 0115 | Mowing (0107-2) | ACRE | 393.50 | $80.00 | $78.82 | $78.63 | $78.68 |
| 0120 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $51,344 | $17,986 | $169,875 | $53,644 |
| 0125 | Removal of existing concrete (0110-4-10) | SY | 631 | $38.00 | $28.49 | $41.70 | $71.10 |
| 0130 | Regular excavation (0120-1) | CY | 1,500 | $11.00 | $31.19 | $21.65 | $48.66 |
| 0135 | Embankment (0120-6) | CY | 500 | $21.00 | $35.18 | $33.20 | $46.81 |
| 0140 | Type B stabilization (0160-4) | SY | 2,228 | $16.00 | $13.28 | $32.12 | $20.23 |
| 0145 | Optional base, base group 09 (0285-709) | SY | 2,099 | $44.75 | $64.85 | $56.08 | $63.81 |
| 0150 | Milling existing asphalt pavement, 4 1/2" avg depth (0327-70-3) | SY | 21,559 | $2.84 | $0.90 | $4.30 | $6.30 |
| 0155 | Milling existing asphalt pavement, 3" avg depth (0327-70-4) | SY | 48,943 | $1.00 | $1.04 | $2.94 | $4.87 |
| 0160 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 43,898 | $5.00 | $3.69 | $3.51 | $6.94 |
| 0165 | Milling existing asphalt pavement, 4" avg depth (0327-70-7) | SY | 38,773 | $3.97 | $2.06 | $3.60 | $5.97 |
| 0170 | Milling existing asphalt pavement, 5" avg depth (0327-70-10) | SY | 8,565 | $2.59 | $3.06 | $4.57 | $11.68 |
| 0175 | Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11) | SY | 1,857 | $3.86 | $2.59 | $5.79 | $6.59 |
| 0180 | Milling existing asphalt pavement, 3 3/4" avg depth (0327-70-20) | SY | 9,150 | $4.05 | $2.03 | $4.74 | $6.01 |
| 0185 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 17,038.90 | $109.50 | $144.65 | $123.40 | $143.31 |
| 0190 | Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25) | TN | 441.70 | $309.00 | $285.63 | $309.39 | $332.79 |
| 0195 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 12,706.80 | $177.00 | $164.09 | $180.99 | $176.89 |
| 0200 | Pipe culvert, optional material, round, 18"SD (0430-174118) | LF | 675 | $89.00 | $147.67 | $200.29 | $189.28 |
| 0205 | Pipe culvert, optional material, round, 24"SD (0430-174124) | LF | 210 | $111.00 | $150.99 | $278.71 | $226.46 |
| 0210 | Pipe culvert, optional material, other shape - ellip/arch, 15"SD (0430-174215) | LF | 98 | $107.25 | $167.03 | $191.99 | $197.50 |
| 0215 | Pipe culvert, optional material, other shape - ellip/arch, 18"SD (0430-174218) | LF | 362 | $113.35 | $167.03 | $235.69 | $234.28 |
| 0220 | Mitered end section, optional round, 18" SD (0430-984125) | EACH | 22 | $2,024.00 | $1,858.34 | $3,231.00 | $1,944.60 |
| 0225 | Mitered end section, optional round, 24" SD (0430-984129) | EACH | 4 | $2,591.00 | $2,024.27 | $3,795.73 | $2,172.27 |
| 0230 | Mitered end section, optional other - ellip/arch, 15" SD (0430-984623) | EACH | 4 | $2,065.00 | $2,013.21 | $3,073.01 | $1,867.96 |
| 0235 | Mitered end sect, optional - elliptical / arch, 18" SD (0430-984625) | EACH | 8 | $2,226.00 | $2,101.71 | $3,369.35 | $1,969.40 |
| 0240 | Chemical grout repair, pipe, test, 18" (0432-3-2) | EACH | 1 | $6,553.00 | $663.69 | $3,721.59 | $2,106.70 |
| 0245 | Chemical grout repair, pipe, test, 24" (0432-3-4) | EACH | 1 | $9,913.00 | $1,050.85 | $4,245.75 | $2,370.03 |
| 0250 | Chemical grout repair, pipe, test, 30" (0432-3-5) | EACH | 1 | $10,320 | $1,106.16 | $4,481.63 | $2,370.03 |
| 0255 | Chemical grout repair, pipe, test, 36" (0432-3-6) | EACH | 1 | $12,045 | $1,327.39 | $4,481.63 | $2,633.37 |
| 0260 | Concrete curb & gutter, type F (0520-1-10) | LF | 863 | $39.00 | $41.92 | $41.63 | $57.64 |
| 0265 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 305 | $83.00 | $129.15 | $81.07 | $101.62 |
| 0270 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 115 | $124.50 | $149.16 | $112.38 | $153.63 |
| 0275 | Detectable warnings (0527-2) | SF | 74 | $43.65 | $45.35 | $49.29 | $22.12 |
| 0280 | Performance turf, sod (0570-1-2) | SY | 3,406 | $6.30 | $6.72 | $8.75 | $7.35 |
| 0285 | Shoulder drop off soil (0570-13-1) | CY | 439.90 | $27.80 | $35.18 | $50.54 | $26.33 |
| 0290 | Conduit, furnish & install, open trench (0630-2-11) | LF | 48 | $60.99 | $17.14 | $26.02 | $16.33 |
| 0295 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 201 | $53.30 | $40.93 | $57.72 | $38.97 |
| 0300 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 8 | $1,913.00 | $1,947.95 | $1,487.44 | $1,854.95 |
| 0305 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 8 | $3,544.00 | $3,152.55 | $2,522.61 | $3,002.04 |
| 0310 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 8 | $3,342.00 | $2,943.49 | $3,311.72 | $2,802.96 |
| 0315 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 12.36 | $2,010.50 | $2,046.40 | $1,467.19 | $1,474.69 |
| 0320 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.75 | $2,111.50 | $2,157.01 | $1,566.24 | $1,580.02 |
| 0325 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 4,375 | $1.10 | $1.10 | $1.05 | $1.05 |
| 0330 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 2,220 | $1.65 | $1.66 | $1.31 | $1.32 |
| 0335 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 1,320 | $2.20 | $2.21 | $1.57 | $1.58 |
| 0340 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 5.63 | $652.00 | $663.69 | $733.31 | $737.34 |
| 0345 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.81 | $752.50 | $774.31 | $725.67 | $737.34 |
| 0350 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 14 | $43.50 | $44.25 | $68.14 | $68.47 |
| 0355 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 168 | $43.50 | $44.25 | $36.69 | $36.87 |
| 0360 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 9.59 | $2,010.50 | $2,046.40 | $1,467.21 | $1,474.69 |
| 0365 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 796 | $1.65 | $1.66 | $1.31 | $1.32 |
| 0370 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.83 | $761.00 | $774.31 | $733.83 | $737.34 |
| 0375 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $95,000 | $95,000 | $95,000 | $95,000 |
| 0385 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 9.85 | $2,083.00 | $2,238.29 | $2,963.06 | $1,637.50 |
| 0390 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 109 | $543.56 | $580.74 | $524.17 | $526.67 |
| 0395 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 15 | $2,174.00 | $2,322.93 | $2,096.67 | $2,106.70 |
| 0400 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 2 | $2,664.00 | $2,654.79 | $2,568.43 | $2,580.70 |
| 0405 | Single column ground sign assembly, F&I ground mount, SF sheeting area for back to back signs (0700-1114) | EACH | 2 | $3,044.00 | $2,765.40 | $2,935.34 | $2,949.37 |
| 0410 | Single column ground sign assembly, relocate (0700-1500) | EACH | 1 | $234.00 | $553.08 | $225.39 | $226.47 |
| 0415 | Single column ground sign assembly, remove (0700-1600) | EACH | 83 | $11.00 | $11.06 | $10.48 | $10.53 |
| 0420 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 2 | $299.00 | $331.85 | $288.30 | $289.67 |
| 0425 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 4 | $21.74 | $11.06 | $20.97 | $21.07 |
| 0430 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 73 | $92.41 | $99.56 | $89.11 | $89.53 |
| 0435 | Tubular marker, 36" white post (0704-1-3) | EACH | 29 | $130.45 | $193.58 | $125.80 | $126.40 |
| 0440 | Object marker, type 1 (0705-10-1) | EACH | 6 | $217.50 | $276.53 | $209.67 | $210.67 |
| 0445 | Raised pavement marker, type B (0706-1-3) | EACH | 3,622 | $4.35 | $4.43 | $4.19 | $4.21 |
| 0450 | Painted pavement markings, surface (0710-90) | LS | 1 | $78,000 | $78,670 | $59,650 | $59,935 |
| 0455 | Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102) | GM | 0.75 | $5,793.00 | $5,917.95 | $6,787.03 | $6,846.76 |
| 0460 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 4,375 | $3.25 | $3.31 | $4.19 | $4.21 |
| 0465 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 2,220 | $4.65 | $4.71 | $5.24 | $5.27 |
| 0470 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 1,372 | $6.00 | $6.09 | $6.29 | $6.32 |
| 0475 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.81 | $1,505.00 | $1,548.63 | $3,110.01 | $3,160.04 |
| 0480 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 14 | $217.50 | $221.23 | $262.08 | $263.34 |
| 0485 | Thermoplastic, standard, arrow (0711-11170) | EACH | 168 | $98.00 | $99.56 | $83.87 | $84.27 |
| 0490 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 796 | $4.60 | $4.71 | $5.24 | $5.27 |
| 0495 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.83 | $1,522.00 | $1,548.63 | $3,145.00 | $3,160.04 |
| 0500 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 3,459 | $16.30 | $16.59 | $15.73 | $15.80 |
| 0505 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 7 | $206.55 | $210.17 | $235.87 | $237.00 |
| 0510 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 7 | $81.55 | $82.97 | $131.04 | $131.67 |
| 0515 | Thermoplastic, preformed, 12" white on asphalt pavement, railroad dynamic envelope (0711-14193) | LF | 537 | $6.55 | $6.64 | $15.73 | $15.80 |
| 0520 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 11.64 | $5,452.00 | $5,548.49 | $5,240.77 | $5,266.74 |
| 0525 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 5.63 | $1,390.50 | $1,415.89 | $2,618.98 | $2,633.37 |
| 0530 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 9.59 | $5,451.00 | $5,548.49 | $5,240.03 | $5,266.74 |
| 0535 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 12' arm length (0715-61342) | EACH | 1 | $11,605 | $12,086 | $8,959.42 | $11,509 |
| 0540 | Light pole complete, remove pole and foundation (0715-69000) | EACH | 1 | $2,976.50 | $2,525.36 | $1,249.60 | $2,404.79 |
| 0545 | Light pole complete, remove pole, foundation remains (0715-69001) | EACH | 1 | $1,622.00 | $516.57 | $684.05 | $491.91 |
| 0550 | Itsfm location documentation- intersection (0611-2-1) | EACH | 3 | $2,106.00 | $3,201.23 | $3,473.02 | $3,048.39 |
| 0555 | Conduit, furnish & install, open trench (0630-2-11) | LF | 689 | $25.70 | $17.14 | $14.97 | $16.33 |
| 0560 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 621 | $51.09 | $40.93 | $38.80 | $38.97 |
| 0565 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 4 | $8,270.83 | $11,750 | $9,357.01 | $11,189 |
| 0570 | Fiber optic cable locator (0633-6) | DA | 220 | $154.92 | $149.33 | $140.61 | $142.20 |
| 0575 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 22 | $1,913.00 | $1,947.95 | $1,491.55 | $1,854.95 |
| 0580 | Aluminum signals pole, (0646-1-11) | EACH | 7 | $2,701.50 | $3,467.81 | $2,840.94 | $3,302.24 |
| 0585 | Aluminum signals pole, remove (0646-1-60) | EACH | 4 | $1,150.00 | $1,151.51 | $1,126.96 | $1,096.53 |
| 0590 | Vehicular traffic signal, furnish & install aluminum, 1 section, 2-4 way (0650-1-12) | AS | 3 | $3,073.00 | $3,420.25 | $2,002.14 | $3,256.95 |
| 0595 | Vehicular traffic signal, furnish & install aluminum, 2 section, 1-2 ways (0650-1-13) | AS | 2 | $2,065.50 | $1,650.39 | $1,492.03 | $1,571.59 |
| 0600 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 15 | $2,383.00 | $2,358.34 | $2,050.18 | $2,245.74 |
| 0605 | Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16) | AS | 1 | $2,670.00 | $3,362.72 | $2,770.09 | $3,202.18 |
| 0610 | Vehicular traffic signal, furnish & install aluminum, 5 section cluster, 1 way (0650-1-19) | AS | 1 | $4,223.40 | $4,328.40 | $3,464.69 | $4,121.75 |
| 0615 | Vehicular traffic signal, remove- poles to remain (0650-1-60) | AS | 20 | $323.00 | $26.27 | $367.26 | $25.02 |
| 0620 | Vehicular traffic signal, relocate- includes removal reinstallation (0650-1-70) | AS | 2 | $1,446.00 | $1,412.56 | $1,224.32 | $1,345.12 |
| 0625 | Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109) | EACH | 11 | $796.00 | $658.16 | $498.64 | $626.74 |
| 0630 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 6 | $1,055.00 | $1,043.11 | $1,068.07 | $993.31 |
| 0635 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 1 | $2,065.53 | $2,293.07 | $2,043.44 | $2,183.59 |
| 0640 | Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60) | AS | 1 | $193.50 | $127.21 | $362.03 | $121.13 |
| 0645 | Loop detector inductive, F&I, type 10 (0660-1110) | EACH | 9 | $407.70 | $349.82 | $619.38 | $333.12 |
| 0650 | Loop assembly, F&I, type B (0660-2102) | AS | 4 | $2,498.00 | $1,664.77 | $2,301.10 | $1,585.29 |
| 0655 | Loop assembly, F&I, type F (0660-2106) | AS | 16 | $1,543.00 | $2,058.56 | $2,512.95 | $1,960.28 |
| 0660 | Vehicle detection system- avi, bluetooth, furnish & install, cabinet equipment (0660-6121) | EACH | 3 | $1,293.65 | $1,202.39 | $2,027.64 | $1,144.99 |
| 0665 | Vehicle detection system- avi, bluetooth, furnish & install, above ground equipment (0660-6122) | EACH | 3 | $15,250 | $11,942 | $15,420 | $11,372 |
| 0670 | Pedestrian detector, furnish & install, accessible (0665-1-12) | EACH | 8 | $2,257.00 | $2,222.27 | $1,646.09 | $2,116.18 |
| 0675 | Traffic controller assembly, modify only - no components added (0670-5710) | AS | 3 | $1,274.00 | $2,430.23 | $2,503.16 | $2,314.20 |
| 0680 | Traffic controller without cabinet, atc, F&I in existing NEMA cabinet (0671-2-15) | EACH | 1 | $8,398.00 | $9,683.31 | $13,135 | $9,221.00 |
| 0685 | Traffic controller, remove- cabinet to remain (0671-2-60) | EACH | 1 | $1,235.50 | $254.42 | $651.38 | $242.27 |
| 0690 | ITS CCTV camera, pressurized, high definition (0682-1163) | EACH | 3 | $11,550 | $12,137 | $9,269.16 | $11,557 |
| 0695 | Cellular modem, furnish and install (0684-8-1) | EACH | 1 | $8,985.00 | $8,528.48 | $6,068.86 | $8,121.31 |
| 0700 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 3 | $1,230.00 | $1,942.41 | $1,192.85 | $1,849.68 |
| 0705 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 3 | $315.00 | $100.66 | $339.19 | $95.85 |
| 0710 | Sign panel, remove, 12-20 SF (0700-3602) | EACH | 12 | $394.00 | $150.99 | $315.81 | $143.78 |
| 0715 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 12 | $8,249.00 | $6,757.53 | $6,762.09 | $6,434.90 |