FDOT contract T4745 bid tabulation

SR 882 FOREST HILL BLVD) FROM E OF LAKE CLARKE DR TO US1 (DIXIE HWY). Let by Florida DOT on July 29, 2026, Palm Beach, District 4. 6 bids received; low bid $5,317,094 by Florida Engineering & Development Corp.

Owner
Florida DOT
Letting
29 JUL 2026
Pay items
192
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Florida Engineering & Development Corp$5,317,094Low
2The Stout Group LLC$5,422,489+2.0%
3Ranger Construction Industries, Inc.$5,788,888+9.0%
4Community Asphalt Corp.$5,797,094+9.0%
5Sice Inc$5,889,874+11%
6Aum Construction Inc.$5,999,000+13%
FDOT contract T4745: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Florida Engineering & Development Corp2. The Stout Group LLC3. Ranger Construction Industries, Inc.4. Community Asphalt Corp.5. Sice Inc6. Aum Construction Inc.
0005Mobilization (0101-1)LS1$267,938$275,000$325,000$375,000$237,189$300,000
0010Mobilization (0101-1)LS1$262,857$275,000$245,000$200,000$313,996$250,000
0015Maintenance of traffic (0102-1)DA1$214,105$270,000$362,500$250,000$128,711$210,000
0020Maintenance of traffic (0102-1)DA1$213,928$270,000$294,500$200,000$157,313$170,000
0025Special detour- temporary pavement (0102-2200)SY1$3,757.18$16,000$6,596.74$1.00$10,437$25,000
0030Special detour- temporary earthwork/base (0102-2300)CY1$5,426.54$15,000$5,560.00$1.00$10,564$24,155
0035Commercial material for temporary driveway maintenance (0102-3)CY30.10$189.04$35.00$365.50$250.00$451.46$200.00
0040Pedestrian or bicycle special detour (0102-4-1)SY1$2,344.04$3,500.00$2,300.00$1.00$2,807.02$32,000
0045Traffic control officer (0102-14)HR624$86.29$90.00$85.30$90.00$111.11$75.00
0050Work zone sign (0102-60)ED19,584$0.20$0.19$0.23$0.20$0.22$0.25
0055Business sign (0102-61)EACH5$37.56$45.00$42.10$37.00$52.63$60.00
0060Temporary barrier, F&I, low profile, concrete (0102-71-13)LF350$39.59$39.00$51.20$0.13$58.98$55.00
0065Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED25,880$0.10$0.15$0.11$0.10$0.13$0.20
0070Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD13,530$0.05$0.10$0.06$0.05$0.07$0.15
0075Arrow board / advance warning arrow panel (0102-76)ED1,159$5.08$5.00$5.70$5.00$5.67$6.00
0080Temporary raised/retroreflective pavement marker, type B (0102-78-2)EACH1,265$4.06$5.00$4.55$4.00$5.85$5.25
0085Portable changeable message sign, temporary (0102-99)ED1,468$10.15$10.00$11.35$10.00$10.64$12.00
0090Temporary signalization and maintenance, intersection (0102-104)ED1,936$7.81$8.00$9.40$10.00$22.27$12.00
0095Temporary traffic detection and maintenance, intersection (0102-107-1)ED1,936$7.81$8.00$9.40$10.00$22.27$12.00
0100Existing ITS maintenance (0102-112)DA242$160.23$160.00$154.60$150.00$146.20$125.00
0105Sediment barrier (0104-10-3)LF595$3.24$6.00$6.85$18.00$5.85$5.00
0110Inlet protection system (0104-18)EACH28$161.97$150.00$190.00$450.00$233.92$150.00
0115Litter removal (0107-1)ACRE53.80$112.05$5.00$73.90$25.00$100.18$25.00
0120Mowing (0107-2)ACRE37.42$181.53$5.00$96.70$52.00$144.03$50.00
0125Monitor existing structures- inspection and settlement monitoring (0108-1)LS1$11,624$15,000$13,000$75,000$16,608$25,000
0130Monitor existing structures- inspection and settlement monitoring (0108-1)LS1$11,624$15,000$13,000$50,000$16,608$15,000
0135Clearing & grubbing (0110-1-1)ACRE1$38,203$10,000$21,900$150,000$35,147$15,000
0140Clearing & grubbing (0110-1-1)ACRE1$29,677$30,000$40,800$108,175$35,147$30,000
0145Selective clearing and areas with trees to remain (0110-2-2)ACRE0.10$16,485$100,000$38,700$71,513$55,307$200,000
0150Removal of existing concrete (0110-4-10)SY1,810$35.79$30.00$22.00$27.54$47.24$35.00
0155Tree protection barrier (0110-21)LF785$11.43$6.00$13.65$10.00$8.77$12.00
0160Tree root and branch pruning (0110-22)EACH19$3,553.30$550.00$3,980.00$3,500.00$4,327.49$4,000.00
0165Regular excavation (0120-1)CY1,410$50.35$30.00$40.15$47.46$89.45$70.00
0170Embankment (0120-6)CY402$90.94$30.00$16.40$91.81$68.22$130.00
0175Regular excavation (3-R projects only) (0120-71)LS1$1,012.44$5,000.00$3,300.00$10,000$543.13$5,000.00
0180Type B stabilization (0160-4)SY1,684$23.00$15.00$27.55$1.00$7.47$32.00
0185Optional base, base group 06 (0285-706)SY596$27.62$40.00$31.90$50.00$41.01$43.00
0190Optional base, base group 11 (0285-711)SY844$62.73$60.00$46.25$50.00$59.49$90.00
0195Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY20,131$3.81$3.00$4.72$2.00$2.61$4.50
0200Milling existing asphalt pavement, 1 1/4" avg depth (0327-70-12)SY22,075$3.55$2.90$3.23$2.00$2.61$4.75
0205Milling existing asphalt pavement, 3/4" avg depth (0327-70-19)SY186$3.55$20.00$2.42$20.00$2.61$45.00
0210Superpave asphaltic conc, traffic B (0334-1-12)TN204.80$236.32$200.00$375.25$195.00$395.05$330.00
0215Asphalt concrete friction course,traffic B, FC-9.5, PG 76-22 (0337-7-80)TN3,297.10$219.09$215.00$196.50$199.00$285.77$245.00
0220Inlets, barrier wall, rigid, curb & gutter, <=10' (0425-1881)EACH2$7,319.45$15,000$9,550.00$12,171$8,187.13$13,000
0225Inlets, closed flume (0425-1910)EACH1$9,510.51$13,000$12,100$14,188$5,847.95$14,500
0230Manhole, adjust (0425-5)EACH2$1,781.36$900.00$909.75$1,200.00$1,754.39$1,500.00
0235Manhole, adjust, utilities (0425-5-1)EACH15$948.27$900.00$966.50$1,200.00$1,754.39$1,500.00
0240Valve boxes, adjust (0425-6)EACH36$843.43$700.00$881.25$1,200.00$1,169.59$1,000.00
0245Pipe culvert,optional material,round, 24"S/CD (0430-175124)LF9$401.19$1,200.00$1,140.00$225.00$526.32$575.00
0250Pipe culvert,optional material,other-elip/arch, (0430-175218)LF7$391.76$1,500.00$682.25$460.00$701.75$575.00
0255Pipe culvert, opt material, shape - elip/arch, 42"S/CD (0430-175242)LF4$1,000.44$3,000.00$2,740.00$1,200.00$1,169.59$1,450.00
0260Mitered end section, optional round, 24" CD (0430-982129)EACH1$5,109.60$8,000.00$4,550.00$2,500.00$4,678.36$11,000
0265Mitered end section, optional - elliptical / arch, 18" CD (0430-982625)EACH1$5,544.12$8,000.00$4,320.00$2,400.00$4,678.36$10,000
0270Mitered end section, optional - elliptical / arch, 42" CD (0430-982640)EACH1$10,000$10,000$13,100$6,400.00$8,187.13$17,250
0275Concrete curb & gutter, type E (0520-1-7)LF308$36.50$40.00$72.20$66.75$31.58$55.00
0280Concrete curb & gutter, type F (0520-1-10)LF1,383$42.05$43.00$73.00$100.00$31.58$57.00
0285Concrete curb, type D (0520-2-4)LF49$47.07$25.00$25.95$68.00$60.88$35.00
0290Shoulder concrete barrier, 38" or 44" height (0521-72-40)LF260$327.60$450.00$405.75$552.00$374.27$450.00
0295Concrete sidewalk and driveways, 4" thick (0522-1)SY408$52.06$63.00$76.40$150.42$76.18$85.00
0300Concrete sidewalk and driveways, 6" thick (0522-2)SY1,024$71.75$78.00$94.30$171.79$108.57$105.00
0305Concrete ditch pavement, non reinforced, 4" (0524-1-2)SY23$65.62$63.00$130.80$238.47$143.86$150.00
0310Pavers, architectural, remove existing and reinstall (0526-1101)SY130$103.70$95.00$113.70$280.12$473.68$100.00
0315Detectable warnings (0527-2)SF555$36.29$35.00$44.55$44.06$46.21$45.00
0320Performance turf, sod (0570-1-2)SY2,856$3.30$8.00$8.55$10.00$5.56$15.00
0325Irrigation system- modify existing system (0590-70-5)LS1$25,914$50,000$29,000$30,000$29,854$30,000
0330Painted pavement markings, standard, white, solid, 6" (0710-11101)GM1.35$2,131.98$1,600.00$2,380.00$2,089.09$1,871.35$2,750.00
0335Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102)GM0.15$2,842.61$1,800.00$3,120.00$2,745.10$2,105.26$3,650.00
0340Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF413$1.52$2.00$1.71$1.50$2.34$2.00
0345Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124)LF185$1.62$3.00$1.82$1.60$3.51$2.10
0350Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF767$1.73$4.00$1.93$1.70$4.68$2.25
0355Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM0.18$558.39$1,000.00$625.50$550.00$1,169.59$1,000.00
0360Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM0.10$701.24$1,000.00$738.50$649.48$1,169.59$2,000.00
0365Painted pavement markings, standard, white, message or symbol (0710-11160)EACH37$45.69$85.00$51.20$45.00$99.42$60.00
0370Painted pavement markings, standard, white, arrows (0710-11170)EACH54$40.61$45.00$45.50$40.00$52.63$55.00
0375Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM0.52$2,131.99$1,600.00$2,350.00$2,067.57$1,871.35$2,750.00
0380Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224)LF139$1.62$3.00$1.82$1.60$3.51$3.00
0385Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241)GM0.05$710.67$1,000.00$707.50$622.22$1,169.59$3,000.00
0390Partnering, DO not bid (0999-16)LS1$6,000.00$6,000.00$6,000.00$6,000.00$6,000.00$6,000.00
0395Initial contingency amount, DO not bid (0999-25)LS1$23,842$23,842$23,842$23,842$23,842$23,842
0400Initial contingency amount, DO not bid (0999-25)LS1$36,079$36,079$36,079$36,079$36,079$36,079
0405Local agency initial amount (DO not bid) (0999-26)LS1$2,190.00$2,190.00$2,190.00$2,190.00$2,190.00$2,190.00
0410Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH48$583.76$575.00$622.00$552.45$672.51$800.00
0415Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH3$2,436.55$2,400.00$1,480.00$1,311.84$2,807.02$2,500.00
0420Single column ground sign assembly, remove (0700-1600)EACH48$35.53$35.00$131.90$117.12$40.94$50.00
0425Sign panel, furnish & install overhead mount, 12-20 SF (0700-3202)EACH4$1,725.89$1,700.00$2,070.00$1,834.45$1,988.30$1,200.00
0430Sign panel, remove, UP to 12 SF (0700-3601)EACH1$35.53$35.00$395.50$351.35$40.94$100.00
0435Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH9$101.52$100.00$127.10$111.00$116.96$150.00
0440Raised pavement marker, type B (0706-1-3)EACH1,160$4.06$5.00$4.55$4.00$5.85$5.25
0445Painted pavement markings, surface (0710-90)LS1$15,085$20,000$16,900$14,859$23,392$20,000
0450Painted pavement markings, surface (0710-90)LS1$8,122.84$10,000$9,100.00$8,001.00$11,696$10,500
0455Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102)GM0.09$6,649.18$7,500.00$7,000.00$6,157.18$8,771.93$8,500.00
0460Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF1,091$2.94$4.00$3.30$2.90$4.68$3.75
0465Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF532$4.44$5.00$4.97$4.37$5.85$5.75
0470Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF1,599$5.89$6.00$6.60$5.80$7.02$7.60
0475Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.23$1,870.04$3,500.00$2,040.00$1,793.10$4,093.57$3,000.00
0480Thermoplastic, standard, message or symbol (0711-11160)EACH64$115.74$250.00$129.60$114.00$292.40$150.00
0485Thermoplastic, standard, arrow (0711-11170)EACH88$51.78$90.00$58.00$51.00$105.26$67.00
0490Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF280$4.44$5.00$4.97$4.37$5.85$5.70
0495Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.04$1,870.00$3,500.00$1,750.00$1,535.00$4,093.57$5,000.00
0500Thermoplastic, preformed, white, solid, 12" for crosswalk (0711-14123)LF1,975$7.51$10.00$8.40$7.40$11.70$9.60
0505Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF2,227$15.03$16.00$16.85$14.80$18.71$19.00
0510Thermoplastic, preformed, white with black contrast on concrete pavement, message symbol (0711-14560)EACH6$1,561.42$800.00$1,750.00$1,538.00$935.67$2,000.00
0515Thermoplastic, preformed, white with black contrast, arrow on concrete surface (0711-14570)EACH6$703.55$700.00$788.00$693.00$818.71$900.00
0520Thermoplastic, preformed, color route shield (0711-14660)EACH12$1,858.88$3,500.00$2,080.00$1,831.00$4,093.57$2,400.00
0525Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM3.40$4,979.69$5,000.00$5,570.00$4,899.24$5,847.95$6,375.00
0530Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102)GM0.11$6,639.56$5,500.00$7,180.00$6,310.53$6,432.75$8,500.00
0535Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM1.56$1,245.69$3,000.00$1,390.00$1,226.21$3,508.77$1,600.00
0540Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM2.40$4,416.24$5,000.00$4,930.00$4,339.11$5,847.95$5,660.00
0545Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231)GM0.82$1,104.57$3,000.00$1,240.00$1,088.00$3,508.77$1,500.00
0550Permanent tape, white, solid, 6" for concrete bridges (0713-103101)GM0.09$45,685$30,000$49,500$43,548$35,088$58,500
0555Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181)GM0.11$11,421$10,000$12,000$10,514$11,696$14,625
0560Permanent tape, yellow, solid, for concrete bridges (0713-103201)GM0.09$45,685$30,000$49,500$43,548$35,088$58,500
0565Preformed/permanent tape, remove (0713-107)SF2,454$2.54$2.50$2.84$2.50$2.92$3.25
0570Conduit, furnish & install, open trench (0630-2-11)LF1,852$14.79$15.00$20.10$18.78$21.21$20.00
0575Conduit, furnish & install, directional bore (0630-2-12)LF1,853$31.52$32.00$27.25$25.43$47.00$30.00
0580Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH50$1,357.41$1,500.00$882.50$824.00$1,283.92$1,500.00
0585Electrical power service, F&I, underground, meter furnished by power company (0639-1121)AS1$5,824.05$5,900.00$7,370.00$6,885.35$4,711.70$7,500.00
0590Electrical power service, F&I, underground, meter by contractor (0639-1122)AS3$5,824.05$5,900.00$4,600.00$4,292.66$4,711.70$7,500.00
0595Electrical power service, remove underground (0639-1620)AS1$585.60$600.00$527.50$492.47$1,010.53$750.00
0600Electrical service wire, & install (0639-2-1)LF709$9.72$10.00$15.25$14.26$15.17$15.00
0605Prestressed concrete pole, type P-II service pole (0641-2-12)EACH1$2,484.74$2,500.00$2,440.00$2,278.29$3,171.95$2,000.00
0610Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60)EACH1$780.80$800.00$1,050.00$984.93$673.68$750.00
0615Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12)LF14,049$2.86$3.00$2.87$2.68$2.75$3.00
0620Lighting conductors, remove & dispose, contractor owns (0715-1-60)LF5,564$0.39$0.50$0.98$0.91$1.75$0.20
0625Luminaire & bracket arm- aluminum, furnish & install new luminaire and arm on new/existing pole (0715-5-31)EACH6$2,441.15$2,500.00$2,680.00$2,503.24$1,851.46$1,200.00
0630Luminaire & bracket arm, luminaire and arm; pole remains (0715-5-51)EACH7$390.41$400.00$435.25$406.32$224.56$250.00
0635Load center, F&I, secondary voltage (0715-7-11)EACH4$15,330$16,000$18,900$17,658$12,456$18,000
0640Load center, remove, primary voltage (0715-7-42)EACH1$1,171.21$1,200.00$1,120.00$1,046.94$1,932.16$750.00
0645Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211)EACH2$1,598.99$1,600.00$2,140.00$1,997.74$1,350.53$1,250.00
0650Light pole complete, F&I, standard pole standard foundation, 30' mounting height, 8' arm length (0715-61111)EACH11$8,976.65$9,000.00$9,360.00$8,737.56$8,915.44$7,300.00
0655Light pole complete, F&I, standard pole standard foundation, 30' mounting height, 10' arm length (0715-61121)EACH1$8,353.13$8,400.00$9,510.00$8,879.28$7,813.72$7,400.00
0660Light pole complete, F&I, standard pole standard foundation, 30' mounting height, 15' arm length (0715-61152)EACH1$8,504.00$8,600.00$7,750.00$7,238.96$6,521.64$7,500.00
0665Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 10' arm length (0715-61321)EACH7$9,566.97$9,600.00$11,300$10,510$9,352.78$9,000.00
0670Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 15' arm length (0715-61352)EACH3$9,717.85$9,800.00$9,500.00$8,870.06$7,853.64$9,200.00
0675Light pole complete, remove pole and foundation (0715-69000)EACH8$780.80$800.00$1,050.00$984.93$1,550.88$1,500.00
0680Pole cable distribution system, furnish and install, conventional (0715-500-1)EACH34$820.86$850.00$1,010.00$939.10$987.08$750.00
0685Conduit, furnish & install, open trench (0630-2-11)LF103$24.43$25.00$14.65$13.70$23.25$30.00
0690Conduit, furnish & install, directional bore (0630-2-12)LF2,526$35.39$40.00$28.60$26.73$59.32$60.00
0695Conduit, furnish & install, aboveground (0630-2-14)LF147$47.04$50.00$46.05$42.99$77.79$70.00
0700Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI4$9,047.45$9,500.00$13,400$12,486$15,506$20,000
0705Signal cable, remove- intersection (0632-7-6)PI3$1,366.41$1,400.00$1,650.00$1,539.65$2,021.05$500.00
0710Fiber optic cable, F&I, underground,2-12 fibers (0633-1121)LF112$4.29$5.00$3.82$3.57$3.92$4.50
0715Fiber optic connection, install, splice (0633-2-31)EACH4$64.09$65.00$56.70$52.94$58.48$65.00
0720Fiber optic connection hardware, F&I, splice enclosure (0633-3-11)EACH1$1,570.27$1,600.00$1,790.00$1,669.43$1,432.75$1,600.00
0725Fiber optic connection hardware, F&I, splice tray (0633-3-12)EACH1$70.50$71.00$87.20$81.46$64.33$100.00
0730Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16)EACH1$2,877.77$3,000.00$2,140.00$1,993.57$2,625.73$3,000.00
0735Fiber optic cable locator (0633-6)DA242$160.23$160.00$158.20$147.74$146.20$50.00
0740Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH1$2,333.87$2,500.00$2,410.00$2,251.77$3,465.16$2,500.00
0745Pull & splice box, F&I, 17" X 30" cover size (0635-2-14)EACH68$1,555.75$1,600.00$1,570.00$1,465.86$2,518.16$1,800.00
0750Pull & splice box, install (0635-2-30)EACH1$1,055.12$1,100.00$977.25$912.44$2,350.88$1,200.00
0755Junction box, furnish & install, aerial (0635-3-11)EACH2$962.79$1,000.00$706.75$659.87$1,169.59$1,500.00
0760Electrical power service, F&I, underground, meter by contractor (0639-1122)AS3$5,412.58$5,500.00$4,180.00$3,906.90$4,336.26$7,500.00
0765Electrical power service, remove underground (0639-1620)AS3$488.00$500.00$527.50$492.47$1,595.32$750.00
0770Electrical service wire, & install (0639-2-1)LF276$9.72$10.00$15.25$14.26$12.91$10.00
0775Electrical service wire, (0639-2-6)LF49$0.40$0.50$0.97$0.90$2.34$1.00
0780Prestressed concrete pole, type P-II service pole (0641-2-12)EACH3$2,484.74$2,500.00$2,440.00$2,278.29$3,171.95$2,500.00
0785Prestressed concrete pole, complete pole removal- pole 30' and greater (0641-2-80)EACH7$8,390.51$8,500.00$3,690.00$3,441.56$8,187.13$2,000.00
0790Aluminum signals pole, (0646-1-11)EACH16$2,290.20$2,300.00$3,060.00$2,855.24$1,927.76$1,800.00
0795Aluminum signals pole, furnish install pedestrian detector post (0646-1-12)EACH1$2,224.37$2,300.00$2,320.00$2,167.51$1,117.23$1,500.00
0800Aluminum signals pole, remove (0646-1-60)EACH4$488.00$500.00$527.75$492.72$505.26$500.00
0805Steel mast arm assembly, and install, single arm 50' (0649-21-6)EACH1$69,306$70,000$78,900$73,662$60,291$72,000
0810Steel mast arm assembly, and install, double arm 50'-40' (0649-21-8)EACH1$96,541$97,000$115,800$108,079$82,303$102,000
0815Steel mast arm assembly, and install, single arm 60' (0649-21-10)EACH1$75,441$76,000$88,500$82,637$68,217$80,000
0820Steel mast arm assembly, and install, double arm 60'-40' (0649-21-12)EACH1$101,207$102,000$117,600$109,811$80,339$102,000
0825Steel mast arm assembly, and install, single arm 70' (0649-21-15)EACH1$93,424$94,000$98,500$91,976$72,066$90,000
0830Steel mast arm assembly, and install, single arm 78' (0649-21-21)EACH1$113,319$115,000$122,400$114,269$89,421$105,000
0835Steel mast arm assembly, remove, deep foundation- bolt on attachment (0649-26-5)EACH1$16,934$17,000$16,100$15,043$8,880.38$5,000.00
0840Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS27$1,653.85$1,700.00$2,550.00$2,376.96$1,670.76$1,900.00
0845Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16)AS1$1,970.68$2,000.00$2,920.00$2,727.96$1,939.44$2,500.00
0850Vehicular traffic signal, furnish & install aluminum, 5 section cluster, 1 way (0650-1-19)AS2$2,697.80$2,800.00$4,310.00$4,024.47$2,632.22$3,500.00
0855Vehicular traffic signal, remove- poles to remain (0650-1-60)AS6$292.80$300.00$428.50$400.12$505.26$500.00
0860Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109)EACH6$728.03$800.00$543.75$507.71$702.99$650.00
0865Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS16$967.84$1,000.00$1,130.00$1,058.02$1,017.29$1,500.00
0870Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60)AS4$195.20$200.00$254.10$237.24$449.12$500.00
0875Loop detector inductive, F&I, type 9 (0660-1109)EACH12$550.22$600.00$768.00$717.00$1,086.67$650.00
0880Loop assembly, F&I, type F (0660-2106)AS78$1,769.93$1,800.00$538.75$503.07$1,722.81$1,800.00
0885Vehicle detection system- furnish & install cabinet equipment (0660-4-11)EACH1$20,513$21,000$28,700$26,760$19,481$19,500
0890Vehicle detection system- furnish & install above ground equipment (0660-4-12)EACH2$4,850.48$5,000.00$7,610.00$7,105.94$4,367.57$5,500.00
0895Pedestrian detector, furnish & install, standard (0665-1-11)EACH17$411.03$500.00$714.25$714.58$587.13$300.00
0900Pedestrian detector, furnish & install, accessible (0665-1-12)EACH1$1,632.56$1,700.00$2,480.00$2,316.54$1,647.33$1,200.00
0905Pedestrian detector, remove- pole/pedestal to remain (0665-1-60)EACH5$97.60$100.00$142.30$132.85$336.84$100.00
0910Traffic controller assembly, F&I, NEMA W/standard lock, 2 preemption (0670-5162)AS1$72,550$73,000$98,100$91,566$70,135$75,000
0915Traffic controller assembly, remove controller with (0670-5600)AS1$1,366.41$1,400.00$2,000.00$1,867.26$1,887.72$750.00
0920Traffic controller, modify (0671-2-40)EACH3$1,904.50$2,000.00$3,800.00$3,545.55$421.05$2,500.00
0925Traffic signal controller cabinet, adjust/modify (0676-1500)EACH3$1,904.50$2,000.00$2,520.00$2,349.29$673.68$5,000.00
0930ITS CCTV camera, non- pressurized, IP, high definition (0682-1173)EACH2$6,402.87$6,500.00$12,500$11,698$6,264.49$6,500.00
0935Managed field ethernet switch, furnish & install (0684-1-1)EACH1$3,713.69$3,800.00$4,350.00$4,062.96$3,368.09$4,500.00
0940Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH11$1,105.22$1,200.00$1,100.00$1,025.68$931.62$1,200.00
0945Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH7$4,525.71$4,600.00$5,840.00$5,453.12$3,734.40$3,500.00
0950Relocate trees and palms, palms, <10.0" DBH, <14.0' of clear trunk (0581-1271)EACH3$1,522.84$2,500.00$1,710.00$1,500.00$1,754.39$3,000.00
0955Relocate trees and palms, tree, 8.1" to 14.0" DBH (0581-1340)EACH3$20,305$2,500.00$22,700$20,000$23,392$25,000
0960Relocate trees and palms, tree, 14.1" to 16.0" DBH (0581-1350)EACH1$20,305$3,500.00$22,700$20,000$23,392$25,000
FDOT contract T4745: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of July 29, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy