Community Asphalt Corp.: FDOT bid record
Community Asphalt Corp. submitted 55 bids on Florida DOT contracts in the data, from 31 JAN 2018 to 29 JUL 2026, and was the low bidder on 4 of them (7%). When it was not low, its total sat a median +18% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $52,081,470
- Latest bid
- 29 JUL 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 45 | 4 | 9% |
| 2019 | 9 | 0 | 0% |
| 2026 | 1 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 1 | 17 | 0 | 0% |
| District 4 | 16 | 3 | 19% |
| District 6 | 16 | 1 | 6% |
| District 5 | 6 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Pull & splice box, F&I, 13" X 24" cover size | 0635-2-11 | EACH | 94 | 26 (28%) | $605.34 | $1,150.00 |
| Conduit, furnish & install, directional bore | 0630-2-12 | LF | 84 | 20 (24%) | $19.55 | $30.82 |
| Performance turf, sod | 0570-1-2 | SY | 45 | 16 (36%) | $3.63 | $5.00 |
| Detectable warnings | 0527-2 | SF | 45 | 15 (33%) | $24.64 | $35.00 |
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 45 | 13 (29%) | $0.14 | $0.13 |
| Inlet protection system | 0104-18 | EACH | 44 | 13 (30%) | $90.70 | $150.00 |
| Single post sign, remove | 0700-1-60 | AS | 41 | 13 (32%) | $23.00 | $31.94 |
| Conduit, furnish & install, open trench | 0630-2-11 | LF | 63 | 12 (19%) | $7.22 | $16.54 |
| Sediment barrier | 0104-10-3 | LF | 31 | 12 (39%) | $1.20 | $2.60 |
| Concrete sidewalk and driveways, 6" thick | 0522-2 | SY | 46 | 11 (24%) | $47.70 | $86.00 |
| Work zone sign | 0102-60 | ED | 45 | 11 (24%) | $0.25 | $0.25 |
| Portable changeable message sign, temporary | 0102-99 | ED | 44 | 11 (25%) | $12.00 | $12.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Weekley Asphalt Paving, Inc. | 23 | 15 of 23 |
| General Asphalt Company, LLC | 17 | 14 of 17 |
| Ranger Construction Industries, Inc. | 16 | 7 of 16 |
| Halley Engineering Contractors, Inc. | 15 | 12 of 15 |
| Ajax Paving Industries of Florida LLC | 14 | 10 of 14 |
| Horizon Contractors, Inc. | 11 | 6 of 11 |
| Roadway Construction, LLC | 10 | 9 of 10 |
| Preferred Materials Inc. | 10 | 10 of 10 |
| Wright Construction Group, Inc. | 9 | 6 of 9 |
| Lead Engineering Contractors, LLC | 8 | 4 of 8 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 29 JUL 2026 | T4745 | District 4 | SR 882 FOREST HILL BLVD) FROM E OF LAKE CLARKE DR TO US1 (DIXIE HWY) | 4 of 6 | $5,797,094 | +9.0% |
| 24 APR 2019 | T1722 | District 1 | SR 25 (US 27) | 4 of 6 | $12,764,000 | +10% |
| 24 APR 2019 | T1724 | District 1 | SR 93 (I-75) | 2 of 4 | $8,694,000 | 0.0% |
| 27 MAR 2019 | T1721 | District 1 | SR 951 | 3 of 4 | $5,309,000 | +11% |
| 27 MAR 2019 | T1744 | District 1 | SR 80 | 3 of 3 | $2,729,000 | +4.0% |
| 27 MAR 2019 | T4502 | District 4 | SR 9 (I-95) INGRESS/EGRESS RAMPS | 3 of 3 | $1,953,255 | +33% |
| 27 MAR 2019 | T4505 | District 4 | NW 21ST AVE; BRIDGE NO. 864066 | 2 of 5 | $7,366,148 | +2.0% |
| 27 MAR 2019 | T4508 | District 4 | SR 817 (UNIVERSITY DR) | 4 of 4 | $8,995,358 | +32% |
| 27 FEB 2019 | T6449 | District 6 | SR 5 (US 1) | 7 of 9 | $3,216,235 | +17% |
| 30 JAN 2019 | T5670 | District 5 | SR A1A/SR 520 INTERSECTION | 4 of 6 | $2,609,280 | +18% |
| 05 DEC 2018 | T1717 | District 1 | SR 45A (US 41) (VENICE BYPASS) | 8 of 8 | $21,854,000 | +38% |
| 05 DEC 2018 | T1739 | District 1 | SR 776 | 4 of 4 | $1,233,000 | +13% |
| 05 DEC 2018 | T5604 | District 5 | SR 50 (CHENEY HWY) | 6 of 7 | $8,972,543 | +42% |
| 05 DEC 2018 | T6441 | District 6 | SR 94 (SW 88 ST) (N KENDALL DR) | 11 of 11 | $4,888,860 | +55% |
| 31 OCT 2018 | T1736 | District 1 | SR 15 (US 441) | 4 of 6 | $1,027,897 | +30% |
| 31 OCT 2018 | T4496 | District 4 | SR 706 (INDIANTOWN RD) | 2 of 4 | $3,987,676 | +18% |
| 31 OCT 2018 | T6451 | District 6 | SR 7 (US 441 SB) | 6 of 8 | $898,554 | +35% |
| 26 SEP 2018 | T1735 | District 1 | SR 45 (US 41) | 4 of 5 | $468,000 | +14% |
| 26 SEP 2018 | T4479 | District 4 | SR 824 (PEMBROKE RD) | 9 of 9 | $1,056,421 | +30% |
| 29 AUG 2018 | T6455 | District 6 | SR 25 (US 27) (OKEECHOBEE RD) | 8 of 9 | $668,539 | +18% |
| 25 JUL 2018 | T1711 | District 1 | SR 45 (US 41) | 3 of 5 | $819,000 | +14% |
| 25 JUL 2018 | T1723 | District 1 | SR 84 (DAVIS BLVD) | 3 of 3 | $1,464,000 | +5.0% |
| 25 JUL 2018 | T1727 | District 1 | SR 876 (DANIELS PKWY) | 3 of 4 | $2,709,000 | +2.0% |
| 25 JUL 2018 | T1730 | District 1 | JEFFCOTT ST | 3 of 6 | $483,000 | +4.0% |
| 25 JUL 2018 | T5623 | District 5 | SR 406 | 4 of 4 | $3,117,846 | +64% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.