FDOT contract T6625 bid tabulation

SR 968 (W FLAGLER ST) FROM E OF SW 48 CT TO W OF SW 48 AVE. Let by Florida DOT on July 29, 2026, Miami-Dade, District 6. 7 bids received; low bid $594,156 by Florida Signal & Lighting Contractors, Inc..

Owner
Florida DOT
Letting
29 JUL 2026
Pay items
62
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Florida Signal & Lighting Contractors, Inc.$594,156Low
2Florida Engineering & Development Corp$596,9070.0%
3Arc Electric Inc$624,242+5.0%
4Traffico LLC$643,888+8.0%
5Horsepower Electric, Inc.$649,445+9.0%
6Signal Technology and Installation Corp.$656,163+10%
7Sice Inc$675,646+14%
FDOT contract T6625: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Florida Signal & Lighting Contractors, Inc.2. Florida Engineering & Development Corp3. Arc Electric Inc4. Traffico LLC5. Horsepower Electric, Inc.6. Signal Technology and Installation Corp.
0005Mobilization (0101-1)LS1$55,000$71,223$65,000$64,917$60,000$48,184
0010Maintenance of traffic (0102-1)DA1$55,000$66,554$45,000$45,000$20,000$32,950
0015Traffic control officer (0102-14)HR16$85.00$87.95$100.00$120.00$100.00$106.13
0020Work zone sign (0102-60)ED3,640$0.35$0.25$0.30$0.20$0.30$0.34
0025Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED3,780$0.25$0.20$0.25$0.20$0.30$0.25
0030Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD1,350$0.20$0.15$0.20$0.80$0.20$0.17
0035Arrow board / advance warning arrow panel (0102-76)ED280$8.00$6.75$10.00$6.00$20.00$8.29
0040Portable changeable message sign, temporary (0102-99)ED308$15.00$13.70$18.00$14.00$25.00$16.85
0045Type III barricade (0102-115)ED280$0.35$0.90$1.00$5.00$0.50$1.08
0050Litter removal (0107-1)ACRE1.58$6,000.00$289.75$1,200.00$100.00$90.00$27.61
0055Mowing (0107-2)ACRE0.61$5,000.00$750.50$1,000.00$200.00$1,000.00$34.55
0060Monitor existing structures- inspection and settlement monitoring (0108-1)LS1$3,500.00$7,560.15$8,000.00$8,500.00$10,000$5,930.28
0065Clearing & grubbing (0110-1-1)ACRE1$5,000.00$521.05$9,000.00$6,500.00$10,000$7,412.85
0070Removal of existing concrete (0110-4-10)SY175$50.00$38.45$110.00$55.00$45.50$47.18
0075Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY1,664$12.00$3.75$4.00$11.00$8.00$11.80
0080Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN137.30$270.00$224.10$365.00$302.50$475.00$352.59
0085Manhole, adjust (0425-5)EACH1$1,200.00$1,285.45$1,600.00$1,045.00$2,535.00$2,965.14
0090Concrete curb & gutter, type F (0520-1-10)LF148$65.00$30.05$125.00$44.00$75.40$78.18
0095Concrete curb, type D (0520-2-4)LF8$700.00$40.75$130.00$38.50$49.40$51.22
0100Concrete sidewalk and driveways, 4" thick (0522-1)SY100$80.00$67.20$135.00$99.00$114.40$132.09
0105Concrete sidewalk and driveways, 6" thick (0522-2)SY57$140.00$75.35$160.00$121.00$130.00$148.26
0110Detectable warnings (0527-2)SF54$55.00$42.35$55.00$44.00$45.50$47.18
0115Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130)LS1$1,032.81$1,032.81$1,032.81$1,032.81$1,032.81$1,032.81
0120Initial contingency amount, DO not bid (0999-25)LS1$29,837$29,837$29,837$29,837$29,837$29,837
0125Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH7$800.00$761.50$1,000.00$650.00$936.00$1,347.80
0130Single column ground sign assembly, remove (0700-1600)EACH2$100.00$10.95$150.00$250.00$97.50$134.78
0135Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH4$1,100.00$1,089.20$900.00$750.00$1,200.00$2,695.59
0140Raised pavement marker, type B (0706-1-3)EACH64$7.00$5.50$10.00$6.00$6.50$6.74
0145Painted pavement markings, surface (0710-90)LS1$1,200.00$1,072.60$9,000.00$1,174.72$2,405.00$11,098
0150Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102)GM0.01$6,500.00$6,936.25$10,000$7,603.20$6,630.00$18,898
0155Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF128$2.50$2.65$7.00$2.88$2.60$5.27
0160Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF7$20.00$3.95$9.00$4.32$3.90$7.92
0165Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF52$20.00$5.25$13.00$5.76$5.20$10.54
0170Thermoplastic, standard, arrow (0711-11170)EACH1$150.00$87.55$165.00$96.00$130.00$90.31
0175Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF90$25.00$20.80$35.00$22.80$23.40$26.96
0180Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM0.15$6,500.00$6,935.95$12,000$7,603.20$6,519.00$14,172
0185Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM0.07$3,000.00$2,517.80$7,500.00$2,760.00$1,755.00$3,543.53
0190Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM0.09$10,000$6,942.20$12,000$7,603.20$6,519.00$12,570
0195Conduit, furnish & install, directional bore (0630-2-12)LF982$25.00$22.55$30.00$36.00$30.00$40.44
0200Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH9$1,500.00$1,618.55$1,500.00$1,900.00$1,900.00$2,248.94
0205Electrical power service, F&I, underground, meter by contractor (0639-1122)AS1$6,900.00$13,894$5,000.00$5,400.00$10,000$6,896.28
0210Electrical service disconnect, remove- pole or cabinet to remain (0639-3-60)EACH1$850.00$683.05$500.00$2,000.00$100.00$1,153.20
0215Load center, F&I, secondary voltage (0715-7-11)EACH1$23,500$16,641$12,500$22,000$25,000$22,301
0220Load center, remove, voltage (0715-7-41)EACH1$850.00$910.70$500.00$5,000.00$500.00$3,459.54
0225Light pole complete, F&I, standard pole standard foundation, 30' mounting height, 10' arm length (0715-61121)EACH1$11,000$6,904.50$10,000$9,000.00$13,000$12,784
0230Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 10' arm length (0715-61321)EACH1$12,000$7,312.85$12,000$10,000$14,000$13,072
0235Pole cable distribution system, furnish and install, conventional (0715-500-1)EACH2$850.00$886.85$800.00$1,100.00$900.00$1,321.79
0240Conduit, furnish & install, directional bore (0630-2-12)LF423$35.00$48.20$40.00$36.00$30.00$47.18
0245Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI1$12,000$16,211$12,000$12,500$3,000.00$10,213
0250Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH15$1,500.00$1,349.55$1,300.00$1,900.00$1,900.00$1,761.00
0255Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH1$2,500.00$2,798.15$3,000.00$2,800.00$2,500.00$2,671.51
0260Pull & splice box, install (0635-2-30)EACH1$1,200.00$1,048.25$1,500.00$1,000.00$900.00$1,734.13
0265Electrical power service, F&I, underground, meter by contractor (0639-1122)AS1$6,000.00$10,972$6,200.00$5,400.00$10,000$6,896.28
0270Electrical service wire, & install (0639-2-1)LF246$10.00$8.10$12.00$12.00$15.00$6.25
0275Prestressed concrete pole, type P-II service pole (0641-2-12)EACH1$2,500.00$4,372.50$3,000.00$3,200.00$4,500.00$6,661.21
0280Aluminum signals pole, (0646-1-11)EACH2$2,100.00$2,641.90$1,600.00$3,000.00$3,000.00$4,987.29
0285Steel mast arm assembly, and install, single arm 70' (0649-21-15)EACH1$80,000$103,486$85,000$108,000$112,000$94,492
0290Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS4$1,500.00$1,462.20$2,000.00$2,200.00$2,000.00$1,817.73
0295Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS2$1,200.00$792.30$1,600.00$2,400.00$1,100.00$982.11
0300Pedestrian detector, furnish & install, standard (0665-1-11)EACH2$260.00$370.65$600.00$750.00$500.00$455.43
0305Traffic controller assembly, F&I, caltrans W/standard lock (0670-5180)AS1$48,000$48,862$45,000$53,000$50,000$48,384
0310Cellular modem, furnish and install (0684-8-1)EACH1$2,500.00$2,252.95$3,917.00$3,200.00$3,500.00$2,592.23
FDOT contract T6625: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of July 29, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy