FDOT contract T5883 bid tabulation
SR 400 (I-4) AND SR 600 (US 17/92) FROM MP 13.83 TO MP 13.856 AND MP 7.544. Let by Florida DOT on July 29, 2026, Seminole, District 5. 9 bids received; low bid $19,820,019 by Masci General Contractors, Inc.
- Owner
- Florida DOT
- Letting
- 29 JUL 2026
- Pay items
- 206
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Masci General Contractors, Inc | $19,820,019 | Low |
| 2 | Ryan Incorporated Civil | $20,256,583 | +2.0% |
| 3 | Ranger Construction Industries, Inc. | $21,106,328 | +6.0% |
| 4 | Hubbard Construction Company | $21,129,845 | +7.0% |
| 5 | Southland Construction, Inc. | $21,260,000 | +7.0% |
| 6 | Crisdel Group, Inc | $22,779,931 | +15% |
| 7 | Granite Construction Company | $23,442,217 | +18% |
| 8 | Middlesex Corporation (the) | $24,453,338 | +23% |
| 9 | Webber, LLC | $24,993,061 | +26% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Masci General Contractors, Inc | 2. Ryan Incorporated Civil | 3. Ranger Construction Industries, Inc. | 4. Hubbard Construction Company | 5. Southland Construction, Inc. | 6. Crisdel Group, Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $745,474 | $2,000,000 | $1,978,500 | $2,100,000 | $1,443,696 | $2,269,600 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $160,000 | $49,001 | $224,000 | $760,000 | $59,000 | $393,000 |
| 0015 | Work zone sign (0102-60) | ED | 17,600 | $0.24 | $0.20 | $0.20 | $0.21 | $0.21 | $0.40 |
| 0020 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 108 | $40.00 | $107.00 | $41.70 | $75.04 | $116.00 | $135.00 |
| 0025 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 15,200 | $0.13 | $0.07 | $0.10 | $0.11 | $0.10 | $0.10 |
| 0030 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 24,000 | $0.09 | $0.07 | $0.05 | $0.05 | $0.05 | $0.05 |
| 0035 | Arrow board / advance warning arrow panel (0102-76) | ED | 400 | $6.00 | $5.35 | $5.50 | $5.71 | $5.30 | $5.50 |
| 0040 | Portable changeable message sign, temporary (0102-99) | ED | 2,898 | $12.00 | $10.70 | $11.00 | $10.38 | $10.60 | $11.00 |
| 0045 | Type III barricade (0102-115) | ED | 7,600 | $0.37 | $0.31 | $0.25 | $0.29 | $0.24 | $0.25 |
| 0050 | Removable tape, white, solid 6" (0102-913-21) | GM | 0.25 | $15,750 | $14,445 | $14,500 | $14,634 | $16,000 | $22,000 |
| 0055 | Sediment barrier (0104-10-3) | LF | 3,506 | $1.00 | $2.14 | $2.60 | $3.31 | $0.85 | $8.00 |
| 0060 | Floating turbidity barrier (0104-11) | LF | 140 | $12.50 | $13.74 | $16.60 | $16.24 | $12.00 | $31.00 |
| 0065 | Staked turbidity barrier- nylon reinforced PVC (0104-12) | LF | 1,418 | $7.80 | $5.72 | $10.15 | $7.13 | $7.90 | $9.00 |
| 0070 | Soil tracking prevention device (0104-15) | EACH | 3 | $3,500.00 | $3,210.00 | $1,570.00 | $4,400.00 | $3,700.00 | $20,000 |
| 0075 | Inlet protection system (0104-18) | EACH | 16 | $100.00 | $141.06 | $164.65 | $256.95 | $160.00 | $355.00 |
| 0080 | Litter removal (0107-1) | ACRE | 255.87 | $67.00 | $80.25 | $71.35 | $74.10 | $35.00 | $84.00 |
| 0085 | Mowing (0107-2) | ACRE | 183.07 | $160.00 | $80.25 | $164.65 | $42.50 | $85.00 | $48.00 |
| 0090 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $175,200 | $590,000 | $295,615 | $1,003,000 | $128,000 | $742,000 |
| 0095 | Removal of existing concrete (0110-4-10) | SY | 577 | $19.50 | $0.01 | $12.55 | $54.68 | $37.00 | $30.00 |
| 0100 | Plugging water wells, artesian (0110-5) | EACH | 1 | $6,500.00 | $85,600 | $4,340.00 | $807.93 | $6,000.00 | $12,500 |
| 0105 | Regular excavation (0120-1) | CY | 21,360.50 | $5.25 | $4.17 | $5.15 | $7.40 | $20.40 | $22.00 |
| 0110 | Subsoil excavation (0120-4) | CY | 5,791.10 | $9.99 | $7.27 | $14.35 | $18.46 | $23.00 | $25.00 |
| 0115 | Embankment (0120-6) | CY | 56,455.80 | $12.29 | $22.65 | $14.60 | $16.84 | $25.60 | $31.00 |
| 0120 | Surcharge embankment (0120-74) | CY | 19,944.90 | $8.50 | $8.10 | $20.15 | $13.39 | $41.00 | $46.00 |
| 0124 | Settlement plate assembly (0141-70) | AS | 4 | $1,100.00 | $2,811.92 | $1,320.00 | $1,125.00 | $1,000.00 | $6,100.00 |
| 0125 | Type B stabilization (0160-4) | SY | 51,363 | $5.50 | $10.70 | $2.85 | $6.81 | $5.50 | $12.00 |
| 0130 | Optional base, base group 01 (0285-701) | SY | 3,296 | $27.48 | $35.31 | $32.25 | $34.00 | $33.00 | $34.00 |
| 0135 | Optional base, base group 04 (0285-704) | SY | 796 | $27.48 | $17.55 | $16.60 | $18.39 | $20.00 | $37.00 |
| 0140 | Optional base, base group 09 (0285-709) | SY | 45,448 | $39.69 | $24.87 | $23.20 | $21.13 | $25.25 | $24.00 |
| 0145 | Milling existing asphalt pavement, 2 1/2" avg depth (0327-70-8) | SY | 434 | $4.95 | $31.08 | $21.30 | $24.00 | $28.80 | $22.00 |
| 0150 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 6,215.90 | $135.29 | $140.22 | $128.05 | $146.00 | $130.00 | $132.00 |
| 0155 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 3,896.10 | $199.50 | $180.46 | $187.90 | $184.00 | $167.00 | $194.00 |
| 0160 | Plain cement concrete 11" (0350-3-11) | SY | 3,296 | $139.70 | $133.75 | $138.65 | $127.95 | $127.00 | $124.00 |
| 0165 | Plain cement concrete 12" (0350-3-13) | SY | 46 | $275.49 | $267.50 | $278.20 | $135.78 | $127.00 | $293.00 |
| 0170 | Cleaning & sealing joints- concrete pavement (0350-5) | LF | 6,517 | $7.95 | $8.56 | $8.90 | $5.80 | $5.80 | $16.00 |
| 0175 | Grinding concrete pavement (0352-70) | SY | 3,342 | $9.15 | $5.89 | $9.70 | $7.87 | $4.20 | $5.00 |
| 0180 | Concrete class NS, gravity index 400-011 (0400-0-11) | CY | 234.10 | $1,350.00 | $588.50 | $1,280.00 | $832.93 | $1,175.00 | $900.00 |
| 0185 | Inlets, curb, type P-3, <10' (0425-1331) | EACH | 1 | $10,710 | $11,332 | $10,500 | $8,263.51 | $11,500 | $8,338.63 |
| 0190 | Inlets, curb, type P-4, <10' (0425-1341) | EACH | 4 | $10,960 | $11,296 | $10,500 | $7,907.33 | $11,300 | $9,070.88 |
| 0195 | Inlets, curb, type J-2, <10' (0425-1421) | EACH | 1 | $12,585 | $15,148 | $17,200 | $11,954 | $14,000 | $10,731 |
| 0200 | Inlets, curb, type J-2, >10' (0425-1422) | EACH | 1 | $13,895 | $16,856 | $16,300 | $12,821 | $14,000 | $11,091 |
| 0205 | Inlets, curb, type J-4, <10' (0425-1441) | EACH | 3 | $12,795 | $13,197 | $16,000 | $10,966 | $14,000 | $10,347 |
| 0210 | Inlets, DT bot, type C,<10' (0425-1521) | EACH | 2 | $7,705.00 | $4,551.69 | $7,760.00 | $5,947.83 | $7,700.00 | $5,174.67 |
| 0215 | Inlets, DT bot, type E, <10' (0425-1551) | EACH | 1 | $7,915.00 | $9,073.20 | $12,700 | $5,090.05 | $8,200.00 | $7,494.47 |
| 0220 | Inlets, DT bot, type E, modify (0425-1559) | EACH | 1 | $14,315 | $6,820.40 | $13,700 | $8,401.72 | $14,000 | $15,653 |
| 0225 | Inlets, DT bot, type F, <10' (0425-1561) | EACH | 1 | $8,370.00 | $6,489.89 | $9,730.00 | $7,016.56 | $9,000.00 | $5,327.66 |
| 0230 | Inlets, ditch bottom, type G, <10' (0425-1571) | EACH | 5 | $12,680 | $10,070 | $10,900 | $8,926.83 | $11,000 | $9,368.30 |
| 0235 | Inlets, DT bot, type H, modify (0425-1589) | EACH | 2 | $12,560 | $9,251.01 | $14,200 | $9,605.46 | $12,000 | $19,173 |
| 0240 | Inlets, gutter, type V, partial (0425-1715) | EACH | 1 | $6,975.00 | $4,798.73 | $4,970.00 | $9,302.83 | $7,200.00 | $7,967.20 |
| 0245 | Inlets, closed flume (0425-1910) | EACH | 7 | $6,750.00 | $6,016.33 | $5,590.00 | $2,942.64 | $9,000.00 | $5,358.50 |
| 0250 | Manholes, P-8, <10' (0425-2-61) | EACH | 1 | $7,570.00 | $7,637.68 | $7,360.00 | $4,718.74 | $6,600.00 | $6,070.65 |
| 0255 | Manholes, J-8, <10' (0425-2-91) | EACH | 1 | $14,680 | $9,725.46 | $12,900 | $10,753 | $9,200.00 | $6,458.30 |
| 0260 | Manholes, J-8, >10' (0425-2-92) | EACH | 1 | $15,690 | $14,376 | $14,400 | $13,787 | $9,200.00 | $10,285 |
| 0265 | Manhole, adjust (0425-5) | EACH | 1 | $1,150.00 | $3,163.77 | $1,220.00 | $1,676.31 | $1,200.00 | $1,002.04 |
| 0270 | Pipe culvert,optional material,round, 12"S/CD (0430-175112) | LF | 94 | $113.29 | $106.49 | $117.25 | $80.49 | $88.00 | $123.23 |
| 0275 | Pipe culvert,optional material,round, 15"S/CD (0430-175115) | LF | 359 | $124.00 | $110.28 | $108.05 | $107.29 | $155.00 | $125.74 |
| 0280 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 1,246 | $147.89 | $118.57 | $114.25 | $109.21 | $158.30 | $135.03 |
| 0285 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 733 | $179.25 | $141.93 | $134.70 | $132.84 | $185.00 | $200.68 |
| 0290 | Pipe culvert, opt material, round, 30"S/CD (0430-175130) | LF | 38 | $315.27 | $203.06 | $178.20 | $204.00 | $244.00 | $263.95 |
| 0295 | Pipe culvert, opt material, round, 36"S/CD (0430-175136) | LF | 980 | $269.39 | $267.23 | $214.25 | $213.85 | $247.00 | $286.93 |
| 0300 | Pipe culvert, opt material, shape - elip/arch, 36"S/CD (0430-175236) | LF | 8 | $425.31 | $284.20 | $443.40 | $1,295.33 | $961.00 | $925.85 |
| 0305 | Winged concrete endwalls, U- type index 430-040, 24" (0430-400024) | EACH | 1 | $4,250.00 | $5,723.95 | $4,060.00 | $5,065.84 | $5,600.00 | $5,468.38 |
| 0310 | Pipe filling and plugging- place out of service (0430-830) | CY | 0.10 | $7,000.00 | $32,728 | $25,800 | $6,135.90 | $7,400.00 | $12,374 |
| 0315 | PVC pipe for back of sidewalk, (0430-963-1) | LF | 50 | $59.65 | $24.39 | $80.45 | $65.16 | $30.00 | $119.35 |
| 0320 | Mitered end section, optional round, 15" CD (0430-982123) | EACH | 1 | $2,500.00 | $2,263.27 | $3,200.00 | $2,814.76 | $2,200.00 | $3,300.00 |
| 0325 | Mitered end section, optional round, 18" CD (0430-982125) | EACH | 2 | $2,900.00 | $2,887.42 | $3,330.00 | $3,399.01 | $2,300.00 | $3,325.00 |
| 0330 | Mitered end section, optional round, 30" CD (0430-982133) | EACH | 1 | $4,999.00 | $5,909.95 | $5,660.00 | $5,969.13 | $5,100.00 | $6,750.00 |
| 0335 | Mitered end section, optional round, 36" CD (0430-982138) | EACH | 1 | $7,259.00 | $6,949.07 | $6,720.00 | $7,335.98 | $7,100.00 | $9,200.00 |
| 0340 | Vertical drainage wicks (0442-70) | LF | 445,446 | $1.07 | $0.83 | $0.65 | $1.00 | $0.92 | $0.70 |
| 0345 | Edgedrain draincrete, (0446-1-1) | LF | 1,783 | $42.99 | $114.12 | $52.10 | $28.94 | $40.00 | $54.00 |
| 0350 | Edgedrain outlet pipe, 4" (0446-71-1) | LF | 211 | $47.39 | $36.06 | $57.35 | $39.42 | $48.00 | $81.00 |
| 0355 | Pipe handrail - guiderail, aluminum (0515-1-2) | LF | 546 | $75.05 | $72.76 | $63.65 | $72.95 | $75.00 | $60.00 |
| 0360 | Bollards (0519-78) | EACH | 138 | $850.00 | $2,009.72 | $733.00 | $1,397.18 | $2,270.00 | $1,170.00 |
| 0365 | Concrete curb & gutter, type F (0520-1-10) | LF | 6,845 | $38.77 | $43.08 | $34.45 | $32.19 | $38.70 | $27.00 |
| 0370 | Concrete curb, type D (0520-2-4) | LF | 1,212 | $38.77 | $27.82 | $30.50 | $37.43 | $39.00 | $19.50 |
| 0375 | Valley gutter- concrete (0520-3) | LF | 355 | $43.50 | $30.61 | $57.80 | $38.13 | $40.00 | $44.00 |
| 0380 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 4,061 | $65.97 | $61.75 | $57.75 | $60.64 | $61.00 | $57.00 |
| 0385 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 372 | $77.21 | $76.11 | $87.65 | $71.18 | $79.60 | $88.00 |
| 0390 | Detectable warnings (0527-2) | SF | 181 | $24.90 | $41.73 | $40.45 | $58.00 | $30.00 | $52.00 |
| 0395 | Riprap, rubble, F&I, ditch lining (0530-3-4) | TN | 4.70 | $525.69 | $907.02 | $774.00 | $1,102.18 | $635.00 | $1,100.00 |
| 0400 | Guardrail -roadway, general/low speed TL-2 (0536-1-0) | LF | 16 | $35.00 | $26.75 | $30.55 | $55.13 | $30.00 | $29.00 |
| 0405 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 2 | $1,800.00 | $1,712.00 | $1,950.00 | $1,722.77 | $1,800.00 | $1,825.00 |
| 0410 | Bumper guards, concrete (0542-70) | EACH | 106 | $385.00 | $64.20 | $164.65 | $365.00 | $137.00 | $206.00 |
| 0415 | Fencing, type B, 5.1-6.0', standard (0550-10220) | LF | 293 | $24.54 | $24.93 | $25.60 | $23.30 | $22.40 | $26.00 |
| 0420 | Fencing, type B, 5.1-6.0, W/ vinyl coating (0550-10222) | LF | 370 | $28.50 | $36.38 | $37.30 | $34.00 | $31.50 | $29.00 |
| 0425 | Fencing, type B, 5.1-6.0, reset existing (0550-10228) | LF | 20 | $18.00 | $29.62 | $30.40 | $27.68 | $10.60 | $41.00 |
| 0430 | Fencing, special type, 5.1-6.0', special features (0550-10929) | LF | 2,164 | $65.90 | $49.70 | $51.00 | $46.45 | $47.10 | $63.00 |
| 0435 | Fence gate, type B vinyl, single, 0-6.0' opening (0550-60611) | EACH | 1 | $2,100.00 | $850.65 | $873.00 | $795.00 | $610.00 | $1,000.00 |
| 0440 | Fence gate, type B with vinyl coating, double, 6.1-12.0' opening (0550-60622) | EACH | 3 | $5,900.00 | $1,444.50 | $1,480.00 | $1,350.00 | $2,640.00 | $1,500.00 |
| 0445 | Performance turf, sod (0570-1-2) | SY | 37,999 | $3.40 | $4.94 | $5.05 | $3.88 | $2.90 | $4.30 |
| 0450 | Conduit, furnish & install, open trench (0630-2-11) | LF | 3,975 | $120.50 | $96.30 | $98.80 | $42.37 | $121.00 | $118.00 |
| 0455 | Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13) | EACH | 1 | $5,066.41 | $4,877.69 | $5,000.00 | $4,558.59 | $5,000.00 | $5,000.00 |
| 0460 | Pull box, HS-20, furnish & 24" X 36" (0635-2219) | EACH | 22 | $2,747.81 | $2,432.94 | $2,500.00 | $2,273.78 | $2,760.00 | $2,700.00 |
| 0465 | Pull box, HS-20, furnish & 13" X 24" (0635-2220) | EACH | 22 | $1,689.08 | $1,588.98 | $1,630.00 | $1,485.03 | $1,690.00 | $1,655.00 |
| 0470 | EV power conduit vault, 11' X 21' 9.5' (10' X 20' X 8') (0635-2221) | EACH | 4 | $92,540 | $49,919 | $51,200 | $46,653 | $93,000 | $90,600 |
| 0475 | Electrical power service, F&I, underground, meter not required (0639-1123) | AS | 2 | $21,068 | $10,141 | $10,400 | $9,477.65 | $21,000 | $20,600 |
| 0480 | Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130) | LS | 1 | $280,000 | $280,000 | $280,000 | $280,000 | $280,000 | $280,000 |
| 0485 | Raised pavement marker, type B (0706-1-3) | EACH | 190 | $4.73 | $10.70 | $4.65 | $4.50 | $4.75 | $8.00 |
| 0490 | Disputes review board, meeting- DO not bid (0999-20-1) | DA | 10 | $4,800.00 | $4,800.00 | $4,800.00 | $4,800.00 | $4,800.00 | $4,800.00 |
| 0495 | Disputes review board, hearing- DO not bid (0999-20-2) | EACH | 2 | $5,750.00 | $5,750.00 | $5,750.00 | $5,750.00 | $5,750.00 | $5,750.00 |
| 0500 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $150,000 | $150,000 | $150,000 | $150,000 | $150,000 | $150,000 |
| 0505 | Utility pipe,remove & dispose, 2- 4.9" (1050-16002) | LF | 771 | $10.00 | $12.29 | $146.45 | $9.07 | $17.60 | $27.00 |
| 0510 | Utility pipe,plug & place out of service, 5- 7.9" (1050-18003) | LF | 1 | $550.00 | $717.36 | $3,740.00 | $1,440.26 | $1,700.00 | $292.00 |
| 0515 | Utility pipe- poly vinyl chloride, furnish & install, water/sewer, (1050-31204) | LF | 77 | $159.22 | $459.57 | $227.05 | $148.96 | $186.00 | $333.00 |
| 0520 | Utility pipe- poly vinyl chloride, furnish & install, water/sewer, (1050-31206) | LF | 25 | $195.35 | $2,266.85 | $245.20 | $210.19 | $70.00 | $146.00 |
| 0525 | Utility pipe- poly vinyl chloride, furnish & install, water/sewer, (1050-31208) | LF | 16 | $189.34 | $3,134.19 | $521.00 | $520.68 | $102.00 | $164.00 |
| 0530 | Utility pipe- ductile iron/cast iron, furnish & install, water/sewer, 6" (1050-51206) | LF | 25 | $225.38 | $74.37 | $621.00 | $245.13 | $124.00 | $241.00 |
| 0535 | Utility pipe- ductile iron/cast iron, furnish & install, water/sewer, 12" (1050-51212) | LF | 57 | $299.35 | $92.73 | $763.00 | $372.75 | $211.00 | $203.00 |
| 0540 | Utility fittings, ductile iron, furnish & install elbow, (1055-51112) | EACH | 2 | $1,650.00 | $1,997.01 | $2,600.00 | $1,795.39 | $1,400.00 | $1,075.00 |
| 0545 | Utility fittings, ductile iron, furnish & install tee, 12" (1055-51212) | EACH | 1 | $2,950.00 | $2,865.57 | $3,320.00 | $1,617.84 | $2,000.00 | $2,163.00 |
| 0550 | Utility fittings, ductile iron, furnish & install reducer, 12" (1055-51312) | EACH | 2 | $1,845.00 | $1,556.65 | $2,290.00 | $902.97 | $1,100.00 | $1,143.00 |
| 0555 | Utility fixture, valve/meter box, furnish & install, 2" (1080-21102) | EACH | 1 | $1,100.00 | $821.46 | $3,900.00 | $2,213.70 | $350.00 | $9,150.00 |
| 0560 | Utility fixture, valve/meter box, furnish & install, 4" (1080-21104) | EACH | 2 | $2,100.00 | $3,867.54 | $3,680.00 | $2,213.72 | $520.00 | $6,000.00 |
| 0565 | Utility fixture, valve/meter box, furnish & install, 6" (1080-21106) | EACH | 1 | $2,300.00 | $29,630 | $3,900.00 | $2,213.70 | $520.00 | $2,150.00 |
| 0570 | Utility fixture, valve/meter box, furnish & install, 8" (1080-21108) | EACH | 1 | $3,100.00 | $1,290.95 | $5,650.00 | $2,677.68 | $520.00 | $6,300.00 |
| 0575 | Utility fixture, valve/meter box, furnish & install, 12" (1080-21112) | EACH | 1 | $5,990.00 | $4,475.29 | $9,150.00 | $3,141.69 | $520.00 | $6,300.00 |
| 0580 | Utility fixture, valve/meter box, relocate (1080-21400) | EACH | 1 | $2,000.00 | $0.01 | $9,150.00 | $1,051.80 | $625.00 | $1,100.00 |
| 0585 | Utility fixture, valve/meter box, adjust (1080-21500) | EACH | 5 | $1,100.00 | $614.76 | $6,610.00 | $661.39 | $625.00 | $530.00 |
| 0589 | Utility fixture- backflow assembly, furnish & install, 6” (1080-22106) | EACH | 1 | $83,630 | $12,848 | $25,200 | $16,423 | $10,000 | $66,500 |
| 0594 | Utility fixture- tapping saddle/sleeve, furnish & 8" (1080-23108) | EACH | 1 | $8,500.00 | $13,393 | $22,500 | $10,702 | $7,500.00 | $13,000 |
| 0595 | Utility fixture- tapping saddle/sleeve, furnish & 12" (1080-23112) | EACH | 1 | $14,900 | $16,086 | $25,400 | $13,823 | $12,500 | $13,000 |
| 0600 | Utility fixture, valve assembly, furnish and install, 2" (1080-24102) | EACH | 1 | $1,100.00 | $1,273.51 | $8,670.00 | $2,198.48 | $1,085.00 | $1,150.00 |
| 0605 | Utility fixture, valve assembly, furnish and install, 6" (1080-24106) | EACH | 1 | $3,100.00 | $2,054.59 | $10,500 | $3,926.56 | $2,240.00 | $1,800.00 |
| 0610 | Utility fixture, valve assembly, furnish and install, 8" (1080-24108) | EACH | 1 | $3,350.00 | $2,745.42 | $11,600 | $4,656.16 | $3,215.00 | $2,600.00 |
| 0615 | Utility fixture, valve assembly, adjust/modify (1080-24500) | EACH | 1 | $3,200.00 | $644.33 | $8,000.00 | $1,181.94 | $625.00 | $412.00 |
| 0620 | Utility fixture, mechanical joint restraint, furnish & install, 12" (1080-29112) | EACH | 11 | $500.00 | $612.96 | $11,500 | $1,282.74 | $315.00 | $638.00 |
| 0625 | Utility fixture- sample point, furnish & install, 8" (1080-32108) | EACH | 2 | $1,500.00 | $927.18 | $2,610.00 | $853.21 | $1,300.00 | $1,350.00 |
| 0630 | Utility fixture, plug valve, furnish and install 4" (1080-33104) | EACH | 1 | $3,300.00 | $1,582.63 | $8,340.00 | $2,140.51 | $2,115.00 | $1,800.00 |
| 0635 | Fire hydrant, relocate (1644-800) | EACH | 3 | $4,700.00 | $9,515.10 | $9,620.00 | $3,480.04 | $5,070.00 | $10,000 |
| 0640 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 61 | $875.00 | $663.40 | $681.00 | $652.80 | $870.00 | $642.00 |
| 0645 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 1 | $2,444.10 | $2,065.10 | $2,120.00 | $2,678.88 | $2,400.00 | $2,675.00 |
| 0650 | Single column ground sign assembly, remove (0700-1600) | EACH | 13 | $231.00 | $53.50 | $54.90 | $154.28 | $230.00 | $206.00 |
| 0655 | Multi-column ground sign assembly, F&I ground mount, 1-200.0 SF (0700-2116) | EACH | 2 | $13,462 | $18,425 | $18,900 | $19,399 | $13,000 | $21,500 |
| 0660 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 1 | $1,386.00 | $1,230.50 | $1,260.00 | $561.57 | $1,300.00 | $1,300.00 |
| 0665 | Embedded dynamic message furnish & install- with UPS, monochrome, UP to 12 SF (0700-7111) | EACH | 2 | $19,926 | $35,751 | $32,800 | $27,349 | $20,000 | $19,500 |
| 0670 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 6 | $94.83 | $128.40 | $164.65 | $158.17 | $96.00 | $87.00 |
| 0675 | Delineator, non-flexible (0705-11-2) | EACH | 2 | $323.69 | $214.00 | $164.65 | $272.37 | $325.00 | $154.00 |
| 0680 | Raised pavement marker, type B (0706-1-3) | EACH | 72 | $4.73 | $10.70 | $4.65 | $4.50 | $4.75 | $8.00 |
| 0685 | Painted pavement markings, surface (0710-90) | LS | 1 | $13,440 | $48,150 | $47,000 | $12,800 | $13,000 | $42,000 |
| 0690 | Thermoplastic, standard, solid, 6" for parking spaces (0711-11121) | LF | 18,983 | $2.31 | $2.14 | $2.20 | $2.20 | $2.30 | $3.10 |
| 0695 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 789 | $4.20 | $5.35 | $4.40 | $4.00 | $4.25 | $4.10 |
| 0700 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 3,259 | $5.25 | $7.49 | $6.60 | $5.00 | $5.30 | $5.10 |
| 0705 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.86 | $2,625.00 | $4,815.01 | $1,750.00 | $2,514.62 | $2,640.00 | $2,450.00 |
| 0710 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 7 | $315.00 | $321.00 | $274.40 | $300.00 | $320.00 | $308.00 |
| 0715 | Thermoplastic, standard, arrow (0711-11170) | EACH | 28 | $105.00 | $96.30 | $120.75 | $100.00 | $106.00 | $113.00 |
| 0720 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 133 | $5.25 | $7.49 | $6.60 | $5.00 | $5.30 | $5.00 |
| 0725 | Thermoplastic, standard, blue, solid,6" (0711-11421) | LF | 1,138 | $5.25 | $10.70 | $4.40 | $5.00 | $5.30 | $8.00 |
| 0730 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 409 | $15.75 | $21.40 | $8.80 | $15.00 | $15.80 | $15.00 |
| 0735 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 1.51 | $9,975.00 | $8,025.00 | $6,880.00 | $9,512.60 | $10,000 | $6,200.00 |
| 0740 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 0.12 | $2,100.00 | $4,815.04 | $1,520.00 | $1,983.47 | $2,200.00 | $2,500.00 |
| 0745 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.93 | $9,975.00 | $8,025.00 | $6,920.00 | $9,500.00 | $10,000 | $6,200.00 |
| 0750 | Conduit, furnish & install, open trench (0630-2-11) | LF | 5,605 | $14.16 | $15.43 | $15.85 | $14.42 | $14.25 | $14.00 |
| 0755 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 44 | $1,275.18 | $1,298.03 | $1,330.00 | $1,213.11 | $1,280.00 | $1,250.00 |
| 0760 | Electrical power service, F&I, underground, meter furnished by power company (0639-1121) | AS | 1 | $4,661.25 | $7,209.26 | $7,400.00 | $6,737.63 | $4,680.00 | $4,600.00 |
| 0765 | Electrical service wire, & install (0639-2-1) | LF | 15 | $6.16 | $36.40 | $37.35 | $34.02 | $6.20 | $6.00 |
| 0770 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 1 | $2,946.98 | $4,472.60 | $4,590.00 | $4,180.00 | $2,960.00 | $2,900.00 |
| 0775 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $2,635.34 | $1,564.89 | $1,610.00 | $1,462.51 | $2,650.00 | $2,600.00 |
| 0780 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 21,186 | $2.21 | $2.74 | $2.80 | $2.56 | $2.20 | $2.15 |
| 0785 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 1 | $23,600 | $22,493 | $23,100 | $21,021 | $23,000 | $23,000 |
| 0790 | Light pole complete, F&I, standard pole standard foundation, 35' mounting height, 0' arm length (0715-61200) | EACH | 4 | $9,829.42 | $8,573.29 | $8,790.00 | $8,012.42 | $9,880.00 | $9,600.00 |
| 0791 | Light pole complete, F&I, standard pole special foundation, 35' mounting height, 0' arm length (0715-62200) | EACH | 11 | $13,758 | $13,608 | $14,000 | $12,718 | $13,800 | $13,500 |
| 0792 | Light pole complete, F&I, standard pole standard foundation, 50' mounting height, 0' arm length (0715-61500) | EACH | 12 | $11,238 | $10,425 | $10,700 | $9,742.54 | $11,300 | $11,000 |
| 0793 | Light pole complete, F&I, standard pole special foundation, 50' mounting height, 0' arm length (0715-62500) | EACH | 6 | $18,207 | $18,380 | $18,900 | $17,177 | $18,300 | $17,800 |
| 0800 | Light pole complete, remove pole and foundation (0715-69000) | EACH | 3 | $808.50 | $966.14 | $991.00 | $902.93 | $813.00 | $800.00 |
| 0805 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 33 | $823.52 | $883.64 | $907.00 | $825.83 | $828.00 | $800.00 |
| 0810 | Electrical power service, F&I, underground, meter furnished by power company (0639-1121) | AS | 1 | $63,374 | $6,886.94 | $7,060.00 | $6,436.39 | $63,000 | $789,000 |
| 0815 | Architectural, building, new, rest area (0750-1-11) | SF | 1 | $3,903,027 | $3,040,000 | $4,114,000 | $3,903,027 | $4,514,000 | $2,820,000 |
| 0820 | Architectural, building, new, storage/mechanical (0750-1-17) | SF | 1 | $385,345 | $330,916 | $378,400 | $353,812 | $310,000 | $273,500 |
| 0825 | Architectural-water, sanitary sewer/sewage treatment (0751-5) | LS | 1 | $949,568 | $139,420 | $769,600 | $503,323 | $342,000 | $474,000 |
| 0830 | Architectural, picnic pavilion, small (0751-30-1) | EACH | 5 | $33,500 | $52,869 | $58,100 | $52,972 | $55,000 | $9,700.00 |
| 0835 | Trash receptacle (0751-37) | EACH | 25 | $2,650.00 | $4,308.08 | $4,100.00 | $3,734.00 | $3,050.00 | $2,400.00 |
| 0840 | Trash receptacle- ash urn (0751-37-1) | EACH | 25 | $1,150.00 | $894.54 | $1,580.00 | $1,440.00 | $965.00 | $364.00 |
| 0845 | Trash receptacle- dog waste (0751-37-2) | EACH | 7 | $999.00 | $1,020.48 | $2,120.00 | $1,928.00 | $1,150.00 | $850.00 |
| 0850 | Bench, F&I, concrete (0751-38-13) | EACH | 9 | $3,150.00 | $3,771.78 | $3,980.00 | $3,624.00 | $2,485.00 | $1,700.00 |
| 0855 | Flag pole, 26-35' (0751-44-2) | EACH | 3 | $12,120 | $15,643 | $22,800 | $20,765 | $13,400 | $43,000 |
| 0860 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 0.60 | $4,158.00 | $39,991 | $4,880.00 | $4,447.28 | $4,180.00 | $4,100.00 |
| 0865 | Itsfm location documentation- ITS site (0611-2-2) | EACH | 48 | $1,848.00 | $882.70 | $2,260.00 | $2,058.00 | $1,850.00 | $1,800.00 |
| 0870 | Conduit, furnish & install, open trench (0630-2-11) | LF | 3,209 | $20.33 | $18.65 | $14.30 | $13.04 | $20.40 | $20.00 |
| 0875 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 412 | $34.88 | $33.35 | $23.45 | $21.38 | $35.00 | $34.00 |
| 0880 | Fiber optic cable, F&I, underground,2-12 fibers (0633-1121) | LF | 8,397 | $3.36 | $3.60 | $4.90 | $4.48 | $3.38 | $3.30 |
| 0885 | Fiber optic connection, install, splice (0633-2-31) | EACH | 12 | $71.02 | $53.35 | $71.25 | $64.93 | $71.00 | $70.00 |
| 0890 | Fiber optic connection, install, termination (0633-2-32) | EACH | 240 | $86.54 | $98.69 | $92.65 | $84.40 | $87.00 | $85.00 |
| 0895 | Fiber optic connection hardware, F&I, splice tray (0633-3-12) | EACH | 1 | $87.90 | $82.09 | $71.25 | $64.93 | $88.00 | $86.00 |
| 0900 | Fiber optic connection hardware, F&I, buffer tube fan out kit (0633-3-14) | EACH | 20 | $160.50 | $130.11 | $121.15 | $110.37 | $161.00 | $160.00 |
| 0905 | Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16) | EACH | 20 | $1,732.50 | $2,008.95 | $1,780.00 | $1,623.10 | $1,740.00 | $1,700.00 |
| 0910 | Fiber optic connection hardware, F&I, connector panel (0633-3-17) | EACH | 18 | $259.88 | $248.13 | $156.80 | $142.84 | $261.00 | $255.00 |
| 0915 | Fiber optic cable locator (0633-6) | DA | 400 | $173.25 | $148.88 | $178.15 | $162.31 | $174.00 | $170.00 |
| 0920 | Multi-conductor cable, furnish & install, cat 6 (0633-8-11) | LF | 14,087 | $6.65 | $5.71 | $6.40 | $5.84 | $6.60 | $6.50 |
| 0925 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 104 | $1,681.00 | $830.35 | $1,400.00 | $1,272.44 | $1,690.00 | $1,650.00 |
| 0930 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 24 | $272.22 | $2,269.13 | $2,400.00 | $2,184.54 | $2,750.00 | $2,700.00 |
| 0935 | Electrical power service, F&I, underground, meter furnished by power company (0639-1121) | AS | 1 | $5,793.20 | $5,789.55 | $9,260.00 | $8,439.60 | $5,820.00 | $5,700.00 |
| 0940 | Electrical service wire, & install (0639-2-1) | LF | 8,107 | $6.16 | $14.37 | $40.70 | $37.08 | $6.20 | $6.00 |
| 0945 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 11 | $2,946.98 | $2,409.93 | $3,530.00 | $3,212.83 | $2,960.00 | $2,900.00 |
| 0950 | Electrical power service- transformer, F&I, 5-10 kva, phase, aluminum windings (0639-6122) | EACH | 10 | $7,221.59 | $620.32 | $3,120.00 | $2,838.97 | $7,260.00 | $7,100.00 |
| 0955 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 11 | $2,635.34 | $2,295.85 | $1,610.00 | $1,462.51 | $2,650.00 | $2,600.00 |
| 0960 | Prestressed concrete pole, type P-III (0641-2-13) | EACH | 35 | $4,843.81 | $6,918.60 | $6,730.00 | $6,130.06 | $4,870.00 | $4,800.00 |
| 0965 | Concrete CCTV pole, furnish & install with lowering device, (0641-3163) | EACH | 2 | $45,547 | $48,926 | $52,700 | $48,014 | $45,800 | $44,600 |
| 0970 | Vehicle detection system- parking detection system, furnish & install, sensor- camera (0660-12-11) | EACH | 74 | $3,487.16 | $11,985 | $4,550.00 | $4,147.26 | $3,500.00 | $3,400.00 |
| 0975 | ITS cabinet, furnish & install, base mount, 334, 24" W X 66" H X 30" D (0676-2143) | EACH | 11 | $14,557 | $13,163 | $11,300 | $10,320 | $14,600 | $14,500 |
| 0980 | Small equipment enclosure, furnish and install, less than 10"W X 13"H X 11" D (0676-3-10) | EACH | 85 | $2,166.03 | $2,500.52 | $3,440.00 | $3,133.99 | $2,170.00 | $2,100.00 |
| 0985 | ITS CCTV camera, non- pressurized, IP, high definition (0682-1173) | EACH | 4 | $7,839.44 | $6,468.75 | $7,970.00 | $7,264.98 | $7,880.00 | $7,700.00 |
| 0990 | Managed field ethernet switch, remove- cabinet to remain (0684-1-6) | EACH | 2 | $1,474.23 | $124.07 | $356.30 | $324.62 | $1,480.00 | $1,500.00 |
| 0995 | Managed field ethernet switch, layer 3, furnish & install (0684-1-10) | EACH | 13 | $5,656.36 | $7,915.71 | $8,540.00 | $7,784.37 | $5,600.00 | $5,500.00 |
| 1000 | Media converter, furnish & install (0684-5-1) | EACH | 2 | $1,097.25 | $1,062.41 | $1,200.00 | $1,097.21 | $1,100.00 | $1,100.00 |
| 1005 | Uninterruptible power supply, furnish and install, online/double conversion (0685-1-12) | EACH | 11 | $6,436.30 | $4,984.72 | $4,990.00 | $4,547.20 | $6,470.00 | $6,300.00 |
| 1010 | Remote power management rpmu, furnish and install (0685-2-1) | EACH | 11 | $607.71 | $931.08 | $1,250.00 | $1,136.73 | $611.00 | $600.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of July 29, 2026. Compiled by Mirage Metrics.