FDOT contract T5889 bid tabulation
SR 9 (I-95) FROM SR 46 TO SB MIMS REST AREA. Let by Florida DOT on July 29, 2026, Brevard, District 5. 5 bids received; low bid $2,981,009 by Masci General Contractors, Inc.
- Owner
- Florida DOT
- Letting
- 29 JUL 2026
- Pay items
- 54
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Masci General Contractors, Inc | $2,981,009 | Low |
| 2 | C.W. Roberts Contracting, Inc. | $3,372,271 | +13% |
| 3 | Preferred Materials Inc. | $3,588,295 | +20% |
| 4 | Halifax Paving, Inc. | $3,687,793 | +24% |
| 5 | Ohla USA Inc | $4,079,090 | +37% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Masci General Contractors, Inc | 2. C.W. Roberts Contracting, Inc. | 3. Preferred Materials Inc. | 4. Halifax Paving, Inc. | 5. Ohla USA Inc |
|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $75,000 | $70,000 | $172,100 | $186,875 | $405,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $35,000 | $59,000 | $137,600 | $140,000 | $250,000 |
| 0015 | Traffic control officer (0102-14) | HR | 1,210 | $80.00 | $102.45 | $100.00 | $110.00 | $0.01 |
| 0020 | Work zone sign (0102-60) | ED | 2,138 | $0.25 | $0.28 | $0.23 | $0.23 | $0.50 |
| 0025 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 11,347 | $0.16 | $0.17 | $0.14 | $0.14 | $0.16 |
| 0030 | Arrow board / advance warning arrow panel (0102-76) | ED | 175 | $10.75 | $8.20 | $7.00 | $7.00 | $7.80 |
| 0035 | Portable changeable message sign, temporary (0102-99) | ED | 293 | $14.69 | $14.05 | $12.00 | $12.00 | $16.50 |
| 0040 | Existing ITS maintenance (0102-112) | DA | 110 | $95.00 | $233.50 | $250.00 | $250.00 | $0.01 |
| 0045 | Type III barricade (0102-115) | ED | 60 | $1.50 | $1.15 | $1.00 | $1.00 | $1.20 |
| 0050 | Portable regulatory, sign (0102-150-1) | ED | 440 | $5.50 | $5.00 | $4.25 | $4.25 | $6.70 |
| 0055 | Radar speed display unit (0102-150-2) | ED | 440 | $5.50 | $5.00 | $4.25 | $4.25 | $7.00 |
| 0060 | Inlet protection system (0104-18) | EACH | 43 | $35.00 | $153.65 | $130.00 | $150.00 | $384.00 |
| 0065 | Litter removal (0107-1) | ACRE | 264.97 | $30.00 | $25.60 | $29.00 | $25.00 | $0.01 |
| 0070 | Mowing (0107-2) | ACRE | 264.97 | $61.00 | $66.60 | $60.00 | $65.00 | $0.01 |
| 0075 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $3,000.00 | $4,000.00 | $3,852.51 | $7,500.00 | $255,000 |
| 0080 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 55 | $2.00 | $50.50 | $161.50 | $100.00 | $0.01 |
| 0085 | Milling existing asphalt pavement, 4" avg depth (0327-70-7) | SY | 3,004 | $2.55 | $7.00 | $9.30 | $6.00 | $12.00 |
| 0090 | Milling existing asphalt pavement, 1 3/4" avg depth (0327-70-13) | SY | 134,248 | $1.50 | $1.50 | $1.56 | $3.50 | $1.50 |
| 0095 | Milling existing asphalt pavement, 5 1/2" avg depth (0327-70-18) | SY | 366 | $3.10 | $15.00 | $18.15 | $20.00 | $19.60 |
| 0100 | Milling existing asphalt pavement, 3/4" avg depth (0327-70-19) | SY | 634 | $1.90 | $26.25 | $27.80 | $10.00 | $0.01 |
| 0105 | Superpave asphaltic concrete, traffic E, PG76-22 (0334-1-55) | TN | 8,030.60 | $137.27 | $161.00 | $151.70 | $165.00 | $171.00 |
| 0110 | Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25) | TN | 5,712 | $190.15 | $212.00 | $227.20 | $185.00 | $215.00 |
| 0115 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 4.50 | $798.14 | $717.00 | $2,023.10 | $500.00 | $200.00 |
| 0120 | Miscellaneous asphalt (0339-1) | TN | 10.10 | $897.58 | $560.00 | $1,244.05 | $400.00 | $405.00 |
| 0125 | Guardrail -roadway, general (0536-1-1) | LF | 178 | $31.15 | $26.40 | $31.13 | $23.00 | $31.00 |
| 0130 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 1 | $1,970.00 | $1,750.10 | $1,512.46 | $1,525.00 | $2,075.00 |
| 0135 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 1 | $4,377.00 | $3,098.60 | $3,180.10 | $2,700.00 | $3,650.00 |
| 0140 | Performance turf, sod (0570-1-2) | SY | 61 | $10.15 | $35.00 | $10.00 | $10.00 | $25.00 |
| 0145 | Fiber optic cable locator (0633-6) | DA | 110 | $215.00 | $200.15 | $187.50 | $187.50 | $45.00 |
| 0150 | Raised pavement marker, type B (0706-1-3) | EACH | 2,058 | $4.73 | $5.80 | $5.00 | $4.00 | $5.00 |
| 0155 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 5.91 | $2,415.00 | $1,311.00 | $1,498.99 | $1,500.00 | $1,675.00 |
| 0160 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.71 | $3,150.00 | $1,732.00 | $2,000.00 | $2,000.00 | $2,050.00 |
| 0165 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 688 | $1.58 | $3.70 | $2.75 | $2.75 | $2.00 |
| 0170 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 12.72 | $630.00 | $1,154.00 | $900.00 | $850.00 | $740.00 |
| 0175 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 5.95 | $2,415.00 | $1,312.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 0180 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $35,000 | $35,000 | $35,000 | $35,000 | $35,000 |
| 0185 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 6 | $551.25 | $563.00 | $550.00 | $550.00 | $715.00 |
| 0190 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 2 | $2,625.00 | $409.80 | $400.00 | $400.00 | $3,300.00 |
| 0195 | Single column ground sign assembly, remove (0700-1600) | EACH | 7 | $10.50 | $25.60 | $25.00 | $25.00 | $55.00 |
| 0200 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 3 | $236.25 | $409.80 | $400.00 | $400.00 | $600.00 |
| 0205 | Sign panel, furnish & install ground mount, 12-20 SF (0700-3102) | EACH | 3 | $630.00 | $717.00 | $700.00 | $700.00 | $900.00 |
| 0210 | Sign panel, furnish & install ground mount, 101-200 SF (0700-3106) | EACH | 1 | $6,562.50 | $7,683.00 | $7,500.00 | $7,500.00 | $9,500.00 |
| 0215 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 3 | $10.50 | $25.60 | $25.00 | $25.00 | $55.00 |
| 0220 | Sign panel, remove, 12-20 SF (0700-3602) | EACH | 3 | $31.50 | $51.20 | $50.00 | $50.00 | $165.00 |
| 0225 | Sign panel, remove, 101-200 SF (0700-3606) | EACH | 1 | $525.00 | $717.15 | $700.00 | $700.00 | $750.00 |
| 0230 | Delineator, flexible tubular (0705-11-1) | EACH | 83 | $105.00 | $102.40 | $100.00 | $100.00 | $120.00 |
| 0235 | Raised pavement marker, type B (0706-1-3) | EACH | 2,059 | $4.73 | $5.65 | $5.00 | $4.00 | $5.00 |
| 0240 | Painted pavement markings, surface (0710-90) | LS | 1 | $48,300 | $31,962 | $38,443 | $33,968 | $38,000 |
| 0245 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 688 | $6.30 | $6.25 | $5.00 | $4.00 | $2.50 |
| 0250 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 1 | $315.00 | $314.90 | $550.00 | $550.00 | $365.00 |
| 0255 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 5.92 | $5,775.00 | $5,767.00 | $5,194.73 | $5,000.00 | $6,000.00 |
| 0260 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.71 | $9,975.00 | $9,971.00 | $6,800.00 | $6,000.00 | $7,500.00 |
| 0265 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 12.72 | $1,785.00 | $1,783.25 | $1,998.74 | $1,750.00 | $1,800.00 |
| 0270 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 5.95 | $5,775.00 | $5,773.00 | $5,200.00 | $4,400.00 | $7,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of July 29, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way