FDOT contract T4648 bid tabulation

SR 84 AT WESTON ROAD. Let by Florida DOT on July 30, 2025, Broward, District 4. 5 bids received; low bid $3,189,222 by Weekley Asphalt Paving, Inc..

Owner
Florida DOT
Letting
30 JUL 2025
Pay items
152
Data through
28 OCT 2026

Bidders

FDOT contract T4648: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Weekley Asphalt Paving, Inc.2. Bacallao Construction & Engineering Development, LLC D/B/A B3. General Asphalt Company, LLC4. The Stout Group LLC5. Florida Engineering & Development Corp
0005Mobilization (0101-1)LS1$139,000$330,000$200,000$350,000$360,283
0010Maintenance of traffic (0102-1)DA1$309,225$133,975$386,000$350,000$359,678
0015Pedestrian or bicycle special detour (0102-4-1)SY1$10,400$0.01$5,500.00$10,000$10,150
0020Traffic control officer (0102-14)HR76$92.00$85.00$88.00$95.00$93.68
0025Work zone sign (0102-60)ED5,786$0.20$0.23$0.23$0.21$0.22
0030Temporary barrier, F&I, low profile, concrete (0102-71-13)LF654$30.00$0.01$45.10$41.00$42.23
0035Temporary barrier, F&I, anchored (0102-71-15)LF1,301$38.00$60.00$42.90$39.00$37.91
0040Temporary barrier, relocate, low profile concrete (0102-71-23)LF84$22.00$0.01$17.60$16.00$16.48
0045Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED25,052$0.10$0.15$0.13$0.12$0.12
0050Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD10,934$0.04$0.06$0.06$0.05$0.05
0055Arrow board / advance warning arrow panel (0102-76)ED361$5.00$6.00$5.50$5.25$5.41
0060Temporary crash cushion, redirective option (0102-89-1)LO1$3,300.00$1,000.00$1,155.00$965.00$993.95
0065Portable changeable message sign, temporary (0102-99)ED645$10.00$12.00$11.00$10.95$11.28
0070Temporary signalization and maintenance, intersection (0102-104)ED438$5.00$18.50$5.50$18.50$19.06
0075Temporary traffic detection and maintenance, intersection (0102-107-1)ED438$5.00$18.50$5.50$18.50$19.06
0080Type III barricade (0102-115)ED506$0.23$1.00$0.25$0.95$0.98
0085Removable tape, white, 24" stop bar (0102-913-23)LF91$30.00$21.00$22.00$50.00$20.60
0090Removable tape, white, 12" crosswalk (0102-913-24)LF88$25.00$11.00$11.00$35.00$10.30
0095Sediment barrier (0104-10-3)LF1,405$2.85$3.00$3.85$8.00$3.25
0100Soil tracking prevention device (0104-15)EACH2$2,400.00$1,500.00$3,190.00$950.00$2,935.50
0105Inlet protection system (0104-18)EACH5$160.00$70.00$192.50$250.00$95.02
0110Litter removal (0107-1)ACRE46.76$1.00$1.00$0.01$1.00$110.22
0115Mowing (0107-2)ACRE30.45$1.00$1.00$0.01$1.00$202.40
0120Clearing & grubbing (0110-1-1)ACRE1$64,590$125,000$218,846$90,000$120,000
0125Removal of existing concrete (0110-4-10)SY1,367$33.77$27.00$29.15$25.00$42.61
0130Tree protection barrier (0110-21)LF207$13.35$10.00$5.50$20.00$12.50
0135Regular excavation (0120-1)CY1,416$30.00$40.00$99.00$25.00$47.35
0140Subsoil excavation (0120-4)CY340$30.00$50.00$99.00$80.00$66.63
0145Embankment (0120-6)CY519.30$29.00$65.00$29.70$80.00$76.69
0150Type B stabilization (0160-4)SY5,166$22.51$2.00$5.50$25.00$7.15
0155Optional base, base group 01 (0285-701)SY604$28.15$30.00$22.83$50.00$27.50
0160Optional base, base group 06 (0285-706)SY1,281$47.97$42.00$40.04$50.00$94.03
0165Optional base, base group 09 (0285-709)SY2,615$50.94$42.00$46.42$50.00$53.66
0170Milling existing asphalt pavement, 3" avg depth (0327-70-4)SY1,837$3.85$6.50$6.25$10.00$6.99
0175Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY2,052$3.00$6.50$4.14$8.00$5.64
0180Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11)SY6,369$3.38$6.50$3.84$5.00$4.48
0185Superpave asphaltic conc, traffic B (0334-1-12)TN1,838.50$188.00$180.00$174.88$195.00$195.70
0190Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25)TN417.30$275.00$240.00$237.46$350.00$266.77
0195Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81)TN410.40$200.00$220.00$230.39$250.00$258.53
0200Inlets, curb, type P-5, <10' (0425-1351)EACH3$12,547$10,000$16,573$18,000$8,880.06
0205Inlets, curb, type P-6, <10' (0425-1361)EACH1$12,645$10,500$15,494$18,000$9,155.02
0210Inlets, DT bot, type C,<10' (0425-1521)EACH1$8,185.00$7,400.00$10,792$15,000$8,934.60
0215Manhole, adjust (0425-5)EACH2$1,200.00$850.00$935.00$950.00$981.80
0220Valve boxes, adjust (0425-6)EACH5$850.00$800.00$660.00$750.00$851.89
0225Pipe culvert, optional material, round, 15"SD (0430-174115)LF8$124.00$350.00$152.63$600.00$565.30
0230Pipe culvert, optional material, round, 18"SD (0430-174118)LF340$145.98$180.00$204.60$250.00$136.48
0235Pipe culvert, optional material, round, 24"SD (0430-174124)LF94$204.00$225.00$220.00$275.00$231.97
0240PVC pipe for back of sidewalk, (0430-963-1)LF80$43.00$50.00$110.00$100.00$111.46
0245Mitered end section, optional round, 24" SD (0430-984129)EACH1$7,130.00$5,500.00$3,410.00$6,000.00$4,740.47
0250Pedestrian/ bicycle railing, aluminum only,42" type 1 (0515-2311)LF38$278.00$275.00$275.00$260.00$257.50
0255Concrete curb & gutter, type F (0520-1-10)LF532$50.56$45.00$52.47$55.00$59.19
0260Concrete curb, type D (0520-2-4)LF20$98.00$45.00$44.00$50.00$50.22
0265Traffic separator concrete- type I, 6' wide (0520-5-12)LF386$105.78$135.00$112.20$130.00$106.77
0270Concrete sidewalk and driveways, 6" thick (0522-2)SY60$95.93$110.00$132.00$150.00$114.29
0275Bus boarding pad- concrete (0522-3)SY51$99.13$110.00$154.00$175.00$144.30
0280Concrete ditch pavt, non reinforced, 3" (0524-1-1)SY64$105.00$105.00$132.00$140.00$61.87
0285Concrete ditch pavement, non reinforced, 6" (0524-1-4)SY803$114.00$145.00$165.00$120.00$179.97
0290Detectable warnings (0527-2)SF62$42.00$35.00$40.70$40.00$40.83
0295Riprap, rubble, F&I, ditch lining (0530-3-4)TN3.80$373.00$550.00$1,100.00$1,500.00$257.53
0300Performance turf, sod (0570-1-2)SY1,811$6.20$5.00$6.33$8.00$6.30
0305Raised pavement marker, type B (0706-1-3)EACH367$5.00$5.50$5.50$4.00$5.15
0310Painted pavement markings, standard, white, solid, 6" (0710-11101)GM1.50$2,640.00$3,000.00$2,750.00$1,565.00$2,719.20
0315Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF270$1.00$1.25$1.10$1.15$1.03
0320Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF460$2.00$2.25$2.20$2.00$2.06
0325Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM0.98$660.00$700.00$1,650.00$725.00$679.80
0330Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM0.02$660.00$700.00$1,650.00$800.00$680.00
0335Painted pavement markings, standard, white, arrows (0710-11170)EACH6$40.00$45.00$66.00$39.00$41.20
0340Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM0.99$2,640.00$3,000.00$2,750.00$1,565.00$2,719.20
0345Partnering, DO not bid (0999-16)LS1$6,000.00$6,000.00$6,000.00$6,000.00$6,000.00
0350Initial contingency amount, DO not bid (0999-25)LS1$50,000$50,000$50,000$50,000$50,000
0355Local agency initial amount (DO not bid) (0999-26)LS1$380.00$380.00$380.00$380.00$380.00
0360Ground-in rumble strips, 16" (0546-72-1)GM0.19$83,000$50,000$88,342$80,311$5,253.01
0365Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH19$565.00$575.00$599.78$550.00$581.95
0370Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH4$2,350.00$2,500.00$1,871.25$1,725.00$2,420.50
0375Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113)EACH7$2,750.00$3,000.00$2,332.59$2,150.00$2,832.50
0380Single column ground sign assembly, F&I ground mount, SF sheeting area for back to back signs (0700-1114)EACH1$2,750.00$3,000.00$3,520.15$3,250.00$2,832.50
0385Single column ground sign assembly, relocate (0700-1500)EACH1$425.00$450.00$467.73$450.00$437.75
0390Single column ground sign assembly, remove (0700-1600)EACH30$10.00$25.00$44.00$50.00$10.30
0395Multi-column ground sign assembly, F&I ground mount, 100.0 SF (0700-2115)EACH2$11,900$13,000$10,041$9,150.00$12,257
0400Multi-column ground sign assembly, F&I ground mount, 1-200.0 SF (0700-2116)EACH1$15,900$18,500$16,907$15,400$16,377
0405Multi-column ground sign assembly, remove (0700-2600)EACH3$500.00$550.00$1,320.00$1,500.00$515.00
0410Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH15$75.00$100.00$148.50$150.00$77.25
0415Object marker, type 1 (0705-10-1)EACH3$270.00$300.00$391.09$360.00$278.10
0420Raised pavement marker, type B (0706-1-3)EACH610$5.00$5.50$5.50$4.00$5.15
0425Painted pavement markings, surface (0710-90)LS1$4,922.92$6,200.00$13,750$8,000.00$5,070.61
0430Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF329$2.40$2.75$3.30$3.25$2.47
0435Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF11$3.60$4.00$4.40$4.30$3.71
0440Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF445$4.80$5.00$5.50$6.20$4.94
0445Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.07$2,200.00$2,300.00$3,300.00$2,850.00$2,266.00
0450Thermoplastic, standard, arrow (0711-11170)EACH42$80.00$100.00$88.00$80.00$82.40
0455Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF46$3.60$4.00$4.40$5.10$3.71
0460Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.03$2,200.00$2,300.00$3,300.00$2,850.00$2,266.06
0465Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF260$19.00$20.00$27.50$6.20$19.57
0470Thermoplastic, preformed, white, message (0711-14160)EACH3$260.00$300.00$330.00$225.00$267.80
0475Thermoplastic, preformed, white, arrow (0711-14170)EACH3$150.00$175.00$165.00$185.00$154.50
0480Thermoplastic, preformed, white, yield line (0711-14180)LF31$15.00$16.00$27.50$22.00$15.45
0485Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101)GM0.87$8,448.00$9,000.00$6,050.00$5,895.00$8,701.43
0490Thermoplastic, standard-open graded asphalt surfaces, solid, 8" (0711-15102)GM0.03$8,712.00$9,000.00$7,700.00$7,350.00$8,973.33
0495Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201)GM0.29$6,336.00$7,500.00$6,050.00$6,000.00$6,526.07
0500Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM0.37$6,336.00$7,500.00$6,050.00$6,320.00$6,526.09
0505Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102)GM0.02$6,600.00$10,000$7,700.00$8,450.00$6,798.00
0510Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM0.35$2,600.00$3,200.00$3,300.00$8,000.00$2,678.01
0515Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM0.21$6,336.00$7,500.00$6,050.00$8,000.00$6,526.08
0520Green-colored pavement markings, bike lane (0714-10)SF141$10.00$12.50$11.00$25.00$10.30
0525Conduit, furnish & install, open trench (0630-2-11)LF310$20.00$45.00$28.60$40.90$42.13
0530Conduit, furnish & install, directional bore (0630-2-12)LF180$40.00$45.00$49.50$40.90$42.13
0535Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH20$1,800.00$1,100.00$2,090.00$1,039.90$1,071.10
0540Electrical power service, F&I, underground, meter furnished by power company (0639-1121)AS1$6,800.00$6,500.00$5,940.00$6,125.10$6,308.85
0545Prestressed concrete pole, type P-II service pole (0641-2-12)EACH1$4,000.00$3,250.00$3,135.00$3,087.80$3,180.43
0550Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60)EACH1$1,000.00$900.00$1,650.00$738.50$760.65
0555Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12)LF2,031$6.00$4.50$6.60$3.90$3.71
0560Luminaire & bracket arm- aluminum, furnish & install new luminaire and arm on new/existing pole (0715-5-31)EACH7$2,500.00$2,750.00$3,850.00$2,266.30$2,334.29
0565Load center, F&I, secondary voltage (0715-7-11)EACH1$16,500$14,000$23,100$14,085$14,507
0570Load center, remove, voltage (0715-7-41)EACH1$1,200.00$750.00$2,750.00$738.50$760.65
0575Light pole complete, F&I, standard pole standard foundation, 30' mounting height, 8' arm length (0715-61111)EACH5$11,000$6,500.00$11,055$5,622.70$5,791.38
0580Light pole complete, remove pole and foundation (0715-69000)EACH1$2,000.00$700.00$2,750.00$553.90$570.52
0585Pole cable distribution system, furnish and install, conventional (0715-500-1)EACH12$700.00$700.00$1,210.00$675.80$696.07
0590Conduit, furnish & install, open trench (0630-2-11)LF384$22.00$65.00$28.60$58.30$60.05
0595Conduit, furnish & install, directional bore (0630-2-12)LF735$45.00$65.00$49.50$58.30$60.05
0600Conduit, furnish & install, aboveground (0630-2-14)LF720$25.00$65.00$77.00$55.60$57.27
0605Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI2$14,000$14,500$13,750$14,177$14,602
0610Fiber optic cable locator (0633-6)DA219$200.00$273.50$297.00$273.30$281.50
0615Span wire assembly, F&I, two point, box or drop box (0634-4153)PI2$9,000.00$16,500$11,550$16,361$16,852
0620Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH36$1,700.00$1,400.00$2,090.00$1,316.20$1,355.69
0625Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH1$4,000.00$2,300.00$3,520.00$2,248.50$2,315.95
0630Electrical power service, F&I, underground, meter furnished by power company (0639-1121)AS1$7,500.00$5,750.00$5,940.00$5,748.30$5,920.75
0635Electrical power service, remove overhead (0639-1610)AS1$3,500.00$600.00$2,750.00$553.90$570.52
0640Electrical service wire, & install (0639-2-1)LF93$22.00$11.00$11.00$10.60$10.92
0645Electrical service disconnect, F&I, pole mount (0639-3-11)EACH1$4,500.00$3,000.00$2,860.00$2,451.50$2,525.04
0650Electrical service disconnect, remove- pole or cabinet to remain (0639-3-60)EACH1$500.00$700.00$1,980.00$553.90$570.52
0655Prestressed concrete pole, type P-II service pole (0641-2-12)EACH1$4,000.00$4,200.00$3,135.00$3,599.70$3,707.69
0660Prestressed concrete pole, type P-VIII (0641-2-18)EACH8$30,000$27,000$17,600$26,155$26,940
0665Prestressed concrete pole, complete pole removal- pole 30' and greater (0641-2-80)EACH4$5,500.00$4,000.00$4,950.00$3,322.90$3,422.59
0670Aluminum signals pole, (0646-1-11)EACH8$2,000.00$2,500.00$2,750.00$2,005.60$2,065.77
0675Aluminum signals pole, furnish install pedestrian detector post (0646-1-12)EACH2$2,500.00$2,500.00$2,860.00$1,955.00$2,013.65
0680Aluminum signals pole, remove (0646-1-60)EACH9$250.00$700.00$1,650.00$533.90$570.52
0685Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS15$1,800.00$1,700.00$2,420.00$1,662.20$1,712.07
0690Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16)AS2$2,300.00$2,100.00$2,640.00$2,054.70$2,116.34
0695Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS8$1,600.00$750.00$2,090.00$736.90$759.01
0700Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12)AS1$2,000.00$1,600.00$3,190.00$1,536.20$1,582.29
0705Vehicle detection system- furnish & install cabinet equipment (0660-4-11)EACH2$26,000$25,000$2,750.00$24,968$25,717
0710Vehicle detection system- furnish & install above ground equipment (0660-4-12)EACH7$3,000.00$10,500$9,020.00$10,320$10,629
0715Signal priority and preemption system, furnish and install, detector (0663-1122)EACH2$4,200.00$9,000.00$7,150.00$8,961.80$9,230.66
0720Signal priority and preemption system, furnish and install, cabinet electronics (0663-1123)EACH1$13,500$8,500.00$8,250.00$7,584.60$7,811.83
0725Pedestrian detector, furnish & install, standard (0665-1-11)EACH10$800.00$400.00$594.00$322.40$332.07
0730Traffic controller assembly, F&I, caltrans W/standard lock, W/concrete riser, 1 preemption (0670-5186)AS1$48,000$56,000$58,575$48,105$47,488
0735Traffic controller assembly, remove controller with (0670-5600)AS1$1,500.00$925.00$2,750.00$738.50$760.65
0740Managed field ethernet switch, furnish & install (0684-1-1)EACH1$6,000.00$6,600.00$2,915.00$5,166.90$5,321.91
0745Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13)EACH1$10,000$19,040$9,900.00$15,253$15,710
0750Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH2$1,000.00$1,200.00$605.00$943.90$971.91
0755Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH6$4,500.00$9,300.00$5,720.00$7,303.30$7,522.40
0760Relocate trees and palms, multi-trunk or clustering (0581-1400)EACH5$7,223.00$2,500.00$8,030.00$3,000.00$8,755.00
FDOT contract T4648: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of July 30, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy