FDOT contract T4648 bid tabulation
SR 84 AT WESTON ROAD. Let by Florida DOT on July 30, 2025, Broward, District 4. 5 bids received; low bid $3,189,222 by Weekley Asphalt Paving, Inc..
- Owner
- Florida DOT
- Letting
- 30 JUL 2025
- Pay items
- 152
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Weekley Asphalt Paving, Inc. | $3,189,222 | Low |
| 2 | Bacallao Construction & Engineering Development, LLC D/B/A B | $3,299,540 | +3.0% |
| 3 | General Asphalt Company, LLC | $3,640,990 | +14% |
| 4 | The Stout Group LLC | $3,746,849 | +17% |
| 5 | Florida Engineering & Development Corp | $3,756,591 | +18% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Weekley Asphalt Paving, Inc. | 2. Bacallao Construction & Engineering Development, LLC D/B/A B | 3. General Asphalt Company, LLC | 4. The Stout Group LLC | 5. Florida Engineering & Development Corp |
|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $139,000 | $330,000 | $200,000 | $350,000 | $360,283 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $309,225 | $133,975 | $386,000 | $350,000 | $359,678 |
| 0015 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $10,400 | $0.01 | $5,500.00 | $10,000 | $10,150 |
| 0020 | Traffic control officer (0102-14) | HR | 76 | $92.00 | $85.00 | $88.00 | $95.00 | $93.68 |
| 0025 | Work zone sign (0102-60) | ED | 5,786 | $0.20 | $0.23 | $0.23 | $0.21 | $0.22 |
| 0030 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 654 | $30.00 | $0.01 | $45.10 | $41.00 | $42.23 |
| 0035 | Temporary barrier, F&I, anchored (0102-71-15) | LF | 1,301 | $38.00 | $60.00 | $42.90 | $39.00 | $37.91 |
| 0040 | Temporary barrier, relocate, low profile concrete (0102-71-23) | LF | 84 | $22.00 | $0.01 | $17.60 | $16.00 | $16.48 |
| 0045 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 25,052 | $0.10 | $0.15 | $0.13 | $0.12 | $0.12 |
| 0050 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 10,934 | $0.04 | $0.06 | $0.06 | $0.05 | $0.05 |
| 0055 | Arrow board / advance warning arrow panel (0102-76) | ED | 361 | $5.00 | $6.00 | $5.50 | $5.25 | $5.41 |
| 0060 | Temporary crash cushion, redirective option (0102-89-1) | LO | 1 | $3,300.00 | $1,000.00 | $1,155.00 | $965.00 | $993.95 |
| 0065 | Portable changeable message sign, temporary (0102-99) | ED | 645 | $10.00 | $12.00 | $11.00 | $10.95 | $11.28 |
| 0070 | Temporary signalization and maintenance, intersection (0102-104) | ED | 438 | $5.00 | $18.50 | $5.50 | $18.50 | $19.06 |
| 0075 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 438 | $5.00 | $18.50 | $5.50 | $18.50 | $19.06 |
| 0080 | Type III barricade (0102-115) | ED | 506 | $0.23 | $1.00 | $0.25 | $0.95 | $0.98 |
| 0085 | Removable tape, white, 24" stop bar (0102-913-23) | LF | 91 | $30.00 | $21.00 | $22.00 | $50.00 | $20.60 |
| 0090 | Removable tape, white, 12" crosswalk (0102-913-24) | LF | 88 | $25.00 | $11.00 | $11.00 | $35.00 | $10.30 |
| 0095 | Sediment barrier (0104-10-3) | LF | 1,405 | $2.85 | $3.00 | $3.85 | $8.00 | $3.25 |
| 0100 | Soil tracking prevention device (0104-15) | EACH | 2 | $2,400.00 | $1,500.00 | $3,190.00 | $950.00 | $2,935.50 |
| 0105 | Inlet protection system (0104-18) | EACH | 5 | $160.00 | $70.00 | $192.50 | $250.00 | $95.02 |
| 0110 | Litter removal (0107-1) | ACRE | 46.76 | $1.00 | $1.00 | $0.01 | $1.00 | $110.22 |
| 0115 | Mowing (0107-2) | ACRE | 30.45 | $1.00 | $1.00 | $0.01 | $1.00 | $202.40 |
| 0120 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $64,590 | $125,000 | $218,846 | $90,000 | $120,000 |
| 0125 | Removal of existing concrete (0110-4-10) | SY | 1,367 | $33.77 | $27.00 | $29.15 | $25.00 | $42.61 |
| 0130 | Tree protection barrier (0110-21) | LF | 207 | $13.35 | $10.00 | $5.50 | $20.00 | $12.50 |
| 0135 | Regular excavation (0120-1) | CY | 1,416 | $30.00 | $40.00 | $99.00 | $25.00 | $47.35 |
| 0140 | Subsoil excavation (0120-4) | CY | 340 | $30.00 | $50.00 | $99.00 | $80.00 | $66.63 |
| 0145 | Embankment (0120-6) | CY | 519.30 | $29.00 | $65.00 | $29.70 | $80.00 | $76.69 |
| 0150 | Type B stabilization (0160-4) | SY | 5,166 | $22.51 | $2.00 | $5.50 | $25.00 | $7.15 |
| 0155 | Optional base, base group 01 (0285-701) | SY | 604 | $28.15 | $30.00 | $22.83 | $50.00 | $27.50 |
| 0160 | Optional base, base group 06 (0285-706) | SY | 1,281 | $47.97 | $42.00 | $40.04 | $50.00 | $94.03 |
| 0165 | Optional base, base group 09 (0285-709) | SY | 2,615 | $50.94 | $42.00 | $46.42 | $50.00 | $53.66 |
| 0170 | Milling existing asphalt pavement, 3" avg depth (0327-70-4) | SY | 1,837 | $3.85 | $6.50 | $6.25 | $10.00 | $6.99 |
| 0175 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 2,052 | $3.00 | $6.50 | $4.14 | $8.00 | $5.64 |
| 0180 | Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11) | SY | 6,369 | $3.38 | $6.50 | $3.84 | $5.00 | $4.48 |
| 0185 | Superpave asphaltic conc, traffic B (0334-1-12) | TN | 1,838.50 | $188.00 | $180.00 | $174.88 | $195.00 | $195.70 |
| 0190 | Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25) | TN | 417.30 | $275.00 | $240.00 | $237.46 | $350.00 | $266.77 |
| 0195 | Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81) | TN | 410.40 | $200.00 | $220.00 | $230.39 | $250.00 | $258.53 |
| 0200 | Inlets, curb, type P-5, <10' (0425-1351) | EACH | 3 | $12,547 | $10,000 | $16,573 | $18,000 | $8,880.06 |
| 0205 | Inlets, curb, type P-6, <10' (0425-1361) | EACH | 1 | $12,645 | $10,500 | $15,494 | $18,000 | $9,155.02 |
| 0210 | Inlets, DT bot, type C,<10' (0425-1521) | EACH | 1 | $8,185.00 | $7,400.00 | $10,792 | $15,000 | $8,934.60 |
| 0215 | Manhole, adjust (0425-5) | EACH | 2 | $1,200.00 | $850.00 | $935.00 | $950.00 | $981.80 |
| 0220 | Valve boxes, adjust (0425-6) | EACH | 5 | $850.00 | $800.00 | $660.00 | $750.00 | $851.89 |
| 0225 | Pipe culvert, optional material, round, 15"SD (0430-174115) | LF | 8 | $124.00 | $350.00 | $152.63 | $600.00 | $565.30 |
| 0230 | Pipe culvert, optional material, round, 18"SD (0430-174118) | LF | 340 | $145.98 | $180.00 | $204.60 | $250.00 | $136.48 |
| 0235 | Pipe culvert, optional material, round, 24"SD (0430-174124) | LF | 94 | $204.00 | $225.00 | $220.00 | $275.00 | $231.97 |
| 0240 | PVC pipe for back of sidewalk, (0430-963-1) | LF | 80 | $43.00 | $50.00 | $110.00 | $100.00 | $111.46 |
| 0245 | Mitered end section, optional round, 24" SD (0430-984129) | EACH | 1 | $7,130.00 | $5,500.00 | $3,410.00 | $6,000.00 | $4,740.47 |
| 0250 | Pedestrian/ bicycle railing, aluminum only,42" type 1 (0515-2311) | LF | 38 | $278.00 | $275.00 | $275.00 | $260.00 | $257.50 |
| 0255 | Concrete curb & gutter, type F (0520-1-10) | LF | 532 | $50.56 | $45.00 | $52.47 | $55.00 | $59.19 |
| 0260 | Concrete curb, type D (0520-2-4) | LF | 20 | $98.00 | $45.00 | $44.00 | $50.00 | $50.22 |
| 0265 | Traffic separator concrete- type I, 6' wide (0520-5-12) | LF | 386 | $105.78 | $135.00 | $112.20 | $130.00 | $106.77 |
| 0270 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 60 | $95.93 | $110.00 | $132.00 | $150.00 | $114.29 |
| 0275 | Bus boarding pad- concrete (0522-3) | SY | 51 | $99.13 | $110.00 | $154.00 | $175.00 | $144.30 |
| 0280 | Concrete ditch pavt, non reinforced, 3" (0524-1-1) | SY | 64 | $105.00 | $105.00 | $132.00 | $140.00 | $61.87 |
| 0285 | Concrete ditch pavement, non reinforced, 6" (0524-1-4) | SY | 803 | $114.00 | $145.00 | $165.00 | $120.00 | $179.97 |
| 0290 | Detectable warnings (0527-2) | SF | 62 | $42.00 | $35.00 | $40.70 | $40.00 | $40.83 |
| 0295 | Riprap, rubble, F&I, ditch lining (0530-3-4) | TN | 3.80 | $373.00 | $550.00 | $1,100.00 | $1,500.00 | $257.53 |
| 0300 | Performance turf, sod (0570-1-2) | SY | 1,811 | $6.20 | $5.00 | $6.33 | $8.00 | $6.30 |
| 0305 | Raised pavement marker, type B (0706-1-3) | EACH | 367 | $5.00 | $5.50 | $5.50 | $4.00 | $5.15 |
| 0310 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 1.50 | $2,640.00 | $3,000.00 | $2,750.00 | $1,565.00 | $2,719.20 |
| 0315 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 270 | $1.00 | $1.25 | $1.10 | $1.15 | $1.03 |
| 0320 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 460 | $2.00 | $2.25 | $2.20 | $2.00 | $2.06 |
| 0325 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 0.98 | $660.00 | $700.00 | $1,650.00 | $725.00 | $679.80 |
| 0330 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.02 | $660.00 | $700.00 | $1,650.00 | $800.00 | $680.00 |
| 0335 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 6 | $40.00 | $45.00 | $66.00 | $39.00 | $41.20 |
| 0340 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 0.99 | $2,640.00 | $3,000.00 | $2,750.00 | $1,565.00 | $2,719.20 |
| 0345 | Partnering, DO not bid (0999-16) | LS | 1 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 |
| 0350 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,000 | $50,000 | $50,000 | $50,000 | $50,000 |
| 0355 | Local agency initial amount (DO not bid) (0999-26) | LS | 1 | $380.00 | $380.00 | $380.00 | $380.00 | $380.00 |
| 0360 | Ground-in rumble strips, 16" (0546-72-1) | GM | 0.19 | $83,000 | $50,000 | $88,342 | $80,311 | $5,253.01 |
| 0365 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 19 | $565.00 | $575.00 | $599.78 | $550.00 | $581.95 |
| 0370 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 4 | $2,350.00 | $2,500.00 | $1,871.25 | $1,725.00 | $2,420.50 |
| 0375 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 7 | $2,750.00 | $3,000.00 | $2,332.59 | $2,150.00 | $2,832.50 |
| 0380 | Single column ground sign assembly, F&I ground mount, SF sheeting area for back to back signs (0700-1114) | EACH | 1 | $2,750.00 | $3,000.00 | $3,520.15 | $3,250.00 | $2,832.50 |
| 0385 | Single column ground sign assembly, relocate (0700-1500) | EACH | 1 | $425.00 | $450.00 | $467.73 | $450.00 | $437.75 |
| 0390 | Single column ground sign assembly, remove (0700-1600) | EACH | 30 | $10.00 | $25.00 | $44.00 | $50.00 | $10.30 |
| 0395 | Multi-column ground sign assembly, F&I ground mount, 100.0 SF (0700-2115) | EACH | 2 | $11,900 | $13,000 | $10,041 | $9,150.00 | $12,257 |
| 0400 | Multi-column ground sign assembly, F&I ground mount, 1-200.0 SF (0700-2116) | EACH | 1 | $15,900 | $18,500 | $16,907 | $15,400 | $16,377 |
| 0405 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 3 | $500.00 | $550.00 | $1,320.00 | $1,500.00 | $515.00 |
| 0410 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 15 | $75.00 | $100.00 | $148.50 | $150.00 | $77.25 |
| 0415 | Object marker, type 1 (0705-10-1) | EACH | 3 | $270.00 | $300.00 | $391.09 | $360.00 | $278.10 |
| 0420 | Raised pavement marker, type B (0706-1-3) | EACH | 610 | $5.00 | $5.50 | $5.50 | $4.00 | $5.15 |
| 0425 | Painted pavement markings, surface (0710-90) | LS | 1 | $4,922.92 | $6,200.00 | $13,750 | $8,000.00 | $5,070.61 |
| 0430 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 329 | $2.40 | $2.75 | $3.30 | $3.25 | $2.47 |
| 0435 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 11 | $3.60 | $4.00 | $4.40 | $4.30 | $3.71 |
| 0440 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 445 | $4.80 | $5.00 | $5.50 | $6.20 | $4.94 |
| 0445 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.07 | $2,200.00 | $2,300.00 | $3,300.00 | $2,850.00 | $2,266.00 |
| 0450 | Thermoplastic, standard, arrow (0711-11170) | EACH | 42 | $80.00 | $100.00 | $88.00 | $80.00 | $82.40 |
| 0455 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 46 | $3.60 | $4.00 | $4.40 | $5.10 | $3.71 |
| 0460 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.03 | $2,200.00 | $2,300.00 | $3,300.00 | $2,850.00 | $2,266.06 |
| 0465 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 260 | $19.00 | $20.00 | $27.50 | $6.20 | $19.57 |
| 0470 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 3 | $260.00 | $300.00 | $330.00 | $225.00 | $267.80 |
| 0475 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 3 | $150.00 | $175.00 | $165.00 | $185.00 | $154.50 |
| 0480 | Thermoplastic, preformed, white, yield line (0711-14180) | LF | 31 | $15.00 | $16.00 | $27.50 | $22.00 | $15.45 |
| 0485 | Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101) | GM | 0.87 | $8,448.00 | $9,000.00 | $6,050.00 | $5,895.00 | $8,701.43 |
| 0490 | Thermoplastic, standard-open graded asphalt surfaces, solid, 8" (0711-15102) | GM | 0.03 | $8,712.00 | $9,000.00 | $7,700.00 | $7,350.00 | $8,973.33 |
| 0495 | Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201) | GM | 0.29 | $6,336.00 | $7,500.00 | $6,050.00 | $6,000.00 | $6,526.07 |
| 0500 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.37 | $6,336.00 | $7,500.00 | $6,050.00 | $6,320.00 | $6,526.09 |
| 0505 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.02 | $6,600.00 | $10,000 | $7,700.00 | $8,450.00 | $6,798.00 |
| 0510 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 0.35 | $2,600.00 | $3,200.00 | $3,300.00 | $8,000.00 | $2,678.01 |
| 0515 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.21 | $6,336.00 | $7,500.00 | $6,050.00 | $8,000.00 | $6,526.08 |
| 0520 | Green-colored pavement markings, bike lane (0714-10) | SF | 141 | $10.00 | $12.50 | $11.00 | $25.00 | $10.30 |
| 0525 | Conduit, furnish & install, open trench (0630-2-11) | LF | 310 | $20.00 | $45.00 | $28.60 | $40.90 | $42.13 |
| 0530 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 180 | $40.00 | $45.00 | $49.50 | $40.90 | $42.13 |
| 0535 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 20 | $1,800.00 | $1,100.00 | $2,090.00 | $1,039.90 | $1,071.10 |
| 0540 | Electrical power service, F&I, underground, meter furnished by power company (0639-1121) | AS | 1 | $6,800.00 | $6,500.00 | $5,940.00 | $6,125.10 | $6,308.85 |
| 0545 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $4,000.00 | $3,250.00 | $3,135.00 | $3,087.80 | $3,180.43 |
| 0550 | Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60) | EACH | 1 | $1,000.00 | $900.00 | $1,650.00 | $738.50 | $760.65 |
| 0555 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 2,031 | $6.00 | $4.50 | $6.60 | $3.90 | $3.71 |
| 0560 | Luminaire & bracket arm- aluminum, furnish & install new luminaire and arm on new/existing pole (0715-5-31) | EACH | 7 | $2,500.00 | $2,750.00 | $3,850.00 | $2,266.30 | $2,334.29 |
| 0565 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 1 | $16,500 | $14,000 | $23,100 | $14,085 | $14,507 |
| 0570 | Load center, remove, voltage (0715-7-41) | EACH | 1 | $1,200.00 | $750.00 | $2,750.00 | $738.50 | $760.65 |
| 0575 | Light pole complete, F&I, standard pole standard foundation, 30' mounting height, 8' arm length (0715-61111) | EACH | 5 | $11,000 | $6,500.00 | $11,055 | $5,622.70 | $5,791.38 |
| 0580 | Light pole complete, remove pole and foundation (0715-69000) | EACH | 1 | $2,000.00 | $700.00 | $2,750.00 | $553.90 | $570.52 |
| 0585 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 12 | $700.00 | $700.00 | $1,210.00 | $675.80 | $696.07 |
| 0590 | Conduit, furnish & install, open trench (0630-2-11) | LF | 384 | $22.00 | $65.00 | $28.60 | $58.30 | $60.05 |
| 0595 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 735 | $45.00 | $65.00 | $49.50 | $58.30 | $60.05 |
| 0600 | Conduit, furnish & install, aboveground (0630-2-14) | LF | 720 | $25.00 | $65.00 | $77.00 | $55.60 | $57.27 |
| 0605 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 2 | $14,000 | $14,500 | $13,750 | $14,177 | $14,602 |
| 0610 | Fiber optic cable locator (0633-6) | DA | 219 | $200.00 | $273.50 | $297.00 | $273.30 | $281.50 |
| 0615 | Span wire assembly, F&I, two point, box or drop box (0634-4153) | PI | 2 | $9,000.00 | $16,500 | $11,550 | $16,361 | $16,852 |
| 0620 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 36 | $1,700.00 | $1,400.00 | $2,090.00 | $1,316.20 | $1,355.69 |
| 0625 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 1 | $4,000.00 | $2,300.00 | $3,520.00 | $2,248.50 | $2,315.95 |
| 0630 | Electrical power service, F&I, underground, meter furnished by power company (0639-1121) | AS | 1 | $7,500.00 | $5,750.00 | $5,940.00 | $5,748.30 | $5,920.75 |
| 0635 | Electrical power service, remove overhead (0639-1610) | AS | 1 | $3,500.00 | $600.00 | $2,750.00 | $553.90 | $570.52 |
| 0640 | Electrical service wire, & install (0639-2-1) | LF | 93 | $22.00 | $11.00 | $11.00 | $10.60 | $10.92 |
| 0645 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 1 | $4,500.00 | $3,000.00 | $2,860.00 | $2,451.50 | $2,525.04 |
| 0650 | Electrical service disconnect, remove- pole or cabinet to remain (0639-3-60) | EACH | 1 | $500.00 | $700.00 | $1,980.00 | $553.90 | $570.52 |
| 0655 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $4,000.00 | $4,200.00 | $3,135.00 | $3,599.70 | $3,707.69 |
| 0660 | Prestressed concrete pole, type P-VIII (0641-2-18) | EACH | 8 | $30,000 | $27,000 | $17,600 | $26,155 | $26,940 |
| 0665 | Prestressed concrete pole, complete pole removal- pole 30' and greater (0641-2-80) | EACH | 4 | $5,500.00 | $4,000.00 | $4,950.00 | $3,322.90 | $3,422.59 |
| 0670 | Aluminum signals pole, (0646-1-11) | EACH | 8 | $2,000.00 | $2,500.00 | $2,750.00 | $2,005.60 | $2,065.77 |
| 0675 | Aluminum signals pole, furnish install pedestrian detector post (0646-1-12) | EACH | 2 | $2,500.00 | $2,500.00 | $2,860.00 | $1,955.00 | $2,013.65 |
| 0680 | Aluminum signals pole, remove (0646-1-60) | EACH | 9 | $250.00 | $700.00 | $1,650.00 | $533.90 | $570.52 |
| 0685 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 15 | $1,800.00 | $1,700.00 | $2,420.00 | $1,662.20 | $1,712.07 |
| 0690 | Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16) | AS | 2 | $2,300.00 | $2,100.00 | $2,640.00 | $2,054.70 | $2,116.34 |
| 0695 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 8 | $1,600.00 | $750.00 | $2,090.00 | $736.90 | $759.01 |
| 0700 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 1 | $2,000.00 | $1,600.00 | $3,190.00 | $1,536.20 | $1,582.29 |
| 0705 | Vehicle detection system- furnish & install cabinet equipment (0660-4-11) | EACH | 2 | $26,000 | $25,000 | $2,750.00 | $24,968 | $25,717 |
| 0710 | Vehicle detection system- furnish & install above ground equipment (0660-4-12) | EACH | 7 | $3,000.00 | $10,500 | $9,020.00 | $10,320 | $10,629 |
| 0715 | Signal priority and preemption system, furnish and install, detector (0663-1122) | EACH | 2 | $4,200.00 | $9,000.00 | $7,150.00 | $8,961.80 | $9,230.66 |
| 0720 | Signal priority and preemption system, furnish and install, cabinet electronics (0663-1123) | EACH | 1 | $13,500 | $8,500.00 | $8,250.00 | $7,584.60 | $7,811.83 |
| 0725 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 10 | $800.00 | $400.00 | $594.00 | $322.40 | $332.07 |
| 0730 | Traffic controller assembly, F&I, caltrans W/standard lock, W/concrete riser, 1 preemption (0670-5186) | AS | 1 | $48,000 | $56,000 | $58,575 | $48,105 | $47,488 |
| 0735 | Traffic controller assembly, remove controller with (0670-5600) | AS | 1 | $1,500.00 | $925.00 | $2,750.00 | $738.50 | $760.65 |
| 0740 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 1 | $6,000.00 | $6,600.00 | $2,915.00 | $5,166.90 | $5,321.91 |
| 0745 | Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13) | EACH | 1 | $10,000 | $19,040 | $9,900.00 | $15,253 | $15,710 |
| 0750 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 2 | $1,000.00 | $1,200.00 | $605.00 | $943.90 | $971.91 |
| 0755 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 6 | $4,500.00 | $9,300.00 | $5,720.00 | $7,303.30 | $7,522.40 |
| 0760 | Relocate trees and palms, multi-trunk or clustering (0581-1400) | EACH | 5 | $7,223.00 | $2,500.00 | $8,030.00 | $3,000.00 | $8,755.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of July 30, 2025. Compiled by Mirage Metrics.