FDOT contract T4719 bid tabulation
SR 15 (E MAIN ST) FROM ANNONA ST TO S OF SR 700 (CONNERS HWY. Let by Florida DOT on May 28, 2025, Palm Beach, District 4. 6 bids received; low bid $3,433,755 by General Asphalt Company, LLC.
- Owner
- Florida DOT
- Letting
- 28 MAY 2025
- Pay items
- 78
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | General Asphalt Company, LLC | $3,433,755 | Low |
| 2 | Ranger Construction Industries, Inc. | $4,042,599 | +18% |
| 3 | Ohla USA Inc | $4,441,949 | +29% |
| 4 | Halley Engineering Contractors, Inc. | $4,450,195 | +30% |
| 5 | C.W. Roberts Contracting, Inc. | $4,495,454 | +31% |
| 6 | The Stout Group LLC | $4,676,051 | +36% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. General Asphalt Company, LLC | 2. Ranger Construction Industries, Inc. | 3. Ohla USA Inc | 4. Halley Engineering Contractors, Inc. | 5. C.W. Roberts Contracting, Inc. | 6. The Stout Group LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $165,000 | $404,082 | $430,000 | $400,000 | $445,117 | $450,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $300,000 | $690,878 | $765,000 | $656,000 | $343,285 | $450,000 |
| 0015 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $22,543 | $9,888.50 | $27,000 | $10,000 | $87,583 | $50,000 |
| 0020 | Work zone sign (0102-60) | ED | 28,892 | $0.23 | $0.25 | $0.20 | $0.01 | $0.24 | $0.21 |
| 0025 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 137,985 | $0.09 | $0.10 | $0.10 | $0.01 | $0.12 | $0.10 |
| 0030 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 254,942 | $0.03 | $0.05 | $0.06 | $0.01 | $0.05 | $0.05 |
| 0035 | Portable changeable message sign, temporary (0102-99) | ED | 494 | $9.90 | $10.45 | $9.00 | $10.00 | $11.82 | $11.00 |
| 0040 | Type III barricade (0102-115) | ED | 1,739 | $0.28 | $0.30 | $0.23 | $0.01 | $0.32 | $0.30 |
| 0045 | Sediment barrier (0104-10-3) | LF | 2,287 | $2.48 | $6.05 | $3.00 | $3.00 | $12.09 | $6.00 |
| 0050 | Floating turbidity barrier (0104-11) | LF | 56 | $19.80 | $41.90 | $20.00 | $20.00 | $18.12 | $25.00 |
| 0055 | Staked turbidity barrier- nylon reinforced PVC (0104-12) | LF | 56 | $4.40 | $78.00 | $5.00 | $10.00 | $10.00 | $25.00 |
| 0060 | Inlet protection system (0104-18) | EACH | 27 | $154.00 | $193.40 | $175.00 | $200.00 | $195.04 | $75.00 |
| 0065 | Litter removal (0107-1) | ACRE | 150.58 | $1.10 | $69.80 | $74.00 | $40.00 | $88.65 | $1.00 |
| 0070 | Mowing (0107-2) | ACRE | 123.48 | $1.10 | $75.60 | $175.00 | $200.00 | $88.65 | $1.00 |
| 0075 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $1.10 | $13,800 | $14,500 | $2,500.00 | $14,066 | $10,000 |
| 0080 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $1.10 | $2,790.00 | $10,000 | $2,500.00 | $16,903 | $10,000 |
| 0085 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $33,275 | $32,800 | $410,000 | $91,000 | $28,961 | $100,000 |
| 0090 | Removal of existing concrete (0110-4-10) | SY | 661 | $81.40 | $17.90 | $27.00 | $50.00 | $104.98 | $25.00 |
| 0095 | Embankment (0120-6) | CY | 80.30 | $129.80 | $195.10 | $325.00 | $60.00 | $281.95 | $100.00 |
| 0100 | Regular excavation (3-R projects only) (0120-71) | LS | 1 | $13,200 | $5,920.00 | $22,000 | $64,000 | $12,056 | $18,000 |
| 0105 | Optional base, base group 15 (0285-715) | SY | 105 | $206.80 | $257.40 | $280.00 | $215.00 | $302.26 | $300.00 |
| 0110 | Turnout construction- asphalt/driveway base- asphalt material (0286-2) | TN | 24.70 | $220.00 | $641.00 | $750.00 | $425.00 | $517.05 | $300.00 |
| 0117 | Milling existing asphalt pavement, 4 1/2" avg depth (0327-70-3) | SY | 20,410 | $5.01 | $6.30 | $6.50 | $9.20 | $7.39 | $10.00 |
| 0120 | Milling existing asphalt pavement, 3" avg depth (0327-70-4) | SY | 24,998 | $3.41 | $5.25 | $4.50 | $5.40 | $4.91 | $7.00 |
| 0125 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 20,145 | $2.84 | $1.95 | $4.75 | $7.00 | $6.30 | $4.00 |
| 0135 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 5,429.70 | $191.37 | $186.00 | $160.00 | $209.00 | $212.07 | $235.00 |
| 0137 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 5,429.90 | $172.81 | $145.40 | $135.00 | $163.00 | $192.07 | $195.00 |
| 0140 | Manhole, adjust, utilities (0425-5-1) | EACH | 8 | $990.00 | $581.50 | $825.00 | $1,500.00 | $221.34 | $950.00 |
| 0145 | Valve boxes, adjust (0425-6) | EACH | 63 | $660.00 | $581.50 | $635.00 | $500.00 | $857.12 | $750.00 |
| 0150 | Concrete curb & gutter, type E (0520-1-7) | LF | 286 | $34.88 | $85.30 | $97.00 | $75.00 | $83.88 | $75.00 |
| 0155 | Concrete curb & gutter, type F (0520-1-10) | LF | 161 | $34.40 | $95.30 | $112.00 | $75.00 | $84.54 | $75.00 |
| 0160 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 131 | $59.46 | $175.90 | $145.00 | $110.00 | $142.73 | $120.00 |
| 0165 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 751 | $81.11 | $103.40 | $172.00 | $122.00 | $134.49 | $140.00 |
| 0170 | Detectable warnings (0527-2) | SF | 434 | $45.76 | $48.35 | $45.00 | $75.00 | $65.01 | $50.00 |
| 0175 | Performance turf, sod (0570-1-2) | SY | 8,050 | $5.72 | $8.30 | $5.60 | $6.00 | $9.05 | $8.25 |
| 0180 | Raised pavement marker, type B (0706-1-3) | EACH | 1,368 | $4.24 | $4.50 | $4.00 | $4.00 | $4.63 | $5.00 |
| 0185 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 6.72 | $1,952.50 | $2,060.00 | $1,800.00 | $1,267.00 | $1,219.13 | $1,500.00 |
| 0190 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.09 | $2,603.70 | $2,560.00 | $2,250.00 | $1,267.00 | $1,657.91 | $1,600.00 |
| 0195 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 1,177 | $1.76 | $1.85 | $1.60 | $0.75 | $1.52 | $2.00 |
| 0200 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 843 | $1.82 | $1.90 | $1.70 | $1.00 | $2.43 | $3.00 |
| 0205 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 351 | $1.93 | $2.05 | $1.80 | $1.50 | $2.92 | $4.00 |
| 0210 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.35 | $715.00 | $736.50 | $650.00 | $422.40 | $794.36 | $1,000.00 |
| 0215 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 5 | $44.00 | $46.50 | $41.00 | $60.00 | $103.58 | $85.00 |
| 0220 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 10 | $38.50 | $40.70 | $36.00 | $40.00 | $36.56 | $45.00 |
| 0225 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 3.09 | $1,952.50 | $2,060.00 | $1,800.00 | $1,267.00 | $1,218.99 | $1,600.00 |
| 0230 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 1,131 | $1.82 | $1.90 | $1.70 | $1.00 | $2.44 | $3.00 |
| 0235 | Painted pavement markings, standard, yellow, skip, 6" (0710-11231) | GM | 2.07 | $550.00 | $580.50 | $510.00 | $316.80 | $790.55 | $1,000.00 |
| 0240 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.06 | $715.00 | $675.00 | $595.00 | $422.40 | $848.75 | $900.00 |
| 0245 | Partnering, DO not bid (0999-16) | LS | 1 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 |
| 0250 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,000 | $50,000 | $50,000 | $50,000 | $50,000 | $50,000 |
| 0255 | Local agency initial amount (DO not bid) (0999-26) | LS | 1 | $2,742.50 | $2,742.50 | $2,742.50 | $2,742.50 | $2,742.50 | $2,742.50 |
| 0260 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 72 | $605.00 | $639.50 | $560.00 | $485.00 | $505.72 | $575.00 |
| 0265 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 22 | $2,035.00 | $2,150.00 | $1,850.00 | $1,900.00 | $1,766.96 | $1,800.00 |
| 0270 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 5 | $2,750.00 | $2,910.00 | $4,600.00 | $2,400.00 | $2,741.83 | $1,900.00 |
| 0275 | Single column ground sign assembly, relocate (0700-1500) | EACH | 1 | $275.00 | $290.70 | $410.00 | $300.00 | $487.43 | $500.00 |
| 0280 | Single column ground sign assembly, remove (0700-1600) | EACH | 85 | $27.50 | $29.05 | $51.00 | $25.00 | $121.86 | $35.00 |
| 0285 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 4 | $110.00 | $116.30 | $160.00 | $95.00 | $115.77 | $125.00 |
| 0290 | Object marker, type 1 (0705-10-1) | EACH | 30 | $275.00 | $290.70 | $375.00 | $245.00 | $225.44 | $300.00 |
| 0295 | Delineator, flexible tubular (0705-11-1) | EACH | 10 | $93.50 | $98.80 | $125.00 | $75.00 | $146.23 | $100.00 |
| 0300 | Raised pavement marker, type B (0706-1-3) | EACH | 1,465 | $4.24 | $4.50 | $4.00 | $4.00 | $4.63 | $5.00 |
| 0305 | Painted pavement markings, surface (0710-90) | LS | 1 | $26,055 | $27,500 | $24,200 | $17,000 | $24,372 | $35,000 |
| 0310 | Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102) | GM | 0.11 | $6,800.20 | $6,660.00 | $5,850.00 | $6,200.00 | $9,308.70 | $7,000.00 |
| 0315 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 1,100 | $3.37 | $3.55 | $3.15 | $4.00 | $4.87 | $4.00 |
| 0320 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 807 | $5.05 | $5.35 | $4.70 | $5.00 | $6.09 | $6.00 |
| 0325 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 421 | $6.73 | $7.10 | $6.25 | $6.00 | $7.31 | $8.00 |
| 0330 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.67 | $2,200.00 | $2,320.00 | $2,035.00 | $2,100.00 | $1,637.76 | $4,500.00 |
| 0335 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 5 | $260.70 | $275.60 | $241.00 | $130.00 | $243.72 | $250.00 |
| 0340 | Thermoplastic, standard, arrow (0711-11170) | EACH | 10 | $57.20 | $60.50 | $53.00 | $95.00 | $103.58 | $90.00 |
| 0345 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 1,127 | $4.70 | $4.95 | $4.35 | $5.00 | $6.09 | $6.00 |
| 0350 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.11 | $2,200.00 | $2,260.00 | $2,000.00 | $1,848.00 | $1,601.42 | $4,400.00 |
| 0355 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 130 | $16.86 | $17.85 | $16.00 | $19.00 | $23.76 | $20.00 |
| 0360 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 63 | $249.70 | $264.00 | $230.00 | $320.00 | $274.18 | $225.00 |
| 0365 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 57 | $88.00 | $93.00 | $82.00 | $210.00 | $182.79 | $100.00 |
| 0370 | Thermoplastic, preformed, 6" white, railroad dynamic envelope (0711-14191) | LF | 80 | $4.24 | $4.50 | $4.00 | $2.10 | $15.78 | $10.00 |
| 0375 | Thermoplastic, preformed, 12" white on asphalt pavement, railroad dynamic envelope (0711-14193) | LF | 1,361 | $8.47 | $8.95 | $7.90 | $22.00 | $31.68 | $15.00 |
| 0380 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 6.35 | $5,098.50 | $5,380.00 | $4,725.00 | $6,200.00 | $7,313.85 | $6,000.00 |
| 0385 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 2.98 | $4,779.50 | $5,050.00 | $4,430.00 | $6,200.00 | $7,306.64 | $6,000.00 |
| 0390 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 2.07 | $1,195.70 | $1,260.00 | $1,100.00 | $2,250.00 | $2,432.48 | $4,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of May 28, 2025. Compiled by Mirage Metrics.