FDOT contract T6618 bid tabulation
SR 934 (71ST ST) FROM BAY DR E TO COLLINS AVE. Let by Florida DOT on January 28, 2026, Miami-Dade, District 6. 5 bids received; low bid $2,189,486 by Weekley Asphalt Paving, Inc..
- Owner
- Florida DOT
- Letting
- 28 JAN 2026
- Pay items
- 117
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Weekley Asphalt Paving, Inc. | $2,189,486 | Low |
| 2 | Florida Engineering & Development Corp | $2,227,843 | +2.0% |
| 3 | Jva Engineering Contractor, Inc | $2,266,277 | +4.0% |
| 4 | General Asphalt Company, LLC | $2,755,758 | +26% |
| 5 | The Stout Group LLC | $2,788,261 | +27% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Weekley Asphalt Paving, Inc. | 2. Florida Engineering & Development Corp | 3. Jva Engineering Contractor, Inc | 4. General Asphalt Company, LLC | 5. The Stout Group LLC |
|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $116,220 | $221,500 | $290,000 | $251,000 | $275,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $311,310 | $255,000 | $186,000 | $400,000 | $315,000 |
| 0015 | Traffic control officer (0102-14) | HR | 560 | $88.00 | $81.45 | $85.00 | $92.00 | $95.00 |
| 0020 | Work zone sign (0102-60) | ED | 11,200 | $0.22 | $0.20 | $0.24 | $0.23 | $0.18 |
| 0025 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 20,800 | $0.10 | $0.10 | $0.12 | $0.12 | $0.10 |
| 0030 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 11,250 | $0.08 | $0.05 | $0.06 | $0.06 | $0.05 |
| 0035 | Arrow board / advance warning arrow panel (0102-76) | ED | 480 | $5.00 | $5.08 | $5.66 | $5.75 | $5.00 |
| 0040 | Portable changeable message sign, temporary (0102-99) | ED | 536 | $10.00 | $10.15 | $12.10 | $11.50 | $9.20 |
| 0045 | Temporary signalization and maintenance, intersection (0102-104) | ED | 1,200 | $10.00 | $4.06 | $11.30 | $4.60 | $8.75 |
| 0050 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 1,200 | $10.00 | $4.06 | $11.30 | $4.60 | $8.75 |
| 0055 | Type III barricade (0102-115) | ED | 2,320 | $0.28 | $0.30 | $0.36 | $0.35 | $0.25 |
| 0060 | Inlet protection system (0104-18) | EACH | 38 | $160.00 | $95.91 | $188.00 | $172.50 | $250.00 |
| 0065 | Litter removal (0107-1) | ACRE | 13.07 | $100.00 | $0.28 | $229.60 | $0.01 | $1.00 |
| 0070 | Mowing (0107-2) | ACRE | 1.60 | $300.00 | $2.71 | $274.00 | $0.01 | $1.00 |
| 0075 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $22,200 | $10,556 | $22,500 | $1.15 | $15,000 |
| 0080 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $5,300.00 | $10,150 | $5,325.00 | $1.15 | $10,000 |
| 0085 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $44,970 | $62,000 | $5,665.00 | $28,750 | $130,000 |
| 0090 | Removal of existing concrete (0110-4-10) | SY | 1,379 | $45.00 | $17.94 | $29.60 | $28.75 | $25.00 |
| 0095 | Tree protection barrier (0110-21) | LF | 1,480 | $14.00 | $5.73 | $5.25 | $13.80 | $10.00 |
| 0100 | Tree removal (0110-23) | EACH | 1 | $900.00 | $873.71 | $3,500.00 | $920.00 | $1,500.00 |
| 0105 | Borrow excavation, truck measure (0120-2-2) | CY | 12.50 | $100.00 | $103.85 | $123.00 | $115.00 | $100.00 |
| 0110 | Regular excavation (3-R projects only) (0120-71) | LS | 1 | $15,000 | $2,699.74 | $5,360.00 | $2,875.00 | $10,000 |
| 0115 | Optional base, base group 15 (0285-715) | SY | 51 | $91.00 | $166.38 | $195.00 | $103.50 | $200.00 |
| 0120 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 16,766 | $3.50 | $3.30 | $4.10 | $5.00 | $4.00 |
| 0125 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 12.80 | $600.00 | $391.11 | $348.00 | $760.00 | $500.00 |
| 0130 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 1,387.50 | $210.00 | $218.23 | $223.00 | $262.00 | $250.00 |
| 0135 | Manhole, adjust (0425-5) | EACH | 36 | $1,200.00 | $1,050.00 | $1,020.00 | $1,150.00 | $950.00 |
| 0140 | Pipe handrail - guiderail, aluminum (0515-1-2) | LF | 18 | $140.00 | $126.88 | $238.00 | $230.00 | $250.00 |
| 0145 | Concrete curb & gutter, type E (0520-1-7) | LF | 70 | $98.00 | $42.29 | $170.00 | $78.20 | $60.00 |
| 0150 | Concrete curb & gutter, type F (0520-1-10) | LF | 1,076 | $75.00 | $60.45 | $43.80 | $78.20 | $60.00 |
| 0155 | Concrete curb, type D (0520-2-4) | LF | 11 | $90.00 | $32.67 | $230.00 | $66.70 | $50.00 |
| 0160 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 138 | $98.00 | $92.50 | $101.00 | $112.70 | $150.00 |
| 0165 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 415 | $119.00 | $105.00 | $114.40 | $138.00 | $175.00 |
| 0170 | Pavers, architectural, (0526-1-2) | SY | 653 | $129.00 | $140.00 | $152.20 | $189.75 | $250.00 |
| 0175 | Detectable warnings (0527-2) | SF | 338 | $43.00 | $40.00 | $40.00 | $40.25 | $50.00 |
| 0180 | Performance turf, sod (0570-1-2) | SY | 114 | $10.00 | $12.20 | $19.00 | $6.90 | $50.00 |
| 0185 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 37 | $40.00 | $45.68 | $45.30 | $51.75 | $58.90 |
| 0190 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 2 | $1,700.00 | $2,030.00 | $1,930.00 | $2,300.00 | $1,800.00 |
| 0195 | Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130) | LS | 1 | $1,646.44 | $1,646.44 | $1,646.44 | $1,646.44 | $1,646.44 |
| 0200 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 3 | $2,500.00 | $2,030.00 | $2,840.00 | $2,300.00 | $3,000.00 |
| 0205 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 3 | $2,500.00 | $2,030.00 | $2,840.00 | $2,300.00 | $2,350.00 |
| 0210 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,000 | $50,000 | $50,000 | $50,000 | $50,000 |
| 0215 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 28 | $695.00 | $705.43 | $787.00 | $672.75 | $585.00 |
| 0220 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 5 | $2,200.00 | $2,233.00 | $2,495.00 | $2,173.50 | $1,890.00 |
| 0225 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 1 | $2,500.00 | $2,537.50 | $2,840.00 | $3,105.00 | $2,700.00 |
| 0230 | Single column ground sign assembly, F&I barrier less than 12 SF (0700-1211) | EACH | 2 | $1,595.00 | $1,618.93 | $1,810.00 | $2,875.00 | $2,500.00 |
| 0235 | Single column ground sign assembly, relocate (0700-1500) | EACH | 1 | $425.00 | $431.38 | $481.53 | $517.50 | $450.00 |
| 0240 | Single column ground sign assembly, remove (0700-1600) | EACH | 19 | $10.00 | $10.15 | $11.30 | $57.50 | $50.00 |
| 0245 | Single column ground sign assembly, F&I cantilever mount, 12.0-20.0 SF (0700-1912) | EACH | 1 | $1,095.00 | $1,111.43 | $1,240.00 | $4,965.70 | $4,318.00 |
| 0250 | Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114) | EACH | 1 | $3,500.00 | $3,552.50 | $3,965.00 | $7,078.25 | $6,155.00 |
| 0255 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 1 | $200.00 | $203.00 | $230.00 | $287.50 | $250.00 |
| 0260 | Delineator, flexible tubular (0705-11-1) | EACH | 15 | $90.00 | $91.35 | $105.00 | $92.00 | $120.00 |
| 0265 | Raised pavement marker, type B (0706-1-3) | EACH | 662 | $5.00 | $5.08 | $5.67 | $5.75 | $5.00 |
| 0270 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 613 | $4.00 | $4.06 | $4.50 | $5.75 | $5.00 |
| 0275 | Painted pavement markings, surface (0710-90) | LS | 1 | $15,000 | $15,225 | $17,000 | $23,000 | $20,000 |
| 0280 | Thermoplastic, standard, solid, 12" for interchange markings (0711-11103) | GM | 0.05 | $10,600 | $10,759 | $12,000 | $17,250 | $10,000 |
| 0285 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 1,764 | $2.00 | $2.03 | $2.30 | $2.30 | $4.00 |
| 0290 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 959 | $3.00 | $3.05 | $3.40 | $2.88 | $5.00 |
| 0295 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 434 | $4.00 | $4.06 | $4.50 | $3.45 | $6.00 |
| 0300 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.34 | $2,300.00 | $2,334.50 | $2,610.00 | $2,300.00 | $4,000.00 |
| 0305 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 9 | $120.00 | $121.80 | $140.00 | $138.00 | $225.00 |
| 0310 | Thermoplastic, standard, arrow (0711-11170) | EACH | 26 | $80.00 | $81.20 | $91.00 | $92.00 | $100.00 |
| 0315 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 411 | $3.60 | $3.65 | $4.00 | $2.88 | $5.00 |
| 0320 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.07 | $2,300.00 | $2,334.49 | $2,610.00 | $2,300.00 | $4,000.00 |
| 0325 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 1,452 | $18.00 | $18.27 | $20.40 | $18.40 | $18.00 |
| 0330 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 21 | $260.00 | $263.90 | $295.00 | $322.00 | $300.00 |
| 0335 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 13 | $150.00 | $152.25 | $170.00 | $207.00 | $125.00 |
| 0340 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 1.29 | $5,280.00 | $5,359.20 | $5,980.00 | $5,750.00 | $6,000.00 |
| 0345 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 0.18 | $2,300.00 | $2,334.51 | $2,610.00 | $2,300.00 | $4,000.00 |
| 0350 | Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133) | GM | 0.10 | $5,280.00 | $5,359.16 | $5,980.00 | $2,875.00 | $8,000.00 |
| 0355 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 1.06 | $6,336.00 | $6,431.05 | $7,180.00 | $5,750.00 | $6,000.00 |
| 0360 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.11 | $32,000 | $32,480 | $36,250 | $40,250 | $35,000 |
| 0365 | Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181) | GM | 0.11 | $6,900.00 | $7,003.48 | $7,820.00 | $17,250 | $12,000 |
| 0370 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.18 | $32,000 | $32,480 | $36,270 | $40,250 | $35,000 |
| 0375 | Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381) | GM | 0.09 | $6,900.00 | $7,003.51 | $7,820.00 | $17,250 | $12,000 |
| 0380 | Green-colored pavement markings, bike lane (0714-10) | SF | 1,687 | $10.00 | $10.15 | $11.30 | $10.35 | $11.50 |
| 0385 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 426 | $27.00 | $45.68 | $28.40 | $51.75 | $47.00 |
| 0390 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 5 | $1,750.00 | $2,030.00 | $1,980.00 | $2,300.00 | $1,900.00 |
| 0395 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 1,518 | $3.00 | $3.15 | $3.40 | $3.57 | $4.00 |
| 0400 | Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13) | LF | 1,012 | $5.00 | $4.11 | $5.00 | $4.66 | $5.50 |
| 0405 | Lighting conductors, remove & dispose, contractor owns (0715-1-60) | LF | 2,520 | $0.50 | $0.42 | $0.57 | $0.47 | $1.00 |
| 0410 | Light pole complete, relocate (0715-68000) | EACH | 1 | $5,000.00 | $4,821.25 | $5,665.00 | $5,462.50 | $4,400.00 |
| 0415 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 1 | $2,100.00 | $1,015.00 | $2,380.00 | $1,150.00 | $900.00 |
| 0420 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 2,150 | $39.00 | $45.68 | $39.70 | $51.75 | $56.00 |
| 0425 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 3 | $10,500 | $8,627.50 | $11,900 | $9,775.00 | $20,000 |
| 0430 | Signal cable, remove- intersection (0632-7-6) | PI | 3 | $650.00 | $862.75 | $750.00 | $977.50 | $1,500.00 |
| 0435 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 88 | $1,750.00 | $2,030.00 | $1,980.00 | $2,300.00 | $1,650.00 |
| 0440 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 3 | $2,500.00 | $2,233.00 | $2,840.00 | $2,530.00 | $3,000.00 |
| 0445 | Pull & splice box, install (0635-2-30) | EACH | 2 | $1,200.00 | $1,116.50 | $1,360.00 | $1,265.00 | $2,250.00 |
| 0450 | Electrical power service, F&I, underground, meter furnished by power company (0639-1121) | AS | 2 | $5,900.00 | $2,030.00 | $6,690.00 | $2,300.00 | $16,000 |
| 0455 | Electrical power service, remove overhead (0639-1610) | AS | 2 | $250.00 | $609.00 | $285.00 | $690.00 | $1,500.00 |
| 0460 | Electrical service wire, & install (0639-2-1) | LF | 494 | $10.00 | $7.61 | $11.40 | $8.63 | $15.00 |
| 0465 | Electrical service wire, (0639-2-6) | LF | 273 | $1.00 | $0.25 | $1.13 | $0.29 | $0.19 |
| 0470 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 2 | $2,100.00 | $2,030.00 | $2,380.00 | $2,300.00 | $6,500.00 |
| 0475 | Aluminum signals pole, (0646-1-11) | EACH | 18 | $1,900.00 | $1,877.75 | $2,160.00 | $2,127.50 | $3,400.00 |
| 0480 | Aluminum signals pole, remove (0646-1-60) | EACH | 5 | $150.00 | $355.25 | $170.00 | $402.50 | $1,200.00 |
| 0485 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 15 | $1,100.00 | $964.25 | $1,240.00 | $1,092.50 | $1,000.00 |
| 0490 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 3 | $1,650.00 | $1,573.25 | $1,870.00 | $1,782.50 | $2,000.00 |
| 0495 | Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60) | AS | 12 | $85.00 | $101.50 | $100.00 | $115.00 | $200.00 |
| 0500 | Loop detector inductive, F&I, type 9 (0660-1109) | EACH | 16 | $300.00 | $228.38 | $340.00 | $258.75 | $500.00 |
| 0505 | Loop detector inductive, remove- cabinet to remain (0660-1600) | EACH | 5 | $25.00 | $50.75 | $30.00 | $57.50 | $200.00 |
| 0510 | Loop assembly, F&I, type F (0660-2106) | AS | 22 | $1,500.00 | $1,522.50 | $1,700.00 | $1,725.00 | $2,500.00 |
| 0515 | Vehicle detection system- furnish & install cabinet equipment (0660-4-11) | EACH | 4 | $3,500.00 | $5,836.25 | $3,970.00 | $6,612.50 | $6,500.00 |
| 0520 | Vehicle detection system- furnish & install above ground equipment (0660-4-12) | EACH | 4 | $3,500.00 | $7,612.50 | $3,970.00 | $8,625.00 | $7,300.00 |
| 0525 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 23 | $320.00 | $355.25 | $370.00 | $402.50 | $550.00 |
| 0530 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 7 | $25.00 | $101.50 | $30.00 | $115.00 | $180.00 |
| 0535 | Traffic controller assembly, F&I, caltrans W/standard lock (0670-5180) | AS | 1 | $52,000 | $40,600 | $58,916 | $46,000 | $55,000 |
| 0540 | Traffic controller assembly, remove controller with (0670-5600) | AS | 1 | $650.00 | $1,116.50 | $740.00 | $1,265.00 | $1,500.00 |
| 0545 | Traffic controller without cabinet, atc, F&I in existing caltrans cabinet (0671-2-16) | EACH | 1 | $6,500.00 | $11,673 | $7,360.00 | $13,225 | $16,000 |
| 0550 | Traffic controller, remove- cabinet to remain (0671-2-60) | EACH | 1 | $150.00 | $812.00 | $170.00 | $920.00 | $1,000.00 |
| 0555 | Cellular modem, furnish and install (0684-8-1) | EACH | 1 | $3,250.00 | $2,436.00 | $3,680.00 | $2,760.00 | $2,300.00 |
| 0560 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 4 | $1,100.00 | $1,268.75 | $1,240.00 | $1,437.50 | $1,400.00 |
| 0565 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 2 | $70.00 | $487.20 | $79.30 | $471.50 | $350.00 |
| 0570 | Relocate trees and palms, palms, 10.0"-18.0" DBH, 14.0' or greater of clear trunk (0581-1282) | EACH | 2 | $4,450.00 | $15,225 | $4,500.00 | $4,600.00 | $3,500.00 |
| 0575 | Local agency initial amount (DO not bid) (0999-26) | LS | 1 | $8,180.00 | $8,180.00 | $8,180.00 | $8,180.00 | $8,180.00 |
| 0580 | Utility structure, below ground, adjust/modify (1060-15) | EACH | 10 | $1,250.00 | $1,100.00 | $1,020.00 | $3,450.00 | $950.00 |
| 0585 | Utility fixture, valve assembly, adjust/modify (1080-24500) | EACH | 49 | $850.00 | $1,000.00 | $1,020.00 | $2,875.00 | $750.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of January 28, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.