FDOT contract T6618 bid tabulation

SR 934 (71ST ST) FROM BAY DR E TO COLLINS AVE. Let by Florida DOT on January 28, 2026, Miami-Dade, District 6. 5 bids received; low bid $2,189,486 by Weekley Asphalt Paving, Inc..

Owner
Florida DOT
Letting
28 JAN 2026
Pay items
117
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Weekley Asphalt Paving, Inc.$2,189,486Low
2Florida Engineering & Development Corp$2,227,843+2.0%
3Jva Engineering Contractor, Inc$2,266,277+4.0%
4General Asphalt Company, LLC$2,755,758+26%
5The Stout Group LLC$2,788,261+27%
FDOT contract T6618: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Weekley Asphalt Paving, Inc.2. Florida Engineering & Development Corp3. Jva Engineering Contractor, Inc4. General Asphalt Company, LLC5. The Stout Group LLC
0005Mobilization (0101-1)LS1$116,220$221,500$290,000$251,000$275,000
0010Maintenance of traffic (0102-1)DA1$311,310$255,000$186,000$400,000$315,000
0015Traffic control officer (0102-14)HR560$88.00$81.45$85.00$92.00$95.00
0020Work zone sign (0102-60)ED11,200$0.22$0.20$0.24$0.23$0.18
0025Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED20,800$0.10$0.10$0.12$0.12$0.10
0030Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD11,250$0.08$0.05$0.06$0.06$0.05
0035Arrow board / advance warning arrow panel (0102-76)ED480$5.00$5.08$5.66$5.75$5.00
0040Portable changeable message sign, temporary (0102-99)ED536$10.00$10.15$12.10$11.50$9.20
0045Temporary signalization and maintenance, intersection (0102-104)ED1,200$10.00$4.06$11.30$4.60$8.75
0050Temporary traffic detection and maintenance, intersection (0102-107-1)ED1,200$10.00$4.06$11.30$4.60$8.75
0055Type III barricade (0102-115)ED2,320$0.28$0.30$0.36$0.35$0.25
0060Inlet protection system (0104-18)EACH38$160.00$95.91$188.00$172.50$250.00
0065Litter removal (0107-1)ACRE13.07$100.00$0.28$229.60$0.01$1.00
0070Mowing (0107-2)ACRE1.60$300.00$2.71$274.00$0.01$1.00
0075Monitor existing structures- inspection and settlement monitoring (0108-1)LS1$22,200$10,556$22,500$1.15$15,000
0080Monitor existing structures- vibration monitoring (0108-2)LS1$5,300.00$10,150$5,325.00$1.15$10,000
0085Clearing & grubbing (0110-1-1)ACRE1$44,970$62,000$5,665.00$28,750$130,000
0090Removal of existing concrete (0110-4-10)SY1,379$45.00$17.94$29.60$28.75$25.00
0095Tree protection barrier (0110-21)LF1,480$14.00$5.73$5.25$13.80$10.00
0100Tree removal (0110-23)EACH1$900.00$873.71$3,500.00$920.00$1,500.00
0105Borrow excavation, truck measure (0120-2-2)CY12.50$100.00$103.85$123.00$115.00$100.00
0110Regular excavation (3-R projects only) (0120-71)LS1$15,000$2,699.74$5,360.00$2,875.00$10,000
0115Optional base, base group 15 (0285-715)SY51$91.00$166.38$195.00$103.50$200.00
0120Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY16,766$3.50$3.30$4.10$5.00$4.00
0125Superpave asphaltic conc, traffic C (0334-1-13)TN12.80$600.00$391.11$348.00$760.00$500.00
0130Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN1,387.50$210.00$218.23$223.00$262.00$250.00
0135Manhole, adjust (0425-5)EACH36$1,200.00$1,050.00$1,020.00$1,150.00$950.00
0140Pipe handrail - guiderail, aluminum (0515-1-2)LF18$140.00$126.88$238.00$230.00$250.00
0145Concrete curb & gutter, type E (0520-1-7)LF70$98.00$42.29$170.00$78.20$60.00
0150Concrete curb & gutter, type F (0520-1-10)LF1,076$75.00$60.45$43.80$78.20$60.00
0155Concrete curb, type D (0520-2-4)LF11$90.00$32.67$230.00$66.70$50.00
0160Concrete sidewalk and driveways, 4" thick (0522-1)SY138$98.00$92.50$101.00$112.70$150.00
0165Concrete sidewalk and driveways, 6" thick (0522-2)SY415$119.00$105.00$114.40$138.00$175.00
0170Pavers, architectural, (0526-1-2)SY653$129.00$140.00$152.20$189.75$250.00
0175Detectable warnings (0527-2)SF338$43.00$40.00$40.00$40.25$50.00
0180Performance turf, sod (0570-1-2)SY114$10.00$12.20$19.00$6.90$50.00
0185Conduit, furnish & install, directional bore (0630-2-12)LF37$40.00$45.68$45.30$51.75$58.90
0190Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH2$1,700.00$2,030.00$1,930.00$2,300.00$1,800.00
0195Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130)LS1$1,646.44$1,646.44$1,646.44$1,646.44$1,646.44
0200Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1)EACH3$2,500.00$2,030.00$2,840.00$2,300.00$3,000.00
0205Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12)EACH3$2,500.00$2,030.00$2,840.00$2,300.00$2,350.00
0210Initial contingency amount, DO not bid (0999-25)LS1$50,000$50,000$50,000$50,000$50,000
0215Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH28$695.00$705.43$787.00$672.75$585.00
0220Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH5$2,200.00$2,233.00$2,495.00$2,173.50$1,890.00
0225Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113)EACH1$2,500.00$2,537.50$2,840.00$3,105.00$2,700.00
0230Single column ground sign assembly, F&I barrier less than 12 SF (0700-1211)EACH2$1,595.00$1,618.93$1,810.00$2,875.00$2,500.00
0235Single column ground sign assembly, relocate (0700-1500)EACH1$425.00$431.38$481.53$517.50$450.00
0240Single column ground sign assembly, remove (0700-1600)EACH19$10.00$10.15$11.30$57.50$50.00
0245Single column ground sign assembly, F&I cantilever mount, 12.0-20.0 SF (0700-1912)EACH1$1,095.00$1,111.43$1,240.00$4,965.70$4,318.00
0250Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114)EACH1$3,500.00$3,552.50$3,965.00$7,078.25$6,155.00
0255Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH1$200.00$203.00$230.00$287.50$250.00
0260Delineator, flexible tubular (0705-11-1)EACH15$90.00$91.35$105.00$92.00$120.00
0265Raised pavement marker, type B (0706-1-3)EACH662$5.00$5.08$5.67$5.75$5.00
0270Painted pavement markings, durable paint, yellow, island nose (0710-12290)SF613$4.00$4.06$4.50$5.75$5.00
0275Painted pavement markings, surface (0710-90)LS1$15,000$15,225$17,000$23,000$20,000
0280Thermoplastic, standard, solid, 12" for interchange markings (0711-11103)GM0.05$10,600$10,759$12,000$17,250$10,000
0285Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF1,764$2.00$2.03$2.30$2.30$4.00
0290Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF959$3.00$3.05$3.40$2.88$5.00
0295Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF434$4.00$4.06$4.50$3.45$6.00
0300Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.34$2,300.00$2,334.50$2,610.00$2,300.00$4,000.00
0305Thermoplastic, standard, message or symbol (0711-11160)EACH9$120.00$121.80$140.00$138.00$225.00
0310Thermoplastic, standard, arrow (0711-11170)EACH26$80.00$81.20$91.00$92.00$100.00
0315Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF411$3.60$3.65$4.00$2.88$5.00
0320Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.07$2,300.00$2,334.49$2,610.00$2,300.00$4,000.00
0325Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF1,452$18.00$18.27$20.40$18.40$18.00
0330Thermoplastic, preformed, white, message (0711-14160)EACH21$260.00$263.90$295.00$322.00$300.00
0335Thermoplastic, preformed, white, arrow (0711-14170)EACH13$150.00$152.25$170.00$207.00$125.00
0340Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM1.29$5,280.00$5,359.20$5,980.00$5,750.00$6,000.00
0345Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM0.18$2,300.00$2,334.51$2,610.00$2,300.00$4,000.00
0350Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133)GM0.10$5,280.00$5,359.16$5,980.00$2,875.00$8,000.00
0355Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM1.06$6,336.00$6,431.05$7,180.00$5,750.00$6,000.00
0360Permanent tape, white, solid, 6" for concrete bridges (0713-103101)GM0.11$32,000$32,480$36,250$40,250$35,000
0365Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181)GM0.11$6,900.00$7,003.48$7,820.00$17,250$12,000
0370Permanent tape, yellow, solid, for concrete bridges (0713-103201)GM0.18$32,000$32,480$36,270$40,250$35,000
0375Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381)GM0.09$6,900.00$7,003.51$7,820.00$17,250$12,000
0380Green-colored pavement markings, bike lane (0714-10)SF1,687$10.00$10.15$11.30$10.35$11.50
0385Conduit, furnish & install, directional bore (0630-2-12)LF426$27.00$45.68$28.40$51.75$47.00
0390Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH5$1,750.00$2,030.00$1,980.00$2,300.00$1,900.00
0395Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12)LF1,518$3.00$3.15$3.40$3.57$4.00
0400Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13)LF1,012$5.00$4.11$5.00$4.66$5.50
0405Lighting conductors, remove & dispose, contractor owns (0715-1-60)LF2,520$0.50$0.42$0.57$0.47$1.00
0410Light pole complete, relocate (0715-68000)EACH1$5,000.00$4,821.25$5,665.00$5,462.50$4,400.00
0415Pole cable distribution system, furnish and install, conventional (0715-500-1)EACH1$2,100.00$1,015.00$2,380.00$1,150.00$900.00
0420Conduit, furnish & install, directional bore (0630-2-12)LF2,150$39.00$45.68$39.70$51.75$56.00
0425Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI3$10,500$8,627.50$11,900$9,775.00$20,000
0430Signal cable, remove- intersection (0632-7-6)PI3$650.00$862.75$750.00$977.50$1,500.00
0435Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH88$1,750.00$2,030.00$1,980.00$2,300.00$1,650.00
0440Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH3$2,500.00$2,233.00$2,840.00$2,530.00$3,000.00
0445Pull & splice box, install (0635-2-30)EACH2$1,200.00$1,116.50$1,360.00$1,265.00$2,250.00
0450Electrical power service, F&I, underground, meter furnished by power company (0639-1121)AS2$5,900.00$2,030.00$6,690.00$2,300.00$16,000
0455Electrical power service, remove overhead (0639-1610)AS2$250.00$609.00$285.00$690.00$1,500.00
0460Electrical service wire, & install (0639-2-1)LF494$10.00$7.61$11.40$8.63$15.00
0465Electrical service wire, (0639-2-6)LF273$1.00$0.25$1.13$0.29$0.19
0470Prestressed concrete pole, type P-II service pole (0641-2-12)EACH2$2,100.00$2,030.00$2,380.00$2,300.00$6,500.00
0475Aluminum signals pole, (0646-1-11)EACH18$1,900.00$1,877.75$2,160.00$2,127.50$3,400.00
0480Aluminum signals pole, remove (0646-1-60)EACH5$150.00$355.25$170.00$402.50$1,200.00
0485Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS15$1,100.00$964.25$1,240.00$1,092.50$1,000.00
0490Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12)AS3$1,650.00$1,573.25$1,870.00$1,782.50$2,000.00
0495Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60)AS12$85.00$101.50$100.00$115.00$200.00
0500Loop detector inductive, F&I, type 9 (0660-1109)EACH16$300.00$228.38$340.00$258.75$500.00
0505Loop detector inductive, remove- cabinet to remain (0660-1600)EACH5$25.00$50.75$30.00$57.50$200.00
0510Loop assembly, F&I, type F (0660-2106)AS22$1,500.00$1,522.50$1,700.00$1,725.00$2,500.00
0515Vehicle detection system- furnish & install cabinet equipment (0660-4-11)EACH4$3,500.00$5,836.25$3,970.00$6,612.50$6,500.00
0520Vehicle detection system- furnish & install above ground equipment (0660-4-12)EACH4$3,500.00$7,612.50$3,970.00$8,625.00$7,300.00
0525Pedestrian detector, furnish & install, standard (0665-1-11)EACH23$320.00$355.25$370.00$402.50$550.00
0530Pedestrian detector, remove- pole/pedestal to remain (0665-1-60)EACH7$25.00$101.50$30.00$115.00$180.00
0535Traffic controller assembly, F&I, caltrans W/standard lock (0670-5180)AS1$52,000$40,600$58,916$46,000$55,000
0540Traffic controller assembly, remove controller with (0670-5600)AS1$650.00$1,116.50$740.00$1,265.00$1,500.00
0545Traffic controller without cabinet, atc, F&I in existing caltrans cabinet (0671-2-16)EACH1$6,500.00$11,673$7,360.00$13,225$16,000
0550Traffic controller, remove- cabinet to remain (0671-2-60)EACH1$150.00$812.00$170.00$920.00$1,000.00
0555Cellular modem, furnish and install (0684-8-1)EACH1$3,250.00$2,436.00$3,680.00$2,760.00$2,300.00
0560Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH4$1,100.00$1,268.75$1,240.00$1,437.50$1,400.00
0565Sign panel, remove, UP to 12 SF (0700-3601)EACH2$70.00$487.20$79.30$471.50$350.00
0570Relocate trees and palms, palms, 10.0"-18.0" DBH, 14.0' or greater of clear trunk (0581-1282)EACH2$4,450.00$15,225$4,500.00$4,600.00$3,500.00
0575Local agency initial amount (DO not bid) (0999-26)LS1$8,180.00$8,180.00$8,180.00$8,180.00$8,180.00
0580Utility structure, below ground, adjust/modify (1060-15)EACH10$1,250.00$1,100.00$1,020.00$3,450.00$950.00
0585Utility fixture, valve assembly, adjust/modify (1080-24500)EACH49$850.00$1,000.00$1,020.00$2,875.00$750.00
FDOT contract T6618: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of January 28, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy