FDOT contract T6588 bid tabulation
SR 7 (US 441/NW 8 AVE/NW 7 AVE) AND SR 993 (NW 12 AVE) FROM. Let by Florida DOT on February 26, 2025, Miami-Dade, District 6. 6 bids received; low bid $1,940,772 by Aum Construction Inc..
- Owner
- Florida DOT
- Letting
- 26 FEB 2025
- Pay items
- 132
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Aum Construction Inc. | $1,940,772 | Low |
| 2 | Florida Engineering & Development Corp | $2,449,246 | +26% |
| 3 | Weekley Asphalt Paving, Inc. | $2,454,277 | +26% |
| 4 | Roadway Construction, LLC | $2,512,056 | +29% |
| 5 | Horsepower Electric, Inc. | $2,919,069 | +50% |
| 6 | Sice Inc | $3,199,610 | +65% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Aum Construction Inc. | 2. Florida Engineering & Development Corp | 3. Weekley Asphalt Paving, Inc. | 4. Roadway Construction, LLC | 5. Horsepower Electric, Inc. | 6. Sice Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $60,000 | $190,000 | $62,910 | $251,200 | $100,000 | $324,265 |
| 0010 | Mobilization (0101-1) | LS | 1 | $60,000 | $78,750 | $20,970 | $251,200 | $100,000 | $168,971 |
| 0015 | Maintenance of traffic (0102-1) | DA | 1 | $55,000 | $156,000 | $279,074 | $150,000 | $178,575 | $177,993 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $55,000 | $98,300 | $93,029 | $150,000 | $178,575 | $62,822 |
| 0025 | Traffic control officer (0102-14) | HR | 168 | $80.00 | $87.66 | $95.00 | $70.00 | $100.00 | $108.70 |
| 0030 | Work zone sign (0102-60) | ED | 12,580 | $0.30 | $0.22 | $0.21 | $0.21 | $0.24 | $0.26 |
| 0035 | Business sign (0102-61) | EACH | 7 | $70.00 | $49.44 | $48.00 | $48.00 | $55.20 | $57.98 |
| 0040 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 16,480 | $0.20 | $0.13 | $0.13 | $0.13 | $0.15 | $0.16 |
| 0045 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 5,048 | $0.15 | $0.08 | $0.10 | $0.08 | $0.09 | $0.10 |
| 0050 | Arrow board / advance warning arrow panel (0102-76) | ED | 1,120 | $7.00 | $5.15 | $5.00 | $5.00 | $5.75 | $6.04 |
| 0055 | Portable changeable message sign, temporary (0102-99) | ED | 1,546 | $12.00 | $10.15 | $9.85 | $9.85 | $11.33 | $11.90 |
| 0060 | Temporary signalization and maintenance, intersection (0102-104) | ED | 960 | $10.00 | $24.41 | $13.00 | $23.70 | $30.00 | $23.19 |
| 0065 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 960 | $10.00 | $24.41 | $13.00 | $23.70 | $16.00 | $23.19 |
| 0070 | Type III barricade (0102-115) | ED | 1,080 | $0.50 | $0.31 | $0.50 | $0.30 | $0.35 | $0.37 |
| 0075 | Inlet protection system (0104-18) | EACH | 29 | $250.00 | $95.98 | $160.00 | $164.27 | $15.00 | $241.55 |
| 0080 | Litter removal (0107-1) | ACRE | 10.51 | $100.00 | $210.16 | $50.00 | $0.01 | $78.00 | $529.52 |
| 0085 | Mowing (0107-2) | ACRE | 10.51 | $150.00 | $418.86 | $50.00 | $0.01 | $500.00 | $529.52 |
| 0090 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $15,000 | $11,124 | $11,000 | $6,000.00 | $12,000 | $14,493 |
| 0095 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $7,500.00 | $81,750 | $119,250 | $38,215 | $20,125 | $15,449 |
| 0100 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $7,500.00 | $72,250 | $39,750 | $9,286.32 | $20,125 | $8,859.91 |
| 0105 | Removal of existing concrete (0110-4-10) | SY | 1,051 | $25.00 | $47.87 | $49.00 | $41.01 | $40.25 | $90.58 |
| 0110 | Tree protection barrier (0110-21) | LF | 163 | $15.00 | $5.60 | $33.00 | $3.82 | $6.00 | $12.08 |
| 0115 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 12,516 | $5.00 | $3.59 | $4.00 | $5.00 | $6.00 | $6.04 |
| 0120 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 26.80 | $500.00 | $406.85 | $350.00 | $215.00 | $300.00 | $374.40 |
| 0125 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 1,032.60 | $250.00 | $229.98 | $245.00 | $215.00 | $310.00 | $483.10 |
| 0130 | Manhole, adjust (0425-5) | EACH | 39 | $850.00 | $996.38 | $700.00 | $550.00 | $1,200.00 | $1,811.60 |
| 0135 | Trench drain, special design (0436-1-3) | LF | 23 | $425.00 | $559.83 | $495.00 | $458.36 | $1,100.00 | $905.80 |
| 0140 | Concrete curb & gutter, type F (0520-1-10) | LF | 707 | $40.00 | $52.62 | $75.00 | $49.33 | $50.00 | $144.93 |
| 0145 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 398 | $75.00 | $76.36 | $100.00 | $83.36 | $115.00 | $181.16 |
| 0150 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 505 | $85.00 | $103.11 | $128.00 | $116.08 | $145.00 | $244.57 |
| 0155 | Detectable warnings (0527-2) | SF | 155 | $35.00 | $43.31 | $49.00 | $35.23 | $45.00 | $120.78 |
| 0160 | Performance turf, sod (0570-1-2) | SY | 18 | $20.00 | $10.81 | $35.00 | $129.82 | $6.00 | $38.65 |
| 0165 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 144 | $30.00 | $60.26 | $60.00 | $58.50 | $35.00 | $36.24 |
| 0170 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 2 | $1,500.00 | $1,354.66 | $2,200.00 | $1,315.20 | $1,500.00 | $2,024.16 |
| 0175 | Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130) | LS | 1 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 |
| 0180 | Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130) | LS | 1 | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 |
| 0185 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 5 | $1,500.00 | $2,160.42 | $3,500.00 | $2,097.50 | $2,500.00 | $2,640.69 |
| 0195 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 5 | $1,800.00 | $2,305.86 | $3,300.00 | $2,238.70 | $3,000.00 | $1,970.42 |
| 0200 | Traffic monitoring site cabinet, furnish & install, type 4, base mount (0695-7141) | EACH | 1 | $8,000.00 | $11,501 | $6,000.00 | $11,166 | $15,000 | $7,540.51 |
| 0205 | Traffic monitoring site cabinet, remove existing cabinet (0695-7600) | EACH | 1 | $1,200.00 | $777.96 | $500.00 | $755.30 | $1,000.00 | $2,599.04 |
| 0210 | Raised pavement marker, type B (0706-1-3) | EACH | 511 | $8.00 | $6.18 | $6.00 | $3.85 | $6.90 | $7.25 |
| 0215 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 1.06 | $3,000.00 | $1,854.00 | $1,800.00 | $1,746.70 | $2,070.00 | $2,173.92 |
| 0220 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.12 | $5,000.00 | $2,060.00 | $2,000.00 | $1,848.74 | $2,300.00 | $2,415.46 |
| 0225 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 1,150 | $3.00 | $2.06 | $2.00 | $1.61 | $2.30 | $2.42 |
| 0230 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 303 | $4.00 | $3.09 | $3.00 | $1.70 | $3.45 | $3.63 |
| 0235 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 375 | $5.00 | $4.12 | $4.00 | $1.80 | $4.60 | $4.84 |
| 0240 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 0.32 | $3,000.00 | $1,030.00 | $1,000.00 | $586.75 | $1,150.00 | $1,207.73 |
| 0245 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.11 | $5,000.00 | $1,030.00 | $1,000.00 | $694.44 | $1,150.00 | $1,207.73 |
| 0250 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 9 | $150.00 | $103.00 | $100.00 | $35.00 | $115.00 | $120.78 |
| 0255 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 22 | $75.00 | $46.35 | $45.00 | $35.00 | $51.75 | $54.35 |
| 0260 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 1.08 | $3,000.00 | $1,854.00 | $1,800.00 | $1,750.00 | $2,070.00 | $2,173.92 |
| 0265 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 189 | $4.00 | $3.09 | $3.00 | $1.85 | $3.45 | $3.63 |
| 0270 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.10 | $3,000.00 | $1,030.00 | $1,000.00 | $735.29 | $1,150.00 | $1,207.73 |
| 0275 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $29,500 | $29,500 | $29,500 | $29,500 | $29,500 | $29,500 |
| 0280 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $20,500 | $20,500 | $20,500 | $20,500 | $20,500 | $20,500 |
| 0285 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 42 | $650.00 | $669.50 | $650.00 | $400.00 | $700.00 | $785.03 |
| 0290 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 2 | $2,500.00 | $2,575.00 | $2,500.00 | $1,300.00 | $2,875.00 | $3,019.33 |
| 0295 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 2 | $3,500.00 | $3,605.00 | $3,500.00 | $1,450.00 | $4,025.00 | $4,227.06 |
| 0300 | Single column ground sign assembly, F&I barrier less than 12 SF (0700-1311) | EACH | 2 | $4,500.00 | $4,635.00 | $4,500.00 | $1,100.00 | $5,175.00 | $5,434.79 |
| 0305 | Single column ground sign assembly, remove (0700-1600) | EACH | 19 | $100.00 | $51.50 | $50.00 | $20.00 | $57.50 | $60.39 |
| 0310 | Sign panel, relocate, UP to 12 SF (0700-3501) | EACH | 9 | $200.00 | $154.50 | $150.00 | $140.00 | $172.50 | $181.16 |
| 0315 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 1 | $100.00 | $25.75 | $25.00 | $70.00 | $28.75 | $30.20 |
| 0320 | Retroreflective sign strip- furnish and install, 2' (0700-13-12) | EACH | 7 | $150.00 | $103.00 | $100.00 | $120.00 | $115.00 | $120.78 |
| 0325 | Tubular marker, 36" yellow (0704-1-4) | EACH | 3 | $250.00 | $257.50 | $250.00 | $0.00 | $287.50 | $301.94 |
| 0330 | Object marker, type 1 (0705-10-1) | EACH | 1 | $350.00 | $360.50 | $350.00 | $300.00 | $402.50 | $434.79 |
| 0335 | Raised pavement marker, type B (0706-1-3) | EACH | 511 | $8.00 | $6.18 | $6.00 | $3.85 | $6.90 | $7.25 |
| 0340 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 7 | $20.00 | $15.45 | $15.00 | $3.85 | $17.25 | $18.12 |
| 0345 | Painted pavement markings, surface (0710-90) | LS | 1 | $14,000 | $12,360 | $12,000 | $9,042.00 | $14,000 | $14,493 |
| 0350 | Painted pavement markings, surface (0710-90) | LS | 1 | $7,000.00 | $2,575.00 | $2,500.00 | $3,250.00 | $3,000.00 | $3,019.33 |
| 0355 | Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102) | GM | 0.12 | $10,000 | $7,724.96 | $7,500.00 | $6,782.10 | $8,625.00 | $9,057.98 |
| 0360 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 1,150 | $4.00 | $4.12 | $4.00 | $4.42 | $4.60 | $4.84 |
| 0365 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 303 | $5.00 | $5.15 | $5.00 | $5.12 | $5.75 | $6.04 |
| 0370 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 375 | $6.00 | $6.18 | $6.00 | $6.84 | $6.90 | $7.25 |
| 0375 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.11 | $5,000.00 | $3,605.00 | $3,500.00 | $1,912.04 | $4,025.00 | $4,227.06 |
| 0380 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 9 | $200.00 | $206.00 | $200.00 | $93.00 | $230.00 | $241.55 |
| 0385 | Thermoplastic, standard, arrow (0711-11170) | EACH | 22 | $120.00 | $92.70 | $90.00 | $68.00 | $103.50 | $108.70 |
| 0390 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 189 | $6.00 | $5.15 | $5.00 | $5.12 | $5.75 | $6.04 |
| 0395 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.10 | $5,000.00 | $3,605.00 | $3,500.00 | $4,965.69 | $4,025.00 | $4,227.06 |
| 0400 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 747 | $24.00 | $18.54 | $18.00 | $17.79 | $20.70 | $21.74 |
| 0405 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 9 | $650.00 | $360.50 | $350.00 | $371.00 | $402.50 | $422.71 |
| 0410 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 1.06 | $6,000.00 | $6,180.00 | $6,000.00 | $5,489.64 | $6,900.00 | $7,246.38 |
| 0415 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 0.32 | $6,000.00 | $3,604.98 | $3,500.00 | $1,344.64 | $4,025.00 | $4,227.06 |
| 0420 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 1.08 | $6,000.00 | $6,180.00 | $6,000.00 | $5,156.00 | $6,900.00 | $7,246.38 |
| 0425 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 1,000 | $28.00 | $59.74 | $38.00 | $58.00 | $35.00 | $36.24 |
| 0430 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 27 | $1,500.00 | $1,431.49 | $1,800.00 | $1,389.80 | $1,500.00 | $2,024.16 |
| 0435 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 1 | $5,000.00 | $5,571.27 | $6,500.00 | $5,409.00 | $10,000 | $3,782.01 |
| 0440 | Electrical power service, remove underground (0639-1620) | AS | 1 | $750.00 | $660.33 | $500.00 | $641.11 | $1,000.00 | $1,391.31 |
| 0445 | Electrical service wire, & install (0639-2-1) | LF | 90 | $10.00 | $12.05 | $15.00 | $11.70 | $20.00 | $6.74 |
| 0450 | Electrical service wire, (0639-2-6) | LF | 30 | $1.00 | $2.27 | $1.00 | $2.20 | $1.00 | $1.21 |
| 0455 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 1 | $4,000.00 | $3,350.38 | $3,500.00 | $3,252.80 | $2,500.00 | $2,117.15 |
| 0460 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $2,000.00 | $3,154.79 | $3,200.00 | $3,062.90 | $4,000.00 | $2,608.27 |
| 0465 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 3,814 | $3.00 | $3.30 | $6.00 | $3.20 | $5.00 | $2.65 |
| 0470 | Lighting conductors, remove & dispose, contractor owns (0715-1-60) | LF | 2,625 | $1.00 | $0.21 | $1.00 | $0.20 | $1.00 | $1.21 |
| 0475 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 1 | $18,500 | $14,675 | $14,000 | $14,248 | $30,000 | $12,574 |
| 0480 | Load center, remove, voltage (0715-7-41) | EACH | 1 | $1,500.00 | $880.44 | $1,000.00 | $854.80 | $1,000.00 | $2,086.96 |
| 0485 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211) | EACH | 2 | $1,500.00 | $1,491.24 | $1,200.00 | $1,447.60 | $1,500.00 | $1,311.50 |
| 0490 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 10' arm length (0715-61321) | EACH | 1 | $12,000 | $8,227.95 | $12,000 | $7,988.30 | $15,000 | $9,649.32 |
| 0495 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 5 | $750.00 | $760.35 | $1,100.00 | $738.20 | $1,000.00 | $1,199.64 |
| 0500 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 2,001 | $30.00 | $60.25 | $48.00 | $58.50 | $35.00 | $48.31 |
| 0505 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 4 | $10,000 | $15,505 | $12,000 | $15,054 | $25,000 | $10,476 |
| 0510 | Signal cable, remove- intersection (0632-7-6) | PI | 3 | $5,000.00 | $2,060.00 | $800.00 | $0.00 | $1,000.00 | $1,565.22 |
| 0515 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 97 | $1,500.00 | $1,354.66 | $1,800.00 | $1,315.20 | $1,500.00 | $2,024.16 |
| 0520 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 4 | $2,000.00 | $2,401.03 | $3,000.00 | $2,331.10 | $4,000.00 | $3,590.58 |
| 0525 | Pull & splice box, install (0635-2-30) | EACH | 4 | $1,000.00 | $886.32 | $1,000.00 | $860.50 | $5,000.00 | $1,095.42 |
| 0530 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 4 | $5,500.00 | $7,980.34 | $6,400.00 | $7,747.90 | $10,000 | $3,782.01 |
| 0535 | Electrical power service, remove underground (0639-1620) | AS | 3 | $750.00 | $583.49 | $500.00 | $566.50 | $1,000.00 | $1,391.31 |
| 0540 | Electrical service wire, & install (0639-2-1) | LF | 684 | $10.00 | $11.64 | $10.00 | $11.30 | $20.00 | $10.87 |
| 0545 | Electrical service wire, (0639-2-6) | LF | 415 | $1.00 | $0.10 | $1.00 | $0.10 | $1.00 | $1.21 |
| 0550 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 4 | $2,000.00 | $2,841.46 | $2,800.00 | $2,758.70 | $4,000.00 | $2,472.20 |
| 0555 | Aluminum signals pole, (0646-1-11) | EACH | 9 | $2,000.00 | $2,197.20 | $1,500.00 | $2,133.20 | $4,500.00 | $2,012.97 |
| 0560 | Aluminum signals pole, furnish install pedestrian detector post (0646-1-12) | EACH | 1 | $1,800.00 | $2,142.30 | $1,800.00 | $2,079.90 | $2,500.00 | $1,315.95 |
| 0565 | Aluminum signals pole, remove (0646-1-60) | EACH | 2 | $750.00 | $583.50 | $250.00 | $566.50 | $1,000.00 | $695.66 |
| 0570 | Steel mast arm assembly, and install, single arm 30' (0649-21-1) | EACH | 3 | $55,000 | $48,579 | $55,000 | $47,165 | $100,000 | $54,257 |
| 0575 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 8 | $1,800.00 | $1,498.34 | $1,800.00 | $1,454.70 | $2,500.00 | $1,675.42 |
| 0580 | Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16) | AS | 1 | $2,000.00 | $1,774.28 | $2,000.00 | $1,772.60 | $3,500.00 | $1,829.52 |
| 0585 | Vehicular traffic signal, remove- poles to remain (0650-1-60) | AS | 2 | $500.00 | $194.57 | $300.00 | $188.90 | $100.00 | $347.83 |
| 0590 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 4 | $1,600.00 | $742.43 | $1,500.00 | $720.80 | $1,200.00 | $952.25 |
| 0595 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 5 | $2,000.00 | $1,575.28 | $1,850.00 | $1,529.40 | $2,000.00 | $1,733.35 |
| 0600 | Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60) | AS | 2 | $500.00 | $97.34 | $250.00 | $94.50 | $300.00 | $463.77 |
| 0605 | Loop detector inductive, F&I, type 9 (0660-1109) | EACH | 1 | $350.00 | $336.60 | $500.00 | $326.80 | $800.00 | $561.83 |
| 0610 | Loop detector inductive, remove- cabinet to remain (0660-1600) | EACH | 1 | $100.00 | $97.23 | $100.00 | $94.40 | $100.00 | $347.83 |
| 0615 | Loop assembly, F&I, type F (0660-2106) | AS | 5 | $1,800.00 | $1,988.00 | $2,600.00 | $1,930.10 | $2,500.00 | $1,995.17 |
| 0620 | Vehicle detection system- furnish & install cabinet equipment (0660-4-11) | EACH | 4 | $6,500.00 | $5,083.15 | $6,500.00 | $4,935.10 | $15,000 | $10,504 |
| 0625 | Vehicle detection system- furnish & install above ground equipment (0660-4-12) | EACH | 4 | $3,500.00 | $2,677.28 | $3,200.00 | $2,599.30 | $8,500.00 | $7,057.14 |
| 0630 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 16 | $500.00 | $331.76 | $600.00 | $322.10 | $800.00 | $493.21 |
| 0635 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 4 | $50.00 | $97.34 | $300.00 | $94.50 | $100.00 | $347.83 |
| 0640 | Traffic controller assembly, furnish & install model 2070 (0670-5140) | AS | 2 | $46,000 | $47,552 | $42,000 | $46,167 | $60,000 | $42,946 |
| 0645 | Traffic controller assembly, remove controller with (0670-5600) | AS | 1 | $1,500.00 | $777.96 | $500.00 | $755.30 | $2,000.00 | $4,323.68 |
| 0650 | Network device, cellular (0684-90102) | EACH | 2 | $1,500.00 | $1,682.40 | $3,500.00 | $1,633.40 | $5,000.00 | $1,765.35 |
| 0655 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 3 | $1,200.00 | $988.70 | $700.00 | $959.90 | $1,000.00 | $1,471.02 |
| 0660 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 3 | $3,200.00 | $2,959.70 | $3,400.00 | $2,873.50 | $6,500.00 | $3,864.17 |
| 0665 | Enhanced highway sign AC powered, F&I ground mount, blank out sign <12 SF (0700-141160) | EACH | 1 | $8,500.00 | $8,101.57 | $15,000 | $7,865.60 | $17,500 | $9,827.96 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of February 26, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.