FDOT contract T4753 bid tabulation

SR 814 (W ATLANTIC BLVD) FROM W OF LAKESIDE DR TO VISTA... Let by Florida DOT on March 25, 2026, Broward, District 4. 3 bids received; low bid $277,277 by Traffico LLC.

Owner
Florida DOT
Letting
25 MAR 2026
Pay items
37
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Traffico LLC$277,277Low
2Aum Construction Inc.$285,285+3.0%
3Jones Benitez Corporation$324,172+17%
FDOT contract T4753: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Traffico LLC2. Aum Construction Inc.3. Jones Benitez Corporation
0005Mobilization (0101-1)LS1$26,197$35,000$15,000
0010Maintenance of traffic (0102-1)DA1$10,901$40,000$32,000
0015Traffic control officer (0102-14)HR16$110.00$80.00$113.00
0020Work zone sign (0102-60)ED2,860$0.25$0.30$0.40
0025Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED11,440$0.10$0.15$0.18
0030Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD1,320$0.10$0.20$0.22
0035Arrow board / advance warning arrow panel (0102-76)ED55$12.00$10.00$10.00
0040Portable changeable message sign, temporary (0102-99)ED138$20.00$18.00$20.00
0045Temporary signalization and maintenance, intersection (0102-104)ED55$7.00$10.00$10.00
0050Temporary traffic detection and maintenance, intersection (0102-107-1)ED55$7.00$10.00$10.00
0055Litter removal (0107-1)ACRE2.77$80.00$100.00$200.00
0060Mowing (0107-2)ACRE1.26$100.00$200.00$350.00
0065Removal of existing concrete (0110-4-10)SY44$80.00$60.00$90.00
0070Concrete sidewalk and driveways, 4" thick (0522-1)SY44$120.00$120.00$200.00
0075Initial contingency amount, DO not bid (0999-25)LS1$15,166$15,166$15,166
0080Conduit, furnish & install, directional bore (0630-2-12)LF560$33.00$35.00$46.00
0085Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH12$1,980.00$1,500.00$2,050.00
0090Electrical power service, F&I, underground, meter by contractor (0639-1122)AS1$6,200.00$7,500.00$10,000
0095Electrical power service, remove underground (0639-1620)AS1$1,500.00$750.00$860.00
0100Electrical service wire, & install (0639-2-1)LF15$30.00$40.00$22.00
0105Electrical service wire, (0639-2-6)LF115$1.00$1.00$0.80
0110Electrical service disconnect, F&I, pole mount (0639-3-11)EACH1$2,850.00$2,500.00$4,900.00
0115Prestressed concrete pole, type P-II service pole (0641-2-12)EACH1$3,150.00$3,000.00$4,100.00
0120Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60)EACH1$2,500.00$750.00$875.00
0125Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12)LF2,321$5.25$3.50$4.60
0130Lighting conductors, remove & dispose, contractor owns (0715-1-60)LF1,220$1.50$0.50$1.80
0135Load center, F&I, secondary voltage (0715-7-11)EACH1$19,000$20,000$22,400
0140Load center, remove, voltage (0715-7-41)EACH1$2,500.00$1,500.00$1,150.00
0145Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211)EACH14$1,420.00$1,200.00$2,180.00
0150Light pole complete, F&I, standard pole standard foundation, 45' mounting height, 12' arm length (0715-61442)EACH1$11,950$10,500$16,400
0155Pole cable distribution system, furnish and install, conventional (0715-500-1)EACH15$915.00$750.00$1,200.00
0160Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI1$11,500$12,000$10,600
0165Signal cable, remove- intersection (0632-7-6)PI1$2,500.00$820.00$1,720.00
0170Span wire assembly, F&I, two point, box or drop box (0634-4153)PI1$22,500$20,000$19,160
0175Traffic controller, modify (0671-2-40)EACH1$19,250$15,000$19,160
0185Internally illuminated sign, furnish & install overhead mount, UP to 12 SF (0700-5-21)EACH2$5,050.00$4,000.00$6,800.00
0190Internally illuminated sign, remove (0700-5-60)EACH2$1,000.00$500.00$720.00
FDOT contract T4753: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of March 25, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy