FDOT contract T6614 bid tabulation
SR 817 (NW 27 AVE) FRM SESAME ST TO DUNAD AVE. Let by Florida DOT on December 3, 2025, Miami-Dade, District 6. 6 bids received; low bid $868,500 by Horsepower Electric, Inc..
- Owner
- Florida DOT
- Letting
- 03 DEC 2025
- Pay items
- 72
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Horsepower Electric, Inc. | $868,500 | Low |
| 2 | Aum Construction Inc. | $869,745 | 0.0% |
| 3 | Weekley Asphalt Paving, Inc. | $893,767 | +3.0% |
| 4 | Florida Engineering & Development Corp | $938,004 | +8.0% |
| 5 | Florida Signal & Lighting Contractors, Inc. | $948,480 | +9.0% |
| 6 | Signal Technology and Installation Corp. | $992,680 | +14% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Horsepower Electric, Inc. | 2. Aum Construction Inc. | 3. Weekley Asphalt Paving, Inc. | 4. Florida Engineering & Development Corp | 5. Florida Signal & Lighting Contractors, Inc. | 6. Signal Technology and Installation Corp. |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $49,710 | $90,000 | $92,370 | $133,440 | $95,000 | $125,457 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $45,000 | $80,000 | $125,000 | $135,440 | $95,000 | $47,393 |
| 0015 | Traffic control officer (0102-14) | HR | 136 | $90.00 | $70.00 | $89.00 | $81.20 | $85.00 | $100.29 |
| 0020 | Work zone sign (0102-60) | ED | 4,185 | $0.40 | $0.30 | $0.22 | $0.22 | $0.25 | $0.30 |
| 0025 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 7,500 | $0.20 | $0.20 | $0.10 | $0.14 | $0.15 | $0.19 |
| 0030 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 1,080 | $0.15 | $0.30 | $0.15 | $0.20 | $0.20 | $0.27 |
| 0035 | Arrow board / advance warning arrow panel (0102-76) | ED | 180 | $12.00 | $9.00 | $5.00 | $6.09 | $8.00 | $8.03 |
| 0040 | Portable changeable message sign, temporary (0102-99) | ED | 328 | $26.00 | $14.00 | $10.00 | $11.67 | $14.00 | $15.38 |
| 0045 | Type III barricade (0102-115) | ED | 480 | $0.60 | $1.00 | $0.35 | $0.46 | $0.90 | $0.61 |
| 0050 | Inlet protection system (0104-18) | EACH | 5 | $100.00 | $250.00 | $165.00 | $136.78 | $300.00 | $130.37 |
| 0055 | Litter removal (0107-1) | ACRE | 1.76 | $100.00 | $500.00 | $10.00 | $412.23 | $500.00 | $130.39 |
| 0060 | Mowing (0107-2) | ACRE | 0.34 | $100.00 | $1,000.00 | $10.00 | $1,275.91 | $2,500.00 | $130.42 |
| 0065 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $8,000.00 | $6,000.00 | $7,900.00 | $5,988.50 | $8,500.00 | $4,813.54 |
| 0070 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $21,000 | $5,332.00 | $22,644 | $29,526 | $35,600 | $22,168 |
| 0075 | Removal of existing concrete (0110-4-10) | SY | 247 | $30.00 | $50.00 | $45.00 | $52.82 | $85.00 | $33.43 |
| 0080 | Tree protection barrier (0110-21) | LF | 278 | $15.00 | $10.00 | $13.00 | $6.22 | $15.00 | $19.56 |
| 0085 | Borrow excavation, truck measure (0120-2-2) | CY | 180.70 | $45.00 | $50.00 | $45.00 | $57.32 | $115.00 | $45.86 |
| 0090 | Regular excavation (3-R projects only) (0120-71) | LS | 1 | $13,200 | $15,000 | $11,250 | $4,942.64 | $6,000.00 | $13,934 |
| 0095 | Type B stabilization (0160-4) | SY | 54 | $36.00 | $20.00 | $69.65 | $23.05 | $39.00 | $37.55 |
| 0100 | Optional base, base group 02 (0285-702) | SY | 54 | $105.00 | $50.00 | $69.00 | $35.49 | $80.00 | $110.53 |
| 0105 | Milling existing asphalt pavement, 1 1/4" avg depth (0327-70-12) | SY | 3,567 | $6.50 | $8.00 | $4.50 | $3.54 | $5.00 | $6.87 |
| 0110 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 4.40 | $780.00 | $500.00 | $450.00 | $497.95 | $520.00 | $823.37 |
| 0115 | Asphalt concrete friction course,traffic C, FC-9.5, PG 76-22 (0337-7-82) | TN | 245.20 | $400.00 | $300.00 | $225.00 | $238.24 | $250.00 | $392.69 |
| 0120 | Concrete class NS, gravity index 400-011 (0400-0-11) | CY | 1.60 | $2,400.00 | $1,500.00 | $3,900.00 | $2,507.13 | $5,500.00 | $2,482.79 |
| 0125 | Pipe handrail - guiderail, aluminum (0515-1-2) | LF | 26 | $260.00 | $250.00 | $125.00 | $126.88 | $300.00 | $167.14 |
| 0130 | Concrete curb & gutter, type F (0520-1-10) | LF | 520 | $85.00 | $45.00 | $58.00 | $53.02 | $60.00 | $86.14 |
| 0135 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 113 | $130.00 | $120.00 | $83.00 | $78.66 | $120.00 | $133.01 |
| 0140 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 70 | $168.00 | $140.00 | $121.00 | $106.82 | $130.00 | $177.35 |
| 0145 | Detectable warnings (0527-2) | SF | 46 | $50.00 | $45.00 | $46.00 | $35.69 | $45.00 | $44.34 |
| 0150 | Fencing, type B, 5.1-6.0, reset existing (0550-10228) | LF | 10 | $50.00 | $50.00 | $200.00 | $25.38 | $120.00 | $267.42 |
| 0155 | Performance turf, sod (0570-1-2) | SY | 250 | $15.00 | $20.00 | $18.00 | $7.94 | $15.00 | $19.56 |
| 0160 | Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130) | LS | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 0165 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 0.24 | $1,300.00 | $5,000.00 | $2,200.00 | $2,233.01 | $1,056.00 | $1,330.56 |
| 0170 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 130 | $0.50 | $5.00 | $3.00 | $3.05 | $0.40 | $1.34 |
| 0175 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 65 | $1.00 | $8.00 | $5.00 | $5.07 | $0.80 | $2.68 |
| 0180 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 0.25 | $325.00 | $3,000.00 | $1,500.00 | $1,522.50 | $264.00 | $1,002.86 |
| 0185 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 1 | $50.00 | $150.00 | $100.00 | $101.50 | $40.00 | $100.29 |
| 0190 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 0.16 | $1,300.00 | $4,000.00 | $2,200.00 | $2,232.99 | $1,056.00 | $1,330.49 |
| 0195 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $47,429 | $47,429 | $47,429 | $47,429 | $47,429 | $47,429 |
| 0200 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 10 | $715.00 | $1,000.00 | $900.00 | $913.50 | $595.00 | $1,111.81 |
| 0205 | Raised pavement marker, type B (0706-1-3) | EACH | 52 | $6.00 | $10.00 | $10.00 | $10.15 | $5.00 | $5.35 |
| 0210 | Painted pavement markings, surface (0710-90) | LS | 1 | $2,100.00 | $3,500.00 | $4,000.00 | $4,060.00 | $1,750.00 | $3,294.60 |
| 0215 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 130 | $3.00 | $8.00 | $7.00 | $7.11 | $2.40 | $2.68 |
| 0220 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 65 | $6.00 | $12.00 | $12.00 | $12.18 | $4.80 | $5.35 |
| 0225 | Thermoplastic, standard, arrow (0711-11170) | EACH | 1 | $100.00 | $250.00 | $150.00 | $152.25 | $80.00 | $133.71 |
| 0230 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 140 | $23.00 | $30.00 | $25.00 | $25.38 | $18.00 | $24.07 |
| 0235 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.24 | $7,100.00 | $9,000.00 | $8,500.00 | $8,627.50 | $5,900.00 | $7,487.80 |
| 0240 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 0.25 | $1,800.00 | $5,000.00 | $4,500.00 | $4,567.50 | $1,500.00 | $2,072.58 |
| 0245 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.16 | $7,100.00 | $9,000.00 | $8,500.00 | $8,627.50 | $5,900.00 | $7,487.75 |
| 0250 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 853 | $30.00 | $30.00 | $35.00 | $35.52 | $31.00 | $40.12 |
| 0255 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 3 | $1,750.00 | $1,500.00 | $1,750.00 | $1,776.25 | $1,750.00 | $2,170.83 |
| 0260 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 2,925 | $2.75 | $3.50 | $3.03 | $3.08 | $3.50 | $4.52 |
| 0265 | Lighting conductors, remove & dispose, contractor owns (0715-1-60) | LF | 2,652 | $0.10 | $1.00 | $0.40 | $0.41 | $1.00 | $2.73 |
| 0270 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211) | EACH | 2 | $1,500.00 | $1,400.00 | $1,612.49 | $1,636.68 | $1,300.00 | $1,706.39 |
| 0275 | Light pole complete, F&I, standard pole special foundation, 40' mounting height, 8' arm length (0715-62311) | EACH | 2 | $14,500 | $13,500 | $13,356 | $13,556 | $8,600.00 | $15,447 |
| 0280 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 6 | $1,000.00 | $750.00 | $1,063.06 | $1,079.01 | $750.00 | $1,293.14 |
| 0285 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 718 | $40.00 | $30.00 | $35.00 | $35.53 | $39.00 | $45.47 |
| 0290 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 1 | $12,500 | $10,000 | $8,177.85 | $8,300.52 | $12,000 | $13,401 |
| 0295 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 24 | $1,750.00 | $1,500.00 | $1,750.00 | $1,776.25 | $1,750.00 | $1,579.45 |
| 0300 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 1 | $3,500.00 | $3,000.00 | $2,316.99 | $2,351.74 | $2,500.00 | $2,614.36 |
| 0305 | Pull & splice box, install (0635-2-30) | EACH | 1 | $1,000.00 | $1,200.00 | $1,160.81 | $1,178.22 | $1,500.00 | $1,648.65 |
| 0310 | Electrical power service, F&I, underground, meter furnished by power company (0639-1121) | AS | 1 | $15,000 | $7,500.00 | $5,381.87 | $5,462.60 | $7,000.00 | $5,514.85 |
| 0315 | Electrical service wire, & install (0639-2-1) | LF | 437 | $10.00 | $10.00 | $8.86 | $8.99 | $8.00 | $7.33 |
| 0320 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $3,500.00 | $3,000.00 | $3,321.55 | $3,371.37 | $2,000.00 | $3,342.66 |
| 0325 | Aluminum signals pole, (0646-1-11) | EACH | 4 | $2,500.00 | $2,500.00 | $2,281.65 | $2,315.88 | $2,000.00 | $4,611.28 |
| 0330 | Steel mast arm assembly, and install, single arm 50' (0649-21-6) | EACH | 1 | $61,000 | $57,500 | $60,000 | $60,900 | $75,000 | $68,629 |
| 0335 | Steel mast arm assembly, and install, single arm 60' (0649-21-10) | EACH | 1 | $76,000 | $75,000 | $70,000 | $71,050 | $85,000 | $80,534 |
| 0340 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 6 | $2,000.00 | $1,800.00 | $1,464.39 | $1,486.36 | $2,000.00 | $1,725.19 |
| 0345 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 4 | $1,000.00 | $1,800.00 | $940.89 | $955.00 | $1,800.00 | $934.73 |
| 0350 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 4 | $400.00 | $450.00 | $378.57 | $384.25 | $350.00 | $421.69 |
| 0355 | Traffic controller assembly, F&I, caltrans W/standard lock (0670-5180) | AS | 1 | $43,500 | $50,000 | $44,047 | $44,707 | $52,000 | $48,523 |
| 0360 | Cellular modem, furnish and install (0684-8-1) | EACH | 1 | $2,500.00 | $2,500.00 | $1,970.22 | $1,999.77 | $2,500.00 | $2,521.45 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of December 3, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.