SR 590 (DREW ST) FROM N OSCEOLA AVE TO US 19. Let by Florida DOT on May 20, 2026, Pinellas, District 7. 6 bids received; low bid $20,715,555 by Russell Engineering, Inc..
- Owner
- Florida DOT
- Letting
- 20 MAY 2026
- Pay items
- 185
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Russell Engineering, Inc. | $20,715,555 | Low |
| 2 | Kamminga & Roodvoets, Inc. | $20,823,233 | +1.0% |
| 3 | Watson Civil Construction, Inc. | $20,956,526 | +1.0% |
| 4 | De Moya Contracting LLC | $22,466,062 | +8.0% |
| 5 | Preferred Materials Inc. | $22,740,122 | +10% |
| 6 | Nelson, David, Construction Co. | $23,382,512 | +13% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Russell Engineering, Inc. | 2. Kamminga & Roodvoets, Inc. | 3. Watson Civil Construction, Inc. | 4. De Moya Contracting LLC | 5. Preferred Materials Inc. | 6. Nelson, David, Construction Co. |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $2,075,013 | $1,828,000 | $2,050,000 | $2,200,000 | $3,010,277 | $3,775,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $2,005,258 | $650,000 | $1,760,000 | $1,500,000 | $1,100,097 | $1,000,000 |
| 0015 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $402,369 | $250,000 | $115,000 | $250,000 | $15,623 | $10,000 |
| 0020 | Pedestrian escort/flagger (0102-5) | HR | 1,000 | $56.13 | $30.00 | $29.00 | $25.00 | $19.41 | $70.00 |
| 0025 | Traffic control officer (0102-14) | HR | 1,000 | $40.00 | $90.00 | $110.00 | $90.00 | $87.04 | $80.00 |
| 0030 | Work zone sign (0102-60) | ED | 112,905 | $0.19 | $0.19 | $0.30 | $0.18 | $0.21 | $0.22 |
| 0035 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 4,094 | $34.00 | $41.36 | $51.00 | $34.00 | $36.99 | $60.00 |
| 0040 | Temporary barrier, relocate, low profile concrete (0102-71-23) | LF | 1,056 | $14.00 | $19.24 | $19.00 | $14.00 | $15.23 | $20.00 |
| 0045 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 381,743 | $0.15 | $0.09 | $0.13 | $0.09 | $0.10 | $0.15 |
| 0050 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 308,460 | $0.04 | $0.04 | $0.06 | $0.03 | $0.04 | $0.05 |
| 0055 | Arrow board / advance warning arrow panel (0102-76) | ED | 3,460 | $4.00 | $4.00 | $5.70 | $4.50 | $4.35 | $6.00 |
| 0060 | Portable changeable message sign, temporary (0102-99) | ED | 11,722 | $9.00 | $9.00 | $12.50 | $9.00 | $9.79 | $11.00 |
| 0065 | Temporary signalization and maintenance, intersection (0102-104) | ED | 10,595 | $14.13 | $14.13 | $25.00 | $14.13 | $15.37 | $20.00 |
| 0070 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 10,595 | $15.13 | $15.01 | $33.00 | $15.01 | $16.33 | $20.00 |
| 0075 | Existing ITS maintenance (0102-112) | DA | 815 | $59.00 | $58.75 | $145.00 | $200.00 | $63.92 | $70.00 |
| 0080 | Type III barricade (0102-115) | ED | 30,410 | $0.35 | $0.35 | $0.47 | $0.23 | $0.38 | $0.30 |
| 0085 | Floating turbidity barrier (0104-11) | LF | 78 | $20.00 | $20.00 | $20.00 | $15.00 | $23.94 | $30.00 |
| 0090 | Inlet protection system (0104-18) | EACH | 67 | $294.00 | $200.00 | $138.00 | $175.00 | $100.10 | $150.00 |
| 0095 | Litter removal (0107-1) | ACRE | 467.68 | $60.00 | $50.00 | $85.00 | $50.00 | $95.65 | $60.00 |
| 0100 | Mowing (0107-2) | ACRE | 315.35 | $40.00 | $75.00 | $190.00 | $50.00 | $141.85 | $60.00 |
| 0105 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $575,013 | $1,850,000 | $328,500 | $125,000 | $1,811,043 | $1,250,000 |
| 0110 | Removal of existing concrete (0110-4-10) | SY | 6,598 | $26.13 | $9.00 | $26.00 | $60.00 | $23.02 | $50.00 |
| 0115 | Mailbox, F&I single (0110-7-1) | EACH | 4 | $445.00 | $500.00 | $320.00 | $500.00 | $621.27 | $300.00 |
| 0120 | Tree root and branch pruning (0110-22) | EACH | 3 | $2,255.00 | $250.00 | $600.00 | $604.00 | $1,332.72 | $2,000.00 |
| 0125 | Regular excavation (0120-1) | CY | 1,755 | $39.09 | $55.00 | $15.00 | $20.00 | $21.85 | $150.00 |
| 0130 | Embankment (0120-6) | CY | 156 | $19.23 | $57.00 | $8.00 | $40.00 | $28.82 | $75.00 |
| 0135 | Type B stabilization (0160-4) | SY | 4,880 | $6.00 | $24.00 | $24.00 | $20.00 | $28.80 | $50.00 |
| 0140 | Optional base, base group 05 (0285-705) | SY | 3,699 | $30.13 | $38.00 | $44.00 | $40.00 | $35.08 | $50.00 |
| 0145 | Milling existing asphalt pavement, 1" avg depth (0327-70-1) | SY | 2,300 | $8.23 | $13.88 | $14.00 | $13.88 | $4.65 | $15.00 |
| 0150 | Milling existing asphalt pavement, 3" avg depth (0327-70-4) | SY | 108,704 | $6.23 | $5.92 | $6.00 | $5.92 | $4.61 | $6.00 |
| 0155 | Milling existing asphalt pavement, 2" avg depth (0327-70-5) | SY | 5,456 | $7.75 | $8.00 | $8.00 | $8.00 | $4.54 | $8.00 |
| 0160 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 13,733.60 | $192.00 | $183.14 | $171.00 | $169.57 | $169.64 | $170.00 |
| 0165 | Asphalt concrete friction course,traffic C, FC-9.5, PG 76-22 (0337-7-82) | TN | 6,338.10 | $233.00 | $258.90 | $241.00 | $239.05 | $259.02 | $240.00 |
| 0170 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 511 | $381.00 | $374.56 | $238.00 | $237.78 | $232.20 | $240.00 |
| 0175 | Inlets, curb, type 9, <10' (0425-1201) | EACH | 5 | $9,255.00 | $7,000.00 | $6,200.00 | $20,000 | $9,187.37 | $8,000.00 |
| 0180 | Inlets, curb, type 9, partial (0425-1205) | EACH | 2 | $5,300.00 | $3,250.00 | $5,500.00 | $10,000 | $9,778.96 | $5,000.00 |
| 0185 | Inlets, curb, type P-1, <10' (0425-1311) | EACH | 7 | $11,855 | $9,250.00 | $8,600.00 | $20,000 | $12,634 | $11,000 |
| 0190 | Inlets, curb, type P-3, <10' (0425-1331) | EACH | 1 | $11,655 | $10,000 | $9,400.00 | $20,000 | $11,884 | $11,000 |
| 0195 | Inlets, curb, type P-4, partial (0425-1345) | EACH | 1 | $6,455.00 | $4,750.00 | $7,500.00 | $15,000 | $9,187.37 | $6,500.00 |
| 0200 | Inlets, curb, type P-5, <10' (0425-1351) | EACH | 27 | $10,923 | $8,750.00 | $7,500.00 | $20,000 | $10,836 | $9,000.00 |
| 0205 | Inlets, curb, type P-5, partial (0425-1355) | EACH | 1 | $5,200.00 | $4,000.00 | $6,700.00 | $20,000 | $8,438.19 | $5,000.00 |
| 0210 | Inlets, curb, type P-6, partial (0425-1365) | EACH | 1 | $4,300.00 | $4,500.00 | $6,400.00 | $20,000 | $8,887.69 | $6,000.00 |
| 0215 | Inlets, curb type J-1, <10' (0425-1411) | EACH | 1 | $17,000 | $15,000 | $11,000 | $20,000 | $18,927 | $20,000 |
| 0220 | Inlets, curb, type J-4, <10' (0425-1441) | EACH | 1 | $17,000 | $15,750 | $13,000 | $25,000 | $19,376 | $20,000 |
| 0225 | Inlets, DT bot, type F, <10' (0425-1561) | EACH | 2 | $9,000.00 | $7,500.00 | $5,700.00 | $15,000 | $7,660.08 | $7,000.00 |
| 0230 | Inlets, gutter, type V, <10' (0425-1711) | EACH | 4 | $9,600.00 | $8,000.00 | $5,900.00 | $15,000 | $7,515.48 | $8,000.00 |
| 0235 | Manholes, P-8, <10' (0425-2-61) | EACH | 4 | $10,255 | $8,500.00 | $6,400.00 | $15,000 | $9,337.20 | $8,000.00 |
| 0240 | Pipe culvert,optional material,round, 15"S/CD (0430-175115) | LF | 54 | $624.00 | $130.00 | $159.00 | $250.00 | $197.96 | $125.00 |
| 0245 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 2,261 | $103.00 | $187.00 | $184.00 | $250.00 | $176.56 | $175.00 |
| 0250 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 1,733 | $137.00 | $196.00 | $207.00 | $300.00 | $235.13 | $250.00 |
| 0255 | Pipe culvert, opt material, round, 30"S/CD (0430-175130) | LF | 1,900 | $170.00 | $241.00 | $244.00 | $400.00 | $328.38 | $400.00 |
| 0257 | Pipe filling and plugging- place out of service (0430-830) | CY | 28.70 | $323.00 | $600.00 | $720.00 | $600.00 | $523.39 | $1,000.00 |
| 0260 | Chemical grout repair, pipe, test, 18" (0432-3-2) | EACH | 7 | $1,255.00 | $650.00 | $740.00 | $2,500.00 | $979.25 | $2,000.00 |
| 0265 | Chemical grout repair, pipe, test, >66" (0432-3-12) | EACH | 7 | $3,013.00 | $4,600.00 | $2,100.00 | $5,000.00 | $2,176.12 | $2,500.00 |
| 0270 | Chemical grout repair, box culvert, non-test, 6' X 8' (0432-5-1) | EACH | 47 | $3,213.00 | $3,200.00 | $3,000.00 | $6,000.00 | $3,100.97 | $2,500.00 |
| 0275 | Chemical grout repair, box culvert, non-test, 6' X 9' (0432-5-2) | EACH | 5 | $3,655.00 | $5,275.00 | $3,100.00 | $7,500.00 | $3,454.59 | $2,500.00 |
| 0280 | Trench drain, standard (0436-1-1) | LF | 12 | $315.00 | $500.00 | $390.00 | $1,000.00 | $1,236.56 | $650.00 |
| 0285 | Pipe handrail - guiderail, aluminum (0515-1-2) | LF | 6 | $275.00 | $300.00 | $585.00 | $200.00 | $256.78 | $400.00 |
| 0290 | Concrete curb & gutter, type E (0520-1-7) | LF | 695 | $42.00 | $63.00 | $38.00 | $50.00 | $53.08 | $40.00 |
| 0295 | Concrete curb & gutter, type F (0520-1-10) | LF | 7,515 | $36.00 | $55.00 | $37.00 | $50.00 | $51.88 | $40.00 |
| 0300 | Concrete traffic separator, special- variable width (0520-70) | SY | 1,148 | $196.00 | $218.00 | $161.00 | $150.00 | $193.00 | $150.00 |
| 0305 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 2,322 | $61.55 | $63.00 | $79.00 | $150.00 | $68.80 | $75.00 |
| 0310 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 2,278 | $92.00 | $90.00 | $94.00 | $150.00 | $114.69 | $95.00 |
| 0315 | Concrete slope pavement, 6", reinforced (0524-2-49) | SY | 5 | $626.55 | $156.00 | $327.00 | $300.00 | $310.95 | $120.00 |
| 0320 | Pavers, architectural, remove existing and reinstall (0526-1101) | SY | 204 | $108.55 | $200.00 | $89.00 | $200.00 | $198.80 | $185.00 |
| 0325 | Detectable warnings (0527-2) | SF | 1,966 | $32.00 | $30.00 | $47.00 | $60.00 | $31.42 | $30.00 |
| 0330 | Performance turf, sod (0570-1-2) | SY | 2,640 | $11.23 | $18.00 | $8.40 | $8.00 | $5.03 | $12.00 |
| 0335 | Performance turf, sod and shoulder treatment index (0570-1-3) | SY | 206 | $36.55 | $24.00 | $13.50 | $10.00 | $6.80 | $15.00 |
| 0340 | Raised pavement marker, type B (0706-1-3) | EACH | 848 | $4.03 | $4.00 | $4.30 | $4.00 | $4.35 | $5.00 |
| 0345 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 2.03 | $2,013.00 | $2,000.00 | $2,150.00 | $2,000.00 | $2,171.84 | $2,300.00 |
| 0350 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 1.22 | $509.00 | $500.00 | $535.00 | $500.00 | $540.46 | $570.00 |
| 0355 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 5.18 | $2,013.00 | $2,000.00 | $2,150.00 | $2,000.00 | $2,172.76 | $2,300.00 |
| 0360 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.02 | $755.00 | $750.00 | $701.00 | $750.00 | $709.57 | $850.00 |
| 0365 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $150,000 | $150,000 | $150,000 | $150,000 | $150,000 | $150,000 |
| 0370 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 117 | $469.00 | $460.00 | $585.00 | $460.00 | $500.51 | $600.00 |
| 0375 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 22 | $2,113.00 | $2,100.00 | $2,600.00 | $2,100.00 | $2,284.92 | $2,600.00 |
| 0380 | Single column ground sign assembly, relocate (0700-1500) | EACH | 21 | $555.00 | $550.00 | $320.00 | $550.00 | $598.43 | $320.00 |
| 0385 | Single column ground sign assembly, remove (0700-1600) | EACH | 17 | $25.13 | $25.00 | $65.00 | $25.00 | $27.20 | $65.00 |
| 0390 | Multi-column ground sign assembly, relocate (0700-2500) | EACH | 1 | $7,513.00 | $7,500.00 | $1,750.00 | $7,500.00 | $8,160.45 | $1,750.00 |
| 0395 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 76 | $255.00 | $250.00 | $350.00 | $250.00 | $272.01 | $350.00 |
| 0400 | Sign panel, furnish & install ground mount, 12-20 SF (0700-3102) | EACH | 10 | $455.00 | $450.00 | $750.00 | $450.00 | $489.63 | $750.00 |
| 0405 | Sign panel, furnish & install ground mount, 21-30 SF (0700-3103) | EACH | 3 | $903.00 | $900.00 | $1,300.00 | $900.00 | $979.25 | $1,300.00 |
| 0410 | Sign panel, furnish & install ground mount, 31-50 SF (0700-3104) | EACH | 2 | $1,103.00 | $1,100.00 | $1,800.00 | $1,100.00 | $1,196.87 | $1,800.00 |
| 0415 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 2 | $1,203.00 | $1,200.00 | $1,000.00 | $1,200.00 | $1,305.67 | $1,000.00 |
| 0420 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 94 | $11.00 | $10.00 | $75.00 | $10.00 | $10.88 | $75.00 |
| 0425 | Sign panel, remove, 12-20 SF (0700-3602) | EACH | 10 | $21.00 | $20.00 | $225.00 | $20.00 | $21.76 | $225.00 |
| 0430 | Sign panel, remove, 21-30 SF (0700-3603) | EACH | 3 | $51.00 | $50.00 | $150.00 | $50.00 | $54.40 | $150.00 |
| 0435 | Sign panel, remove, 31-50 SF (0700-3604) | EACH | 2 | $103.00 | $100.00 | $300.00 | $100.00 | $108.81 | $300.00 |
| 0440 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 65 | $81.00 | $80.00 | $115.00 | $80.00 | $87.04 | $120.00 |
| 0445 | Enhanced highway sign solar powered, F&I ground mount, W/eds, UP to 12 SF of static sign panels (0700-142131) | EACH | 2 | $11,009 | $11,000 | $10,500 | $11,000 | $11,969 | $10,500 |
| 0450 | Tubular marker, 36" white post (0704-1-3) | EACH | 15 | $213.00 | $175.00 | $227.00 | $175.00 | $190.41 | $240.00 |
| 0455 | Tubular marker, 36" yellow (0704-1-4) | EACH | 18 | $213.00 | $175.00 | $227.00 | $175.00 | $190.41 | $240.00 |
| 0460 | Object marker, type 1 (0705-10-1) | EACH | 37 | $275.00 | $250.00 | $294.00 | $250.00 | $272.01 | $310.00 |
| 0465 | Raised pavement marker, type B (0706-1-3) | EACH | 2,995 | $4.03 | $4.00 | $4.30 | $4.00 | $4.35 | $5.00 |
| 0470 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 326 | $4.03 | $4.00 | $4.30 | $4.00 | $4.35 | $5.00 |
| 0475 | Painted pavement markings, surface (0710-90) | LS | 1 | $109,000 | $100,759 | $100,000 | $125,000 | $141,586 | $115,000 |
| 0480 | Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102) | GM | 0.12 | $6,655.00 | $6,656.00 | $6,950.00 | $6,656.00 | $7,008.47 | $7,500.00 |
| 0485 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 9,771 | $3.03 | $3.00 | $3.25 | $3.00 | $3.26 | $3.50 |
| 0490 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 270 | $4.55 | $4.50 | $4.85 | $4.50 | $4.90 | $5.10 |
| 0495 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 2,281 | $6.03 | $6.00 | $6.45 | $6.00 | $6.53 | $7.00 |
| 0500 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 1.00 | $1,880.00 | $1,875.00 | $2,010.00 | $1,875.00 | $2,034.01 | $2,200.00 |
| 0505 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 23 | $113.00 | $110.00 | $119.00 | $110.00 | $119.69 | $125.00 |
| 0510 | Thermoplastic, standard, arrow (0711-11170) | EACH | 82 | $53.13 | $53.00 | $57.00 | $53.00 | $57.67 | $60.00 |
| 0515 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 645 | $4.23 | $4.20 | $4.55 | $4.20 | $4.57 | $5.00 |
| 0520 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.56 | $1,880.00 | $1,875.00 | $2,020.00 | $1,875.00 | $2,032.85 | $2,200.00 |
| 0525 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 7,318 | $15.36 | $15.25 | $16.50 | $15.25 | $16.59 | $18.00 |
| 0530 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 58 | $203.00 | $200.00 | $215.00 | $200.00 | $217.61 | $225.00 |
| 0535 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 56 | $85.55 | $85.00 | $92.00 | $85.00 | $92.49 | $100.00 |
| 0540 | Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101) | GM | 0.46 | $8,509.00 | $8,500.00 | $9,000.00 | $8,500.00 | $9,106.85 | $9,600.00 |
| 0545 | Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131) | GM | 0.17 | $2,169.00 | $2,125.00 | $2,300.00 | $2,125.00 | $2,298.60 | $2,400.00 |
| 0550 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 8.10 | $5,255.00 | $5,250.00 | $5,650.00 | $5,250.00 | $5,712.31 | $6,000.00 |
| 0555 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.05 | $7,009.00 | $7,000.00 | $7,000.00 | $7,000.00 | $7,052.22 | $8,000.00 |
| 0560 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 5.03 | $1,313.00 | $1,313.00 | $1,410.00 | $1,313.00 | $1,427.20 | $1,500.00 |
| 0565 | Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133) | GM | 0.08 | $2,655.00 | $2,626.00 | $2,550.00 | $2,626.00 | $2,564.23 | $3,000.00 |
| 0570 | Thermoplastic, standard other surfaces, white, 6", 6-10 dotted managed lane marking (0711-16171) | GM | 0.02 | $2,513.00 | $2,500.00 | $1,800.00 | $2,500.00 | $1,813.33 | $3,000.00 |
| 0575 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 7.32 | $5,255.00 | $5,250.00 | $5,650.00 | $5,250.00 | $5,708.41 | $6,000.00 |
| 0580 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 1.15 | $1,313.00 | $1,313.00 | $1,420.00 | $1,313.00 | $1,419.90 | $1,500.00 |
| 0585 | Green-colored pavement markings, bike lane (0714-10) | SF | 1,254 | $7.55 | $7.40 | $15.00 | $17.60 | $8.05 | $8.50 |
| 0590 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 4.39 | $5,043.00 | $5,042.26 | $4,150.00 | $5,043.00 | $5,487.53 | $5,200.00 |
| 0595 | Itsfm location documentation- intersection (0611-2-1) | EACH | 12 | $3,675.00 | $3,673.64 | $3,000.00 | $3,674.00 | $3,997.14 | $3,800.00 |
| 0600 | Conduit, furnish & install, open trench (0630-2-11) | LF | 2,123 | $8.00 | $7.94 | $26.50 | $8.00 | $8.64 | $8.25 |
| 0605 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 26,147 | $38.00 | $37.97 | $53.00 | $50.00 | $41.31 | $40.00 |
| 0610 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 10 | $21,855 | $21,836 | $16,500 | $21,836 | $23,759 | $23,000 |
| 0615 | Signal cable, remove- intersection (0632-7-6) | PI | 8 | $800.00 | $797.17 | $755.00 | $798.00 | $867.37 | $825.00 |
| 0620 | Fiber optic cable, F&I, underground, 97 - 144 fibers (0633-1124) | LF | 24,954 | $6.85 | $6.84 | $5.75 | $7.00 | $7.44 | $7.10 |
| 0625 | Fiber optic connection, install, splice (0633-2-31) | EACH | 88 | $65.00 | $64.83 | $54.00 | $65.00 | $70.54 | $67.00 |
| 0630 | Fiber optic connection hardware, F&I, splice enclosure (0633-3-11) | EACH | 11 | $2,023.00 | $2,016.90 | $1,600.00 | $2,017.00 | $2,194.51 | $2,100.00 |
| 0635 | Fiber optic connection hardware, F&I, splice tray (0633-3-12) | EACH | 11 | $80.00 | $79.24 | $60.00 | $79.00 | $86.22 | $82.00 |
| 0640 | Fiber optic connection hardware, F&I, preterminated patch panel (0633-3-15) | EACH | 12 | $3,674.00 | $3,673.64 | $3,050.00 | $3,675.00 | $3,997.14 | $3,800.00 |
| 0645 | Fiber optic cable locator (0633-6) | DA | 815 | $135.00 | $134.64 | $103.00 | $135.00 | $146.50 | $140.00 |
| 0650 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 22 | $2,333.00 | $2,331.77 | $2,000.00 | $2,332.00 | $2,537.10 | $2,500.00 |
| 0655 | Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13) | EACH | 13 | $5,197.00 | $5,196.55 | $7,400.00 | $5,197.00 | $5,654.16 | $5,500.00 |
| 0660 | Pull & splice box, F&I, 17" X 30" cover size (0635-2-14) | EACH | 136 | $1,659.00 | $1,658.64 | $2,900.00 | $1,659.00 | $1,804.70 | $1,800.00 |
| 0665 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 7 | $5,798.00 | $5,797.48 | $8,700.00 | $5,798.00 | $6,308.00 | $6,000.00 |
| 0670 | Electrical power service, remove underground (0639-1620) | AS | 1 | $839.00 | $838.40 | $565.00 | $838.00 | $912.23 | $880.00 |
| 0675 | Electrical service wire, & install (0639-2-1) | LF | 777 | $9.85 | $9.84 | $7.60 | $10.00 | $10.71 | $10.50 |
| 0680 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 3 | $1,955.00 | $1,946.06 | $3,220.00 | $1,950.00 | $2,117.43 | $2,100.00 |
| 0685 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 10 | $2,021.00 | $2,020.68 | $2,800.00 | $2,021.00 | $2,198.62 | $2,100.00 |
| 0690 | Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60) | EACH | 1 | $1,565.00 | $1,564.04 | $755.00 | $1,564.00 | $1,701.77 | $1,700.00 |
| 0695 | Prestressed concrete pole, shallow pole removal- pole 30' and greater (0641-2-70) | EACH | 2 | $5,092.00 | $5,091.15 | $3,400.00 | $5,091.00 | $5,539.48 | $5,300.00 |
| 0700 | Prestressed concrete pole, complete pole removal- pole 30' and greater (0641-2-80) | EACH | 10 | $18,775 | $18,774 | $4,520.00 | $18,775 | $20,427 | $20,000 |
| 0705 | Aluminum signals pole, (0646-1-11) | EACH | 40 | $2,655.00 | $2,645.03 | $2,250.00 | $2,645.00 | $2,877.95 | $2,800.00 |
| 0710 | Aluminum signals pole, furnish install pedestrian detector post (0646-1-12) | EACH | 3 | $2,213.00 | $2,209.30 | $2,200.00 | $2,209.00 | $2,403.85 | $2,300.00 |
| 0715 | Aluminum signals pole, remove (0646-1-60) | EACH | 19 | $101.55 | $101.23 | $565.00 | $101.00 | $110.14 | $105.00 |
| 0720 | Steel mast arm assembly, and install, single arm 30' (0649-21-1) | EACH | 10 | $52,400 | $52,392 | $32,000 | $60,000 | $57,006 | $54,000 |
| 0725 | Steel mast arm assembly, and install, double arm 30'-30' (0649-21-2) | EACH | 1 | $78,169 | $78,157 | $58,100 | $90,000 | $85,039 | $81,000 |
| 0730 | Steel mast arm assembly, and install, single arm 40' (0649-21-3) | EACH | 1 | $63,000 | $62,913 | $63,000 | $75,000 | $68,453 | $65,000 |
| 0735 | Steel mast arm assembly, and install, single arm 50' (0649-21-6) | EACH | 7 | $67,655 | $67,621 | $73,000 | $78,000 | $73,576 | $70,000 |
| 0740 | Steel mast arm assembly, and install, single arm 70' (0649-21-15) | EACH | 2 | $88,080 | $88,078 | $88,000 | $100,000 | $95,834 | $91,000 |
| 0745 | Steel mast arm assembly, and install, single arm 78' (0649-21-21) | EACH | 1 | $126,855 | $126,845 | $108,000 | $150,000 | $138,015 | $132,000 |
| 0750 | Steel mast arm assembly, remove, shallow foundation- bolt on attachment (0649-26-3) | EACH | 1 | $4,180.00 | $4,179.26 | $3,400.00 | $4,179.00 | $4,547.28 | $4,400.00 |
| 0755 | Steel mast arm assembly, remove, deep foundation- bolt on attachment (0649-26-5) | EACH | 3 | $8,022.00 | $8,021.60 | $3,400.00 | $8,022.00 | $8,727.98 | $8,300.00 |
| 0760 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 50 | $1,644.00 | $1,643.63 | $1,425.00 | $1,644.00 | $1,788.37 | $1,700.00 |
| 0765 | Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16) | AS | 7 | $2,018.00 | $2,017.90 | $1,820.00 | $2,018.00 | $2,195.60 | $2,100.00 |
| 0770 | Vehicular traffic signal, remove- poles to remain (0650-1-60) | AS | 4 | $344.00 | $343.02 | $188.00 | $343.00 | $373.23 | $360.00 |
| 0775 | Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- black with reflect border (0650-2102) | EACH | 8 | $269.00 | $268.04 | $347.00 | $268.00 | $291.64 | $280.00 |
| 0780 | Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109) | EACH | 16 | $240.00 | $239.50 | $430.00 | $240.00 | $260.59 | $250.00 |
| 0785 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 30 | $937.13 | $937.07 | $777.00 | $937.00 | $1,019.59 | $970.00 |
| 0790 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 10 | $1,698.00 | $1,697.04 | $1,700.00 | $1,697.00 | $1,846.48 | $1,850.00 |
| 0795 | Midblock crosswalk: rec rapid flashing beacon, solar, sign assembly- back-back accessible detector (0654-2-28) | AS | 2 | $11,715 | $11,714 | $8,600.00 | $11,714 | $12,746 | $12,100 |
| 0800 | Midblock crosswalk: hybrid beacon assembly, & install complete assembly (0654-3-10) | AS | 4 | $3,728.00 | $3,727.18 | $1,900.00 | $3,727.00 | $4,055.39 | $4,000.00 |
| 0805 | Loop detector inductive, F&I, type 9 (0660-1109) | EACH | 39 | $532.00 | $531.54 | $370.00 | $532.00 | $578.35 | $550.00 |
| 0810 | Loop detector inductive, F&I, type 10 (0660-1110) | EACH | 12 | $561.00 | $560.40 | $440.00 | $560.00 | $609.75 | $580.00 |
| 0815 | Loop assembly- F&I, type A (0660-2101) | AS | 96 | $1,750.00 | $1,749.65 | $2,200.00 | $1,750.00 | $1,903.72 | $1,850.00 |
| 0820 | Vehicle detection system- furnish & install cabinet equipment (0660-4-11) | EACH | 12 | $13,172 | $13,172 | $29,500 | $13,172 | $14,332 | $13,600 |
| 0825 | Vehicle detection system- furnish & install above ground equipment (0660-4-12) | EACH | 43 | $6,200.69 | $6,200.61 | $5,900.00 | $6,201.00 | $6,746.63 | $6,400.00 |
| 0830 | Vehicle detection system- adjust/modify above ground equipment (0660-4-52) | EACH | 2 | $1,538.00 | $1,537.64 | $1,600.00 | $1,538.00 | $1,673.05 | $1,600.00 |
| 0835 | Signal priority and preemption system, F&I, optical, cabinet electronics (0663-1111) | EACH | 3 | $8,131.00 | $8,130.06 | $8,250.00 | $8,130.00 | $8,845.99 | $8,400.00 |
| 0840 | Signal priority and preemption system, F&I, optical, detector (0663-1112) | EACH | 1 | $5,161.00 | $5,160.65 | $4,800.00 | $5,161.00 | $5,615.09 | $5,400.00 |
| 0845 | Signal priority & preemption system, adjust/modify (0663-1500) | EACH | 1 | $885.00 | $884.73 | $1,100.00 | $885.00 | $962.64 | $925.00 |
| 0850 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 75 | $324.55 | $324.46 | $407.00 | $325.00 | $353.03 | $335.00 |
| 0855 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 24 | $56.55 | $56.35 | $94.00 | $57.00 | $61.31 | $60.00 |
| 0860 | Traffic controller assembly, F&I, NEMA W/standard lock (0670-5160) | AS | 10 | $52,313 | $52,312 | $54,000 | $52,312 | $56,919 | $54,000 |
| 0865 | Traffic controller assembly, F&I, NEMA W/standard lock, 1 preemption (0670-5161) | AS | 2 | $53,972 | $53,971 | $54,000 | $53,972 | $58,724 | $56,000 |
| 0870 | Traffic controller assembly, F&I, NEMA W/standard lock, 2 preemption (0670-5162) | AS | 1 | $54,239 | $54,238 | $54,000 | $54,238 | $59,015 | $56,000 |
| 0875 | Traffic controller assembly, remove controller with (0670-5600) | AS | 11 | $1,066.00 | $1,065.86 | $755.00 | $1,066.00 | $1,159.72 | $1,100.00 |
| 0880 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 11 | $5,214.00 | $5,213.40 | $8,000.00 | $5,213.00 | $5,672.49 | $5,400.00 |
| 0885 | Cellular modem, relocate (0684-8-4) | EACH | 2 | $968.00 | $967.48 | $930.00 | $968.00 | $1,052.68 | $1,000.00 |
| 0890 | Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13) | EACH | 13 | $15,900 | $15,898 | $18,100 | $15,900 | $17,298 | $17,000 |
| 0895 | Uninterruptible power supply, remove- pole/cabinet remains (0685-1-60) | EACH | 1 | $624.00 | $623.29 | $1,150.00 | $623.00 | $678.18 | $650.00 |
| 0900 | Single column ground sign assembly, remove (0700-1600) | EACH | 2 | $333.00 | $307.77 | $190.00 | $308.00 | $334.87 | $320.00 |
| 0905 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 31 | $921.00 | $920.46 | $995.00 | $921.00 | $1,001.52 | $950.00 |
| 0910 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 2 | $208.00 | $207.95 | $189.00 | $208.00 | $226.26 | $215.00 |
| 0915 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 40 | $4,393.00 | $4,392.73 | $3,150.00 | $4,393.00 | $4,779.55 | $4,600.00 |
| 0920 | Internally illuminated sign, remove (0700-5-60) | EACH | 17 | $857.00 | $856.85 | $188.00 | $857.00 | $932.30 | $890.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of May 20, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.