| 0005 | Mobilization (0101-1) | LS | 1 | $35,965 | $84,160 | $92,696 | $63,508 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $4,000.00 | $59,654 | $58,561 | $93,283 |
| 0015 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $1,000.00 | $98.58 | $3,263.87 | $13,948 |
| 0020 | Work zone sign (0102-60) | ED | 3,075 | $0.27 | $0.78 | $0.54 | $0.36 |
| 0025 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 1,925 | $0.13 | $0.21 | $0.14 | $0.17 |
| 0030 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 3,000 | $0.12 | $0.12 | $0.08 | $0.09 |
| 0035 | Arrow board / advance warning arrow panel (0102-76) | ED | 150 | $6.50 | $8.64 | $6.02 | $8.52 |
| 0040 | Portable changeable message sign, temporary (0102-99) | ED | 328 | $13.00 | $19.00 | $13.25 | $14.20 |
| 0045 | Temporary signalization and maintenance, intersection (0102-104) | ED | 150 | $20.00 | $25.69 | $42.16 | $21.47 |
| 0050 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 150 | $20.00 | $25.69 | $36.14 | $28.96 |
| 0055 | Existing ITS maintenance (0102-112) | DA | 150 | $135.94 | $60.50 | $145.77 | $156.25 |
| 0060 | Sediment barrier (0104-10-3) | LF | 668 | $5.00 | $4.00 | $7.85 | $9.26 |
| 0065 | Litter removal (0107-1) | ACRE | 0.55 | $100.00 | $463.16 | $4,457.36 | $3,551.14 |
| 0070 | Mowing (0107-2) | ACRE | 0.55 | $100.00 | $1,190.44 | $4,457.36 | $3,551.14 |
| 0075 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $30,000 | $28,665 | $30,296 | $46,376 |
| 0080 | Removal of existing concrete (0110-4-10) | SY | 120 | $70.00 | $34.49 | $90.99 | $107.29 |
| 0085 | Embankment (0120-6) | CY | 57 | $20.00 | $83.64 | $102.33 | $120.65 |
| 0090 | Regular excavation (3-R projects only) (0120-71) | LS | 1 | $15,000 | $1,401.13 | $3,657.09 | $4,312.06 |
| 0095 | Optional base, base group 09 (0285-709) | SY | 88 | $70.00 | $82.49 | $149.53 | $176.31 |
| 0100 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 1,188 | $23.00 | $19.55 | $10.00 | $26.02 |
| 0105 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 105 | $480.00 | $373.98 | $404.54 | $644.28 |
| 0110 | Concrete curb, type D (0520-2-4) | LF | 277 | $30.00 | $37.63 | $48.50 | $57.19 |
| 0115 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 149 | $76.00 | $64.14 | $180.40 | $212.71 |
| 0120 | Detectable warnings (0527-2) | SF | 160 | $35.00 | $25.00 | $39.85 | $46.99 |
| 0125 | Performance turf, sod (0570-1-2) | SY | 85 | $6.00 | $18.77 | $16.73 | $19.73 |
| 0130 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $19,000 | $19,000 | $19,000 | $19,000 |
| 0135 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 4 | $432.00 | $700.00 | $843.29 | $568.18 |
| 0140 | Single column ground sign assembly, relocate (0700-1500) | EACH | 4 | $162.00 | $500.00 | $481.88 | $213.07 |
| 0145 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 8 | $129.60 | $150.00 | $132.52 | $113.64 |
| 0150 | Raised pavement marker, type B (0706-1-3) | EACH | 29 | $7.56 | $7.00 | $6.02 | $7.10 |
| 0155 | Painted pavement markings, surface (0710-90) | LS | 1 | $3,031.56 | $2,807.00 | $5,421.14 | $3,125.00 |
| 0160 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 549 | $3.47 | $3.21 | $7.23 | $5.68 |
| 0165 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 24 | $5.21 | $4.82 | $12.05 | $8.52 |
| 0170 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 63 | $6.93 | $6.42 | $14.46 | $11.36 |
| 0175 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 252 | $17.33 | $16.05 | $21.68 | $21.31 |
| 0180 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 1 | $334.80 | $310.00 | $421.64 | $710.23 |
| 0185 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.08 | $9,315.00 | $8,414.63 | $8,227.20 | $10,653 |
| 0190 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 0.01 | $2,329.56 | $2,696.25 | $3,312.50 | $3,551.14 |
| 0195 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.08 | $8,262.00 | $7,373.49 | $8,128.07 | $11,364 |
| 0200 | Itsfm location documentation- intersection (0611-2-1) | EACH | 1 | $3,950.64 | $4,568.66 | $3,776.73 | $4,048.30 |
| 0205 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 135 | $25.49 | $89.67 | $32.53 | $226.92 |
| 0210 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 1 | $7,187.95 | $14,837 | $8,185.92 | $9,541.56 |
| 0215 | Fiber optic cable locator (0633-6) | DA | 150 | $135.00 | $60.26 | $177.09 | $156.25 |
| 0220 | Pull & splice box, F&I, 17" X 30" cover size (0635-2-14) | EACH | 8 | $3,807.32 | $1,512.72 | $2,383.11 | $1,951.95 |
| 0225 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 1 | $6,476.12 | $10,840 | $5,903.01 | $4,269.77 |
| 0230 | Aluminum signals pole, (0646-1-11) | EACH | 8 | $910.57 | $2,951.26 | $3,500.26 | $3,919.83 |
| 0235 | Aluminum signals pole, remove (0646-1-60) | EACH | 7 | $5,892.70 | $770.41 | $210.82 | $1,025.00 |
| 0240 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 8 | $989.66 | $1,002.92 | $1,328.12 | $1,169.94 |
| 0245 | Loop assembly, F&I, type F (0660-2106) | AS | 2 | $3,811.43 | $3,013.92 | $2,317.84 | $3,404.77 |
| 0250 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 8 | $352.92 | $503.80 | $600.87 | $675.98 |