FDOT contract T7587 bid tabulation
SR 597 (N DALE MABRY HWY) FROM N OF W SOUTH AVE TO N OF W... Let by Florida DOT on May 20, 2026, Hillsborough, District 7. 5 bids received; low bid $7,418,953 by Hubbard Construction Company.
- Owner
- Florida DOT
- Letting
- 20 MAY 2026
- Pay items
- 155
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Hubbard Construction Company | $7,418,953 | Low |
| 2 | C.W. Roberts Contracting, Inc. | $7,469,177 | +1.0% |
| 3 | Preferred Materials Inc. | $8,978,340 | +21% |
| 4 | Ajax Paving Industries of Florida LLC | $10,788,825 | +45% |
| 5 | Superior Asphalt, Inc. | $12,612,001 | +70% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Hubbard Construction Company | 2. C.W. Roberts Contracting, Inc. | 3. Preferred Materials Inc. | 4. Ajax Paving Industries of Florida LLC | 5. Superior Asphalt, Inc. |
|---|---|---|---|---|---|---|---|---|
| 0005 | Concrete class IV, bridge substructure (0400-4-5) | CY | 76.60 | $2,457.05 | $2,330.00 | $2,347.84 | $2,709.23 | $7,200.00 |
| 0010 | Reinforcing steel- bridge substructure (0415-1-5) | LB | 21,006 | $6.37 | $6.05 | $6.08 | $3.25 | $6.65 |
| 0015 | Mobilization (0101-1) | LS | 1 | $397,113 | $819,000 | $698,648 | $690,000 | $850,000 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $237,800 | $343,000 | $640,726 | $680,000 | $665,121 |
| 0025 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $20,013 | $30,300 | $47,089 | $120,163 | $44,500 |
| 0030 | Pedestrian escort/flagger (0102-5) | HR | 201 | $38.68 | $47.75 | $29.76 | $108.44 | $60.00 |
| 0035 | Traffic control officer (0102-14) | HR | 1,512 | $93.03 | $88.25 | $8.00 | $113.79 | $115.00 |
| 0040 | Work zone sign (0102-60) | ED | 20,668 | $0.21 | $0.20 | $0.20 | $0.21 | $0.25 |
| 0045 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 1,404 | $42.22 | $39.45 | $40.55 | $49.69 | $45.50 |
| 0050 | Temporary barrier, relocate, low profile concrete (0102-71-23) | LF | 264 | $20.00 | $18.70 | $19.21 | $23.54 | $21.50 |
| 0055 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 41,919 | $0.11 | $0.10 | $0.11 | $0.11 | $0.15 |
| 0060 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 17,473 | $0.04 | $0.05 | $0.04 | $0.04 | $0.05 |
| 0065 | Arrow board / advance warning arrow panel (0102-76) | ED | 496 | $4.44 | $4.15 | $4.27 | $4.33 | $4.80 |
| 0070 | Portable changeable message sign, temporary (0102-99) | ED | 790 | $10.00 | $9.35 | $9.60 | $9.75 | $10.00 |
| 0075 | Temporary signalization and maintenance, intersection (0102-104) | ED | 705 | $6.91 | $17.05 | $6.64 | $14.90 | $16.50 |
| 0080 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 675 | $28.92 | $17.05 | $27.78 | $8.94 | $10.00 |
| 0085 | Existing ITS maintenance (0102-112) | DA | 225 | $143.72 | $106.00 | $138.03 | $200.48 | $225.00 |
| 0090 | Type III barricade (0102-115) | ED | 990 | $0.39 | $0.35 | $0.37 | $0.38 | $0.45 |
| 0095 | Inlet protection system (0104-18) | EACH | 92 | $104.22 | $377.00 | $98.18 | $151.53 | $150.00 |
| 0100 | Litter removal (0107-1) | ACRE | 268.32 | $56.91 | $67.85 | $64.19 | $80.42 | $62.50 |
| 0105 | Mowing (0107-2) | ACRE | 166.52 | $129.15 | $115.00 | $103.41 | $80.42 | $141.75 |
| 0110 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $230,255 | $30,500 | $195,425 | $89,765 | $250,000 |
| 0115 | Removal of existing concrete (0110-4-10) | SY | 842 | $47.21 | $62.25 | $45.35 | $82.04 | $51.50 |
| 0120 | Regular excavation (0120-1) | CY | 1,710.80 | $30.62 | $10.25 | $29.41 | $39.20 | $33.35 |
| 0125 | Embankment (0120-6) | CY | 1,747.20 | $42.87 | $10.65 | $41.17 | $38.38 | $46.50 |
| 0130 | Type B stabilization (0160-4) | SY | 350 | $67.18 | $61.85 | $64.21 | $73.99 | $73.00 |
| 0135 | Optional base, base group 06 (0285-706) | SY | 350 | $76.85 | $61.85 | $104.39 | $79.94 | $66.00 |
| 0140 | Milling existing asphalt pavement, 3 1/2" avg depth (0327-70-2) | SY | 87,056 | $1.92 | $2.85 | $1.97 | $5.37 | $4.00 |
| 0145 | Milling existing asphalt pavement, 3" avg depth (0327-70-4) | SY | 8,415 | $3.46 | $3.00 | $4.38 | $7.23 | $5.50 |
| 0150 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 46,873 | $3.40 | $3.80 | $4.51 | $5.49 | $5.75 |
| 0155 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 10,615.90 | $149.54 | $140.00 | $165.72 | $165.50 | $221.50 |
| 0160 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 11,460.70 | $154.89 | $158.00 | $215.23 | $184.40 | $228.35 |
| 0165 | Miscellaneous asphalt (0339-1) | TN | 37.20 | $410.69 | $263.00 | $563.24 | $641.01 | $350.00 |
| 0170 | Cleaning & sealing joints- concrete pavement (0350-5) | LF | 89 | $65.67 | $77.90 | $64.03 | $113.73 | $90.00 |
| 0175 | Concrete class II, culverts (0400-2-1) | CY | 6.20 | $2,273.62 | $2,280.00 | $2,187.76 | $2,175.28 | $2,450.00 |
| 0180 | Reinforcing steel- roadway (0415-1-1) | LB | 1,241 | $8.38 | $2.70 | $2.77 | $1.35 | $9.00 |
| 0185 | Inlets, curb type P-1, partial (0425-1315) | EACH | 2 | $10,607 | $10,100 | $10,187 | $19,506 | $24,000 |
| 0190 | Inlets, curb, type P-2, partial (0425-1325) | EACH | 1 | $10,607 | $4,940.00 | $10,187 | $21,674 | $28,300 |
| 0195 | Inlets, curb type J-1, <10' (0425-1411) | EACH | 2 | $30,040 | $22,300 | $28,851 | $61,770 | $69,600 |
| 0200 | Inlets, curb, type J-2, <10' (0425-1421) | EACH | 1 | $20,553 | $15,300 | $19,740 | $59,603 | $44,500 |
| 0205 | Inlets, curb, type J-4, <10' (0425-1441) | EACH | 1 | $30,040 | $22,500 | $28,851 | $63,938 | $72,275 |
| 0210 | Manholes, J-8, <10' (0425-2-91) | EACH | 1 | $20,553 | $15,300 | $19,740 | $45,515 | $55,000 |
| 0215 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 17 | $287.94 | $304.00 | $276.54 | $2,709.23 | $1,035.00 |
| 0220 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 8 | $404.09 | $417.00 | $388.10 | $7,044.00 | $1,540.00 |
| 0225 | Pipe culvert, opt material, round, 42"S/CD (0430-175142) | LF | 44 | $891.53 | $592.00 | $856.25 | $4,334.77 | $1,120.00 |
| 0230 | Pipe culvert, opt material, round, 54"S/CD (0430-175154) | LF | 16 | $994.46 | $1,000.00 | $955.11 | $7,585.84 | $2,360.00 |
| 0235 | Pipe culvert, opt material, round, 60"S/CD (0430-175160) | LF | 8 | $1,080.15 | $1,070.00 | $1,037.41 | $7,802.58 | $3,035.00 |
| 0240 | Pipe culvert,optional material,round, jack & bore, 48", storm and cross drain (0430-185148) | LF | 108 | $2,599.73 | $1,860.00 | $3,821.00 | $11,704 | $14,500 |
| 0245 | Pipe filling and plugging- place out of service (0430-830) | CY | 37.90 | $507.87 | $517.00 | $487.78 | $975.32 | $1,080.00 |
| 0250 | Pipe handrail - guiderail, aluminum (0515-1-2) | LF | 105 | $61.11 | $57.10 | $58.70 | $59.60 | $66.00 |
| 0255 | Concrete curb & gutter, type F (0520-1-10) | LF | 494 | $61.84 | $31.20 | $59.39 | $61.11 | $62.50 |
| 0260 | Traffic separator concrete- type IV, 4' wide (0520-5-41) | LF | 46 | $162.71 | $44.65 | $156.27 | $109.51 | $165.00 |
| 0265 | Concrete traffic separator, special- variable width (0520-70) | SY | 1 | $617.26 | $366.00 | $592.83 | $2,226.90 | $630.00 |
| 0270 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 513 | $93.92 | $84.10 | $90.20 | $125.29 | $95.00 |
| 0275 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 293 | $140.91 | $117.00 | $135.33 | $140.76 | $145.00 |
| 0280 | Concrete ditch pavt, non reinforced, 3" (0524-1-1) | SY | 27 | $168.44 | $306.00 | $161.78 | $175.28 | $170.00 |
| 0285 | Concrete slope pavement,non reinforced, 4" (0524-2-2) | SY | 113 | $148.87 | $258.00 | $142.98 | $122.46 | $150.00 |
| 0290 | Detectable warnings (0527-2) | SF | 59 | $49.91 | $55.05 | $47.94 | $22.76 | $30.00 |
| 0295 | Guardrail -roadway, general (0536-1-1) | LF | 454 | $27.78 | $25.95 | $26.68 | $27.09 | $28.00 |
| 0300 | Guardrail- roadway, double (0536-1-3) | LF | 141 | $38.89 | $36.35 | $37.35 | $37.93 | $40.00 |
| 0305 | Pipe rail for guardrail (0536-6) | LF | 200 | $16.67 | $15.60 | $16.01 | $16.26 | $17.00 |
| 0310 | Guardrail removal (0536-73) | LF | 494 | $2.22 | $2.10 | $2.13 | $2.17 | $2.30 |
| 0315 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 2 | $2,222.34 | $2,080.00 | $2,134.41 | $2,167.38 | $2,265.00 |
| 0320 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 1 | $3,889.10 | $3,630.00 | $3,735.21 | $3,792.92 | $3,960.00 |
| 0325 | Guardrail end treatment- double face approach terminal (0536-85-27) | EACH | 1 | $8,333.78 | $7,790.00 | $8,004.02 | $8,127.69 | $8,500.00 |
| 0330 | Guardrail reset (0538-1) | LF | 200 | $16.67 | $15.60 | $16.01 | $16.26 | $17.00 |
| 0335 | Performance turf, sod (0570-1-2) | SY | 3,468 | $5.82 | $3.65 | $5.59 | $10.24 | $4.50 |
| 0340 | Conduit, furnish & install, open trench (0630-2-11) | LF | 94 | $54.37 | $30.00 | $52.22 | $39.72 | $41.50 |
| 0345 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 189 | $57.95 | $51.20 | $55.65 | $53.70 | $55.00 |
| 0350 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 4 | $1,545.65 | $2,490.00 | $1,484.49 | $2,015.67 | $2,100.00 |
| 0355 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 12 | $2,754.09 | $2,370.00 | $2,645.11 | $3,578.35 | $3,740.00 |
| 0360 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 12 | $2,985.73 | $2,700.00 | $2,867.58 | $3,190.39 | $3,335.00 |
| 0365 | Traffic monitoring site cabinet, F&I, type 3, 2 pane back, pedestal mount (0695-7162) | EACH | 2 | $8,026.42 | $7,870.00 | $7,708.82 | $7,954.30 | $8,300.00 |
| 0370 | Traffic monitoring site cabinet, remove existing cabinet (0695-7600) | EACH | 2 | $808.12 | $904.00 | $776.14 | $1,725.24 | $1,800.00 |
| 0375 | Raised pavement marker, type B (0706-1-3) | EACH | 2,703 | $4.09 | $4.15 | $3.95 | $4.41 | $5.10 |
| 0380 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 7.48 | $1,878.95 | $1,560.00 | $1,813.76 | $2,027.76 | $1,360.00 |
| 0385 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.74 | $2,639.07 | $1,650.00 | $2,547.51 | $2,862.71 | $1,700.00 |
| 0390 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 5,050 | $1.33 | $0.80 | $1.28 | $1.43 | $1.15 |
| 0395 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 1,763 | $1.44 | $1.30 | $1.39 | $1.55 | $2.30 |
| 0400 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 4,390 | $1.55 | $1.55 | $1.49 | $1.67 | $2.30 |
| 0405 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 7.68 | $552.13 | $726.00 | $532.98 | $596.40 | $565.00 |
| 0410 | Painted pavement marking, standard,white, 3'-9' skip drop line and approach to toll 12" wide, (0710-11133) | GM | 0.16 | $1,056.31 | $1,190.00 | $1,019.62 | $1,192.80 | $1,130.00 |
| 0415 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 1.41 | $718.11 | $726.00 | $693.19 | $775.32 | $680.00 |
| 0420 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 73 | $38.69 | $67.50 | $37.35 | $41.75 | $55.00 |
| 0425 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 201 | $38.69 | $31.15 | $37.35 | $41.75 | $34.00 |
| 0430 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 5.24 | $1,879.09 | $1,560.00 | $1,813.90 | $2,027.76 | $1,360.00 |
| 0435 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 63 | $1.55 | $1.30 | $1.49 | $1.67 | $2.30 |
| 0440 | Painted pavement markings, standard, yellow, skip, 6" (0710-11231) | GM | 0.35 | $548.10 | $721.00 | $529.07 | $596.40 | $680.00 |
| 0445 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.39 | $705.61 | $714.00 | $681.14 | $775.32 | $680.00 |
| 0450 | Two component polyurethane injection (0906-173200) | LB | 14,250 | $7.61 | $8.85 | $7.42 | $7.10 | $20.00 |
| 0455 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $91,000 | $91,000 | $91,000 | $91,000 | $91,000 |
| 0460 | Prestressed concrete pole, shallow pole removal- pole 30' and greater (0641-2-70) | EACH | 1 | $4,722.48 | $8,510.00 | $4,535.61 | $9,509.40 | $9,900.00 |
| 0465 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 118 | $500.03 | $467.00 | $480.24 | $487.66 | $510.00 |
| 0470 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 22 | $1,888.99 | $1,770.00 | $1,814.24 | $1,842.28 | $1,925.00 |
| 0475 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 3 | $2,777.93 | $2,600.00 | $2,668.01 | $2,709.23 | $2,830.00 |
| 0480 | Single column ground sign assembly, remove (0700-1600) | EACH | 113 | $27.78 | $25.95 | $26.68 | $27.09 | $28.00 |
| 0485 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 9 | $388.91 | $363.00 | $373.52 | $379.29 | $395.00 |
| 0490 | Sign panel, furnish & install ground mount, 12-20 SF (0700-3102) | EACH | 2 | $666.70 | $623.00 | $640.32 | $650.22 | $680.00 |
| 0495 | Sign panel, furnish & install ground mount, 21-30 SF (0700-3103) | EACH | 3 | $833.38 | $779.00 | $800.40 | $812.77 | $850.00 |
| 0500 | Sign panel, furnish & install ground mount, 31-50 SF (0700-3104) | EACH | 2 | $1,722.32 | $1,610.00 | $1,654.17 | $1,679.72 | $1,755.00 |
| 0505 | Sign panel, furnish & install ground mount, 101-200 SF (0700-3106) | EACH | 1 | $7,778.20 | $7,270.00 | $7,470.41 | $7,585.84 | $7,925.00 |
| 0510 | Sign panel, furnish & install overhead mount, 101-200 SF (0700-3206) | EACH | 1 | $7,778.20 | $7,270.00 | $7,470.41 | $7,585.84 | $7,925.00 |
| 0515 | Sign panel, furnish & install overhead mount, 201-300 SF (0700-3207) | EACH | 2 | $11,112 | $10,400 | $10,672 | $10,837 | $11,320 |
| 0520 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 9 | $27.78 | $25.95 | $26.68 | $27.09 | $28.00 |
| 0525 | Sign panel, remove, 12-20 SF (0700-3602) | EACH | 2 | $55.56 | $51.90 | $53.36 | $54.18 | $55.00 |
| 0530 | Sign panel, remove, 21-30 SF (0700-3603) | EACH | 3 | $55.56 | $51.90 | $53.36 | $54.18 | $55.00 |
| 0535 | Sign panel, remove, 31-50 SF (0700-3604) | EACH | 2 | $111.12 | $104.00 | $106.72 | $108.37 | $115.00 |
| 0540 | Sign panel, remove, 51-100 SF (0700-3605) | EACH | 2 | $222.24 | $208.00 | $213.44 | $216.74 | $225.00 |
| 0545 | Sign panel, remove, 101-200 SF (0700-3606) | EACH | 2 | $277.79 | $260.00 | $266.80 | $270.92 | $280.00 |
| 0550 | Sign panel, remove, 201-300 SF (0700-3607) | EACH | 2 | $555.59 | $519.00 | $533.60 | $541.85 | $565.00 |
| 0555 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 18 | $111.12 | $104.00 | $106.72 | $108.37 | $115.00 |
| 0560 | Tubular marker, 36" white post (0704-1-3) | EACH | 28 | $166.68 | $156.00 | $160.08 | $162.55 | $170.00 |
| 0565 | Tubular marker, 36" yellow (0704-1-4) | EACH | 27 | $166.68 | $156.00 | $160.08 | $162.55 | $170.00 |
| 0570 | Raised pavement marker, type B (0706-1-3) | EACH | 2,703 | $4.09 | $4.15 | $3.95 | $4.41 | $5.00 |
| 0575 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 148 | $5.53 | $5.20 | $5.34 | $5.96 | $5.70 |
| 0580 | Painted pavement markings, surface (0710-90) | LS | 1 | $65,394 | $57,100 | $63,125 | $70,554 | $60,000 |
| 0585 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 5,050 | $3.22 | $3.65 | $3.11 | $3.47 | $5.00 |
| 0590 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 1,763 | $4.79 | $4.65 | $4.62 | $5.16 | $6.20 |
| 0595 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 849 | $6.43 | $6.25 | $6.21 | $6.94 | $7.35 |
| 0600 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 1.41 | $2,209.55 | $3,110.00 | $2,132.89 | $2,385.59 | $3,965.00 |
| 0605 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 15 | $81.81 | $234.00 | $78.97 | $88.27 | $225.00 |
| 0610 | Thermoplastic, standard, arrow (0711-11170) | EACH | 143 | $55.28 | $77.90 | $53.36 | $59.64 | $85.00 |
| 0615 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 63 | $4.42 | $6.25 | $4.27 | $4.77 | $6.80 |
| 0620 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.39 | $2,171.14 | $3,570.00 | $2,095.79 | $2,385.59 | $3,965.00 |
| 0625 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 3,541 | $16.31 | $15.60 | $15.74 | $17.59 | $17.00 |
| 0630 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 58 | $204.53 | $208.00 | $197.43 | $220.67 | $255.00 |
| 0635 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 58 | $88.44 | $83.05 | $85.38 | $95.42 | $140.00 |
| 0640 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 7.48 | $4,946.05 | $5,400.00 | $4,774.45 | $5,337.77 | $7,360.00 |
| 0645 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.74 | $6,560.30 | $5,990.00 | $6,332.70 | $7,116.23 | $8,490.00 |
| 0650 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 7.68 | $1,236.77 | $2,590.00 | $1,193.87 | $1,335.93 | $2,265.00 |
| 0655 | Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133) | GM | 0.16 | $2,365.99 | $4,960.00 | $2,283.95 | $2,671.87 | $5,660.00 |
| 0660 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 5.24 | $4,642.46 | $5,400.00 | $4,481.39 | $5,009.75 | $7,360.00 |
| 0665 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 0.35 | $1,150.96 | $3,090.00 | $1,111.05 | $1,252.44 | $2,265.00 |
| 0670 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.09 | $35,836 | $31,300 | $34,592 | $41,080 | $39,600 |
| 0675 | Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181) | GM | 0.17 | $9,518.82 | $12,500 | $9,188.59 | $10,270 | $13,580 |
| 0680 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.09 | $35,836 | $31,300 | $34,592 | $41,080 | $39,600 |
| 0685 | Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381) | GM | 0.17 | $9,518.82 | $12,500 | $9,188.59 | $10,270 | $13,585 |
| 0690 | Conduit, furnish & install, open trench (0630-2-11) | LF | 119 | $32.76 | $34.55 | $31.46 | $47.90 | $50.00 |
| 0695 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 317 | $73.48 | $57.10 | $70.57 | $67.57 | $70.50 |
| 0700 | Conduit, furnish & install, aboveground (0630-2-14) | LF | 80 | $86.97 | $58.50 | $83.53 | $47.03 | $50.00 |
| 0705 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 2 | $12,069 | $13,000 | $11,591 | $11,921 | $12,450 |
| 0710 | Signal cable, remove- intersection (0632-7-6) | PI | 2 | $2,424.38 | $904.00 | $2,328.44 | $866.95 | $900.00 |
| 0715 | Fiber optic cable locator (0633-6) | DA | 225 | $207.88 | $53.85 | $199.65 | $197.23 | $210.00 |
| 0720 | Pull & splice box, F&I, 17" X 30" cover size (0635-2-14) | EACH | 9 | $1,710.41 | $2,880.00 | $1,642.73 | $2,492.49 | $2,600.00 |
| 0725 | Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109) | EACH | 26 | $875.80 | $484.00 | $841.15 | $774.84 | $810.00 |
| 0730 | Vehicle detection system- furnish & install cabinet equipment (0660-4-11) | EACH | 2 | $34,256 | $31,200 | $32,901 | $32,680 | $34,000 |
| 0735 | Vehicle detection system- furnish & install above ground equipment (0660-4-12) | EACH | 4 | $15,135 | $8,380.00 | $14,536 | $7,897.95 | $8,250.00 |
| 0740 | Vehicle detection system- adjust/modify cabinet (0660-4-51) | EACH | 1 | $1,212.18 | $904.00 | $1,164.22 | $654.55 | $680.00 |
| 0745 | Traffic controller, modify (0671-2-40) | EACH | 3 | $1,624.10 | $3,890.00 | $1,559.83 | $574.36 | $600.00 |
| 0750 | Traffic signal controller cabinet, adjust/modify (0676-1500) | EACH | 1 | $2,275.31 | $4,980.00 | $2,185.27 | $2,659.38 | $2,780.00 |
| 0755 | Local agency initial amount (DO not bid) (0999-26) | LS | 1 | $1,335.00 | $1,335.00 | $1,335.00 | $1,335.00 | $1,335.00 |
| 0760 | Utility pipe,remove & dispose, 2- 4.9" (1050-16002) | LF | 56 | $21.00 | $56.40 | $21.34 | $54.18 | $230.00 |
| 0765 | Utility pipe- poly vinyl chloride, furnish & install, water/sewer, (1050-31204) | LF | 56 | $59.50 | $77.60 | $149.41 | $541.85 | $340.00 |
| 0770 | Utility pipe- high density polyethylene, furnish & install, water/sewer, 4" (1050-42204) | LF | 84 | $68.41 | $76.90 | $168.62 | $433.48 | $230.00 |
| 0775 | Utility fixture, mechanical joint restraint, furnish & install, 4" (1080-29104) | EACH | 2 | $1,026.10 | $699.00 | $747.04 | $1,625.54 | $10,250 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of May 20, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.