FDOT contract T7558 bid tabulation
SR 43 (US 301) AT SYMMES ROAD AND AT SHADY PRESERVE DR. Let by Florida DOT on January 29, 2025, Hillsborough, District 7. 5 bids received; low bid $13,569,477 by Gosalia Concrete Constructors, Inc..
- Owner
- Florida DOT
- Letting
- 29 JAN 2025
- Pay items
- 181
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Gosalia Concrete Constructors, Inc. | $13,569,477 | Low |
| 2 | Webber, LLC | $13,867,700 | +2.0% |
| 3 | Ajax Paving Industries of Florida LLC | $15,248,150 | +12% |
| 4 | Watson Civil Construction, Inc. | $16,775,281 | +24% |
| 5 | Superior Construction Company Southeast, LLC | $17,878,669 | +32% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Gosalia Concrete Constructors, Inc. | 2. Webber, LLC | 3. Ajax Paving Industries of Florida LLC | 4. Watson Civil Construction, Inc. | 5. Superior Construction Company Southeast, LLC |
|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $1,245,000 | $1,218,600 | $1,524,815 | $1,420,000 | $1,784,000 |
| 0010 | Mobilization (0101-1) | LS | 1 | $107,057 | $122,400 | $18,417 | $250,000 | $4,500.00 |
| 0015 | Maintenance of traffic (0102-1) | DA | 1 | $557,000 | $1,336,335 | $1,329,610 | $1,200,000 | $535,000 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $51,870 | $145,550 | $35,295 | $205,000 | $185,000 |
| 0025 | Special detour- temporary pavement (0102-2200) | SY | 1 | $249,000 | $333,436 | $256,307 | $213,000 | $400,000 |
| 0030 | Special detour- temporary earthwork/base (0102-2300) | CY | 1 | $410,557 | $62,495 | $121,658 | $140,000 | $1,300,000 |
| 0035 | Commercial material for temporary driveway maintenance (0102-3) | CY | 931.20 | $125.00 | $135.00 | $82.62 | $185.00 | $50.00 |
| 0040 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $7,191.00 | $37,930 | $18,814 | $26,000 | $32,000 |
| 0045 | Traffic control officer (0102-14) | HR | 2,840 | $75.00 | $90.00 | $98.47 | $100.00 | $115.00 |
| 0050 | Work zone sign (0102-60) | ED | 49,309 | $0.19 | $0.35 | $0.21 | $0.30 | $0.20 |
| 0055 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 3,229 | $40.50 | $20.00 | $41.58 | $47.00 | $40.00 |
| 0060 | Temporary barrier, relocate, low profile concrete (0102-71-23) | LF | 2,247 | $15.00 | $20.00 | $13.13 | $16.00 | $15.00 |
| 0065 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 79,072 | $0.09 | $0.15 | $0.10 | $0.17 | $0.10 |
| 0070 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 293,105 | $0.03 | $0.15 | $0.03 | $0.06 | $0.05 |
| 0075 | Temporary separator, F&I remove (0102-75-1) | LF | 5,813 | $19.50 | $25.00 | $21.34 | $20.00 | $20.00 |
| 0080 | Arrow board / advance warning arrow panel (0102-76) | ED | 769 | $5.00 | $6.00 | $5.47 | $7.00 | $5.00 |
| 0085 | Portable changeable message sign, temporary (0102-99) | ED | 1,384 | $9.00 | $12.00 | $9.85 | $15.00 | $9.00 |
| 0090 | Temporary signalization and maintenance, intersection (0102-104) | ED | 1,260 | $16.00 | $16.00 | $16.41 | $40.00 | $16.00 |
| 0095 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 1,260 | $15.00 | $15.10 | $43.76 | $40.00 | $15.00 |
| 0100 | Type III barricade (0102-115) | ED | 9,181 | $0.23 | $0.50 | $0.25 | $0.36 | $0.25 |
| 0105 | Removable tape, white, solid 6" (0102-913-21) | GM | 2.29 | $10,491 | $20,000 | $13,129 | $13,000 | $10,500 |
| 0110 | Sediment barrier (0104-10-3) | LF | 1,822 | $1.50 | $3.00 | $3.01 | $5.00 | $15.00 |
| 0115 | Inlet protection system (0104-18) | EACH | 50 | $240.00 | $125.00 | $191.47 | $231.00 | $800.00 |
| 0120 | Litter removal (0107-1) | ACRE | 176.68 | $35.00 | $30.00 | $49.24 | $90.00 | $190.00 |
| 0125 | Mowing (0107-2) | ACRE | 134.68 | $35.00 | $75.00 | $60.18 | $110.00 | $230.00 |
| 0130 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $75,777 | $988,800 | $392,256 | $800,000 | $1,663,100 |
| 0135 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $8,329.50 | $86,900 | $43,391 | $155,000 | $5,000.00 |
| 0140 | Removal of existing concrete (0110-4-10) | SY | 2,102 | $16.00 | $55.00 | $46.77 | $32.00 | $75.00 |
| 0145 | Regular excavation (0120-1) | CY | 494.70 | $80.00 | $60.00 | $130.14 | $34.00 | $160.00 |
| 0150 | Embankment (0120-6) | CY | 818.90 | $86.00 | $70.00 | $194.88 | $50.00 | $105.00 |
| 0155 | Type B stabilization (0160-4) | SY | 1,645 | $86.50 | $65.00 | $62.42 | $48.00 | $55.00 |
| 0160 | Optional base, base group 01 (0285-701) | SY | 78 | $108.50 | $77.00 | $118.42 | $70.00 | $60.00 |
| 0162 | Optional base, base group 02 (0285-702) | SY | 2,620 | $43.50 | $38.00 | $42.42 | $33.00 | $45.00 |
| 0165 | Optional base, base group 03 (0285-703) | SY | 114 | $83.00 | $85.00 | $77.78 | $94.00 | $76.00 |
| 0170 | Optional base, base group 15 (0285-715) | SY | 507 | $86.50 | $205.00 | $182.23 | $145.00 | $209.00 |
| 0175 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 21,285 | $5.00 | $13.00 | $5.35 | $3.20 | $6.00 |
| 0178 | Milling existing asphalt pavement, 6 1/2" avg depth (0327-70-14) | SY | 2,004 | $9.00 | $20.00 | $10.72 | $17.00 | $11.00 |
| 0180 | Milling existing asphalt pavement, 12" avg depth (0327-70-46) | SY | 34,336 | $10.00 | $22.00 | $11.70 | $18.50 | $20.00 |
| 0185 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 6,143.70 | $162.00 | $165.00 | $157.84 | $197.00 | $165.00 |
| 0190 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 1,635.40 | $184.00 | $230.00 | $218.31 | $261.00 | $226.00 |
| 0195 | Plain cement concrete 9" (0350-3-7) | SY | 34,345 | $139.50 | $81.00 | $136.76 | $152.00 | $140.00 |
| 0200 | Cleaning & sealing joints- concrete pavement (0350-5) | LF | 50,631 | $5.00 | $4.50 | $5.47 | $4.90 | $6.00 |
| 0205 | Grinding concrete pavement (0352-70) | SY | 34,168 | $5.00 | $4.55 | $4.38 | $4.10 | $4.00 |
| 0210 | Inlets, gutter, type S, <10' (0425-1701) | EACH | 2 | $11,258 | $4,500.00 | $4,923.53 | $9,000.00 | $11,000 |
| 0215 | Manhole, adjust (0425-5) | EACH | 11 | $1,782.00 | $1,100.00 | $1,203.53 | $2,600.00 | $2,800.00 |
| 0220 | Valve boxes, adjust (0425-6) | EACH | 10 | $691.50 | $850.00 | $392.17 | $1,900.00 | $2,500.00 |
| 0225 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 272 | $185.50 | $302.00 | $89.72 | $240.00 | $225.00 |
| 0230 | Underdrain, type II (0440-1-20) | LF | 320 | $56.00 | $43.00 | $47.05 | $62.00 | $50.00 |
| 0235 | Underdrain outlet pipe, 4" (0440-73-1) | LF | 13 | $344.00 | $32.50 | $35.56 | $37.00 | $50.00 |
| 0240 | Edgedrain draincrete, (0446-1-1) | LF | 5,621 | $44.50 | $32.50 | $43.90 | $39.00 | $45.00 |
| 0245 | Edgedrain outlet pipe, 4" (0446-71-1) | LF | 165 | $210.00 | $33.00 | $36.11 | $50.00 | $200.00 |
| 0250 | Concrete curb & gutter, type E (0520-1-7) | LF | 2,647 | $51.00 | $32.00 | $68.32 | $39.00 | $45.00 |
| 0255 | Concrete curb & gutter, type F (0520-1-10) | LF | 360 | $48.00 | $32.00 | $131.64 | $43.00 | $65.00 |
| 0260 | Traffic separator concrete- type I, 4' wide (0520-5-11) | LF | 280 | $55.00 | $51.00 | $161.14 | $95.00 | $180.00 |
| 0265 | Traffic separator - concrete, type II, 4' wide (0520-5-21) | LF | 941 | $50.50 | $67.00 | $92.62 | $110.00 | $120.00 |
| 0270 | Shoulder gutter- concrete (0520-6) | LF | 194 | $40.00 | $38.00 | $94.18 | $33.50 | $70.00 |
| 0275 | Concrete traffic separator, special- variable width (0520-70) | SY | 101 | $152.50 | $58.00 | $260.68 | $148.00 | $260.00 |
| 0280 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 22 | $127.00 | $90.00 | $211.97 | $82.00 | $250.00 |
| 0285 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 177 | $164.00 | $95.00 | $156.77 | $87.00 | $310.00 |
| 0290 | Detectable warnings (0527-2) | SF | 329 | $31.00 | $32.00 | $24.62 | $42.00 | $35.00 |
| 0295 | Performance turf, sod (0570-1-2) | SY | 4,794 | $3.50 | $4.95 | $6.42 | $8.65 | $20.00 |
| 0300 | Raised pavement marker, type B (0706-1-3) | EACH | 3,491 | $4.00 | $5.00 | $5.47 | $5.35 | $4.00 |
| 0305 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 5.43 | $1,747.50 | $1,500.00 | $1,641.18 | $1,600.00 | $1,750.00 |
| 0310 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 1,269 | $1.50 | $1.50 | $1.64 | $1.60 | $2.00 |
| 0315 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 527 | $2.00 | $2.00 | $4.38 | $3.30 | $2.00 |
| 0320 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.15 | $657.72 | $600.00 | $875.29 | $800.00 | $700.00 |
| 0325 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 17 | $40.00 | $85.00 | $93.00 | $91.00 | $40.00 |
| 0330 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 44 | $35.00 | $45.00 | $49.24 | $48.00 | $35.00 |
| 0335 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 3.14 | $1,745.50 | $1,500.00 | $1,641.18 | $1,600.00 | $1,750.00 |
| 0340 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.10 | $663.16 | $1,000.00 | $875.29 | $805.00 | $700.00 |
| 0345 | Painted pavement markings, standard,black, skip, 6" (0710-11331) | GM | 0.21 | $485.38 | $800.00 | $875.29 | $845.00 | $490.00 |
| 0350 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $140,000 | $140,000 | $140,000 | $140,000 | $140,000 |
| 0355 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $10,000 | $10,000 | $10,000 | $10,000 | $10,000 |
| 0360 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 0.69 | $18,169 | $10,000 | $1,094.12 | $27,000 | $12,500 |
| 0365 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 9 | $452.00 | $400.00 | $437.65 | $103.00 | $440.00 |
| 0370 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 11 | $1,724.50 | $1,900.00 | $2,078.82 | $310.00 | $1,670.00 |
| 0375 | Single column ground sign assembly, remove (0700-1600) | EACH | 18 | $51.50 | $50.00 | $54.71 | $620.00 | $50.00 |
| 0380 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 20 | $282.50 | $150.00 | $164.12 | $83.00 | $275.00 |
| 0385 | Sign panel, install, UP to 12 SF (0700-3401) | EACH | 2 | $194.50 | $300.00 | $328.24 | $210.00 | $190.00 |
| 0390 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 22 | $31.00 | $40.00 | $43.76 | $55.00 | $30.00 |
| 0395 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 5 | $77.50 | $100.00 | $109.41 | $465.00 | $75.00 |
| 0400 | Profiled thermoplastic,standard- concrete surfaces, white, solid,6" (0701-17101) | GM | 0.55 | $14,408 | $20,000 | $21,882 | $22,000 | $14,600 |
| 0405 | Tubular marker, 36" white post (0704-1-3) | EACH | 4 | $233.00 | $225.00 | $109.41 | $620.00 | $91.00 |
| 0410 | Tubular marker, 36" yellow (0704-1-4) | EACH | 22 | $233.00 | $225.00 | $246.18 | $305.00 | $91.00 |
| 0415 | Object marker, type 1 (0705-10-1) | EACH | 1 | $258.50 | $302.85 | $328.24 | $401.00 | $250.00 |
| 0420 | Raised pavement marker, type B (0706-1-3) | EACH | 1,159 | $4.00 | $5.00 | $5.47 | $5.40 | $4.00 |
| 0425 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 19 | $5.00 | $10.00 | $10.94 | $11.00 | $5.00 |
| 0430 | Painted pavement markings, surface (0710-90) | LS | 1 | $24,310 | $10,000 | $10,941 | $10,000 | $25,000 |
| 0435 | Painted pavement markings, surface (0710-90) | LS | 1 | $2,999.00 | $2,000.00 | $2,188.23 | $2,150.00 | $3,000.00 |
| 0440 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 1,244 | $3.50 | $4.00 | $4.38 | $4.30 | $3.50 |
| 0445 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 1,449 | $5.00 | $6.00 | $6.56 | $6.40 | $5.00 |
| 0450 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 274 | $6.50 | $8.00 | $8.75 | $8.55 | $6.50 |
| 0455 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.06 | $1,906.78 | $3,400.00 | $4,376.47 | $3,600.00 | $2,250.00 |
| 0460 | Thermoplastic, standard, arrow (0711-11170) | EACH | 20 | $64.00 | $90.00 | $98.47 | $96.00 | $64.00 |
| 0465 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 16 | $4.50 | $6.00 | $6.56 | $6.40 | $5.00 |
| 0470 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.04 | $2,142.86 | $4,000.00 | $4,376.47 | $4,100.00 | $2,250.00 |
| 0475 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 1,019 | $16.00 | $16.00 | $17.51 | $17.00 | $16.00 |
| 0480 | Thermoplastic, preformed, white, 2-4 dotted guideline on concrete surfaces (0711-14141) | GM | 0.32 | $8,630.12 | $20,000 | $21,882 | $21,000 | $8,800.00 |
| 0485 | Thermoplastic, preformed, yellow, 2-4 dotted guideline on concrete surfaces (0711-14241) | GM | 0.07 | $8,495.28 | $20,000 | $21,882 | $21,000 | $8,800.00 |
| 0490 | Thermoplastic, preformed, black, 2-4 dotted guideline on concrete surfaces (0711-14341) | GM | 0.33 | $8,577.18 | $20,000 | $21,882 | $21,000 | $8,800.00 |
| 0495 | Thermoplastic, preformed, 24" white with 4" black contrast crosswalk on concrete pavement, 32" (0711-14526) | LF | 737 | $21.50 | $30.00 | $32.82 | $32.00 | $22.00 |
| 0500 | Thermoplastic, preformed, 24" white with 4" black contrast stop line on concrete 32" (0711-14527) | LF | 213 | $21.50 | $30.00 | $32.82 | $32.00 | $22.00 |
| 0505 | Thermoplastic, preformed, 12" white with 4" black contrast crosswalk on concrete pavement, 20" (0711-14528) | LF | 771 | $13.50 | $20.00 | $21.88 | $22.00 | $13.50 |
| 0510 | Thermoplastic, preformed, white with black contrast on concrete pavement, message symbol (0711-14560) | EACH | 8 | $1,164.00 | $1,100.00 | $1,203.53 | $1,200.00 | $1,200.00 |
| 0515 | Thermoplastic, preformed, white with black contrast, arrow on concrete surface (0711-14570) | EACH | 47 | $999.00 | $750.00 | $820.59 | $800.00 | $1,000.00 |
| 0520 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 1.16 | $5,223.00 | $6,000.00 | $6,564.70 | $6,400.00 | $5,300.00 |
| 0525 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.26 | $6,733.59 | $6,300.00 | $7,111.76 | $6,700.00 | $7,000.00 |
| 0530 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 1.33 | $1,302.00 | $4,500.00 | $4,923.53 | $4,800.00 | $1,300.00 |
| 0535 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 1.70 | $4,885.00 | $6,000.00 | $6,564.70 | $6,400.00 | $5,000.00 |
| 0540 | Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1) | SF | 24 | $10.00 | $150.00 | $164.12 | $160.00 | $10.00 |
| 0545 | Permanent tape, white, solid W/contrast, 6" primary line width, for concrete surfaces (0713-103121) | GM | 0.99 | $50,647 | $40,000 | $43,765 | $43,000 | $51,000 |
| 0550 | Permanent tape, white, solid W/contrast, 8" primary line width, for concrete surfaces (0713-103122) | GM | 0.48 | $67,319 | $60,000 | $65,647 | $65,000 | $68,000 |
| 0555 | Permanent tape, white, 6-10 skip/dotted, 6" for concrete surfaces (0713-103141) | GM | 0.07 | $10,294 | $8,300.00 | $9,300.00 | $8,800.00 | $10,600 |
| 0560 | Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181) | GM | 1.85 | $7,055.00 | $8,500.00 | $9,300.00 | $9,100.00 | $7,060.00 |
| 0565 | Permanent tape, black, 6-10 dotted extension, 6" for concrete surfaces (0713-103341) | GM | 0.07 | $10,294 | $8,300.00 | $9,300.00 | $8,800.00 | $10,600 |
| 0570 | Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381) | GM | 1.85 | $10,583 | $8,500.00 | $9,300.00 | $9,100.00 | $10,600 |
| 0575 | Conduit, furnish & install, open trench (0630-2-11) | LF | 769 | $25.50 | $25.30 | $23.52 | $31.00 | $25.00 |
| 0580 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 952 | $26.50 | $26.50 | $34.46 | $32.00 | $26.00 |
| 0585 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 10 | $1,034.50 | $1,040.00 | $1,258.23 | $1,250.00 | $1,040.00 |
| 0590 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 6,028 | $2.00 | $1.90 | $2.63 | $2.30 | $2.00 |
| 0595 | Lighting conductors, remove & dispose, contractor owns (0715-1-60) | LF | 5,276 | $0.95 | $1.00 | $0.77 | $1.15 | $1.00 |
| 0600 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211) | EACH | 2 | $1,181.50 | $1,180.00 | $1,914.71 | $1,450.00 | $1,185.00 |
| 0605 | Light pole complete, F&I, standard pole standard foundation, 30' mounting height, 15' arm length (0715-61152) | EACH | 2 | $8,797.50 | $8,810.00 | $10,722 | $11,000 | $8,800.00 |
| 0610 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 0' arm length (0715-61300) | EACH | 3 | $8,270.50 | $8,280.00 | $11,379 | $9,900.00 | $8,300.00 |
| 0615 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 15' arm length (0715-61352) | EACH | 5 | $8,309.50 | $8,320.00 | $11,051 | $9,900.00 | $8,400.00 |
| 0620 | Light pole complete, remove pole and foundation (0715-69000) | EACH | 6 | $1,051.50 | $1,060.00 | $826.06 | $1,300.00 | $1,060.00 |
| 0625 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 10 | $640.50 | $642.00 | $1,203.53 | $765.00 | $640.00 |
| 0630 | Conduit, furnish & install, open trench (0630-2-11) | LF | 660 | $30.00 | $30.25 | $25.16 | $36.00 | $30.00 |
| 0635 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 1,288 | $42.00 | $42.00 | $43.22 | $5.10 | $42.00 |
| 0640 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 3 | $15,832 | $15,830 | $14,224 | $25,000 | $20,400 |
| 0645 | Signal cable, remove- intersection (0632-7-6) | PI | 1 | $963.50 | $969.00 | $2,040.53 | $1,200.00 | $970.00 |
| 0650 | Fiber optic cable, F&I, underground,2-12 fibers (0633-1121) | LF | 639 | $4.50 | $4.60 | $6.35 | $5.50 | $5.00 |
| 0655 | Fiber optic connection, install, splice (0633-2-31) | EACH | 16 | $55.50 | $55.25 | $76.59 | $66.00 | $55.00 |
| 0660 | Fiber optic connection hardware, F&I, splice (0633-3-11) | EACH | 1 | $1,381.50 | $1,380.00 | $1,914.71 | $1,700.00 | $1,400.00 |
| 0665 | Fiber optic connection hardware, F&I, splice tray (0633-3-12) | EACH | 2 | $61.50 | $61.50 | $84.79 | $73.50 | $62.00 |
| 0670 | Fiber optic connection hardware, F&I, preterminated patch panel (0633-3-15) | EACH | 1 | $2,363.50 | $2,360.00 | $3,282.35 | $2,900.00 | $2,400.00 |
| 0675 | Fiber optic cable locator (0633-6) | DA | 420 | $268.50 | $271.00 | $382.94 | $325.00 | $271.00 |
| 0680 | Span wire assembly, F&I, two point, diagonal (0634-4152) | PI | 2 | $5,829.50 | $5,850.00 | $7,002.35 | $7,000.00 | $5,900.00 |
| 0685 | Span wire assembly, F&I, two point, box or drop box (0634-4153) | PI | 1 | $19,404 | $19,470 | $11,160 | $23,500 | $19,500 |
| 0690 | Span wire assembly, remove- poles remain (0634-4600) | PI | 1 | $2,054.50 | $2,070.00 | $1,969.41 | $2,500.00 | $2,070.00 |
| 0695 | Fiberglass insulator, furnish & install (0634-5-1) | LF | 75 | $126.50 | $127.00 | $22.98 | $151.00 | $127.00 |
| 0700 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 3 | $2,352.50 | $2,360.00 | $31.73 | $2,850.00 | $2,400.00 |
| 0705 | Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13) | EACH | 1 | $5,657.00 | $5,680.00 | $5,634.70 | $6,800.00 | $5,700.00 |
| 0710 | Pull & splice box, F&I, 17" X 30" cover size (0635-2-14) | EACH | 45 | $1,650.00 | $1,860.00 | $2,133.53 | $2,250.00 | $1,900.00 |
| 0715 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 3 | $5,716.00 | $5,730.00 | $5,306.47 | $6,900.00 | $5,800.00 |
| 0720 | Electrical power service, remove underground (0639-1620) | AS | 1 | $925.00 | $931.00 | $1,148.82 | $1,150.00 | $930.00 |
| 0725 | Electrical service wire, & install (0639-2-1) | LF | 432 | $6.50 | $6.50 | $12.58 | $7.75 | $6.50 |
| 0730 | Electrical service wire, (0639-2-6) | LF | 10 | $1.00 | $1.20 | $109.41 | $1.45 | $1.25 |
| 0735 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 2 | $2,804.00 | $2,820.00 | $1,422.35 | $3,400.00 | $2,800.00 |
| 0740 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 5 | $2,663.00 | $2,670.00 | $2,790.00 | $3,200.00 | $2,600.00 |
| 0745 | Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60) | EACH | 1 | $1,870.00 | $1,880.00 | $661.94 | $2,300.00 | $1,880.00 |
| 0750 | Aluminum signals pole, (0646-1-11) | EACH | 16 | $2,028.50 | $2,040.00 | $2,844.70 | $2,500.00 | $2,040.00 |
| 0755 | Aluminum signals pole, furnish install pedestrian detector post (0646-1-12) | EACH | 2 | $1,690.50 | $1,700.00 | $2,242.94 | $2,100.00 | $1,700.00 |
| 0760 | Aluminum signals pole, remove (0646-1-60) | EACH | 2 | $256.00 | $258.00 | $328.24 | $310.00 | $260.00 |
| 0765 | Steel strain pole, F&I, type PS- (0649-1-14) | EACH | 2 | $58,559 | $58,700 | $63,459 | $70,000 | $59,000 |
| 0770 | Steel strain pole, F&I, type PS- IX (0649-1-16) | EACH | 4 | $70,142 | $70,300 | $74,619 | $85,000 | $70,300 |
| 0775 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 30 | $1,608.00 | $1,610.00 | $1,695.88 | $2,000.00 | $1,600.00 |
| 0780 | Vehicular traffic signal, furnish & install aluminum, 3 section, 2-4 ways (0650-1-15) | AS | 1 | $2,794.50 | $2,800.00 | $3,501.17 | $3,400.00 | $2,800.00 |
| 0785 | Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16) | AS | 5 | $1,900.00 | $1,900.00 | $2,133.53 | $2,300.00 | $1,900.00 |
| 0790 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 16 | $884.50 | $887.00 | $930.00 | $1,100.00 | $900.00 |
| 0795 | Loop detector inductive, remove- cabinet to remain (0660-1600) | EACH | 4 | $84.00 | $84.25 | $27.35 | $100.00 | $85.00 |
| 0800 | Vehicle detection system- microwave, furnish & install cabinet equipment (0660-3-11) | EACH | 2 | $11,676 | $11,680 | $13,239 | $14,000 | $11,700 |
| 0805 | Vehicle detection system- microwave, furnish & install, above ground equipment (0660-3-12) | EACH | 8 | $8,221.00 | $8,230.00 | $14,114 | $9,800.00 | $8,230.00 |
| 0810 | Vehicle detection system - microwave, relocate, above ground equipment (0660-3-42) | EACH | 4 | $906.50 | $911.00 | $2,024.12 | $1,100.00 | $910.00 |
| 0815 | Vehicle detection system- microwave, adjust & modify, cabinet equipment (0660-3-51) | EACH | 1 | $299.00 | $301.00 | $661.94 | $360.00 | $301.00 |
| 0820 | Vehicle detection system- furnish & install cabinet equipment (0660-4-11) | EACH | 1 | $24,817 | $24,820 | $36,872 | $30,000 | $24,820 |
| 0825 | Vehicle detection system- furnish & install above ground equipment (0660-4-12) | EACH | 2 | $4,699.50 | $4,700.00 | $7,987.06 | $5,600.00 | $4,700.00 |
| 0830 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 18 | $313.50 | $314.00 | $55.25 | $375.00 | $315.00 |
| 0835 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 2 | $76.50 | $77.00 | $55.25 | $92.00 | $77.00 |
| 0840 | Traffic controller assembly, F&I, NEMA (0670-5110) | AS | 2 | $41,725 | $41,770 | $59,629 | $50,000 | $41,800 |
| 0845 | Traffic controller, modify (0671-2-40) | EACH | 1 | $1,592.00 | $1,600.00 | $661.94 | $1,950.00 | $1,600.00 |
| 0850 | Traffic signal controller cabinet, adjust/modify (0676-1500) | EACH | 1 | $3,522.50 | $3,540.00 | $1,367.65 | $4,210.00 | $3,540.00 |
| 0855 | ITS CCTV camera, F&I, dome PTZ enclosure - pressurized, IP, definition (0682-1113) | EACH | 1 | $9,137.50 | $9,150.00 | $13,676 | $11,000 | $9,150.00 |
| 0860 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 1 | $4,046.00 | $4,050.00 | $5,470.59 | $4,900.00 | $4,050.00 |
| 0865 | Wireless communication device, furnish & install ethernet access point (0684-6-11) | EACH | 1 | $5,413.00 | $5,420.00 | $3,391.76 | $6,500.00 | $5,425.00 |
| 0870 | Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13) | EACH | 2 | $8,341.50 | $8,350.00 | $14,114 | $10,000 | $8,350.00 |
| 0875 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 4 | $459.50 | $462.00 | $180.53 | $550.00 | $465.00 |
| 0880 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 6 | $846.00 | $849.00 | $793.23 | $1,010.00 | $850.00 |
| 0885 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 4 | $235.50 | $237.00 | $28.99 | $282.00 | $240.00 |
| 0890 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 12 | $6,443.50 | $6,460.00 | $6,674.11 | $7,700.00 | $6,460.00 |
| 0895 | Internally illuminated sign, remove (0700-5-60) | EACH | 4 | $861.50 | $866.00 | $486.88 | $1,050.00 | $865.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of January 29, 2025. Compiled by Mirage Metrics.