FDOT contract T7558 bid tabulation

SR 43 (US 301) AT SYMMES ROAD AND AT SHADY PRESERVE DR. Let by Florida DOT on January 29, 2025, Hillsborough, District 7. 5 bids received; low bid $13,569,477 by Gosalia Concrete Constructors, Inc..

Owner
Florida DOT
Letting
29 JAN 2025
Pay items
181
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Gosalia Concrete Constructors, Inc.$13,569,477Low
2Webber, LLC$13,867,700+2.0%
3Ajax Paving Industries of Florida LLC$15,248,150+12%
4Watson Civil Construction, Inc.$16,775,281+24%
5Superior Construction Company Southeast, LLC$17,878,669+32%
FDOT contract T7558: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Gosalia Concrete Constructors, Inc.2. Webber, LLC3. Ajax Paving Industries of Florida LLC4. Watson Civil Construction, Inc.5. Superior Construction Company Southeast, LLC
0005Mobilization (0101-1)LS1$1,245,000$1,218,600$1,524,815$1,420,000$1,784,000
0010Mobilization (0101-1)LS1$107,057$122,400$18,417$250,000$4,500.00
0015Maintenance of traffic (0102-1)DA1$557,000$1,336,335$1,329,610$1,200,000$535,000
0020Maintenance of traffic (0102-1)DA1$51,870$145,550$35,295$205,000$185,000
0025Special detour- temporary pavement (0102-2200)SY1$249,000$333,436$256,307$213,000$400,000
0030Special detour- temporary earthwork/base (0102-2300)CY1$410,557$62,495$121,658$140,000$1,300,000
0035Commercial material for temporary driveway maintenance (0102-3)CY931.20$125.00$135.00$82.62$185.00$50.00
0040Pedestrian or bicycle special detour (0102-4-1)SY1$7,191.00$37,930$18,814$26,000$32,000
0045Traffic control officer (0102-14)HR2,840$75.00$90.00$98.47$100.00$115.00
0050Work zone sign (0102-60)ED49,309$0.19$0.35$0.21$0.30$0.20
0055Temporary barrier, F&I, low profile, concrete (0102-71-13)LF3,229$40.50$20.00$41.58$47.00$40.00
0060Temporary barrier, relocate, low profile concrete (0102-71-23)LF2,247$15.00$20.00$13.13$16.00$15.00
0065Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED79,072$0.09$0.15$0.10$0.17$0.10
0070Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD293,105$0.03$0.15$0.03$0.06$0.05
0075Temporary separator, F&I remove (0102-75-1)LF5,813$19.50$25.00$21.34$20.00$20.00
0080Arrow board / advance warning arrow panel (0102-76)ED769$5.00$6.00$5.47$7.00$5.00
0085Portable changeable message sign, temporary (0102-99)ED1,384$9.00$12.00$9.85$15.00$9.00
0090Temporary signalization and maintenance, intersection (0102-104)ED1,260$16.00$16.00$16.41$40.00$16.00
0095Temporary traffic detection and maintenance, intersection (0102-107-1)ED1,260$15.00$15.10$43.76$40.00$15.00
0100Type III barricade (0102-115)ED9,181$0.23$0.50$0.25$0.36$0.25
0105Removable tape, white, solid 6" (0102-913-21)GM2.29$10,491$20,000$13,129$13,000$10,500
0110Sediment barrier (0104-10-3)LF1,822$1.50$3.00$3.01$5.00$15.00
0115Inlet protection system (0104-18)EACH50$240.00$125.00$191.47$231.00$800.00
0120Litter removal (0107-1)ACRE176.68$35.00$30.00$49.24$90.00$190.00
0125Mowing (0107-2)ACRE134.68$35.00$75.00$60.18$110.00$230.00
0130Clearing & grubbing (0110-1-1)ACRE1$75,777$988,800$392,256$800,000$1,663,100
0135Clearing & grubbing (0110-1-1)ACRE1$8,329.50$86,900$43,391$155,000$5,000.00
0140Removal of existing concrete (0110-4-10)SY2,102$16.00$55.00$46.77$32.00$75.00
0145Regular excavation (0120-1)CY494.70$80.00$60.00$130.14$34.00$160.00
0150Embankment (0120-6)CY818.90$86.00$70.00$194.88$50.00$105.00
0155Type B stabilization (0160-4)SY1,645$86.50$65.00$62.42$48.00$55.00
0160Optional base, base group 01 (0285-701)SY78$108.50$77.00$118.42$70.00$60.00
0162Optional base, base group 02 (0285-702)SY2,620$43.50$38.00$42.42$33.00$45.00
0165Optional base, base group 03 (0285-703)SY114$83.00$85.00$77.78$94.00$76.00
0170Optional base, base group 15 (0285-715)SY507$86.50$205.00$182.23$145.00$209.00
0175Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY21,285$5.00$13.00$5.35$3.20$6.00
0178Milling existing asphalt pavement, 6 1/2" avg depth (0327-70-14)SY2,004$9.00$20.00$10.72$17.00$11.00
0180Milling existing asphalt pavement, 12" avg depth (0327-70-46)SY34,336$10.00$22.00$11.70$18.50$20.00
0185Superpave asphaltic conc, traffic C (0334-1-13)TN6,143.70$162.00$165.00$157.84$197.00$165.00
0190Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN1,635.40$184.00$230.00$218.31$261.00$226.00
0195Plain cement concrete 9" (0350-3-7)SY34,345$139.50$81.00$136.76$152.00$140.00
0200Cleaning & sealing joints- concrete pavement (0350-5)LF50,631$5.00$4.50$5.47$4.90$6.00
0205Grinding concrete pavement (0352-70)SY34,168$5.00$4.55$4.38$4.10$4.00
0210Inlets, gutter, type S, <10' (0425-1701)EACH2$11,258$4,500.00$4,923.53$9,000.00$11,000
0215Manhole, adjust (0425-5)EACH11$1,782.00$1,100.00$1,203.53$2,600.00$2,800.00
0220Valve boxes, adjust (0425-6)EACH10$691.50$850.00$392.17$1,900.00$2,500.00
0225Pipe culvert,optional material,round, 24"S/CD (0430-175124)LF272$185.50$302.00$89.72$240.00$225.00
0230Underdrain, type II (0440-1-20)LF320$56.00$43.00$47.05$62.00$50.00
0235Underdrain outlet pipe, 4" (0440-73-1)LF13$344.00$32.50$35.56$37.00$50.00
0240Edgedrain draincrete, (0446-1-1)LF5,621$44.50$32.50$43.90$39.00$45.00
0245Edgedrain outlet pipe, 4" (0446-71-1)LF165$210.00$33.00$36.11$50.00$200.00
0250Concrete curb & gutter, type E (0520-1-7)LF2,647$51.00$32.00$68.32$39.00$45.00
0255Concrete curb & gutter, type F (0520-1-10)LF360$48.00$32.00$131.64$43.00$65.00
0260Traffic separator concrete- type I, 4' wide (0520-5-11)LF280$55.00$51.00$161.14$95.00$180.00
0265Traffic separator - concrete, type II, 4' wide (0520-5-21)LF941$50.50$67.00$92.62$110.00$120.00
0270Shoulder gutter- concrete (0520-6)LF194$40.00$38.00$94.18$33.50$70.00
0275Concrete traffic separator, special- variable width (0520-70)SY101$152.50$58.00$260.68$148.00$260.00
0280Concrete sidewalk and driveways, 4" thick (0522-1)SY22$127.00$90.00$211.97$82.00$250.00
0285Concrete sidewalk and driveways, 6" thick (0522-2)SY177$164.00$95.00$156.77$87.00$310.00
0290Detectable warnings (0527-2)SF329$31.00$32.00$24.62$42.00$35.00
0295Performance turf, sod (0570-1-2)SY4,794$3.50$4.95$6.42$8.65$20.00
0300Raised pavement marker, type B (0706-1-3)EACH3,491$4.00$5.00$5.47$5.35$4.00
0305Painted pavement markings, standard, white, solid, 6" (0710-11101)GM5.43$1,747.50$1,500.00$1,641.18$1,600.00$1,750.00
0310Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF1,269$1.50$1.50$1.64$1.60$2.00
0315Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF527$2.00$2.00$4.38$3.30$2.00
0320Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM0.15$657.72$600.00$875.29$800.00$700.00
0325Painted pavement markings, standard, white, message or symbol (0710-11160)EACH17$40.00$85.00$93.00$91.00$40.00
0330Painted pavement markings, standard, white, arrows (0710-11170)EACH44$35.00$45.00$49.24$48.00$35.00
0335Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM3.14$1,745.50$1,500.00$1,641.18$1,600.00$1,750.00
0340Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241)GM0.10$663.16$1,000.00$875.29$805.00$700.00
0345Painted pavement markings, standard,black, skip, 6" (0710-11331)GM0.21$485.38$800.00$875.29$845.00$490.00
0350Initial contingency amount, DO not bid (0999-25)LS1$140,000$140,000$140,000$140,000$140,000
0355Initial contingency amount, DO not bid (0999-25)LS1$10,000$10,000$10,000$10,000$10,000
0360Ground-in rumble strips, 8" sinusoidal (0546-72-3)GM0.69$18,169$10,000$1,094.12$27,000$12,500
0365Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH9$452.00$400.00$437.65$103.00$440.00
0370Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH11$1,724.50$1,900.00$2,078.82$310.00$1,670.00
0375Single column ground sign assembly, remove (0700-1600)EACH18$51.50$50.00$54.71$620.00$50.00
0380Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH20$282.50$150.00$164.12$83.00$275.00
0385Sign panel, install, UP to 12 SF (0700-3401)EACH2$194.50$300.00$328.24$210.00$190.00
0390Sign panel, remove, UP to 12 SF (0700-3601)EACH22$31.00$40.00$43.76$55.00$30.00
0395Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH5$77.50$100.00$109.41$465.00$75.00
0400Profiled thermoplastic,standard- concrete surfaces, white, solid,6" (0701-17101)GM0.55$14,408$20,000$21,882$22,000$14,600
0405Tubular marker, 36" white post (0704-1-3)EACH4$233.00$225.00$109.41$620.00$91.00
0410Tubular marker, 36" yellow (0704-1-4)EACH22$233.00$225.00$246.18$305.00$91.00
0415Object marker, type 1 (0705-10-1)EACH1$258.50$302.85$328.24$401.00$250.00
0420Raised pavement marker, type B (0706-1-3)EACH1,159$4.00$5.00$5.47$5.40$4.00
0425Painted pavement markings, durable paint, yellow, island nose (0710-12290)SF19$5.00$10.00$10.94$11.00$5.00
0430Painted pavement markings, surface (0710-90)LS1$24,310$10,000$10,941$10,000$25,000
0435Painted pavement markings, surface (0710-90)LS1$2,999.00$2,000.00$2,188.23$2,150.00$3,000.00
0440Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF1,244$3.50$4.00$4.38$4.30$3.50
0445Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF1,449$5.00$6.00$6.56$6.40$5.00
0450Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF274$6.50$8.00$8.75$8.55$6.50
0455Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.06$1,906.78$3,400.00$4,376.47$3,600.00$2,250.00
0460Thermoplastic, standard, arrow (0711-11170)EACH20$64.00$90.00$98.47$96.00$64.00
0465Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF16$4.50$6.00$6.56$6.40$5.00
0470Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.04$2,142.86$4,000.00$4,376.47$4,100.00$2,250.00
0475Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF1,019$16.00$16.00$17.51$17.00$16.00
0480Thermoplastic, preformed, white, 2-4 dotted guideline on concrete surfaces (0711-14141)GM0.32$8,630.12$20,000$21,882$21,000$8,800.00
0485Thermoplastic, preformed, yellow, 2-4 dotted guideline on concrete surfaces (0711-14241)GM0.07$8,495.28$20,000$21,882$21,000$8,800.00
0490Thermoplastic, preformed, black, 2-4 dotted guideline on concrete surfaces (0711-14341)GM0.33$8,577.18$20,000$21,882$21,000$8,800.00
0495Thermoplastic, preformed, 24" white with 4" black contrast crosswalk on concrete pavement, 32" (0711-14526)LF737$21.50$30.00$32.82$32.00$22.00
0500Thermoplastic, preformed, 24" white with 4" black contrast stop line on concrete 32" (0711-14527)LF213$21.50$30.00$32.82$32.00$22.00
0505Thermoplastic, preformed, 12" white with 4" black contrast crosswalk on concrete pavement, 20" (0711-14528)LF771$13.50$20.00$21.88$22.00$13.50
0510Thermoplastic, preformed, white with black contrast on concrete pavement, message symbol (0711-14560)EACH8$1,164.00$1,100.00$1,203.53$1,200.00$1,200.00
0515Thermoplastic, preformed, white with black contrast, arrow on concrete surface (0711-14570)EACH47$999.00$750.00$820.59$800.00$1,000.00
0520Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM1.16$5,223.00$6,000.00$6,564.70$6,400.00$5,300.00
0525Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102)GM0.26$6,733.59$6,300.00$7,111.76$6,700.00$7,000.00
0530Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM1.33$1,302.00$4,500.00$4,923.53$4,800.00$1,300.00
0535Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM1.70$4,885.00$6,000.00$6,564.70$6,400.00$5,000.00
0540Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1)SF24$10.00$150.00$164.12$160.00$10.00
0545Permanent tape, white, solid W/contrast, 6" primary line width, for concrete surfaces (0713-103121)GM0.99$50,647$40,000$43,765$43,000$51,000
0550Permanent tape, white, solid W/contrast, 8" primary line width, for concrete surfaces (0713-103122)GM0.48$67,319$60,000$65,647$65,000$68,000
0555Permanent tape, white, 6-10 skip/dotted, 6" for concrete surfaces (0713-103141)GM0.07$10,294$8,300.00$9,300.00$8,800.00$10,600
0560Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181)GM1.85$7,055.00$8,500.00$9,300.00$9,100.00$7,060.00
0565Permanent tape, black, 6-10 dotted extension, 6" for concrete surfaces (0713-103341)GM0.07$10,294$8,300.00$9,300.00$8,800.00$10,600
0570Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381)GM1.85$10,583$8,500.00$9,300.00$9,100.00$10,600
0575Conduit, furnish & install, open trench (0630-2-11)LF769$25.50$25.30$23.52$31.00$25.00
0580Conduit, furnish & install, directional bore (0630-2-12)LF952$26.50$26.50$34.46$32.00$26.00
0585Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH10$1,034.50$1,040.00$1,258.23$1,250.00$1,040.00
0590Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12)LF6,028$2.00$1.90$2.63$2.30$2.00
0595Lighting conductors, remove & dispose, contractor owns (0715-1-60)LF5,276$0.95$1.00$0.77$1.15$1.00
0600Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211)EACH2$1,181.50$1,180.00$1,914.71$1,450.00$1,185.00
0605Light pole complete, F&I, standard pole standard foundation, 30' mounting height, 15' arm length (0715-61152)EACH2$8,797.50$8,810.00$10,722$11,000$8,800.00
0610Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 0' arm length (0715-61300)EACH3$8,270.50$8,280.00$11,379$9,900.00$8,300.00
0615Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 15' arm length (0715-61352)EACH5$8,309.50$8,320.00$11,051$9,900.00$8,400.00
0620Light pole complete, remove pole and foundation (0715-69000)EACH6$1,051.50$1,060.00$826.06$1,300.00$1,060.00
0625Pole cable distribution system, furnish and install, conventional (0715-500-1)EACH10$640.50$642.00$1,203.53$765.00$640.00
0630Conduit, furnish & install, open trench (0630-2-11)LF660$30.00$30.25$25.16$36.00$30.00
0635Conduit, furnish & install, directional bore (0630-2-12)LF1,288$42.00$42.00$43.22$5.10$42.00
0640Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI3$15,832$15,830$14,224$25,000$20,400
0645Signal cable, remove- intersection (0632-7-6)PI1$963.50$969.00$2,040.53$1,200.00$970.00
0650Fiber optic cable, F&I, underground,2-12 fibers (0633-1121)LF639$4.50$4.60$6.35$5.50$5.00
0655Fiber optic connection, install, splice (0633-2-31)EACH16$55.50$55.25$76.59$66.00$55.00
0660Fiber optic connection hardware, F&I, splice (0633-3-11)EACH1$1,381.50$1,380.00$1,914.71$1,700.00$1,400.00
0665Fiber optic connection hardware, F&I, splice tray (0633-3-12)EACH2$61.50$61.50$84.79$73.50$62.00
0670Fiber optic connection hardware, F&I, preterminated patch panel (0633-3-15)EACH1$2,363.50$2,360.00$3,282.35$2,900.00$2,400.00
0675Fiber optic cable locator (0633-6)DA420$268.50$271.00$382.94$325.00$271.00
0680Span wire assembly, F&I, two point, diagonal (0634-4152)PI2$5,829.50$5,850.00$7,002.35$7,000.00$5,900.00
0685Span wire assembly, F&I, two point, box or drop box (0634-4153)PI1$19,404$19,470$11,160$23,500$19,500
0690Span wire assembly, remove- poles remain (0634-4600)PI1$2,054.50$2,070.00$1,969.41$2,500.00$2,070.00
0695Fiberglass insulator, furnish & install (0634-5-1)LF75$126.50$127.00$22.98$151.00$127.00
0700Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH3$2,352.50$2,360.00$31.73$2,850.00$2,400.00
0705Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13)EACH1$5,657.00$5,680.00$5,634.70$6,800.00$5,700.00
0710Pull & splice box, F&I, 17" X 30" cover size (0635-2-14)EACH45$1,650.00$1,860.00$2,133.53$2,250.00$1,900.00
0715Electrical power service, F&I, underground, meter by contractor (0639-1122)AS3$5,716.00$5,730.00$5,306.47$6,900.00$5,800.00
0720Electrical power service, remove underground (0639-1620)AS1$925.00$931.00$1,148.82$1,150.00$930.00
0725Electrical service wire, & install (0639-2-1)LF432$6.50$6.50$12.58$7.75$6.50
0730Electrical service wire, (0639-2-6)LF10$1.00$1.20$109.41$1.45$1.25
0735Electrical service disconnect, F&I, pole mount (0639-3-11)EACH2$2,804.00$2,820.00$1,422.35$3,400.00$2,800.00
0740Prestressed concrete pole, type P-II service pole (0641-2-12)EACH5$2,663.00$2,670.00$2,790.00$3,200.00$2,600.00
0745Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60)EACH1$1,870.00$1,880.00$661.94$2,300.00$1,880.00
0750Aluminum signals pole, (0646-1-11)EACH16$2,028.50$2,040.00$2,844.70$2,500.00$2,040.00
0755Aluminum signals pole, furnish install pedestrian detector post (0646-1-12)EACH2$1,690.50$1,700.00$2,242.94$2,100.00$1,700.00
0760Aluminum signals pole, remove (0646-1-60)EACH2$256.00$258.00$328.24$310.00$260.00
0765Steel strain pole, F&I, type PS- (0649-1-14)EACH2$58,559$58,700$63,459$70,000$59,000
0770Steel strain pole, F&I, type PS- IX (0649-1-16)EACH4$70,142$70,300$74,619$85,000$70,300
0775Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS30$1,608.00$1,610.00$1,695.88$2,000.00$1,600.00
0780Vehicular traffic signal, furnish & install aluminum, 3 section, 2-4 ways (0650-1-15)AS1$2,794.50$2,800.00$3,501.17$3,400.00$2,800.00
0785Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16)AS5$1,900.00$1,900.00$2,133.53$2,300.00$1,900.00
0790Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS16$884.50$887.00$930.00$1,100.00$900.00
0795Loop detector inductive, remove- cabinet to remain (0660-1600)EACH4$84.00$84.25$27.35$100.00$85.00
0800Vehicle detection system- microwave, furnish & install cabinet equipment (0660-3-11)EACH2$11,676$11,680$13,239$14,000$11,700
0805Vehicle detection system- microwave, furnish & install, above ground equipment (0660-3-12)EACH8$8,221.00$8,230.00$14,114$9,800.00$8,230.00
0810Vehicle detection system - microwave, relocate, above ground equipment (0660-3-42)EACH4$906.50$911.00$2,024.12$1,100.00$910.00
0815Vehicle detection system- microwave, adjust & modify, cabinet equipment (0660-3-51)EACH1$299.00$301.00$661.94$360.00$301.00
0820Vehicle detection system- furnish & install cabinet equipment (0660-4-11)EACH1$24,817$24,820$36,872$30,000$24,820
0825Vehicle detection system- furnish & install above ground equipment (0660-4-12)EACH2$4,699.50$4,700.00$7,987.06$5,600.00$4,700.00
0830Pedestrian detector, furnish & install, standard (0665-1-11)EACH18$313.50$314.00$55.25$375.00$315.00
0835Pedestrian detector, remove- pole/pedestal to remain (0665-1-60)EACH2$76.50$77.00$55.25$92.00$77.00
0840Traffic controller assembly, F&I, NEMA (0670-5110)AS2$41,725$41,770$59,629$50,000$41,800
0845Traffic controller, modify (0671-2-40)EACH1$1,592.00$1,600.00$661.94$1,950.00$1,600.00
0850Traffic signal controller cabinet, adjust/modify (0676-1500)EACH1$3,522.50$3,540.00$1,367.65$4,210.00$3,540.00
0855ITS CCTV camera, F&I, dome PTZ enclosure - pressurized, IP, definition (0682-1113)EACH1$9,137.50$9,150.00$13,676$11,000$9,150.00
0860Managed field ethernet switch, furnish & install (0684-1-1)EACH1$4,046.00$4,050.00$5,470.59$4,900.00$4,050.00
0865Wireless communication device, furnish & install ethernet access point (0684-6-11)EACH1$5,413.00$5,420.00$3,391.76$6,500.00$5,425.00
0870Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13)EACH2$8,341.50$8,350.00$14,114$10,000$8,350.00
0875Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH4$459.50$462.00$180.53$550.00$465.00
0880Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH6$846.00$849.00$793.23$1,010.00$850.00
0885Sign panel, remove, UP to 12 SF (0700-3601)EACH4$235.50$237.00$28.99$282.00$240.00
0890Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH12$6,443.50$6,460.00$6,674.11$7,700.00$6,460.00
0895Internally illuminated sign, remove (0700-5-60)EACH4$861.50$866.00$486.88$1,050.00$865.00
FDOT contract T7558: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of January 29, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy