FDOT contract T7583 bid tabulation

SR 56 AND CR 581 (BRUCE B DOWNS BLVD) FROM BRUCE B DOWNS BL. Let by Florida DOT on February 25, 2026, Pasco, District 7. 5 bids received; low bid $19,729,686 by Preferred Materials Inc..

Owner
Florida DOT
Letting
25 FEB 2026
Pay items
221
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Preferred Materials Inc.$19,729,686Low
2C.W. Roberts Contracting, Inc.$19,822,7830.0%
3Superior Asphalt, Inc.$20,549,001+4.0%
4Ajax Paving Industries of Florida LLC$22,384,541+13%
5Hubbard Construction Company$24,280,726+23%
FDOT contract T7583: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Preferred Materials Inc.2. C.W. Roberts Contracting, Inc.3. Superior Asphalt, Inc.4. Ajax Paving Industries of Florida LLC5. Hubbard Construction Company
0005Mobilization (0101-1)LS1$437,100$808,663$734,798$561,077$681,367
0010Mobilization (0101-1)LS1$160,750$521,169$475,000$76,721$413,249
0015Maintenance of traffic (0102-1)DA1$605,000$357,446$415,550$880,476$896,702
0020Maintenance of traffic (0102-1)DA1$22,395$238,297$225,000$378,075$543,850
0025Pedestrian or bicycle special detour (0102-4-1)SY1$23,656$14,947$14,935$7,869.35$16,547
0030Pedestrian escort/flagger (0102-5)HR672$14.52$32.13$21.50$64.07$42.66
0035Traffic control officer (0102-14)HR2,022$82.94$0.11$102.00$112.13$105.43
0040Work zone sign (0102-60)ED33,631$0.21$0.22$0.25$0.20$0.24
0045Temporary barrier, F&I, low profile, concrete (0102-71-13)LF573$38.36$58.41$44.00$39.51$44.00
0050Temporary barrier, F&I, anchored (0102-71-15)LF483$35.25$53.68$38.65$36.31$40.44
0055Temporary barrier, relocate, low profile concrete (0102-71-23)LF138$16.59$25.26$12.90$17.09$19.03
0060Temporary barrier, relocate, anchored (0102-71-25)LF590$16.59$25.26$15.60$17.09$19.03
0065Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED125,588$0.09$0.01$0.15$0.10$0.11
0070Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD6,006$0.04$0.04$0.05$0.03$0.05
0075Arrow board / advance warning arrow panel (0102-76)ED960$5.18$5.48$5.15$5.34$5.95
0080Temporary crash cushion, redirective option (0102-89-1)LO8$829.45$876.38$1,170.00$854.29$951.44
0085Portable changeable message sign, temporary (0102-99)ED2,004$11.40$12.05$11.50$9.61$13.08
0090Temporary signalization and maintenance, intersection (0102-104)ED2,560$25.92$16.01$26.00$26.70$10.48
0095Temporary traffic detection and maintenance, intersection (0102-107-1)ED2,560$25.92$20.56$26.00$26.70$12.32
0100Existing ITS maintenance (0102-112)DA640$188.18$132.28$185.00$193.82$89.44
0105Type III barricade (0102-115)ED540$0.31$0.33$0.30$0.25$0.36
0110Portable regulatory, sign (0102-150-1)ED640$5.18$5.48$4.55$5.34$5.95
0115Radar speed display unit (0102-150-2)ED640$5.18$5.48$4.85$5.34$5.95
0120Removable tape, white, solid 6" (0102-913-21)GM0.70$9,821.60$10,606$10,735$10,679$11,799
0125Removable tape, white, 10'-30', 6'-10', or 2'-4' skip, 6" wide (0102-913-22)GM0.19$3,046.29$3,414.02$2,415.00$2,402.70$2,607.53
0130Removable tape, white, 24" stop bar (0102-913-23)LF1,424$4.15$4.42$9.70$9.61$10.65
0135Removable tape, white, 12" crosswalk (0102-913-24)LF1,627$2.07$2.21$4.85$4.81$5.32
0140Removable tape, white, symbol or arrow (0102-913-29)EACH16$518.40$551.93$270.00$270.17$299.37
0145Sediment barrier (0104-10-3)LF3,057$1.35$1.59$1.35$1.60$2.96
0150Soil tracking prevention device (0104-15)EACH2$4,769.31$1,137.57$2,950.00$0.00$6,850.40
0155Inlet protection system (0104-18)EACH227$155.52$142.86$134.20$144.16$209.52
0160Litter removal (0107-1)ACRE1,030.49$23.79$24.98$24.50$24.51$27.29
0165Mowing (0107-2)ACRE1,030.49$61.96$65.05$65.00$63.82$71.07
0170Clearing & grubbing (0110-1-1)ACRE1$231,138$169,578$212,800$39,514$240,364
0175Clearing & grubbing (0110-1-1)ACRE1$27,954$22,610$28,385$12,904$32,065
0180Clearing & grubbing (0110-1-1)ACRE1$43,470$90,442$7,250.00$6,130.73$37,478
0185Removal of existing concrete (0110-4-10)SY1,247$26.65$27.61$27.00$43.64$30.57
0190Regular excavation (0120-1)CY385.20$28.57$29.61$29.00$153.79$32.78
0195Embankment (0120-6)CY276.40$36.32$37.63$37.00$209.57$41.66
0200Type B stabilization (0160-4)SY3,060$26.42$27.37$26.00$25.41$30.30
0205Optional base, base group 01 (0285-701)SY59$48.52$50.28$103.77$346.35$285.86
0210Optional base, base group 06 (0285-706)SY763$56.11$58.14$55.15$49.38$41.47
0215Optional base, base group 09 (0285-709)SY749$69.19$71.69$74.20$55.62$59.51
0220Optional base, base group 11 (0285-711)SY392$86.28$94.78$162.00$80.46$117.01
0225Milling existing asphalt pavement, 3 1/2" avg depth (0327-70-2)SY67,828$3.72$3.34$1.20$4.95$4.51
0230Milling existing asphalt pavement, 3" avg depth (0327-70-4)SY17,652$3.94$2.13$1.65$5.59$2.87
0235Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY68,693$3.65$5.81$2.15$5.53$7.82
0240Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11)SY51,740$3.32$3.28$2.30$3.53$4.34
0245Milling existing asphalt pavement, 2 3/4" avg depth (0327-70-15)SY146,090$3.00$2.07$1.60$3.57$2.86
0250Milling existing asphalt pavement, 3 3/4" avg depth (0327-70-20)SY145,803$3.67$3.79$1.65$4.58$5.06
0255Superpave asphaltic conc, traffic C (0334-1-13)TN55,159.70$109.60$103.68$127.75$129.59$129.34
0260Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25)TN13,839.10$219.00$207.93$223.85$225.00$242.10
0265Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN11,723.10$170.00$161.40$153.35$193.91$193.26
0270Miscellaneous asphalt (0339-1)TN18.90$404.24$376.84$486.50$460.75$436.18
0275Plain cement concrete 8.5" (0350-3-6)SY59$218.39$226.29$220.90$160.18$250.51
0280Inlets, curb, type 9, <10' (0425-1201)EACH6$6,733.12$6,976.72$6,810.00$11,233$7,723.44
0285Manhole, adjust (0425-5)EACH8$1,049.11$341.16$1,060.00$142.83$1,203.42
0290Manhole, adjust, utilities (0425-5-1)EACH4$1,022.34$341.17$1,035.00$142.83$1,172.71
0295Valve boxes, adjust (0425-6)EACH21$651.34$207.68$660.00$85.70$747.14
0300Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF6$265.08$274.67$268.00$1,092.14$304.07
0305Pipe culvert,optional material,other-elip/arch, (0430-175218)LF216$202.17$209.48$204.50$332.61$231.90
0310Mitered end sect, optional - elliptical / arch, 18" SD (0430-984625)EACH2$2,938.13$3,044.43$2,970.00$4,078.96$3,370.28
0315Concrete curb & gutter, type E (0520-1-7)LF1,309$50.89$52.73$72.00$48.60$58.37
0320Concrete curb & gutter, type F (0520-1-10)LF893$52.21$54.10$74.25$47.54$59.89
0325Concrete curb, type D (0520-2-4)LF487$31.08$32.21$55.00$37.38$35.66
0330Concrete curb, type RA (0520-2-8)LF200$58.83$60.96$89.50$37.38$67.48
0335Traffic separator concrete- type IV, 8.5' wide (0520-5-46)LF239$119.96$124.30$214.00$195.60$137.60
0340Concrete sidewalk and driveways, 4" thick (0522-1)SY1,088$65.54$67.91$66.30$67.28$75.18
0345Concrete sidewalk and driveways, 6" thick (0522-2)SY731$101.57$105.24$102.75$86.50$116.50
0350Detectable warnings (0527-2)SF446$33.00$34.20$22.50$26.70$37.86
0355Guardrail -roadway, general (0536-1-1)LF435$26.35$27.46$26.65$27.13$30.22
0360Pipe rail for guardrail (0536-6)LF263$5.79$6.03$5.85$5.96$6.64
0365Special guardrail post- special steel post for concrete structure mount (0536-7-2)EACH4$292.03$304.37$295.00$300.78$334.98
0370Guardrail removal (0536-73)LF789$3.06$3.19$3.10$3.15$3.51
0375Guardrail end treatment- trailing anchorage (0536-85-20)EACH1$1,659.20$1,729.33$1,680.00$1,708.91$1,903.24
0380Guardrail end treatment- parallel approach terminal (0536-85-24)EACH6$3,280.40$3,419.07$3,320.00$3,378.67$3,762.89
0385Performance turf, sod (0570-1-2)SY28,873$3.86$3.63$6.80$5.19$3.48
0390Conduit, furnish & install, open trench (0630-2-11)LF68$23.85$27.88$69.25$24.56$78.51
0395Conduit, furnish & install, directional bore (0630-2-12)LF14$67.39$30.00$210.00$69.41$238.91
0400Pull & splice box, F&I, 17" X 30" cover size (0635-2-14)EACH6$36.29$1,662.17$1,635.00$37.38$1,851.12
0405Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1)EACH18$2,815.19$2,301.22$2,485.00$2,899.52$2,816.88
0410Traffic monitoring site speed/classification unit, furnish & install, volume speed and classification (0695-3-11)AS5$19,315$7,220.12$9,560.00$19,893$10,842
0415Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12)EACH18$2,558.84$2,983.37$2,340.00$2,635.49$2,654.31
0420Traffic monitoring site cabinet, F&I, type 3, 2 pane back, pedestal mount (0695-7162)EACH5$6,424.66$7,387.62$7,085.00$6,617.13$8,032.40
0425Raised pavement marker, type B (0706-1-3)EACH4,355$4.15$4.42$3.85$3.93$4.35
0430Painted pavement markings, standard, white, solid, 6" (0710-11101)GM14.47$1,450.93$1,545.83$1,700.00$1,735.28$1,922.06
0435Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF8,340$0.78$0.83$1.60$1.60$1.77
0440Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124)LF3,124$1.30$1.38$1.70$1.71$1.89
0445Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF8,608$1.56$1.66$1.80$1.82$2.01
0450Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM12.54$725.76$772.70$510.00$517.92$573.90
0455Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM1.58$725.77$772.70$655.50$667.42$739.55
0460Painted pavement markings, standard, white, message or symbol (0710-11160)EACH18$62.21$66.23$36.70$37.38$41.42
0465Painted pavement markings, standard, white, arrows (0710-11170)EACH361$36.29$38.64$31.50$32.04$35.50
0470Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM6.82$1,449.61$1,545.63$1,705.00$1,735.28$1,920.31
0475Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224)LF485$1.30$1.38$1.70$1.71$1.89
0480Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241)GM0.47$722.69$785.81$655.50$667.42$736.44
0485Directional indicators (0919-528100)SF80$33.00$95.24$94.40$96.11$107.99
0490Initial contingency amount, DO not bid (0999-25)LS1$80,000$80,000$80,000$80,000$80,000
0495Initial contingency amount, DO not bid (0999-25)LS1$10,000$10,000$10,000$10,000$10,000
0500Initial contingency amount, DO not bid (0999-25)LS1$60,000$60,000$60,000$60,000$60,000
0505Ground-in rumble strips, 8" sinusoidal (0546-72-3)GM14.13$1,975.47$3,124.67$1,180.00$1,201.35$2,736.31
0510Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH160$497.67$513.07$500.00$512.58$621.23
0515Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH42$2,073.61$2,137.78$1,780.00$2,135.73$2,603.25
0520Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113)EACH1$2,592.02$2,672.22$2,600.00$2,669.66$3,313.22
0525Single column ground sign assembly, relocate (0700-1500)EACH1$336.96$347.39$375.00$347.06$236.66
0530Single column ground sign assembly, remove (0700-1600)EACH139$20.74$21.38$62.00$21.36$76.91
0535Single column ground sign assembly, F&I cantilever mount, 20.1-30.0 SF (0700-1913)EACH2$3,836.18$3,954.90$4,130.00$3,951.10$6,508.12
0540Single column ground sign assembly, F&I cantilever mount, 30.1+ SF (0700-1914)EACH3$4,147.22$4,275.56$4,450.00$4,271.46$6,508.12
0545Multi-column ground sign assembly, F&I ground mount, 20.0 SF (0700-2112)EACH1$13,997$14,430$8,960.00$14,416$5,916.48
0550Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114)EACH1$7,776.05$8,016.68$7,800.00$8,008.99$8,578.89
0555Sign panel, furnish & install ground mount, 12-20 SF (0700-3102)EACH7$466.56$481.00$795.00$480.54$692.23
0560Sign panel, furnish & install overhead mount, 101-200 SF (0700-3206)EACH1$5,702.43$5,878.90$7,550.00$5,873.26$5,916.48
0565Sign panel, relocate, UP to 12 SF (0700-3501)EACH1$103.68$106.89$188.00$106.79$82.84
0570Sign panel, remove, 12-20 SF (0700-3602)EACH7$20.74$21.38$188.00$21.36$53.25
0575Retroreflective sign strip- furnish and install, 2' (0700-13-12)EACH36$82.94$85.51$92.00$85.43$59.16
0580Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH42$93.31$96.20$107.00$96.11$130.16
0585Tubular marker, 36" white post (0704-1-3)EACH22$207.36$220.77$213.00$213.57$189.33
0590Tubular marker, 36" yellow (0704-1-4)EACH38$207.36$220.77$213.00$213.57$189.33
0595Object marker, type 2 (0705-10-2)EACH59$103.68$106.89$155.00$106.79$207.08
0600Raised pavement marker, type B (0706-1-3)EACH10,829$4.15$4.42$4.20$4.27$4.73
0605Painted pavement markings, standard, white, island nose (0710-11190)SF29$3.11$3.31$4.20$4.27$4.73
0610Painted pavement markings, standard, yellow, island nose (0710-11290)SF328$3.11$3.31$4.20$4.27$4.73
0615Painted pavement markings, durable paint, yellow, island nose (0710-12290)SF1,260$5.18$5.52$4.40$4.43$4.91
0620Painted pavement markings, surface (0710-90)LS1$82,219$87,536$80,825$76,788$85,088
0625Painted pavement markings, surface (0710-90)LS1$15,448$16,448$10,635$10,783$11,949
0630Painted pavement markings, surface (0710-90)LS1$86,470$92,062$65,970$66,907$74,139
0635Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF11,247$4.15$4.42$3.15$3.19$3.54
0640Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF7,631$4.67$4.97$4.75$4.79$5.31
0645Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF7,288$5.18$5.52$6.30$6.39$7.08
0650Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM3.44$3,105.89$3,316.40$1,760.00$1,783.34$1,973.23
0655Thermoplastic, standard, message or symbol (0711-11160)EACH25$233.28$248.37$83.00$84.36$93.48
0660Thermoplastic, standard, arrow (0711-11170)EACH807$82.94$88.31$62.00$63.00$69.81
0665Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF2,300$7.26$7.73$4.35$4.38$4.85
0670Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.47$4,645.85$5,051.57$1,760.00$1,783.34$1,967.73
0675Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF5,084$14.52$15.45$15.00$15.36$17.02
0680Thermoplastic, preformed, white, message (0711-14160)EACH74$196.99$209.73$195.00$197.56$218.91
0685Thermoplastic, preformed, white, arrow (0711-14170)EACH73$103.68$110.39$82.00$83.29$92.30
0690Thermoplastic, preformed, white with black contrast, arrow on concrete surface (0711-14570)EACH2$518.41$551.93$980.00$995.25$1,102.84
0695Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101)GM25.13$5,596.97$5,961.33$6,555.00$6,648.53$7,364.84
0700Thermoplastic, standard-open graded asphalt surfaces, solid, 8" (0711-15102)GM1.21$6,205.45$6,606.78$8,740.00$8,865.42$9,799.41
0705Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131)GM19.25$3,109.29$3,312.10$1,640.00$1,662.67$1,841.72
0710Thermoplastic, standard-open graded asphalt surfaces, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-15133)GM0.32$6,144.04$6,745.80$3,280.00$3,324.27$3,638.15
0715Thermoplastic, standard-open graded asphalt surfaces, 6", 6-10 dotted managed lane marking (0711-15171)GM0.99$3,082.11$3,314.93$2,460.00$2,493.47$2,737.85
0720Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201)GM14.08$5,598.75$5,960.85$6,015.00$6,097.51$6,756.61
0725Thermoplastic, standard-open graded asphalt surfaces, yellow, skip, 6" (0711-15231)GM0.64$3,091.10$3,342.44$1,500.00$1,524.91$1,679.24
0730Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM5.20$5,176.05$5,521.43$4,665.00$4,728.51$5,231.56
0735Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102)GM0.89$5,702.44$6,071.24$6,215.00$6,304.68$6,986.17
0740Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM3.56$2,586.91$2,761.98$1,165.00$1,182.13$1,307.33
0745Thermoplastic, standard other surfaces, white, 6", 6-10 dotted managed lane marking (0711-16171)GM0.39$2,592.03$2,759.64$1,760.00$1,783.34$1,976.10
0750Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM2.28$5,184.03$5,519.31$4,285.00$4,346.21$4,816.00
0755Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231)GM0.17$2,576.84$2,743.51$1,070.00$1,087.09$1,197.54
0760Permanent tape, white, solid, 6" for concrete bridges (0713-103101)GM0.04$26,661$37,847$52,000$52,806$50,155
0765Permanent tape, white, solid W/contrast, 6" primary line width, for concrete surfaces (0713-103121)GM0.04$53,321$56,770$84,800$86,017$81,698
0770Preformed/permanent tape, remove (0713-107)SF184$20.22$21.53$3.15$3.20$3.55
0775Conduit, furnish & install, open trench (0630-2-11)LF661$10.89$10.78$18.00$11.21$29.36
0780Conduit, furnish & install, directional bore (0630-2-12)LF2,224$32.05$26.17$38.00$33.01$33.82
0785Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH31$1,623.88$1,434.31$1,580.00$1,672.52$2,774.66
0790Electrical service disconnect, remove- pole or cabinet to remain (0639-3-60)EACH1$543.29$636.55$625.00$559.56$417.20
0795Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12)LF13,295$3.01$2.12$2.80$3.10$2.75
0800Lighting conductors, remove & dispose, contractor owns (0715-1-60)LF789$0.78$0.95$0.65$0.80$0.52
0805Luminaire & bracket arm, install (0715-5-30)EACH4$1,087.61$968.09$2,315.00$1,120.19$1,421.75
0810Load center, F&I, secondary voltage (0715-7-11)EACH4$20,431$11,926$16,280$21,043$22,080
0815Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211)EACH4$2,524.11$2,074.60$2,100.00$2,599.72$2,373.68
0820Light pole complete, F&I, standard pole standard foundation, 35' mounting height, 12' arm length (0715-61242)EACH4$9,885.75$8,224.87$10,500$10,182$12,899
0825Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 12' arm length (0715-61342)EACH7$9,859.41$8,740.57$10,700$10,155$13,095
0830Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 15' arm length (0715-61352)EACH6$10,248$7,822.36$10,370$10,555$11,139
0835Light pole complete, F&I, standard pole special foundation, 40' mounting height, 12' arm length (0715-62342)EACH5$14,741$10,712$10,500$15,182$13,815
0840Light pole complete, F&I, utility conflict pole special foundation, 40' mounting height, 16' arm length (0715-66366)EACH2$9,223.43$11,917$11,400$9,499.74$15,423
0845Pole cable distribution system, furnish and install, conventional (0715-500-1)EACH34$888.49$765.43$775.00$915.11$863.60
0850Light pole complete- special design, F&I, single arm mount, aluminum, 30' (0715-511130)EACH2$14,227$10,077$10,000$14,653$13,381
0855Itsfm location documentation- intersection (0611-2-1)EACH9$2,594.61$2,941.29$3,170.00$2,672.33$3,617.19
0860Conduit, furnish & install, open trench (0630-2-11)LF384$19.96$15.11$21.75$20.56$45.30
0865Conduit, furnish & install, directional bore (0630-2-12)LF1,823$21.67$32.41$41.25$22.32$50.87
0870Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI5$11,742$26,603$12,600$12,094$17,742
0875Signal cable, remove- intersection (0632-7-6)PI5$1,036.81$973.74$2,500.00$1,067.87$2,503.25
0880Fiber optic cable locator (0633-6)DA320$142.56$228.72$172.00$146.83$198.74
0885Span wire assembly, F&I, two point, box or drop box (0634-4153)PI4$13,954$18,203$11,000$14,372$55,615
0890Span wire assembly, remove- poles remain (0634-4600)PI4$1,555.21$11,789$2,500.00$1,601.80$7,509.77
0895Pull & splice box, F&I, 17" X 30" cover size (0635-2-14)EACH23$2,041.51$1,862.71$1,760.00$2,102.67$1,851.12
0900Aluminum signals pole, (0646-1-11)EACH15$3,059.17$2,506.68$2,790.00$3,150.81$3,215.38
0905Aluminum signals pole, remove (0646-1-60)EACH7$544.32$258.50$500.00$560.63$834.41
0910Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS85$1,989.60$2,068.57$2,195.00$2,049.20$2,765.36
0915Vehicular traffic signal, furnish & install aluminum, 5 section cluster, 1 way (0650-1-19)AS12$2,411.04$2,959.00$3,275.00$2,483.27$3,922.23
0920Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109)EACH9$743.57$486.55$600.00$765.84$714.94
0925Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS14$1,143.03$914.18$1,025.00$1,177.27$1,078.48
0930Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12)AS1$1,848.46$1,585.85$1,970.00$1,903.83$2,078.17
0935Loop detector inductive, F&I, type 9 (0660-1109)EACH21$880.51$417.65$420.00$906.89$374.83
0940Loop detector inductive, remove- cabinet to remain (0660-1600)EACH55$41.47$86.23$125.00$42.71$26.08
0945Loop assembly, F&I, type B (0660-2102)AS39$1,739.76$2,117.70$1,875.00$1,791.88$2,340.41
0950Vehicle detection system - microwave, remove, complete system (0660-3-60)EACH1$1,529.29$326.32$1,000.00$1,575.10$1,877.45
0955Vehicle detection system- furnish & install cabinet equipment (0660-4-11)EACH5$26,000$29,459$27,700$26,779$31,534
0960Vehicle detection system- furnish & install above ground equipment (0660-4-12)EACH14$7,114.50$7,039.28$6,400.00$7,327.63$7,343.66
0965Vehicle detection system- adjust/modify cabinet (0660-4-51)EACH3$1,995.85$312.83$1,880.00$2,055.64$1,251.63
0970Vehicle detection system- remove cabinet equipment (0660-4-61)EACH2$1,036.81$485.03$375.00$1,067.87$417.21
0975Vehicle detection system- remove above ground (0660-4-62)EACH6$1,016.07$806.70$625.00$1,046.51$417.21
0980Signal priority & preemption system, adjust/modify (0663-1500)EACH3$2,695.70$951.59$1,890.00$2,776.45$5,055.16
0985Pedestrian detector, furnish & install, standard (0665-1-11)EACH15$369.81$348.32$420.00$380.89$610.63
0990Traffic controller, modify (0671-2-40)EACH8$4,769.31$5,200.80$3,240.00$4,912.18$2,349.35
0995Traffic signal controller cabinet, adjust/modify (0676-1500)EACH9$2,661.48$2,200.63$3,570.00$2,741.21$2,094.16
1000ITS CCTV camera, pressurized, high definition (0682-1163)EACH1$9,982.66$6,971.23$9,625.00$10,282$10,955
1005Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH6$944.54$1,146.87$1,215.00$972.84$1,140.25
1010Sign panel, remove, UP to 12 SF (0700-3601)EACH2$259.20$252.08$94.00$266.97$208.60
1015Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH22$5,905.52$8,683.19$4,940.00$6,082.44$8,090.87
1020Internally illuminated sign, remove (0700-5-60)EACH21$466.56$878.11$500.00$480.54$625.81
1025Enhanced highway sign AC powered, F&I overhead blank out sign <12 SF (0700-141360)EACH1$8,698.28$8,099.15$8,395.00$8,958.86$9,417.74
1030Itsfm subsurface documentation- project length (0611-1-1)MI1.68$3,183.84$4,319.87$3,100.00$3,271.41$4,422.75
1035Conduit, furnish & install, open trench (0630-2-11)LF6,694$21.67$27.04$27.00$22.32$39.89
1040Conduit, furnish & install, directional bore (0630-2-12)LF2,170$30.22$36.24$44.00$31.13$58.86
1045Fiber optic cable, F&I, underground,2-12 fibers (0633-1121)LF117$4.28$4.85$4.50$4.41$5.96
1050Fiber optic cable, F&I, underground, 97 - 144 fibers (0633-1124)LF9,964$5.65$6.40$6.00$5.82$7.87
1055Fiber optic connection, install, splice (0633-2-31)EACH292$51.32$60.76$55.00$52.86$71.55
1060Fiber optic connection, install, termination (0633-2-32)EACH12$85.54$96.96$90.00$88.10$119.25
1065Fiber optic connection hardware, F&I, splice (0633-3-11)EACH1$1,476.93$1,706.60$1,720.00$1,521.18$2,059.01
1070Fiber optic connection hardware, F&I, splice tray (0633-3-12)EACH27$57.02$96.96$55.00$58.73$79.49
1075Fiber optic connection hardware, F&I, buffer tube fan out kit (0633-3-14)EACH1$96.94$90.51$105.00$99.85$135.16
1080Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16)EACH1$1,397.10$1,680.74$1,650.00$1,438.95$1,947.71
1085Fiber optic connection hardware, adjust/modify splice enclosure (0633-3-51)EACH2$883.88$1,001.98$965.00$910.36$2,464.46
1090Fiber optic cable locator (0633-6)DA320$142.56$228.72$170.00$146.83$198.74
1095Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH16$2,745.56$2,424.89$3,090.00$2,827.81$2,948.85
1100Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13)EACH1$5,843.29$7,007.49$6,685.00$6,018.34$6,756.44
1105Managed field ethernet switch, furnish & install (0684-1-1)EACH1$24,012$5,162.11$8,940.00$24,731$11,026
FDOT contract T7583: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of February 25, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy