| 0005 | Mobilization (0101-1) | LS | 1 | $419,801 | $550,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $206,198 | $250,000 |
| 0015 | Traffic control officer (0102-14) | HR | 16 | $122.63 | $85.00 |
| 0020 | Work zone sign (0102-60) | ED | 9,000 | $0.45 | $0.40 |
| 0025 | Temporary barrier, F&I, anchored (0102-71-15) | LF | 663 | $25.00 | $40.00 |
| 0030 | Temporary barrier, relocate, anchored (0102-71-25) | LF | 2,750 | $10.00 | $16.00 |
| 0035 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 16,200 | $0.13 | $0.15 |
| 0040 | Temporary crash cushion, redirective option (0102-89-1) | LO | 12 | $1,233.36 | $1,000.00 |
| 0045 | Portable changeable message sign, temporary (0102-99) | ED | 776 | $19.36 | $15.50 |
| 0050 | Type III barricade (0102-115) | ED | 900 | $1.29 | $1.50 |
| 0055 | Temporary raised rumble per day, includes all sets and relocations (0102-909) | DA | 180 | $77.44 | $37.00 |
| 0060 | Sediment barrier (0104-10-3) | LF | 2,958 | $2.10 | $3.50 |
| 0065 | Floating turbidity barrier (0104-11) | LF | 429 | $24.50 | $14.00 |
| 0070 | Inlet protection system (0104-18) | EACH | 1 | $322.70 | $500.00 |
| 0075 | Litter removal (0107-1) | ACRE | 361.44 | $60.00 | $20.00 |
| 0080 | Mowing (0107-2) | ACRE | 312.48 | $80.00 | $40.00 |
| 0085 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $34,053 | $50,000 |
| 0090 | Removal of existing concrete (0110-4-10) | SY | 288 | $49.69 | $60.00 |
| 0095 | Regular excavation (0120-1) | CY | 41 | $1,110.12 | $100.00 |
| 0100 | Embankment (0120-6) | CY | 619 | $30.71 | $30.00 |
| 0105 | Type B stabilization (0160-4) | SY | 2,943 | $10.30 | $25.00 |
| 0110 | Optional base, base group 01 (0285-701) | SY | 4,003 | $19.42 | $28.00 |
| 0115 | Milling existing asphalt pavement, 2" avg depth (0327-70-5) | SY | 94,591 | $1.89 | $2.25 |
| 0120 | Milling existing asphalt pavement, 1/2" avg depth (0327-70-16) | SY | 44,678 | $1.60 | $1.25 |
| 0125 | Superpave asphaltic concrete, traffic B, PG76-22 (0334-1-52) | TN | 7,805 | $153.59 | $170.00 |
| 0130 | Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81) | TN | 11,489.70 | $159.37 | $165.00 |
| 0135 | Miscellaneous asphalt (0339-1) | TN | 191.60 | $305.26 | $375.00 |
| 0140 | Pipe culvert, optional material, round, 18"SD (0430-174118) | LF | 4 | $597.00 | $1,500.00 |
| 0145 | Mitered end section, optional round, 18" SD (0430-984125) | EACH | 1 | $7,454.38 | $4,300.00 |
| 0150 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 220 | $84.54 | $138.00 |
| 0155 | Concrete ditch pavement, 4", reinforced (0524-1-29) | SY | 420 | $124.72 | $210.00 |
| 0160 | Guardrail -roadway, general (0536-1-1) | LF | 2,213 | $45.18 | $36.00 |
| 0165 | Special guardrail post- special steel post for concrete structure mount (0536-7-2) | EACH | 121 | $206.53 | $165.00 |
| 0170 | Guardrail removal (0536-73) | LF | 980 | $2.58 | $2.50 |
| 0175 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 12 | $2,605.80 | $2,100.00 |
| 0180 | Performance turf, sod and shoulder treatment index (0570-1-3) | SY | 30,284 | $3.87 | $3.50 |
| 0185 | Raised pavement marker, type B (0706-1-3) | EACH | 2,318 | $6.45 | $5.25 |
| 0190 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 27.26 | $2,258.91 | $1,800.00 |
| 0195 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 48 | $2.90 | $2.35 |
| 0200 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 136 | $3.87 | $3.25 |
| 0205 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.23 | $1,548.95 | $1,250.00 |
| 0210 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 4 | $58.08 | $48.00 |
| 0215 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 18 | $58.08 | $48.00 |
| 0220 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 13.67 | $2,258.91 | $1,800.00 |
| 0225 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 248 | $2.90 | $2.50 |
| 0230 | Painted pavement markings, standard, yellow, skip, 6" (0710-11231) | GM | 9.35 | $839.02 | $680.00 |
| 0235 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $62,729 | $62,729 |
| 0240 | Raised rumble strip set- permanent (0546-71-1) | EACH | 4 | $1,548.95 | $1,250.00 |
| 0245 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 18.48 | $2,433.17 | $1,600.00 |
| 0250 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 73 | $516.32 | $420.00 |
| 0255 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 8 | $2,129.82 | $1,700.00 |
| 0260 | Single column ground sign assembly, remove (0700-1600) | EACH | 56 | $12.91 | $10.50 |
| 0265 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 2 | $129.08 | $110.00 |
| 0270 | Sign panel, relocate, UP to 12 SF (0700-3501) | EACH | 36 | $38.72 | $32.00 |
| 0275 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 6 | $83.91 | $70.00 |
| 0280 | Object marker, type 1 (0705-10-1) | EACH | 15 | $348.52 | $280.00 |
| 0285 | Object marker, type 2 (0705-10-2) | EACH | 32 | $64.54 | $52.00 |
| 0290 | Delineator, non-flexible (0705-11-2) | EACH | 4 | $64.54 | $52.00 |
| 0295 | Raised pavement marker, type B (0706-1-3) | EACH | 1,568 | $6.45 | $5.25 |
| 0300 | Painted pavement markings, surface (0710-90) | LS | 1 | $38,724 | $31,500 |
| 0305 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 156 | $7.74 | $6.50 |
| 0310 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 235 | $12.91 | $10.50 |
| 0315 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.11 | $4,582.35 | $3,700.00 |
| 0320 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 2 | $322.70 | $260.00 |
| 0325 | Thermoplastic, standard, arrow (0711-11170) | EACH | 9 | $129.08 | $110.00 |
| 0330 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 338 | $7.74 | $6.50 |
| 0335 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.05 | $4,582.35 | $3,750.00 |
| 0340 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 13.49 | $6,712.16 | $5,450.00 |
| 0345 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 7.77 | $6,647.62 | $5,400.00 |
| 0350 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 3.16 | $3,549.70 | $2,850.00 |