FDOT contract T1813 bid tabulation

SR 45 (US 41) FROM N OF EDWARDS DR TO N MAGELLAN... Let by Florida DOT on February 25, 2026, Dist/St-Wide, Manateefed Aid No:D121031B, District 1. 4 bids received; low bid $15,369,593 by Superior Asphalt, Inc..

Owner
Florida DOT
Letting
25 FEB 2026
Pay items
212
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Superior Asphalt, Inc.$15,369,593Low
2Preferred Materials Inc.$15,474,399+1.0%
3Watson Civil Construction, Inc.$16,009,128+4.0%
4Ajax Paving Industries of Florida LLC$16,390,753+7.0%
FDOT contract T1813: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Superior Asphalt, Inc.2. Preferred Materials Inc.3. Watson Civil Construction, Inc.4. Ajax Paving Industries of Florida LLC
0005Mobilization (0101-1)LS1$735,000$1,249,352$1,500,000$875,248
0010Mobilization (0101-1)LS1$40,000$32,892$8,000.00$56,697
0015Mobilization (0101-1)LS1$55,000$291,172$88,000$66,113
0020Maintenance of traffic (0102-1)DA1$772,500$506,947$559,000$968,902
0025Maintenance of traffic (0102-1)DA1$78,250$12,374$3,000.00$42,575
0030Maintenance of traffic (0102-1)DA1$106,000$52,377$31,000$242,680
0033Pedestrian or bicycle special detour (0102-4-1)SY1$106,500$42,055$53,000$197,801
0035Traffic control officer (0102-14)HR1,213$105.00$97.04$120.00$113.71
0040Work zone sign (0102-60)ED33,376$0.25$0.22$0.30$0.22
0045Temporary barrier, F&I, low profile, concrete (0102-71-13)LF25,828$42.00$39.60$39.00$30.00
0050Temporary barrier, F&I, anchored (0102-71-15)LF1,965$37.00$34.91$34.00$36.28
0052Temporary barrier, relocate, low profile concrete (0102-71-23)LF3,257$16.60$12.82$12.50$20.00
0053Temporary barrier, relocate, anchored (0102-71-25)LF1,596$16.60$15.49$15.00$15.70
0055Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED224,850$0.10$0.11$0.12$0.08
0060Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD499,528$0.05$0.05$0.04$0.03
0065Arrow board / advance warning arrow panel (0102-76)ED1,875$5.50$5.05$6.00$4.33
0070Temporary crash cushion, redirective option (0102-89-1)LO4$1,200.00$1,125.53$1,100.00$2,165.94
0075Portable changeable message sign, temporary (0102-99)ED1,167$10.00$10.94$14.00$9.75
0080Temporary signalization and maintenance, intersection (0102-104)ED375$44.20$34.54$62.00$43.32
0085Temporary traffic detection and maintenance, intersection (0102-107-1)ED375$44.20$37.98$62.00$43.32
0090Type III barricade (0102-115)ED1,668$0.50$0.27$0.35$0.27
0095Removable tape, white, solid 6" (0102-913-21)GM2.70$12,000$11,430$11,000$11,371
0100Removable tape, white, 10'-30', 6'-10', or 2'-4' skip, 6" wide (0102-913-22)GM0.07$3,500.00$3,366.92$2,900.00$3,248.92
0105Removable tape, yellow, solid, (0102-913-31)GM1.84$12,000$11,464$11,000$11,371
0110Removable tape, yellow, 10'-30', 9', 6'-10', or 2'-4' skip (0102-913-32)GM0.04$3,500.00$3,393.02$2,900.00$3,248.92
0115Sediment barrier (0104-10-3)LF530$26.00$3.30$1.50$5.96
0120Soil tracking prevention device (0104-15)EACH4$2,715.00$5,182.74$4,300.00$3,790.41
0125Inlet protection system (0104-18)EACH93$295.00$181.79$114.00$189.52
0130Litter removal (0107-1)ACRE136.05$55.00$130.85$104.00$10.83
0135Mowing (0107-2)ACRE80.40$225.00$221.43$151.00$10.83
0140Clearing & grubbing (0110-1-1)ACRE1$27,800$74,929$51,000$313,666
0145Clearing & grubbing (0110-1-1)ACRE1$283,450$59,258$204,000$71,614
0150Removal of existing concrete (0110-4-10)SY1,679$61.00$30.19$30.00$58.48
0155Regular excavation (0120-1)CY137.20$300.00$34.94$45.00$77.97
0160Embankment (0120-6)CY2,621.20$55.00$39.66$41.00$72.56
0165Type B stabilization (0160-4)SY2,934$72.00$53.05$35.00$30.32
0170Optional base, base group 03 (0285-703)SY52$167.00$76.53$105.00$292.66
0175Optional base, base group 09 (0285-709)SY1,824$76.50$65.51$123.00$64.20
0180Milling existing asphalt pavement, 1" avg depth (0327-70-1)SY181$21.00$50.33$24.00$19.93
0185Milling existing asphalt pavement, 3 1/2" avg depth (0327-70-2)SY56,203$2.40$5.20$3.80$7.51
0190Milling existing asphalt pavement, 4 1/2" avg depth (0327-70-3)SY18,730$2.40$6.14$4.15$9.55
0195Milling existing asphalt pavement, 3" avg depth (0327-70-4)SY980$13.00$10.97$15.40$4.49
0200Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY5,711$8.85$10.98$10.30$1.73
0205Milling existing asphalt pavement, 4" avg depth (0327-70-7)SY40,844$2.40$4.94$4.00$8.66
0210Superpave asphaltic conc, traffic C (0334-1-13)TN13,539.70$140.00$156.03$172.00$148.90
0215Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53)TN1,694.30$160.00$178.99$193.00$166.51
0220Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN10,324.90$157.00$188.48$193.00$172.69
0225Miscellaneous asphalt (0339-1)TN8.60$1,475.00$311.06$1,650.00$679.83
0230Plain cement concrete 6" (0350-3-1)SY1,458$82.00$108.70$77.00$81.22
0235Plain cement concrete 12" (0350-3-13)SY52$175.00$203.37$135.00$162.45
0240Inlets, curb, type P-1, <10' (0425-1311)EACH8$12,155$10,868$11,500$16,805
0245Inlets, curb, type P-6, partial (0425-1365)EACH1$15,850$9,034.18$5,600.00$9,798.19
0250Inlets, curb type J-1, <10' (0425-1411)EACH1$14,865$16,087$10,500$13,982
0255Inlets, curb, type J-2, <10' (0425-1421)EACH2$13,500$15,876$16,000$22,441
0260Manholes, P-7, <10' (0425-2-41)EACH3$8,840.00$9,217.57$5,000.00$10,070
0265Manholes, J-7, <10' (0425-2-71)EACH3$11,271$12,716$6,500.00$11,273
0270Pipe culvert,optional material,round, 15"S/CD (0430-175115)LF143$422.50$234.20$230.00$304.48
0275Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF38$643.00$347.66$376.00$423.95
0280Pipe culvert,optional material,round, 24"S/CD (0430-175124)LF32$715.00$370.12$487.00$686.98
0285Pipe culvert, opt material, round, 30"S/CD (0430-175130)LF32$775.00$407.36$496.00$507.09
0290Pipe culvert, opt material, round, 36"S/CD (0430-175136)LF8$1,575.00$446.86$1,000.00$863.27
0295Pipe culvert,optional material,other-elip/arch, (0430-175218)LF81$385.00$235.59$329.00$286.93
0300Concrete curb & gutter, type F (0520-1-10)LF861$57.00$42.01$35.00$27.07
0305Concrete curb, type A (0520-2-1)LF11,139$23.00$23.87$26.00$24.37
0310Valley gutter- concrete (0520-3)LF134$91.00$65.94$45.00$29.24
0315Traffic separator concrete- type I, 4' wide (0520-5-11)LF1,247$53.50$61.01$45.00$102.88
0320Concrete traffic separator, special- variable width (0520-70)SY985$107.00$109.90$117.00$200.35
0325Concrete sidewalk and driveways, 4" thick (0522-1)SY793$87.50$85.39$64.00$64.98
0330Concrete sidewalk and driveways, 6" thick (0522-2)SY370$119.90$108.03$97.00$81.22
0335Detectable warnings (0527-2)SF671$60.00$28.19$37.00$41.15
0340Guardrail -roadway, general (0536-1-1)LF164$25.50$23.97$26.00$24.91
0345Guardrail removal (0536-73)LF226$2.00$2.08$2.30$2.17
0350Guardrail end treatment- trailing anchorage (0536-85-20)EACH1$2,150.00$2,032.20$2,200.00$2,735.59
0355Guardrail end treatment- parallel approach terminal (0536-85-24)EACH1$3,600.00$3,387.00$3,700.00$3,519.67
0360Performance turf, sod (0570-1-2)SY7,431$11.50$4.22$5.60$4.50
0365Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130)LS1$3,804.72$3,804.72$3,804.72$3,804.72
0370Raised pavement marker, type B (0706-1-3)EACH9,484$4.00$4.17$3.90$4.06
0375Painted pavement markings, standard, white, solid, 6" (0710-11101)GM28.18$2,100.00$1,979.95$2,000.00$2,057.65
0380Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102)GM2.55$2,800.00$2,630.46$2,700.00$2,744.26
0385Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF22,419$1.75$1.62$1.65$1.62
0390Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124)LF2,049$1.85$1.72$1.75$1.79
0395Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF17,955$2.00$1.88$1.90$1.95
0400Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM48.52$600.00$546.88$545.00$568.56
0405Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM5.13$750.00$702.08$695.00$731.01
0410Painted pavement markings, standard, white, message or symbol (0710-11160)EACH315$45.00$41.69$42.00$43.32
0415Painted pavement markings, standard, white, arrows (0710-11170)EACH1,162$39.00$36.48$37.00$37.90
0420Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM26.25$2,100.00$1,979.49$1,700.00$2,057.65
0425Painted pavement markings, standard, yellow, skip, 6" (0710-11231)GM0.01$600.00$1,094.00$1,100.00$568.56
0430Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241)GM2.19$750.00$701.20$695.00$731.01
0435Initial contingency amount, DO not bid (0999-25)LS1$59,000$59,000$59,000$59,000
0440Initial contingency amount, DO not bid (0999-25)LS1$45,000$45,000$45,000$45,000
0445Initial contingency amount, DO not bid (0999-25)LS1$15,000$15,000$15,000$15,000
0450Initial contingency amount, DO not bid (0999-25)LS1$6,000.00$6,000.00$6,000.00$6,000.00
0455Initial contingency amount, DO not bid (0999-25)LS1$25,000$25,000$25,000$25,000
0460Prestressed concrete pole, complete pole removal- pole 30' and greater (0641-2-80)EACH2$4,975.00$5,523.42$12,100$4,873.38
0465Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH96$605.00$573.18$570.00$595.64
0470Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH19$2,000.00$1,875.88$1,900.00$1,949.35
0475Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113)EACH5$2,650.00$2,501.17$2,500.00$2,599.14
0480Single column ground sign assembly, relocate (0700-1500)EACH2$165.00$156.33$155.00$162.45
0485Single column ground sign assembly, remove (0700-1600)EACH51$72.00$67.74$68.00$70.39
0490Single column ground sign assembly, F&I cantilever mount, 12.0-20.0 SF (0700-1912)EACH2$2,820.00$2,657.50$2,700.00$2,761.58
0495Single column ground sign assembly, F&I cantilever mount, 20.1-30.0 SF (0700-1913)EACH4$3,100.00$2,918.03$2,900.00$3,032.33
0500Single column ground sign assembly, F&I cantilever mount, 30.1+ SF (0700-1914)EACH2$3,500.00$3,282.79$3,300.00$3,411.37
0505Multi-column ground sign assembly, remove (0700-2600)EACH1$1,655.00$1,563.23$1,600.00$1,624.46
0510Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH1$390.00$364.75$365.00$379.04
0515Sign panel, relocate, UP to 12 SF (0700-3501)EACH29$40.00$36.48$37.00$37.90
0520Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH46$121.50$114.64$114.00$119.13
0525Object marker, type 1 (0705-10-1)EACH9$221.00$208.43$207.00$216.59
0530Delineator, flexible tubular (0705-11-1)EACH27$121.50$114.64$114.00$119.13
0535Raised pavement marker, type B (0706-1-3)EACH1,712$5.00$4.17$3.90$4.06
0540Painted pavement markings, durable paint, yellow, island nose (0710-12290)SF105$5.00$5.21$4.15$4.33
0545Painted pavement markings, surface (0710-90)LS1$55,900$78,793$49,000$54,805
0550Painted pavement markings, surface (0710-90)LS1$4,700.00$8,077.74$4,000.00$4,602.64
0555Painted pavement markings, surface (0710-90)LS1$6,100.00$7,816.16$5,000.00$5,956.36
0560Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF4,020$3.50$3.49$3.25$3.39
0565Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF345$5.20$5.24$4.90$5.09
0570Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF861$7.00$6.98$6.50$6.78
0575Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.86$2,800.00$2,590.15$2,600.00$2,707.44
0580Thermoplastic, standard, message or symbol (0711-11160)EACH5$600.00$571.10$570.00$593.47
0585Thermoplastic, standard, arrow (0711-11170)EACH152$70.00$66.70$66.00$69.31
0590Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.39$2,800.00$2,598.72$2,600.00$2,707.44
0595Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF2,440$18.00$16.92$17.00$17.59
0600Thermoplastic, preformed, white, message (0711-14160)EACH50$245.00$230.32$230.00$239.34
0605Thermoplastic, preformed, white, arrow (0711-14170)EACH48$100.00$91.71$91.00$95.30
0610Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101)GM0.08$7,450.00$6,311.15$6,300.00$6,224.94
0615Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131)GM0.13$2,000.00$1,732.50$1,750.00$1,828.06
0620Thermoplastic, standard-open graded asphalt surfaces, yellow, skip, 6" (0711-15231)GM0.01$2,000.00$3,230.00$3,200.00$1,678.61
0625Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM5.05$5,300.00$4,998.38$5,000.00$5,198.28
0630Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102)GM0.44$7,100.00$6,639.62$6,600.00$6,931.04
0635Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM8.48$1,350.00$1,249.26$1,250.00$1,299.57
0640Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM4.69$5,000.00$4,587.08$4,600.00$4,775.92
0645Preformed/permanent tape, remove (0713-107)SF330$4.50$4.17$4.20$4.33
0650Conduit, furnish & install, open trench (0630-2-11)LF1,038$15.50$13.27$14.50$15.16
0655Conduit, furnish & install, directional bore (0630-2-12)LF16,281$22.00$24.27$26.00$21.66
0660Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH108$1,380.00$1,550.30$1,675.00$1,353.72
0665Electrical power service, adjust/modify (0639-1500)AS2$4,550.00$6,290.33$6,750.00$4,440.19
0670Electrical service wire, & install (0639-2-1)LF8$30.00$28.93$31.00$29.78
0675Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12)LF88,308$2.00$2.09$2.25$1.95
0680Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13)LF12,545$3.00$4.29$4.60$2.92
0685Lighting conductors, remove & dispose, contractor owns (0715-1-60)LF51,925$0.15$0.77$0.85$0.11
0690Luminaire & bracket arm, relocate (0715-5-40)EACH1$725.00$948.45$1,020.00$703.93
0695Load center, F&I, secondary voltage (0715-7-11)EACH2$22,250$20,041$21,500$21,768
0700Load center, remove, voltage (0715-7-41)EACH2$885.00$5,768.76$6,200.00$866.38
0705Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211)EACH25$1,660.00$1,304.12$1,400.00$1,624.46
0710Light pole complete, F&I, standard pole standard foundation, 30' mounting height, 8' arm length (0715-61111)EACH3$14,150$7,908.48$8,500.00$13,862
0715Light pole complete, F&I, standard pole standard foundation, 30' mounting height, 15' arm length (0715-61152)EACH25$14,150$8,287.81$8,900.00$13,862
0720Light pole complete, F&I, standard pole standard foundation, 35' mounting height, 8' arm length (0715-61211)EACH4$12,750$7,800.93$8,350.00$12,454
0725Light pole complete, F&I, standard pole standard foundation, 35' mounting height, 15' arm length (0715-61252)EACH2$12,750$8,509.84$9,100.00$12,454
0730Light pole complete, F&I, standard pole standard foundation, 45' mounting height, 8' arm length (0715-61411)EACH1$1,650.00$11,674$12,500$16,245
0735Light pole complete, F&I, standard pole standard foundation, 45' mounting height, 15' arm length (0715-61452)EACH41$16,500$10,507$11,200$16,245
0740Light pole complete, F&I, utility conflict pole standard foundation, 30' mounting height, 16' arm length (0715-65166)EACH9$14,600$11,235$12,000$14,295
0745Light pole complete, F&I, utility conflict pole standard foundation, 35' mounting height, 16' arm length (0715-65266)EACH1$16,950$11,670$12,500$16,461
0750Light pole complete, remove pole and foundation (0715-69000)EACH39$1,105.00$919.22$980.00$1,082.97
0755Pole cable distribution system, furnish and install, conventional (0715-500-1)EACH118$965.00$705.50$755.00$947.60
0760Conduit, furnish & install, open trench (0630-2-11)LF1,036$15.50$16.11$17.20$15.16
0765Conduit, furnish & install, directional bore (0630-2-12)LF1,776$48.00$66.06$71.00$46.57
0770Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI5$15,000$21,420$23,000$14,620
0775Signal cable, remove- intersection (0632-7-6)PI4$760.00$786.55$840.00$741.84
0780Fiber optic cable, F&I, underground,2-12 fibers (0633-1121)LF1,804$6.00$7.26$7.80$5.85
0785Fiber optic connection, install, splice (0633-2-31)EACH68$72.00$72.62$78.00$69.85
0790Fiber optic connection hardware, F&I, splice tray (0633-3-12)EACH8$80.00$123.45$132.00$77.43
0795Fiber optic connection hardware, F&I, preterminated connector assembly (0633-3-13)EACH48$87.00$79.88$86.00$85.01
0800Fiber optic connection hardware, F&I, preterminated patch panel (0633-3-15)EACH4$1,900.00$3,093.57$3,300.00$1,841.06
0805Fiber optic connection hardware, adjust/modify splice enclosure (0633-3-51)EACH4$1,300.00$1,234.53$1,320.00$1,245.42
0810Fiber optic cable locator (0633-6)DA375$196.00$167.36$180.00$189.52
0815Multi-conductor cable, furnish & install, cat 6 (0633-8-11)LF118$5.00$4.39$4.70$3.03
0820Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH5$3,150.00$2,323.64$255.00$3,086.48
0825Pull & splice box, F&I, 17" X 30" cover size (0635-2-14)EACH102$1,925.00$1,988.85$2,150.00$1,895.21
0830Electrical power service, F&I, underground, meter by contractor (0639-1122)AS4$5,000.00$10,802$11,600$4,602.64
0835Electrical power service, remove overhead (0639-1610)AS4$250.00$732.64$785.00$433.19
0840Electrical service wire, & install (0639-2-1)LF574$12.00$11.36$12.20$11.91
0845Prestressed concrete pole, type P-II service pole (0641-2-12)EACH4$2,200.00$2,012.13$2,200.00$2,165.95
0850Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60)EACH4$615.00$1,620.26$1,800.00$601.05
0855Aluminum signals pole, (0646-1-11)EACH30$2,325.00$2,818.34$3,050.00$2,274.25
0860Aluminum signals pole, remove (0646-1-60)EACH19$275.00$193.37$207.00$270.74
0865Steel mast arm assembly, and install, single arm 30' (0649-21-1)EACH1$66,500$48,560$52,000$64,978
0870Steel mast arm assembly, and install, single arm 40' (0649-21-3)EACH1$68,500$58,168$62,000$67,144
0875Steel mast arm assembly, and install, single arm 50' (0649-21-6)EACH1$79,500$72,121$77,000$77,974
0880Steel mast arm assembly, and install, single arm 60' (0649-21-10)EACH2$79,500$73,562$79,000$77,974
0885Steel mast arm assembly, remove, deep foundation- bolt on attachment (0649-26-5)EACH5$36,500$8,153.76$8,700.00$35,738
0890Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS40$1,650.00$2,077.40$2,250.00$1,624.46
0895Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16)AS8$2,650.00$2,428.16$1,400.00$2,599.14
0900Vehicular traffic signal, remove- poles to remain (0650-1-60)AS30$300.00$337.77$360.00$281.57
0905Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS30$995.00$936.96$1,000.00$974.68
0910Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60)AS3$185.00$124.60$133.00$178.69
0915Loop assembly, F&I, type B (0660-2102)AS10$1,150.00$1,444.58$1,550.00$1,137.12
0920Loop assembly, F&I, type F (0660-2106)AS6$2,325.00$2,637.92$2,850.00$2,274.25
0925Vehicle detection system- microwave, furnish & install cabinet equipment (0660-3-11)EACH4$13,250$10,333$11,100$12,996
0930Vehicle detection system- microwave, furnish & install, above ground equipment (0660-3-12)EACH24$12,700$9,767.62$10,500$12,454
0935Vehicle detection system- avi, bluetooth, furnish & install, cabinet equipment (0660-6121)EACH1$2,800.00$2,523.08$2,700.00$2,761.58
0940Vehicle detection system- avi, bluetooth, furnish & install, above ground equipment (0660-6122)EACH1$9,400.00$8,756.67$9,400.00$9,205.28
0945Vehicle detection system- avi, bluetooth relocate, cabinet equipment (0660-6421)EACH1$550.00$446.33$480.00$541.49
0950Signal priority and preemption system, F&I, optical, cabinet electronics (0663-1111)EACH4$9,900.00$8,099.48$900.00$9,692.62
0955Signal priority and preemption system, F&I, optical, detector (0663-1112)EACH4$4,500.00$4,021.14$4,300.00$4,494.34
0960Signal priority & preemption system, remove (0663-1600)EACH3$445.00$289.03$308.00$433.19
0965Pedestrian detector, furnish & install, standard (0665-1-11)EACH30$425.00$354.42$380.00$416.95
0970Pedestrian detector, remove- pole/pedestal to remain (0665-1-60)EACH3$72.00$56.17$60.00$70.39
0975Traffic controller assembly, F&I, NEMA W/standard lock, 1 preemption (0670-5161)AS4$65,000$58,412$63,000$63,895
0980Traffic controller assembly, remove controller with (0670-5600)AS4$925.00$616.37$660.00$904.28
0985Traffic signal controller cabinet, furnish & install without controller, type/size 20" W X 32" H X 14" D (0676-1112)EACH3$11,000$40,082$42,800$10,721
0990Traffic signal controller cabinet, remove (0676-1600)EACH3$500.00$1,861.20$2,000.00$487.34
0995ITS cabinet- adjust/modify (0676-2500)EACH2$1,500.00$4,567.02$4,900.00$1,462.02
1000ITS CCTV camera, pressurized, high definition (0682-1163)EACH3$555.00$7,448.10$8,000.00$9,800.92
1005ITS CCTV camera, remove & disposal (0682-1600)EACH2$10,000$360.34$385.00$541.49
1010Managed field ethernet switch, furnish & install (0684-1-1)EACH4$5,900.00$10,238$11,000$5,793.91
1015Uninterruptible power supply, furnish and install, line interactive (0685-1-11)EACH4$13,925$14,250$15,200$13,645
1020Remote power management rpmu, furnish and install (0685-2-1)EACH4$850.00$1,304.32$1,400.00$839.31
1025Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH8$940.00$943.04$1,050.00$920.53
1030Sign panel, remove, UP to 12 SF (0700-3601)EACH3$165.00$185.75$200.00$162.45
1035Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH16$6,740.00$5,209.55$5,550.00$6,606.14
1040Internally illuminated sign, remove (0700-5-60)EACH11$250.00$763.12$815.00$243.67
1045Enhanced highway sign AC powered, F&I overhead blank out sign <12 SF (0700-141360)EACH2$9,945.00$8,967.46$9,600.00$9,746.77
FDOT contract T1813: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of February 25, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.