FDOT contract T2A59 bid tabulation
SR 500 (US 27) FROM NE 10TH ST TO MARION CO LINE. Let by Florida DOT on February 25, 2026, Levy, District 2. 6 bids received; low bid $3,937,846 by Whitehurst, V. E. & Sons, Inc..
- Owner
- Florida DOT
- Letting
- 25 FEB 2026
- Pay items
- 83
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Whitehurst, V. E. & Sons, Inc. | $3,937,846 | Low |
| 2 | Anderson Columbia Co., Inc. | $4,474,478 | +14% |
| 3 | Preferred Materials Inc. | $4,522,722 | +15% |
| 4 | C.W. Roberts Contracting, Inc. | $4,859,051 | +23% |
| 5 | Superior Asphalt, Inc. | $5,189,001 | +32% |
| 6 | Watson Construction Company, LLC | $5,915,485 | +50% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Whitehurst, V. E. & Sons, Inc. | 2. Anderson Columbia Co., Inc. | 3. Preferred Materials Inc. | 4. C.W. Roberts Contracting, Inc. | 5. Superior Asphalt, Inc. | 6. Watson Construction Company, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $279,313 | $331,372 | $64,691 | $337,000 | $160,391 | $355,042 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $111,238 | $192,879 | $244,716 | $223,000 | $215,000 | $350,000 |
| 0015 | Traffic control officer (0102-14) | HR | 680 | $125.00 | $128.97 | $100.00 | $100.00 | $110.00 | $115.00 |
| 0020 | Work zone sign (0102-60) | ED | 8,256 | $0.22 | $0.22 | $0.35 | $0.22 | $0.40 | $0.25 |
| 0025 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 31,814 | $0.05 | $0.06 | $0.11 | $0.10 | $0.15 | $0.15 |
| 0030 | Arrow board / advance warning arrow panel (0102-76) | ED | 121 | $5.38 | $5.61 | $4.80 | $5.56 | $5.50 | $8.00 |
| 0035 | Portable changeable message sign, temporary (0102-99) | ED | 583 | $10.75 | $11.21 | $10.50 | $11.10 | $12.00 | $12.00 |
| 0040 | Type III barricade (0102-115) | ED | 210 | $0.11 | $0.11 | $0.30 | $0.13 | $0.35 | $0.50 |
| 0045 | Portable regulatory, sign (0102-150-1) | ED | 170 | $5.38 | $5.61 | $5.00 | $5.56 | $5.70 | $8.00 |
| 0050 | Radar speed display unit (0102-150-2) | ED | 170 | $5.38 | $5.61 | $5.00 | $5.56 | $5.70 | $8.00 |
| 0055 | Sediment barrier (0104-10-3) | LF | 3,746 | $1.75 | $2.74 | $1.10 | $2.22 | $1.45 | $3.75 |
| 0060 | Inlet protection system (0104-18) | EACH | 25 | $125.00 | $168.21 | $100.00 | $210.00 | $145.00 | $300.00 |
| 0065 | Litter removal (0107-1) | ACRE | 293.55 | $107.50 | $44.86 | $65.00 | $22.00 | $63.00 | $100.00 |
| 0070 | Mowing (0107-2) | ACRE | 270.71 | $161.25 | $44.86 | $100.00 | $66.00 | $125.50 | $100.00 |
| 0075 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $10,000 | $77,341 | $35,155 | $11,372 | $20,000 | $64,550 |
| 0080 | Removal of existing concrete (0110-4-10) | SY | 125 | $38.85 | $63.44 | $72.38 | $39.00 | $63.00 | $180.00 |
| 0085 | Borrow excavation, truck measure (0120-2-2) | CY | 21.70 | $15.00 | $129.56 | $262.36 | $571.50 | $75.50 | $105.00 |
| 0090 | Regular excavation (3-R projects only) (0120-71) | LS | 1 | $1,750.00 | $16,882 | $7,149.40 | $14,300 | $9,275.00 | $32,000 |
| 0095 | Optional base, base group 01 (0285-701) | SY | 162 | $44.00 | $109.18 | $52.08 | $289.00 | $151.00 | $100.00 |
| 0100 | Turnout base- optional materials (0286-1) | SY | 50 | $25.00 | $63.41 | $117.25 | $138.00 | $143.80 | $95.00 |
| 0105 | Milling existing asphalt pavement, 1" avg depth (0327-70-1) | SY | 18,680 | $1.77 | $2.05 | $1.17 | $2.24 | $1.95 | $4.00 |
| 0110 | Milling existing asphalt pavement, 3" avg depth (0327-70-4) | SY | 9,507 | $2.52 | $4.00 | $2.70 | $3.26 | $2.55 | $8.50 |
| 0115 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 18,486 | $1.97 | $4.21 | $3.10 | $7.11 | $6.10 | $3.00 |
| 0120 | Milling existing asphalt pavement, 4" avg depth (0327-70-7) | SY | 16,729 | $2.92 | $5.39 | $3.10 | $5.27 | $4.00 | $6.00 |
| 0125 | Milling existing asphalt pavement, 2 3/4" avg depth (0327-70-15) | SY | 41,590 | $2.39 | $3.82 | $1.82 | $3.87 | $3.10 | $3.75 |
| 0130 | Milling existing asphalt pavement, 3 3/4" avg depth (0327-70-20) | SY | 16,616 | $2.80 | $5.75 | $3.16 | $5.08 | $3.65 | $5.50 |
| 0135 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 12,224.40 | $135.39 | $143.04 | $156.51 | $147.10 | $180.75 | $183.50 |
| 0140 | Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25) | TN | 4,009.30 | $140.90 | $177.90 | $232.28 | $231.47 | $266.15 | $270.00 |
| 0145 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 1,185.30 | $190.33 | $151.26 | $190.20 | $191.61 | $181.50 | $183.50 |
| 0150 | Inlets, adjust (0425-4) | EACH | 1 | $2,077.00 | $5,242.54 | $4,426.50 | $1,965.00 | $2,775.00 | $3,500.00 |
| 0155 | Manhole, adjust (0425-5) | EACH | 1 | $2,077.00 | $1,682.10 | $2,178.15 | $1,859.00 | $1,460.00 | $3,000.00 |
| 0160 | Pipe culvert, optional material, other shape - ellip/arch, 18"SD (0430-174218) | LF | 144 | $201.35 | $132.33 | $309.74 | $169.00 | $197.30 | $200.00 |
| 0165 | Mitered end sect, optional - elliptical / arch, 18" SD (0430-984625) | EACH | 4 | $5,388.00 | $2,495.12 | $2,359.50 | $3,301.00 | $2,915.00 | $4,000.00 |
| 0170 | Concrete curb & gutter, type E (0520-1-7) | LF | 218 | $62.75 | $54.67 | $84.26 | $78.00 | $60.00 | $65.00 |
| 0175 | Performance turf, sod (0570-1-2) | SY | 19,508 | $2.58 | $2.69 | $2.65 | $4.30 | $7.10 | $4.50 |
| 0180 | Raised pavement marker, type B (0706-1-3) | EACH | 4,466 | $7.00 | $4.77 | $6.60 | $4.73 | $4.85 | $6.50 |
| 0185 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 12.22 | $2,150.00 | $2,242.79 | $2,498.77 | $2,224.00 | $2,285.00 | $2,640.00 |
| 0190 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.04 | $2,419.00 | $2,579.22 | $3,000.00 | $2,558.00 | $2,625.00 | $10,480 |
| 0195 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 380 | $4.30 | $2.52 | $4.50 | $2.50 | $2.60 | $4.00 |
| 0200 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 58 | $5.38 | $3.08 | $5.50 | $3.06 | $3.15 | $7.50 |
| 0205 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 362 | $5.91 | $3.64 | $5.75 | $3.62 | $3.70 | $8.50 |
| 0210 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 10.77 | $1,881.25 | $1,065.33 | $1,759.02 | $1,056.00 | $1,085.00 | $2,640.00 |
| 0215 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 1.09 | $2,150.00 | $1,065.33 | $1,985.29 | $1,049.00 | $1,085.00 | $2,640.00 |
| 0220 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 198 | $62.35 | $67.28 | $60.00 | $67.00 | $68.50 | $75.00 |
| 0225 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 9.86 | $2,150.00 | $2,242.79 | $2,497.97 | $2,223.00 | $2,285.00 | $2,640.00 |
| 0230 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 1,738 | $4.30 | $3.08 | $5.50 | $3.06 | $3.15 | $7.50 |
| 0235 | Painted pavement markings, standard, yellow, skip, 6" (0710-11231) | GM | 1.40 | $1,881.25 | $1,065.33 | $1,752.44 | $1,052.00 | $1,085.00 | $2,640.00 |
| 0240 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.17 | $2,150.00 | $1,065.33 | $1,927.71 | $1,019.00 | $1,085.00 | $2,640.00 |
| 0245 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,434 | $50,434 | $50,434 | $50,434 | $50,434 | $50,434 |
| 0250 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 7.24 | $2,257.50 | $2,618.29 | $2,689.87 | $3,806.00 | $1,425.00 | $3,000.00 |
| 0255 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 80 | $430.00 | $448.55 | $626.00 | $445.00 | $605.00 | $720.00 |
| 0260 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 14 | $1,720.00 | $1,794.24 | $2,423.00 | $1,780.00 | $2,080.00 | $2,786.00 |
| 0265 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 1 | $1,720.00 | $1,794.24 | $3,079.00 | $1,780.00 | $2,935.00 | $3,540.00 |
| 0270 | Single column ground sign assembly, F&I ground mount, SF sheeting area for back to back signs (0700-1114) | EACH | 4 | $1,720.00 | $1,794.24 | $3,085.00 | $1,780.00 | $3,080.00 | $3,548.00 |
| 0275 | Single column ground sign assembly, relocate (0700-1500) | EACH | 4 | $161.25 | $168.21 | $192.00 | $167.00 | $435.00 | $220.00 |
| 0280 | Single column ground sign assembly, remove (0700-1600) | EACH | 28 | $26.90 | $28.03 | $30.00 | $27.00 | $72.50 | $50.00 |
| 0285 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 1 | $322.50 | $336.42 | $244.00 | $334.00 | $385.00 | $300.00 |
| 0290 | Sign panel, relocate, UP to 12 SF (0700-3501) | EACH | 8 | $26.90 | $28.03 | $94.00 | $27.00 | $220.00 | $125.00 |
| 0295 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 3 | $26.90 | $28.03 | $20.00 | $27.00 | $72.50 | $125.00 |
| 0300 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 62 | $64.50 | $67.28 | $90.00 | $67.00 | $120.00 | $110.00 |
| 0305 | Tubular marker, 36" yellow (0704-1-4) | EACH | 17 | $161.25 | $168.21 | $234.00 | $167.00 | $220.00 | $275.00 |
| 0310 | Object marker, type 1 (0705-10-1) | EACH | 3 | $307.15 | $320.39 | $302.00 | $318.00 | $305.00 | $350.00 |
| 0315 | Raised pavement marker, type B (0706-1-3) | EACH | 2,233 | $8.06 | $4.77 | $7.65 | $4.73 | $4.85 | $6.50 |
| 0320 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 120 | $10.75 | $11.21 | $15.00 | $11.12 | $11.40 | $10.00 |
| 0325 | Painted pavement markings, surface (0710-90) | LS | 1 | $65,040 | $42,567 | $80,000 | $42,226 | $43,350 | $94,500 |
| 0330 | Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102) | GM | 0.02 | $12,362 | $8,881.50 | $10,000 | $8,810.00 | $9,050.00 | $26,000 |
| 0335 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 190 | $7.50 | $3.92 | $6.00 | $3.89 | $4.00 | $10.00 |
| 0340 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 29 | $9.95 | $5.05 | $8.00 | $5.00 | $5.15 | $40.00 |
| 0345 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 181 | $12.90 | $6.17 | $10.00 | $6.10 | $6.30 | $25.00 |
| 0350 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.54 | $6,181.25 | $1,480.24 | $4,963.24 | $1,458.00 | $1,500.00 | $7,400.00 |
| 0355 | Thermoplastic, standard, arrow (0711-11170) | EACH | 99 | $129.00 | $112.15 | $105.00 | $111.00 | $114.15 | $175.00 |
| 0360 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 869 | $9.95 | $5.05 | $8.00 | $5.00 | $5.15 | $9.00 |
| 0365 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.08 | $6,181.25 | $4,440.74 | $4,819.28 | $4,246.00 | $4,520.00 | $7,400.00 |
| 0370 | Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101) | GM | 5.20 | $8,036.00 | $8,289.39 | $6,488.75 | $8,209.00 | $8,440.00 | $7,400.00 |
| 0375 | Thermoplastic, standard-open graded asphalt surfaces, solid, 8" (0711-15102) | GM | 0.02 | $12,363 | $10,362 | $10,000 | $10,278 | $10,550 | $12,400 |
| 0380 | Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131) | GM | 4.71 | $2,150.00 | $4,440.74 | $1,697.83 | $4,400.00 | $4,520.00 | $7,400.00 |
| 0385 | Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201) | GM | 3.00 | $8,036.00 | $8,289.39 | $6,480.49 | $8,198.00 | $8,440.00 | $7,400.00 |
| 0390 | Thermoplastic, standard-open graded asphalt surfaces, yellow, skip, 6" (0711-15231) | GM | 0.51 | $2,150.00 | $4,440.74 | $1,686.77 | $4,371.00 | $4,520.00 | $7,400.00 |
| 0395 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.91 | $7,418.00 | $6,809.13 | $5,940.59 | $6,687.00 | $6,930.00 | $7,400.00 |
| 0400 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 0.68 | $1,881.25 | $2,960.50 | $1,484.49 | $2,906.00 | $3,015.00 | $7,400.00 |
| 0405 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 1.93 | $7,418.00 | $6,809.13 | $5,975.10 | $6,726.00 | $6,930.00 | $7,400.00 |
| 0410 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 0.18 | $1,881.25 | $4,440.74 | $1,467.39 | $4,309.00 | $4,520.00 | $7,400.00 |
| 0415 | Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1) | SF | 103 | $16.15 | $11.21 | $10.00 | $11.12 | $11.40 | $50.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of February 25, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.