FDOT contract T1916 bid tabulation
SR 72 FROM SR 45 (US 41) TO SAWYER RD. Let by Florida DOT on February 25, 2026, Sarasota, District 1. 5 bids received; low bid $14,860,718 by Preferred Materials Inc..
- Owner
- Florida DOT
- Letting
- 25 FEB 2026
- Pay items
- 215
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Preferred Materials Inc. | $14,860,718 | Low |
| 2 | Russell Engineering, Inc. | $16,198,185 | +9.0% |
| 3 | Ajax Paving Industries of Florida LLC | $16,313,692 | +10% |
| 4 | Watson Civil Construction, Inc. | $16,450,906 | +11% |
| 5 | Superior Asphalt, Inc. | $16,749,613 | +13% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Preferred Materials Inc. | 2. Russell Engineering, Inc. | 3. Ajax Paving Industries of Florida LLC | 4. Watson Civil Construction, Inc. | 5. Superior Asphalt, Inc. |
|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $680,925 | $800,000 | $880,796 | $328,000 | $552,500 |
| 0010 | Mobilization (0101-1) | LS | 1 | $910,132 | $800,000 | $340,476 | $1,355,498 | $736,000 |
| 0015 | Maintenance of traffic (0102-1) | DA | 1 | $208,956 | $600,000 | $686,290 | $207,000 | $490,000 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $282,662 | $600,000 | $681,093 | $828,000 | $520,000 |
| 0025 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $40,654 | $103,257 | $107,372 | $51,000 | $194,500 |
| 0030 | Pedestrian escort/flagger (0102-5) | HR | 480 | $45.25 | $107.00 | $108.36 | $32.00 | $66.00 |
| 0035 | Traffic control officer (0102-14) | HR | 768 | $103.38 | $82.00 | $113.69 | $120.00 | $110.00 |
| 0040 | Work zone sign (0102-60) | ED | 146,853 | $0.22 | $0.21 | $0.23 | $0.33 | $0.25 |
| 0045 | Business sign (0102-61) | EACH | 85 | $46.90 | $46.00 | $48.73 | $47.00 | $34.50 |
| 0050 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 594 | $37.52 | $37.00 | $38.98 | $44.00 | $44.00 |
| 0055 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 1,278,588 | $0.09 | $0.01 | $0.10 | $0.12 | $0.10 |
| 0060 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 348,059 | $0.04 | $0.04 | $0.04 | $0.06 | $0.05 |
| 0065 | Arrow board / advance warning arrow panel (0102-76) | ED | 7,443 | $4.17 | $0.01 | $0.25 | $7.50 | $6.00 |
| 0070 | Portable changeable message sign, temporary (0102-99) | ED | 1,938 | $10.42 | $10.00 | $10.83 | $15.00 | $10.50 |
| 0075 | Temporary signalization and maintenance, intersection (0102-104) | ED | 1,800 | $52.11 | $50.00 | $54.14 | $70.00 | $57.50 |
| 0080 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 1,800 | $52.11 | $50.00 | $54.14 | $70.00 | $57.50 |
| 0085 | Existing ITS maintenance (0102-112) | DA | 450 | $31.27 | $30.00 | $32.48 | $45.00 | $34.50 |
| 0090 | Type III barricade (0102-115) | ED | 20,426 | $0.21 | $0.20 | $0.22 | $0.33 | $0.35 |
| 0095 | Inlet protection system (0104-18) | EACH | 121 | $182.39 | $300.00 | $189.49 | $130.00 | $230.00 |
| 0100 | Litter removal (0107-1) | ACRE | 155.78 | $95.97 | $103.00 | $16.24 | $94.00 | $57.50 |
| 0105 | Mowing (0107-2) | ACRE | 34.08 | $438.64 | $365.00 | $37.90 | $115.00 | $230.00 |
| 0110 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $7,489.35 | $9,000.00 | $39,846 | $25,000 | $5,175.00 |
| 0115 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $139,483 | $300,000 | $245,544 | $60,000 | $141,500 |
| 0120 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $94,766 | $300,000 | $100,012 | $240,000 | $96,500 |
| 0125 | Removal of existing concrete (0110-4-10) | SY | 2,644 | $37.61 | $40.00 | $58.47 | $28.00 | $68.00 |
| 0130 | Regular excavation (0120-1) | CY | 76.40 | $42.30 | $213.00 | $73.09 | $44.00 | $200.00 |
| 0135 | Embankment (0120-6) | CY | 3,332.60 | $42.70 | $65.00 | $68.22 | $34.00 | $63.50 |
| 0140 | Type B stabilization (0160-4) | SY | 1,549 | $52.42 | $16.55 | $32.48 | $38.00 | $88.00 |
| 0145 | Optional base, base group 03 (0285-703) | SY | 28 | $59.32 | $439.00 | $74.07 | $595.00 | $268.50 |
| 0150 | Optional base, base group 10 (0285-710) | SY | 850 | $83.39 | $292.00 | $122.69 | $100.00 | $170.70 |
| 0155 | Milling existing asphalt pavement, 3" avg depth (0327-70-4) | SY | 138,351 | $2.84 | $3.00 | $5.28 | $3.60 | $3.00 |
| 0160 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 5,960 | $17.87 | $20.00 | $17.19 | $3.95 | $20.00 |
| 0165 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 11,660.80 | $185.77 | $192.00 | $166.92 | $209.00 | $192.00 |
| 0170 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 11,866.20 | $180.73 | $180.00 | $171.05 | $193.00 | $180.00 |
| 0175 | Miscellaneous asphalt (0339-1) | TN | 1 | $373.42 | $3,655.00 | $356.58 | $11,000 | $3,625.00 |
| 0180 | Inlets, curb, type P-5, <10' (0425-1351) | EACH | 5 | $10,516 | $10,113 | $15,793 | $10,500 | $13,735 |
| 0185 | Inlets, curb, type 7, <10' (0425-1471) | EACH | 2 | $9,739.98 | $13,383 | $16,198 | $16,500 | $10,800 |
| 0190 | Inlets, curb, type 7, J bot ,>10' (0425-1474) | EACH | 1 | $32,479 | $15,700 | $27,328 | $30,000 | $30,000 |
| 0195 | Inlets, ditch bottom, type C modified- back of sidewalk, <10' (0425-1531) | EACH | 1 | $6,633.34 | $8,913.00 | $9,172.94 | $5,500.00 | $7,525.00 |
| 0200 | Manholes, P-7, <10' (0425-2-41) | EACH | 1 | $11,927 | $10,013 | $10,496 | $5,500.00 | $11,250 |
| 0205 | Manholes, P-8, partial (0425-2-63) | EACH | 1 | $5,011.05 | $4,720.00 | $9,570.46 | $3,500.00 | $9,135.00 |
| 0210 | Manholes, J-8, <10' (0425-2-91) | EACH | 1 | $15,665 | $9,900.00 | $17,658 | $10,700 | $17,925 |
| 0215 | Back of sidewalk endwall, 18" pipe diameter (0425-17-18) | EACH | 1 | $4,587.85 | $5,440.00 | $9,063.20 | $3,800.00 | $7,950.00 |
| 0220 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 262 | $179.76 | $259.00 | $314.55 | $140.00 | $405.00 |
| 0225 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 66 | $276.47 | $394.00 | $495.90 | $257.00 | $585.00 |
| 0230 | Pipe culvert, opt material, round, 30"S/CD (0430-175130) | LF | 8 | $407.38 | $777.00 | $1,237.53 | $531.00 | $1,250.00 |
| 0235 | Pipe culvert, opt material, round, 54"S/CD (0430-175154) | LF | 4 | $1,221.04 | $1,660.00 | $6,092.95 | $1,900.00 | $3,500.00 |
| 0240 | Pipe culvert, opt material, round, 60"S/CD (0430-175160) | LF | 4 | $1,379.03 | $1,909.00 | $6,438.38 | $2,100.00 | $3,900.00 |
| 0245 | Pipe culvert,optional material,other-elip/arch, (0430-175218) | LF | 14 | $290.09 | $495.00 | $332.76 | $275.00 | $660.00 |
| 0250 | Pipe culvert, opt material, shape - elip/arch, 60"S/CD (0430-175260) | LF | 8 | $1,266.88 | $1,745.00 | $4,750.87 | $2,200.00 | $2,400.00 |
| 0255 | Pipe handrail - guiderail, steel (0515-1-1) | LF | 102 | $84.89 | $99.00 | $103.95 | $84.00 | $144.00 |
| 0260 | Concrete curb & gutter, type E (0520-1-7) | LF | 6,395 | $47.21 | $51.00 | $34.87 | $63.00 | $60.00 |
| 0265 | Concrete curb & gutter, type F (0520-1-10) | LF | 1,113 | $49.67 | $46.00 | $56.24 | $76.00 | $86.00 |
| 0270 | Concrete curb, type D (0520-2-4) | LF | 16 | $43.18 | $77.00 | $53.99 | $103.00 | $207.00 |
| 0275 | Valley gutter- concrete (0520-3) | LF | 142 | $64.98 | $56.55 | $25.99 | $57.00 | $125.00 |
| 0280 | Traffic separator concrete- type I, 4' wide (0520-5-11) | LF | 618 | $63.77 | $85.00 | $82.19 | $78.00 | $94.50 |
| 0285 | Traffic separator concrete- type I, 6' wide (0520-5-12) | LF | 476 | $102.53 | $129.00 | $117.16 | $162.00 | $103.00 |
| 0290 | Traffic separator concrete- type I, 8.5' wide (0520-5-16) | LF | 1,113 | $135.63 | $184.00 | $189.23 | $240.00 | $113.00 |
| 0295 | Concrete traffic separator, special- variable width (0520-70) | SY | 1,314 | $145.52 | $175.00 | $160.19 | $230.00 | $142.00 |
| 0300 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 841 | $75.31 | $70.00 | $77.96 | $84.00 | $111.50 |
| 0305 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 643 | $107.53 | $98.00 | $81.21 | $115.00 | $154.00 |
| 0310 | Detectable warnings (0527-2) | SF | 1,517 | $25.99 | $32.00 | $41.69 | $41.00 | $65.00 |
| 0315 | Performance turf, sod (0570-1-2) | SY | 5,881 | $3.75 | $8.33 | $4.70 | $6.50 | $10.50 |
| 0320 | Conduit, furnish & install, open trench (0630-2-11) | LF | 25 | $19.28 | $18.55 | $20.03 | $19.00 | $21.50 |
| 0325 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 65 | $27.10 | $26.13 | $28.15 | $27.00 | $30.00 |
| 0330 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 6 | $1,302.76 | $1,255.00 | $1,353.47 | $1,300.00 | $1,435.00 |
| 0335 | Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130) | LS | 1 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 |
| 0340 | Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130) | LS | 1 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 |
| 0345 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 18 | $1,010.94 | $976.00 | $1,050.30 | $990.00 | $1,115.00 |
| 0350 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 18 | $2,084.41 | $2,009.00 | $2,165.56 | $2,050.00 | $2,300.00 |
| 0355 | Raised pavement marker, type B (0706-1-3) | EACH | 468 | $4.43 | $5.00 | $4.60 | $4.30 | $6.00 |
| 0360 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 5.86 | $2,603.29 | $1,613.00 | $2,706.95 | $2,550.00 | $1,750.00 |
| 0365 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 3,924 | $1.88 | $1.00 | $1.95 | $1.85 | $2.50 |
| 0370 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 640 | $2.08 | $3.00 | $2.17 | $2.05 | $2.50 |
| 0375 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 2.40 | $602.46 | $1,006.00 | $628.01 | $585.00 | $800.00 |
| 0380 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.04 | $781.75 | $1,003.00 | $812.08 | $760.00 | $805.00 |
| 0385 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 0.05 | $2,605.60 | $1,613.00 | $2,706.95 | $2,550.00 | $11,500 |
| 0390 | Single component injection (0906-173100) | GA | 1,439 | $109.43 | $93.00 | $243.63 | $92.00 | $120.00 |
| 0395 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,000 | $50,000 | $50,000 | $50,000 | $50,000 |
| 0400 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $91,290 | $91,290 | $91,290 | $91,290 | $91,290 |
| 0405 | Steel strain pole, remove, deep foundation removal, bolt on attachment (0649-1-65) | EACH | 6 | $37,103 | $35,623 | $38,547 | $36,500 | $41,000 |
| 0410 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 87 | $599.27 | $492.00 | $622.60 | $590.00 | $747.00 |
| 0415 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 33 | $2,397.07 | $2,309.00 | $2,490.39 | $2,350.00 | $2,300.00 |
| 0420 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 1 | $3,126.62 | $4,013.00 | $3,248.34 | $3,100.00 | $4,000.00 |
| 0425 | Single column ground sign assembly, relocate (0700-1500) | EACH | 4 | $208.44 | $303.00 | $216.56 | $203.00 | $290.00 |
| 0430 | Single column ground sign assembly, remove (0700-1600) | EACH | 75 | $67.74 | $20.00 | $70.38 | $66.00 | $57.50 |
| 0435 | Single column ground sign assembly, F&I cantilever mount, 12.0-20.0 SF (0700-1912) | EACH | 3 | $3,022.40 | $4,455.00 | $3,140.06 | $3,000.00 | $3,675.00 |
| 0440 | Single column ground sign assembly, F&I cantilever mount, 20.1-30.0 SF (0700-1913) | EACH | 5 | $3,960.38 | $4,555.00 | $4,114.56 | $3,850.00 | $4,595.00 |
| 0445 | Sign panel, furnish & install overhead mount, 51-100 SF (0700-3205) | EACH | 2 | $6,044.79 | $5,855.00 | $6,280.12 | $5,500.00 | $6,675.00 |
| 0450 | Sign panel, remove, 51-100 SF lighting (0700-3625) | EACH | 2 | $937.99 | $909.00 | $974.50 | $2,050.00 | $1,035.00 |
| 0455 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 28 | $114.64 | $106.00 | $119.11 | $112.00 | $115.00 |
| 0460 | Tubular marker, 36" white post (0704-1-3) | EACH | 10 | $166.75 | $202.00 | $173.24 | $162.00 | $230.00 |
| 0465 | Tubular marker, 36" yellow (0704-1-4) | EACH | 46 | $166.75 | $202.00 | $173.24 | $162.00 | $230.00 |
| 0470 | Object marker, type 1 (0705-10-1) | EACH | 12 | $218.86 | $279.00 | $227.38 | $213.00 | $230.00 |
| 0475 | Raised pavement marker, type B (0706-1-3) | EACH | 3,118 | $4.43 | $5.00 | $4.60 | $4.30 | $6.00 |
| 0480 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 193 | $4.17 | $10.00 | $4.33 | $4.05 | $6.00 |
| 0485 | Painted pavement markings, surface (0710-90) | LS | 1 | $36,457 | $15,555 | $30,006 | $24,000 | $40,000 |
| 0490 | Painted pavement markings, surface (0710-90) | LS | 1 | $83,783 | $62,555 | $79,174 | $68,000 | $92,000 |
| 0495 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 7,051 | $3.32 | $4.06 | $3.45 | $3.25 | $5.75 |
| 0500 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 716 | $4.99 | $7.02 | $5.19 | $4.85 | $8.00 |
| 0505 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 1,495 | $6.65 | $8.09 | $6.91 | $6.45 | $9.00 |
| 0510 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.24 | $2,562.79 | $4,555.00 | $2,706.95 | $2,500.00 | $5,000.00 |
| 0515 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 10 | $97.97 | $255.00 | $101.78 | $95.00 | $230.00 |
| 0520 | Thermoplastic, standard, arrow (0711-11170) | EACH | 174 | $63.57 | $92.00 | $66.05 | $62.00 | $115.00 |
| 0525 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 441 | $4.59 | $7.00 | $4.76 | $4.50 | $8.00 |
| 0530 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.45 | $2,553.30 | $4,502.00 | $2,706.95 | $2,500.00 | $5,000.00 |
| 0535 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 3,880 | $16.74 | $16.00 | $17.39 | $16.40 | $18.40 |
| 0540 | Thermoplastic, preformed, color, in pavement warning (0711-14760) | EACH | 6 | $2,045.85 | $3,013.00 | $2,125.50 | $2,000.00 | $2,750.00 |
| 0545 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 7.42 | $5,119.67 | $5,255.00 | $5,319.70 | $5,000.00 | $7,500.00 |
| 0550 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.75 | $6,799.24 | $6,009.00 | $7,092.21 | $6,600.00 | $10,000 |
| 0555 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 9.18 | $1,280.03 | $3,013.00 | $1,330.74 | $1,250.00 | $2,500.00 |
| 0560 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 5.14 | $4,700.98 | $5,209.00 | $4,888.75 | $4,600.00 | $7,800.00 |
| 0565 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 0.45 | $1,174.04 | $3,013.00 | $1,222.46 | $1,200.00 | $2,500.00 |
| 0570 | Conduit, furnish & install, open trench (0630-2-11) | LF | 903 | $15.11 | $14.55 | $15.70 | $14.80 | $17.00 |
| 0575 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 1,885 | $32.31 | $31.00 | $33.57 | $32.00 | $35.50 |
| 0580 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 42 | $1,302.76 | $1,255.00 | $1,353.47 | $1,300.00 | $1,435.00 |
| 0585 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 1 | $4,273.04 | $4,109.00 | $4,439.40 | $4,200.00 | $4,700.00 |
| 0590 | Electrical service wire, & install (0639-2-1) | LF | 80 | $16.68 | $16.02 | $17.32 | $16.50 | $18.50 |
| 0595 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $2,240.74 | $2,155.00 | $2,327.98 | $2,200.00 | $2,500.00 |
| 0600 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 14,907 | $1.98 | $1.93 | $2.06 | $1.95 | $2.25 |
| 0605 | Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13) | LF | 777 | $3.02 | $2.93 | $3.14 | $2.95 | $3.50 |
| 0610 | Lighting conductors, remove & dispose, contractor owns (0715-1-60) | LF | 10,095 | $0.16 | $0.15 | $0.16 | $0.16 | $0.20 |
| 0615 | Luminaire & bracket arm, luminaire and arm on existing pole (0715-5-21) | EACH | 2 | $1,406.98 | $1,355.00 | $1,461.75 | $1,375.00 | $1,550.00 |
| 0620 | Luminaire & bracket arm- galv steel, furnish & install new luminaire and arm on new/existing pole (0715-5-32) | EACH | 7 | $2,866.07 | $2,755.00 | $2,977.64 | $2,800.00 | $3,150.00 |
| 0625 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 1 | $21,782 | $20,909 | $22,630 | $21,300 | $24,000 |
| 0630 | Load center, rework, voltage (0715-7-21) | EACH | 1 | $1,719.64 | $1,655.00 | $1,786.59 | $1,700.00 | $1,900.00 |
| 0635 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211) | EACH | 9 | $1,459.09 | $1,413.00 | $1,515.89 | $1,450.00 | $1,600.00 |
| 0640 | Light pole complete, F&I, standard pole standard foundation, 30' mounting height, 0' arm length (0715-61100) | EACH | 2 | $10,162 | $9,755.00 | $10,557 | $9,900.00 | $11,205 |
| 0645 | Light pole complete, F&I, standard pole standard foundation, 30' mounting height, 12' arm length (0715-61142) | EACH | 1 | $10,162 | $9,755.00 | $10,557 | $9,900.00 | $11,205 |
| 0650 | Light pole complete, F&I, standard pole standard foundation, 35' mounting height, 0' arm length (0715-61200) | EACH | 1 | $10,266 | $9,855.00 | $10,665 | $10,000 | $11,320 |
| 0655 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 0' arm length (0715-61300) | EACH | 2 | $11,464 | $11,055 | $11,911 | $11,200 | $12,650 |
| 0660 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 12' arm length (0715-61342) | EACH | 1 | $11,464 | $11,013 | $11,911 | $11,200 | $12,650 |
| 0665 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 15' arm length (0715-61352) | EACH | 1 | $11,464 | $11,009 | $11,911 | $11,200 | $12,650 |
| 0670 | Light pole complete, F&I, standard pole standard foundation, 45' mounting height, 15' arm length (0715-61452) | EACH | 1 | $11,985 | $11,555 | $12,452 | $11,700 | $13,200 |
| 0675 | Light pole complete, F&I, standard pole special foundation, 30' mounting height, 0' arm length (0715-62100) | EACH | 1 | $14,382 | $13,813 | $14,942 | $14,100 | $15,900 |
| 0680 | Light pole complete, F&I, standard pole special foundation, 40' mounting height, 0' arm length (0715-62300) | EACH | 1 | $14,382 | $13,809 | $14,942 | $14,100 | $15,900 |
| 0685 | Light pole complete, F&I, utility conflict pole standard foundation, 30' mounting height, 16' arm length (0715-65166) | EACH | 3 | $11,256 | $10,809 | $11,694 | $11,000 | $12,400 |
| 0690 | Light pole complete, F&I, utility conflict pole standard foundation, 35' mounting height, 16' arm length (0715-65266) | EACH | 2 | $11,673 | $11,213 | $12,127 | $11,400 | $12,900 |
| 0695 | Light pole complete, remove pole and foundation (0715-69000) | EACH | 5 | $677.43 | $655.00 | $703.81 | $660.00 | $750.00 |
| 0700 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 34 | $922.35 | $885.00 | $958.26 | $900.00 | $1,015.00 |
| 0705 | Conduit, furnish & install, open trench (0630-2-11) | LF | 565 | $19.28 | $18.55 | $20.03 | $19.00 | $21.50 |
| 0710 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 1,724 | $46.90 | $45.09 | $48.73 | $46.00 | $52.00 |
| 0715 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 5 | $12,194 | $11,713 | $12,669 | $11,900 | $13,450 |
| 0720 | Signal cable, remove- intersection (0632-7-6) | PI | 4 | $375.20 | $363.00 | $389.80 | $370.00 | $415.00 |
| 0725 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 67 | $1,615.42 | $1,555.00 | $1,678.31 | $1,580.00 | $1,780.00 |
| 0730 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 5 | $2,866.07 | $2,755.00 | $2,977.64 | $2,800.00 | $3,160.00 |
| 0735 | Electrical service wire, & install (0639-2-1) | LF | 180 | $10.01 | $9.69 | $10.39 | $9.80 | $11.00 |
| 0740 | Electrical service wire, (0639-2-6) | LF | 120 | $0.16 | $0.16 | $0.16 | $0.16 | $0.25 |
| 0745 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 10 | $1,146.43 | $1,109.00 | $1,191.06 | $1,150.00 | $1,265.00 |
| 0750 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 6 | $2,136.52 | $2,055.00 | $2,219.70 | $2,100.00 | $2,350.00 |
| 0755 | Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60) | EACH | 4 | $521.10 | $509.00 | $541.39 | $510.00 | $575.00 |
| 0760 | Strain pole, wood, remove (0643-600) | EACH | 2 | $911.93 | $875.00 | $947.43 | $890.00 | $1,000.00 |
| 0765 | Aluminum signals pole, (0646-1-11) | EACH | 26 | $2,188.63 | $2,113.00 | $2,273.84 | $2,150.00 | $2,415.00 |
| 0770 | Aluminum signals pole, furnish install pedestrian detector post (0646-1-12) | EACH | 1 | $578.42 | $555.00 | $600.94 | $565.00 | $650.00 |
| 0775 | Aluminum signals pole, remove (0646-1-60) | EACH | 8 | $312.66 | $309.00 | $324.83 | $305.00 | $350.00 |
| 0780 | Steel mast arm assembly, and install, single arm 30' (0649-21-1) | EACH | 2 | $62,532 | $60,013 | $64,967 | $61,000 | $68,950 |
| 0785 | Steel mast arm assembly, and install, double arm 40'-40' (0649-21-5) | EACH | 1 | $83,898 | $80,555 | $87,164 | $82,000 | $92,500 |
| 0790 | Steel mast arm assembly, and install, double arm 50'-40' (0649-21-8) | EACH | 1 | $86,503 | $83,055 | $89,871 | $85,000 | $95,000 |
| 0795 | Steel mast arm assembly, and install, single arm 60' (0649-21-10) | EACH | 2 | $76,081 | $73,013 | $79,043 | $74,500 | $83,900 |
| 0800 | Steel mast arm assembly, and install, double arm 60'-50' (0649-21-13) | EACH | 2 | $104,221 | $100,009 | $108,278 | $102,000 | $114,900 |
| 0805 | Steel mast arm assembly, and install, single arm 70' (0649-21-15) | EACH | 1 | $89,109 | $85,555 | $92,578 | $87,000 | $98,250 |
| 0810 | Steel mast arm assembly, and install, double arm 70'-70' (0649-21-20) | EACH | 1 | $122,459 | $117,513 | $127,227 | $120,000 | $135,000 |
| 0815 | Steel mast arm assembly, and install, double arm 78'-60' (0649-21-25) | EACH | 1 | $120,375 | $115,513 | $125,061 | $118,000 | $132,735 |
| 0820 | Steel mast arm assembly, remove, shallow foundation- bolt on attachment (0649-26-3) | EACH | 11 | $5,523.69 | $5,355.00 | $5,738.73 | $5,400.00 | $6,100.00 |
| 0825 | Steel mast arm assembly, remove, deep foundation- bolt on attachment (0649-26-5) | EACH | 2 | $35,018 | $33,613 | $36,381 | $34,500 | $38,500 |
| 0830 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 46 | $1,615.42 | $1,555.00 | $1,678.31 | $1,600.00 | $1,780.00 |
| 0835 | Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16) | AS | 10 | $2,501.29 | $2,413.00 | $2,598.67 | $2,500.00 | $2,750.00 |
| 0840 | Vehicular traffic signal, remove- poles to remain (0650-1-60) | AS | 6 | $81.29 | $79.00 | $84.46 | $80.00 | $90.00 |
| 0845 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 28 | $885.87 | $855.00 | $920.36 | $865.00 | $975.00 |
| 0850 | Midblock crosswalk: hybrid beacon assembly, & install complete assembly (0654-3-10) | AS | 6 | $1,928.08 | $1,855.00 | $2,003.14 | $1,900.00 | $2,125.00 |
| 0855 | Vehicle detection system- microwave, furnish & install cabinet equipment (0660-3-11) | EACH | 1 | $11,985 | $11,513 | $12,452 | $12,000 | $13,215 |
| 0860 | Signal priority and preemption system, furnish and install, detector (0663-1122) | EACH | 14 | $8,702.42 | $8,355.00 | $9,041.21 | $8,500.00 | $9,600.00 |
| 0865 | Signal priority and preemption system, furnish and install, cabinet electronics (0663-1123) | EACH | 4 | $9,275.63 | $8,955.00 | $9,636.74 | $9,100.00 | $10,225 |
| 0870 | Pedestrian detector, furnish & install, accessible (0665-1-12) | EACH | 33 | $2,084.41 | $2,013.00 | $2,165.56 | $2,100.00 | $2,300.00 |
| 0875 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 5 | $99.01 | $95.13 | $102.86 | $97.00 | $110.00 |
| 0880 | Traffic controller assembly, F&I, NEMA W/standard lock, 1 preemption (0670-5161) | AS | 5 | $64,617 | $62,013 | $67,132 | $63,000 | $71,250 |
| 0885 | Traffic controller assembly, remove controller with (0670-5600) | AS | 4 | $781.66 | $755.00 | $812.08 | $770.00 | $860.00 |
| 0890 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 1 | $5,732.13 | $5,513.00 | $5,955.29 | $5,600.00 | $6,300.00 |
| 0895 | Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13) | EACH | 5 | $10,943 | $10,555 | $11,369 | $11,000 | $12,000 |
| 0900 | Remote power management rpmu, furnish and install (0685-2-1) | EACH | 1 | $1,563.31 | $779.00 | $839.15 | $790.00 | $890.00 |
| 0905 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 22 | $849.40 | $815.00 | $882.47 | $830.00 | $935.00 |
| 0910 | Internally illuminated sign, furnish & install overhead mount, UP to 12 SF (0700-5-21) | EACH | 2 | $7,295.44 | $7,013.00 | $7,579.46 | $7,200.00 | $8,100.00 |
| 0915 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 11 | $10,943 | $10,555 | $11,369 | $10,700 | $12,065 |
| 0920 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 2.68 | $3,963.34 | $3,813.00 | $4,114.56 | $3,900.00 | $4,500.00 |
| 0925 | Itsfm location documentation- intersection (0611-2-1) | EACH | 5 | $3,074.51 | $2,955.00 | $3,194.20 | $3,000.00 | $3,400.00 |
| 0930 | Conduit, furnish & install, open trench (0630-2-11) | LF | 238 | $15.63 | $15.13 | $16.24 | $15.50 | $17.50 |
| 0935 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 8,401 | $34.39 | $33.13 | $35.73 | $34.00 | $38.00 |
| 0940 | Conduit, furnish & install, aboveground (0630-2-14) | LF | 160 | $33.87 | $32.55 | $35.19 | $33.00 | $37.50 |
| 0945 | Fiber optic cable, F&I, underground,2-12 fibers (0633-1121) | LF | 1,297 | $4.79 | $4.69 | $4.98 | $4.70 | $5.50 |
| 0950 | Fiber optic cable, F&I, underground,49-96 fibers (0633-1123) | LF | 11,244 | $5.32 | $5.13 | $5.52 | $5.20 | $5.85 |
| 0955 | Fiber optic cable, remove, underground (0633-1620) | LF | 9,748 | $1.35 | $1.33 | $1.41 | $1.35 | $1.50 |
| 0960 | Fiber optic connection, install, splice (0633-2-31) | EACH | 320 | $60.97 | $59.00 | $63.34 | $60.00 | $67.50 |
| 0965 | Fiber optic connection hardware, F&I, splice (0633-3-11) | EACH | 8 | $1,719.64 | $1,655.00 | $1,786.59 | $1,700.00 | $1,900.00 |
| 0970 | Fiber optic connection hardware, F&I, splice tray (0633-3-12) | EACH | 6 | $67.74 | $66.00 | $70.38 | $66.00 | $75.00 |
| 0975 | Fiber optic connection hardware, F&I, preterminated connector assembly (0633-3-13) | EACH | 72 | $60.97 | $59.00 | $63.34 | $60.00 | $67.50 |
| 0980 | Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16) | EACH | 6 | $1,615.42 | $1,555.00 | $1,678.31 | $1,600.00 | $1,800.00 |
| 0985 | Fiber optic cable locator (0633-6) | DA | 450 | $114.64 | $113.00 | $119.11 | $115.00 | $126.50 |
| 0990 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 8 | $1,563.31 | $1,509.00 | $1,624.17 | $1,550.00 | $1,725.00 |
| 0995 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 7 | $2,657.62 | $2,555.00 | $2,761.09 | $2,600.00 | $2,950.00 |
| 1000 | Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13) | EACH | 3 | $4,846.26 | $4,655.00 | $5,034.93 | $4,800.00 | $5,350.00 |
| 1005 | Vehicle detection system- microwave, furnish & install cabinet equipment (0660-3-11) | EACH | 6 | $12,090 | $11,609 | $12,560 | $11,800 | $13,250 |
| 1010 | Vehicle detection system- microwave, furnish & install, above ground equipment (0660-3-12) | EACH | 38 | $14,487 | $13,909 | $15,051 | $14,200 | $15,975 |
| 1015 | Vehicle detection system- remove (0660-4-60) | EACH | 3 | $82.33 | $79.00 | $85.54 | $81.00 | $3.50 |
| 1020 | Vehicle detection system- avi, bluetooth, furnish & install, cabinet equipment (0660-6121) | EACH | 3 | $2,553.40 | $2,455.00 | $2,652.81 | $2,500.00 | $2,800.00 |
| 1025 | Vehicle detection system- avi, bluetooth, furnish & install, above ground equipment (0660-6122) | EACH | 3 | $9,692.51 | $9,309.00 | $10,070 | $9,500.00 | $10,700 |
| 1030 | Traffic controller without cabinet, atc, F&I in existing NEMA cabinet (0671-2-15) | EACH | 3 | $11,152 | $10,703 | $11,586 | $11,000 | $12,300 |
| 1035 | Traffic controller, remove- cabinet to remain (0671-2-60) | EACH | 3 | $297.03 | $285.00 | $308.59 | $290.00 | $325.00 |
| 1040 | Traffic signal controller cabinet, remove (0676-1600) | EACH | 1 | $849.40 | $815.00 | $882.47 | $830.00 | $935.00 |
| 1045 | ITS CCTV camera, pressurized, high definition (0682-1163) | EACH | 2 | $8,650.31 | $8,309.00 | $8,987.07 | $8,500.00 | $9,550.00 |
| 1050 | ITS CCTV camera, relocate (0682-1400) | EACH | 2 | $1,928.08 | $1,855.00 | $2,003.14 | $1,900.00 | $2,125.00 |
| 1055 | ITS CCTV camera, remove & disposal (0682-1600) | EACH | 1 | $505.47 | $485.00 | $525.15 | $495.00 | $555.00 |
| 1060 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 8 | $11,047 | $10,609 | $11,477 | $10,800 | $12,200 |
| 1065 | Managed field ethernet switch, remove- cabinet to remain (0684-1-6) | EACH | 3 | $192.81 | $185.00 | $200.31 | $190.00 | $225.00 |
| 1070 | Connected vehicle roadside equipment, rsu (0924-681-1) | EACH | 6 | $10,943 | $10,555 | $11,369 | $10,700 | $12,065 |
| 1075 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $4,500.00 | $4,500.00 | $4,500.00 | $4,500.00 | $4,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of February 25, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.