SR 72 FROM SR 45 (US 41) TO SAWYER RD. Let by Florida DOT on February 25, 2026, Sarasota, District 1. 5 bids received; low bid $14,860,718 by Preferred Materials Inc..

Owner
Florida DOT
Letting
25 FEB 2026
Pay items
215
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Preferred Materials Inc.$14,860,718Low
2Russell Engineering, Inc.$16,198,185+9.0%
3Ajax Paving Industries of Florida LLC$16,313,692+10%
4Watson Civil Construction, Inc.$16,450,906+11%
5Superior Asphalt, Inc.$16,749,613+13%
FDOT contract T1916: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Preferred Materials Inc.2. Russell Engineering, Inc.3. Ajax Paving Industries of Florida LLC4. Watson Civil Construction, Inc.5. Superior Asphalt, Inc.
0005Mobilization (0101-1)LS1$680,925$800,000$880,796$328,000$552,500
0010Mobilization (0101-1)LS1$910,132$800,000$340,476$1,355,498$736,000
0015Maintenance of traffic (0102-1)DA1$208,956$600,000$686,290$207,000$490,000
0020Maintenance of traffic (0102-1)DA1$282,662$600,000$681,093$828,000$520,000
0025Pedestrian or bicycle special detour (0102-4-1)SY1$40,654$103,257$107,372$51,000$194,500
0030Pedestrian escort/flagger (0102-5)HR480$45.25$107.00$108.36$32.00$66.00
0035Traffic control officer (0102-14)HR768$103.38$82.00$113.69$120.00$110.00
0040Work zone sign (0102-60)ED146,853$0.22$0.21$0.23$0.33$0.25
0045Business sign (0102-61)EACH85$46.90$46.00$48.73$47.00$34.50
0050Temporary barrier, F&I, low profile, concrete (0102-71-13)LF594$37.52$37.00$38.98$44.00$44.00
0055Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED1,278,588$0.09$0.01$0.10$0.12$0.10
0060Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD348,059$0.04$0.04$0.04$0.06$0.05
0065Arrow board / advance warning arrow panel (0102-76)ED7,443$4.17$0.01$0.25$7.50$6.00
0070Portable changeable message sign, temporary (0102-99)ED1,938$10.42$10.00$10.83$15.00$10.50
0075Temporary signalization and maintenance, intersection (0102-104)ED1,800$52.11$50.00$54.14$70.00$57.50
0080Temporary traffic detection and maintenance, intersection (0102-107-1)ED1,800$52.11$50.00$54.14$70.00$57.50
0085Existing ITS maintenance (0102-112)DA450$31.27$30.00$32.48$45.00$34.50
0090Type III barricade (0102-115)ED20,426$0.21$0.20$0.22$0.33$0.35
0095Inlet protection system (0104-18)EACH121$182.39$300.00$189.49$130.00$230.00
0100Litter removal (0107-1)ACRE155.78$95.97$103.00$16.24$94.00$57.50
0105Mowing (0107-2)ACRE34.08$438.64$365.00$37.90$115.00$230.00
0110Monitor existing structures- inspection and settlement monitoring (0108-1)LS1$7,489.35$9,000.00$39,846$25,000$5,175.00
0115Clearing & grubbing (0110-1-1)ACRE1$139,483$300,000$245,544$60,000$141,500
0120Clearing & grubbing (0110-1-1)ACRE1$94,766$300,000$100,012$240,000$96,500
0125Removal of existing concrete (0110-4-10)SY2,644$37.61$40.00$58.47$28.00$68.00
0130Regular excavation (0120-1)CY76.40$42.30$213.00$73.09$44.00$200.00
0135Embankment (0120-6)CY3,332.60$42.70$65.00$68.22$34.00$63.50
0140Type B stabilization (0160-4)SY1,549$52.42$16.55$32.48$38.00$88.00
0145Optional base, base group 03 (0285-703)SY28$59.32$439.00$74.07$595.00$268.50
0150Optional base, base group 10 (0285-710)SY850$83.39$292.00$122.69$100.00$170.70
0155Milling existing asphalt pavement, 3" avg depth (0327-70-4)SY138,351$2.84$3.00$5.28$3.60$3.00
0160Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY5,960$17.87$20.00$17.19$3.95$20.00
0165Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53)TN11,660.80$185.77$192.00$166.92$209.00$192.00
0170Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN11,866.20$180.73$180.00$171.05$193.00$180.00
0175Miscellaneous asphalt (0339-1)TN1$373.42$3,655.00$356.58$11,000$3,625.00
0180Inlets, curb, type P-5, <10' (0425-1351)EACH5$10,516$10,113$15,793$10,500$13,735
0185Inlets, curb, type 7, <10' (0425-1471)EACH2$9,739.98$13,383$16,198$16,500$10,800
0190Inlets, curb, type 7, J bot ,>10' (0425-1474)EACH1$32,479$15,700$27,328$30,000$30,000
0195Inlets, ditch bottom, type C modified- back of sidewalk, <10' (0425-1531)EACH1$6,633.34$8,913.00$9,172.94$5,500.00$7,525.00
0200Manholes, P-7, <10' (0425-2-41)EACH1$11,927$10,013$10,496$5,500.00$11,250
0205Manholes, P-8, partial (0425-2-63)EACH1$5,011.05$4,720.00$9,570.46$3,500.00$9,135.00
0210Manholes, J-8, <10' (0425-2-91)EACH1$15,665$9,900.00$17,658$10,700$17,925
0215Back of sidewalk endwall, 18" pipe diameter (0425-17-18)EACH1$4,587.85$5,440.00$9,063.20$3,800.00$7,950.00
0220Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF262$179.76$259.00$314.55$140.00$405.00
0225Pipe culvert,optional material,round, 24"S/CD (0430-175124)LF66$276.47$394.00$495.90$257.00$585.00
0230Pipe culvert, opt material, round, 30"S/CD (0430-175130)LF8$407.38$777.00$1,237.53$531.00$1,250.00
0235Pipe culvert, opt material, round, 54"S/CD (0430-175154)LF4$1,221.04$1,660.00$6,092.95$1,900.00$3,500.00
0240Pipe culvert, opt material, round, 60"S/CD (0430-175160)LF4$1,379.03$1,909.00$6,438.38$2,100.00$3,900.00
0245Pipe culvert,optional material,other-elip/arch, (0430-175218)LF14$290.09$495.00$332.76$275.00$660.00
0250Pipe culvert, opt material, shape - elip/arch, 60"S/CD (0430-175260)LF8$1,266.88$1,745.00$4,750.87$2,200.00$2,400.00
0255Pipe handrail - guiderail, steel (0515-1-1)LF102$84.89$99.00$103.95$84.00$144.00
0260Concrete curb & gutter, type E (0520-1-7)LF6,395$47.21$51.00$34.87$63.00$60.00
0265Concrete curb & gutter, type F (0520-1-10)LF1,113$49.67$46.00$56.24$76.00$86.00
0270Concrete curb, type D (0520-2-4)LF16$43.18$77.00$53.99$103.00$207.00
0275Valley gutter- concrete (0520-3)LF142$64.98$56.55$25.99$57.00$125.00
0280Traffic separator concrete- type I, 4' wide (0520-5-11)LF618$63.77$85.00$82.19$78.00$94.50
0285Traffic separator concrete- type I, 6' wide (0520-5-12)LF476$102.53$129.00$117.16$162.00$103.00
0290Traffic separator concrete- type I, 8.5' wide (0520-5-16)LF1,113$135.63$184.00$189.23$240.00$113.00
0295Concrete traffic separator, special- variable width (0520-70)SY1,314$145.52$175.00$160.19$230.00$142.00
0300Concrete sidewalk and driveways, 4" thick (0522-1)SY841$75.31$70.00$77.96$84.00$111.50
0305Concrete sidewalk and driveways, 6" thick (0522-2)SY643$107.53$98.00$81.21$115.00$154.00
0310Detectable warnings (0527-2)SF1,517$25.99$32.00$41.69$41.00$65.00
0315Performance turf, sod (0570-1-2)SY5,881$3.75$8.33$4.70$6.50$10.50
0320Conduit, furnish & install, open trench (0630-2-11)LF25$19.28$18.55$20.03$19.00$21.50
0325Conduit, furnish & install, directional bore (0630-2-12)LF65$27.10$26.13$28.15$27.00$30.00
0330Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH6$1,302.76$1,255.00$1,353.47$1,300.00$1,435.00
0335Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130)LS1$6,000.00$6,000.00$6,000.00$6,000.00$6,000.00
0340Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130)LS1$6,000.00$6,000.00$6,000.00$6,000.00$6,000.00
0345Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1)EACH18$1,010.94$976.00$1,050.30$990.00$1,115.00
0350Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12)EACH18$2,084.41$2,009.00$2,165.56$2,050.00$2,300.00
0355Raised pavement marker, type B (0706-1-3)EACH468$4.43$5.00$4.60$4.30$6.00
0360Painted pavement markings, standard, white, solid, 6" (0710-11101)GM5.86$2,603.29$1,613.00$2,706.95$2,550.00$1,750.00
0365Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF3,924$1.88$1.00$1.95$1.85$2.50
0370Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF640$2.08$3.00$2.17$2.05$2.50
0375Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM2.40$602.46$1,006.00$628.01$585.00$800.00
0380Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM0.04$781.75$1,003.00$812.08$760.00$805.00
0385Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM0.05$2,605.60$1,613.00$2,706.95$2,550.00$11,500
0390Single component injection (0906-173100)GA1,439$109.43$93.00$243.63$92.00$120.00
0395Initial contingency amount, DO not bid (0999-25)LS1$50,000$50,000$50,000$50,000$50,000
0400Initial contingency amount, DO not bid (0999-25)LS1$91,290$91,290$91,290$91,290$91,290
0405Steel strain pole, remove, deep foundation removal, bolt on attachment (0649-1-65)EACH6$37,103$35,623$38,547$36,500$41,000
0410Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH87$599.27$492.00$622.60$590.00$747.00
0415Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH33$2,397.07$2,309.00$2,490.39$2,350.00$2,300.00
0420Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113)EACH1$3,126.62$4,013.00$3,248.34$3,100.00$4,000.00
0425Single column ground sign assembly, relocate (0700-1500)EACH4$208.44$303.00$216.56$203.00$290.00
0430Single column ground sign assembly, remove (0700-1600)EACH75$67.74$20.00$70.38$66.00$57.50
0435Single column ground sign assembly, F&I cantilever mount, 12.0-20.0 SF (0700-1912)EACH3$3,022.40$4,455.00$3,140.06$3,000.00$3,675.00
0440Single column ground sign assembly, F&I cantilever mount, 20.1-30.0 SF (0700-1913)EACH5$3,960.38$4,555.00$4,114.56$3,850.00$4,595.00
0445Sign panel, furnish & install overhead mount, 51-100 SF (0700-3205)EACH2$6,044.79$5,855.00$6,280.12$5,500.00$6,675.00
0450Sign panel, remove, 51-100 SF lighting (0700-3625)EACH2$937.99$909.00$974.50$2,050.00$1,035.00
0455Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH28$114.64$106.00$119.11$112.00$115.00
0460Tubular marker, 36" white post (0704-1-3)EACH10$166.75$202.00$173.24$162.00$230.00
0465Tubular marker, 36" yellow (0704-1-4)EACH46$166.75$202.00$173.24$162.00$230.00
0470Object marker, type 1 (0705-10-1)EACH12$218.86$279.00$227.38$213.00$230.00
0475Raised pavement marker, type B (0706-1-3)EACH3,118$4.43$5.00$4.60$4.30$6.00
0480Painted pavement markings, durable paint, yellow, island nose (0710-12290)SF193$4.17$10.00$4.33$4.05$6.00
0485Painted pavement markings, surface (0710-90)LS1$36,457$15,555$30,006$24,000$40,000
0490Painted pavement markings, surface (0710-90)LS1$83,783$62,555$79,174$68,000$92,000
0495Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF7,051$3.32$4.06$3.45$3.25$5.75
0500Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF716$4.99$7.02$5.19$4.85$8.00
0505Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF1,495$6.65$8.09$6.91$6.45$9.00
0510Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.24$2,562.79$4,555.00$2,706.95$2,500.00$5,000.00
0515Thermoplastic, standard, message or symbol (0711-11160)EACH10$97.97$255.00$101.78$95.00$230.00
0520Thermoplastic, standard, arrow (0711-11170)EACH174$63.57$92.00$66.05$62.00$115.00
0525Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF441$4.59$7.00$4.76$4.50$8.00
0530Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.45$2,553.30$4,502.00$2,706.95$2,500.00$5,000.00
0535Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF3,880$16.74$16.00$17.39$16.40$18.40
0540Thermoplastic, preformed, color, in pavement warning (0711-14760)EACH6$2,045.85$3,013.00$2,125.50$2,000.00$2,750.00
0545Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM7.42$5,119.67$5,255.00$5,319.70$5,000.00$7,500.00
0550Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102)GM0.75$6,799.24$6,009.00$7,092.21$6,600.00$10,000
0555Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM9.18$1,280.03$3,013.00$1,330.74$1,250.00$2,500.00
0560Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM5.14$4,700.98$5,209.00$4,888.75$4,600.00$7,800.00
0565Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231)GM0.45$1,174.04$3,013.00$1,222.46$1,200.00$2,500.00
0570Conduit, furnish & install, open trench (0630-2-11)LF903$15.11$14.55$15.70$14.80$17.00
0575Conduit, furnish & install, directional bore (0630-2-12)LF1,885$32.31$31.00$33.57$32.00$35.50
0580Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH42$1,302.76$1,255.00$1,353.47$1,300.00$1,435.00
0585Electrical power service, F&I, underground, meter by contractor (0639-1122)AS1$4,273.04$4,109.00$4,439.40$4,200.00$4,700.00
0590Electrical service wire, & install (0639-2-1)LF80$16.68$16.02$17.32$16.50$18.50
0595Prestressed concrete pole, type P-II service pole (0641-2-12)EACH1$2,240.74$2,155.00$2,327.98$2,200.00$2,500.00
0600Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12)LF14,907$1.98$1.93$2.06$1.95$2.25
0605Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13)LF777$3.02$2.93$3.14$2.95$3.50
0610Lighting conductors, remove & dispose, contractor owns (0715-1-60)LF10,095$0.16$0.15$0.16$0.16$0.20
0615Luminaire & bracket arm, luminaire and arm on existing pole (0715-5-21)EACH2$1,406.98$1,355.00$1,461.75$1,375.00$1,550.00
0620Luminaire & bracket arm- galv steel, furnish & install new luminaire and arm on new/existing pole (0715-5-32)EACH7$2,866.07$2,755.00$2,977.64$2,800.00$3,150.00
0625Load center, F&I, secondary voltage (0715-7-11)EACH1$21,782$20,909$22,630$21,300$24,000
0630Load center, rework, voltage (0715-7-21)EACH1$1,719.64$1,655.00$1,786.59$1,700.00$1,900.00
0635Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211)EACH9$1,459.09$1,413.00$1,515.89$1,450.00$1,600.00
0640Light pole complete, F&I, standard pole standard foundation, 30' mounting height, 0' arm length (0715-61100)EACH2$10,162$9,755.00$10,557$9,900.00$11,205
0645Light pole complete, F&I, standard pole standard foundation, 30' mounting height, 12' arm length (0715-61142)EACH1$10,162$9,755.00$10,557$9,900.00$11,205
0650Light pole complete, F&I, standard pole standard foundation, 35' mounting height, 0' arm length (0715-61200)EACH1$10,266$9,855.00$10,665$10,000$11,320
0655Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 0' arm length (0715-61300)EACH2$11,464$11,055$11,911$11,200$12,650
0660Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 12' arm length (0715-61342)EACH1$11,464$11,013$11,911$11,200$12,650
0665Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 15' arm length (0715-61352)EACH1$11,464$11,009$11,911$11,200$12,650
0670Light pole complete, F&I, standard pole standard foundation, 45' mounting height, 15' arm length (0715-61452)EACH1$11,985$11,555$12,452$11,700$13,200
0675Light pole complete, F&I, standard pole special foundation, 30' mounting height, 0' arm length (0715-62100)EACH1$14,382$13,813$14,942$14,100$15,900
0680Light pole complete, F&I, standard pole special foundation, 40' mounting height, 0' arm length (0715-62300)EACH1$14,382$13,809$14,942$14,100$15,900
0685Light pole complete, F&I, utility conflict pole standard foundation, 30' mounting height, 16' arm length (0715-65166)EACH3$11,256$10,809$11,694$11,000$12,400
0690Light pole complete, F&I, utility conflict pole standard foundation, 35' mounting height, 16' arm length (0715-65266)EACH2$11,673$11,213$12,127$11,400$12,900
0695Light pole complete, remove pole and foundation (0715-69000)EACH5$677.43$655.00$703.81$660.00$750.00
0700Pole cable distribution system, furnish and install, conventional (0715-500-1)EACH34$922.35$885.00$958.26$900.00$1,015.00
0705Conduit, furnish & install, open trench (0630-2-11)LF565$19.28$18.55$20.03$19.00$21.50
0710Conduit, furnish & install, directional bore (0630-2-12)LF1,724$46.90$45.09$48.73$46.00$52.00
0715Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI5$12,194$11,713$12,669$11,900$13,450
0720Signal cable, remove- intersection (0632-7-6)PI4$375.20$363.00$389.80$370.00$415.00
0725Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH67$1,615.42$1,555.00$1,678.31$1,580.00$1,780.00
0730Electrical power service, F&I, underground, meter by contractor (0639-1122)AS5$2,866.07$2,755.00$2,977.64$2,800.00$3,160.00
0735Electrical service wire, & install (0639-2-1)LF180$10.01$9.69$10.39$9.80$11.00
0740Electrical service wire, (0639-2-6)LF120$0.16$0.16$0.16$0.16$0.25
0745Electrical service disconnect, F&I, pole mount (0639-3-11)EACH10$1,146.43$1,109.00$1,191.06$1,150.00$1,265.00
0750Prestressed concrete pole, type P-II service pole (0641-2-12)EACH6$2,136.52$2,055.00$2,219.70$2,100.00$2,350.00
0755Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60)EACH4$521.10$509.00$541.39$510.00$575.00
0760Strain pole, wood, remove (0643-600)EACH2$911.93$875.00$947.43$890.00$1,000.00
0765Aluminum signals pole, (0646-1-11)EACH26$2,188.63$2,113.00$2,273.84$2,150.00$2,415.00
0770Aluminum signals pole, furnish install pedestrian detector post (0646-1-12)EACH1$578.42$555.00$600.94$565.00$650.00
0775Aluminum signals pole, remove (0646-1-60)EACH8$312.66$309.00$324.83$305.00$350.00
0780Steel mast arm assembly, and install, single arm 30' (0649-21-1)EACH2$62,532$60,013$64,967$61,000$68,950
0785Steel mast arm assembly, and install, double arm 40'-40' (0649-21-5)EACH1$83,898$80,555$87,164$82,000$92,500
0790Steel mast arm assembly, and install, double arm 50'-40' (0649-21-8)EACH1$86,503$83,055$89,871$85,000$95,000
0795Steel mast arm assembly, and install, single arm 60' (0649-21-10)EACH2$76,081$73,013$79,043$74,500$83,900
0800Steel mast arm assembly, and install, double arm 60'-50' (0649-21-13)EACH2$104,221$100,009$108,278$102,000$114,900
0805Steel mast arm assembly, and install, single arm 70' (0649-21-15)EACH1$89,109$85,555$92,578$87,000$98,250
0810Steel mast arm assembly, and install, double arm 70'-70' (0649-21-20)EACH1$122,459$117,513$127,227$120,000$135,000
0815Steel mast arm assembly, and install, double arm 78'-60' (0649-21-25)EACH1$120,375$115,513$125,061$118,000$132,735
0820Steel mast arm assembly, remove, shallow foundation- bolt on attachment (0649-26-3)EACH11$5,523.69$5,355.00$5,738.73$5,400.00$6,100.00
0825Steel mast arm assembly, remove, deep foundation- bolt on attachment (0649-26-5)EACH2$35,018$33,613$36,381$34,500$38,500
0830Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS46$1,615.42$1,555.00$1,678.31$1,600.00$1,780.00
0835Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16)AS10$2,501.29$2,413.00$2,598.67$2,500.00$2,750.00
0840Vehicular traffic signal, remove- poles to remain (0650-1-60)AS6$81.29$79.00$84.46$80.00$90.00
0845Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS28$885.87$855.00$920.36$865.00$975.00
0850Midblock crosswalk: hybrid beacon assembly, & install complete assembly (0654-3-10)AS6$1,928.08$1,855.00$2,003.14$1,900.00$2,125.00
0855Vehicle detection system- microwave, furnish & install cabinet equipment (0660-3-11)EACH1$11,985$11,513$12,452$12,000$13,215
0860Signal priority and preemption system, furnish and install, detector (0663-1122)EACH14$8,702.42$8,355.00$9,041.21$8,500.00$9,600.00
0865Signal priority and preemption system, furnish and install, cabinet electronics (0663-1123)EACH4$9,275.63$8,955.00$9,636.74$9,100.00$10,225
0870Pedestrian detector, furnish & install, accessible (0665-1-12)EACH33$2,084.41$2,013.00$2,165.56$2,100.00$2,300.00
0875Pedestrian detector, remove- pole/pedestal to remain (0665-1-60)EACH5$99.01$95.13$102.86$97.00$110.00
0880Traffic controller assembly, F&I, NEMA W/standard lock, 1 preemption (0670-5161)AS5$64,617$62,013$67,132$63,000$71,250
0885Traffic controller assembly, remove controller with (0670-5600)AS4$781.66$755.00$812.08$770.00$860.00
0890Managed field ethernet switch, furnish & install (0684-1-1)EACH1$5,732.13$5,513.00$5,955.29$5,600.00$6,300.00
0895Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13)EACH5$10,943$10,555$11,369$11,000$12,000
0900Remote power management rpmu, furnish and install (0685-2-1)EACH1$1,563.31$779.00$839.15$790.00$890.00
0905Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH22$849.40$815.00$882.47$830.00$935.00
0910Internally illuminated sign, furnish & install overhead mount, UP to 12 SF (0700-5-21)EACH2$7,295.44$7,013.00$7,579.46$7,200.00$8,100.00
0915Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH11$10,943$10,555$11,369$10,700$12,065
0920Itsfm subsurface documentation- project length (0611-1-1)MI2.68$3,963.34$3,813.00$4,114.56$3,900.00$4,500.00
0925Itsfm location documentation- intersection (0611-2-1)EACH5$3,074.51$2,955.00$3,194.20$3,000.00$3,400.00
0930Conduit, furnish & install, open trench (0630-2-11)LF238$15.63$15.13$16.24$15.50$17.50
0935Conduit, furnish & install, directional bore (0630-2-12)LF8,401$34.39$33.13$35.73$34.00$38.00
0940Conduit, furnish & install, aboveground (0630-2-14)LF160$33.87$32.55$35.19$33.00$37.50
0945Fiber optic cable, F&I, underground,2-12 fibers (0633-1121)LF1,297$4.79$4.69$4.98$4.70$5.50
0950Fiber optic cable, F&I, underground,49-96 fibers (0633-1123)LF11,244$5.32$5.13$5.52$5.20$5.85
0955Fiber optic cable, remove, underground (0633-1620)LF9,748$1.35$1.33$1.41$1.35$1.50
0960Fiber optic connection, install, splice (0633-2-31)EACH320$60.97$59.00$63.34$60.00$67.50
0965Fiber optic connection hardware, F&I, splice (0633-3-11)EACH8$1,719.64$1,655.00$1,786.59$1,700.00$1,900.00
0970Fiber optic connection hardware, F&I, splice tray (0633-3-12)EACH6$67.74$66.00$70.38$66.00$75.00
0975Fiber optic connection hardware, F&I, preterminated connector assembly (0633-3-13)EACH72$60.97$59.00$63.34$60.00$67.50
0980Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16)EACH6$1,615.42$1,555.00$1,678.31$1,600.00$1,800.00
0985Fiber optic cable locator (0633-6)DA450$114.64$113.00$119.11$115.00$126.50
0990Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH8$1,563.31$1,509.00$1,624.17$1,550.00$1,725.00
0995Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH7$2,657.62$2,555.00$2,761.09$2,600.00$2,950.00
1000Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13)EACH3$4,846.26$4,655.00$5,034.93$4,800.00$5,350.00
1005Vehicle detection system- microwave, furnish & install cabinet equipment (0660-3-11)EACH6$12,090$11,609$12,560$11,800$13,250
1010Vehicle detection system- microwave, furnish & install, above ground equipment (0660-3-12)EACH38$14,487$13,909$15,051$14,200$15,975
1015Vehicle detection system- remove (0660-4-60)EACH3$82.33$79.00$85.54$81.00$3.50
1020Vehicle detection system- avi, bluetooth, furnish & install, cabinet equipment (0660-6121)EACH3$2,553.40$2,455.00$2,652.81$2,500.00$2,800.00
1025Vehicle detection system- avi, bluetooth, furnish & install, above ground equipment (0660-6122)EACH3$9,692.51$9,309.00$10,070$9,500.00$10,700
1030Traffic controller without cabinet, atc, F&I in existing NEMA cabinet (0671-2-15)EACH3$11,152$10,703$11,586$11,000$12,300
1035Traffic controller, remove- cabinet to remain (0671-2-60)EACH3$297.03$285.00$308.59$290.00$325.00
1040Traffic signal controller cabinet, remove (0676-1600)EACH1$849.40$815.00$882.47$830.00$935.00
1045ITS CCTV camera, pressurized, high definition (0682-1163)EACH2$8,650.31$8,309.00$8,987.07$8,500.00$9,550.00
1050ITS CCTV camera, relocate (0682-1400)EACH2$1,928.08$1,855.00$2,003.14$1,900.00$2,125.00
1055ITS CCTV camera, remove & disposal (0682-1600)EACH1$505.47$485.00$525.15$495.00$555.00
1060Managed field ethernet switch, furnish & install (0684-1-1)EACH8$11,047$10,609$11,477$10,800$12,200
1065Managed field ethernet switch, remove- cabinet to remain (0684-1-6)EACH3$192.81$185.00$200.31$190.00$225.00
1070Connected vehicle roadside equipment, rsu (0924-681-1)EACH6$10,943$10,555$11,369$10,700$12,065
1075Initial contingency amount, DO not bid (0999-25)LS1$4,500.00$4,500.00$4,500.00$4,500.00$4,500.00
FDOT contract T1916: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of February 25, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy