| 0005 | Mobilization (0101-1) | LS | 1 | $810,000 | $331,550 | $444,000 | $1,225,000 |
| 0010 | Mobilization (0101-1) | LS | 1 | $200,000 | $331,550 | $86,000 | $1,110,000 |
| 0015 | Mobilization (0101-1) | LS | 1 | $170,000 | $331,550 | $126,000 | $975,000 |
| 0020 | Mobilization (0101-1) | LS | 1 | $12,000 | $331,550 | $8,800.00 | $775,000 |
| 0025 | Maintenance of traffic (0102-1) | DA | 1 | $255,000 | $175,000 | $291,000 | $225,000 |
| 0030 | Maintenance of traffic (0102-1) | DA | 1 | $60,000 | $175,000 | $57,000 | $225,000 |
| 0035 | Maintenance of traffic (0102-1) | DA | 1 | $82,500 | $175,000 | $82,000 | $220,000 |
| 0040 | Maintenance of traffic (0102-1) | DA | 1 | $9,000.00 | $175,000 | $5,800.00 | $150,000 |
| 0045 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $11,500 | $84,170 | $45,000 | $65,000 |
| 0050 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $6,500.00 | $30,062 | $33,500 | $65,000 |
| 0055 | Traffic control officer (0102-14) | HR | 648 | $96.00 | $1.00 | $58.00 | $90.42 |
| 0060 | Work zone sign (0102-60) | ED | 63,135 | $0.20 | $0.21 | $0.25 | $0.28 |
| 0065 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 239,302 | $0.10 | $0.10 | $0.10 | $0.12 |
| 0070 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 25,498 | $0.10 | $0.05 | $0.05 | $0.12 |
| 0075 | Arrow board / advance warning arrow panel (0102-76) | ED | 1,808 | $5.90 | $5.25 | $5.85 | $6.03 |
| 0080 | Temporary raised/retroreflective pavement marker, type D (0102-78-1) | EACH | 297 | $5.30 | $5.05 | $5.30 | $4.46 |
| 0085 | Portable changeable message sign, temporary (0102-99) | ED | 2,945 | $11.80 | $10.25 | $11.65 | $12.48 |
| 0090 | Temporary signalization and maintenance, intersection (0102-104) | ED | 600 | $12.50 | $26.00 | $11.75 | $25.00 |
| 0095 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 600 | $12.50 | $26.00 | $11.75 | $25.00 |
| 0100 | Type III barricade (0102-115) | ED | 75 | $0.30 | $0.37 | $0.50 | $0.78 |
| 0105 | Temporary raised rumble per day, includes all sets and relocations (0102-909) | DA | 75 | $77.00 | $32.50 | $37.25 | $106.70 |
| 0110 | Sediment barrier (0104-10-3) | LF | 13,607 | $2.40 | $1.80 | $4.50 | $1.53 |
| 0115 | Soil tracking prevention device (0104-15) | EACH | 1 | $4,500.00 | $1.00 | $5,400.00 | $4,285.85 |
| 0120 | Inlet protection system (0104-18) | EACH | 130 | $180.00 | $180.00 | $133.00 | $211.00 |
| 0125 | Litter removal (0107-1) | ACRE | 843.76 | $85.00 | $55.00 | $55.00 | $30.14 |
| 0130 | Mowing (0107-2) | ACRE | 723.86 | $55.00 | $57.00 | $110.75 | $60.28 |
| 0135 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $29,000 | $200,000 | $2,500.00 | $325,000 |
| 0140 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $22,500 | $100,000 | $2,500.00 | $425,000 |
| 0145 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $5,500.00 | $100,000 | $8,000.00 | $1,865.71 |
| 0150 | Removal of existing concrete (0110-4-10) | SY | 1,665 | $34.00 | $40.00 | $37.00 | $11.06 |
| 0155 | Embankment (0120-6) | CY | 12 | $220.00 | $55.50 | $185.00 | $319.27 |
| 0160 | Regular excavation (3-R projects only) (0120-71) | LS | 1 | $6,500.00 | $24,500 | $5,500.00 | $9,302.24 |
| 0165 | Optional base, base group 09 (0285-709) | SY | 112 | $145.00 | $790.00 | $176.00 | $146.17 |
| 0170 | Milling existing asphalt pavement, 3" avg depth (0327-70-4) | SY | 190,533 | $3.20 | $5.90 | $3.80 | $9.00 |
| 0175 | Milling existing asphalt pavement, 2" avg depth (0327-70-5) | SY | 2,778 | $19.00 | $11.20 | $12.00 | $17.00 |
| 0180 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 85,495 | $3.10 | $4.20 | $4.05 | $13.00 |
| 0185 | Milling existing asphalt pavement, 4" avg depth (0327-70-7) | SY | 12,097 | $3.90 | $8.80 | $3.15 | $13.00 |
| 0190 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 14,674.20 | $147.00 | $132.00 | $185.15 | $225.00 |
| 0195 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 2,724.90 | $171.00 | $150.40 | $202.50 | $265.00 |
| 0200 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 24,090.80 | $189.00 | $170.90 | $202.15 | $285.00 |
| 0205 | Manhole, adjust (0425-5) | EACH | 3 | $1,600.00 | $2,050.00 | $1,400.00 | $1,500.00 |
| 0210 | Valve boxes, adjust (0425-6) | EACH | 33 | $830.00 | $950.00 | $705.00 | $1,500.00 |
| 0215 | Concrete curb & gutter, type E (0520-1-7) | LF | 96 | $78.00 | $45.00 | $115.00 | $185.00 |
| 0220 | Concrete curb & gutter, type F (0520-1-10) | LF | 2,347 | $74.00 | $40.00 | $86.50 | $55.00 |
| 0225 | Traffic separator concrete- type IV, 4' wide (0520-5-41) | LF | 12 | $90.00 | $70.00 | $128.50 | $185.00 |
| 0230 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 952 | $356.00 | $300.00 | $137.50 | $65.00 |
| 0235 | Detectable warnings (0527-2) | SF | 1,625 | $53.00 | $50.00 | $46.50 | $50.00 |
| 0240 | Performance turf, sod (0570-1-2) | SY | 19,586 | $5.90 | $3.00 | $7.25 | $7.00 |
| 0245 | Raised pavement marker, type B (0706-1-3) | EACH | 4,723 | $5.20 | $5.25 | $5.30 | $4.46 |
| 0250 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 39.61 | $1,480.00 | $1,400.00 | $1,200.00 | $2,109.96 |
| 0255 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.80 | $432.00 | $1,500.00 | $1,400.00 | $2,815.28 |
| 0260 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 7,364 | $0.90 | $1.20 | $1.20 | $2.05 |
| 0265 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 669 | $1.20 | $2.25 | $2.35 | $2.17 |
| 0270 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 6,984 | $1.80 | $3.25 | $2.35 | $2.29 |
| 0275 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 11.40 | $432.00 | $825.00 | $590.00 | $602.85 |
| 0280 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.20 | $432.00 | $825.00 | $710.00 | $843.99 |
| 0285 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 23 | $61.00 | $90.00 | $59.00 | $48.23 |
| 0290 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 222 | $42.60 | $37.00 | $35.35 | $48.23 |
| 0295 | Painted pavement markings, standard, white, island nose (0710-11190) | SF | 129 | $6.10 | $5.25 | $3.50 | $4.82 |
| 0300 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 21.05 | $1,480.00 | $1,500.00 | $1,200.00 | $2,109.96 |
| 0305 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 1,212 | $1.20 | $2.25 | $2.35 | $2.29 |
| 0310 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 2.05 | $432.00 | $800.00 | $705.00 | $843.99 |
| 0315 | Painted pavement markings, standard, yellow, island nose (0710-11290) | SF | 1,791 | $6.10 | $5.25 | $3.50 | $4.52 |
| 0320 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $65,377 | $65,377 | $65,377 | $65,377 |
| 0325 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $25,000 | $25,000 | $25,000 | $25,000 |
| 0330 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $25,000 | $25,000 | $25,000 | $25,000 |
| 0335 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $15,000 | $15,000 | $15,000 | $15,000 |
| 0340 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 3.33 | $9,050.00 | $4,100.00 | $3,400.00 | $4,500.00 |
| 0345 | Single column ground sign assembly, remove (0700-1600) | EACH | 2 | $61.00 | $225.00 | $118.00 | $2,210.00 |
| 0350 | Delineator, flexible tubular (0705-11-1) | EACH | 99 | $67.00 | $130.00 | $106.00 | $98.86 |
| 0355 | Raised pavement marker, type B (0706-1-3) | EACH | 4,613 | $5.50 | $5.25 | $5.25 | $4.46 |
| 0360 | Painted pavement markings, standard, white, island nose (0710-11190) | SF | 47 | $8.50 | $5.25 | $3.50 | $4.52 |
| 0365 | Painted pavement markings, standard, yellow, island nose (0710-11290) | SF | 363 | $8.50 | $5.25 | $3.50 | $4.52 |
| 0370 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 26 | $8.50 | $5.25 | $4.70 | $4.82 |
| 0375 | Painted pavement markings, surface (0710-90) | LS | 1 | $61,300 | $62,500 | $58,000 | $185,000 |
| 0380 | Painted pavement markings, surface (0710-90) | LS | 1 | $13,900 | $10,500 | $16,500 | $55,000 |
| 0385 | Painted pavement markings, surface (0710-90) | LS | 1 | $20,000 | $21,000 | $30,500 | $55,000 |
| 0390 | Painted pavement markings, surface (0710-90) | LS | 1 | $1,510.00 | $3,050.00 | $4,700.00 | $5,727.02 |
| 0395 | Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102) | GM | 0.59 | $5,320.00 | $8,000.00 | $8,200.00 | $7,962.37 |
| 0400 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 8,085 | $2.00 | $4.25 | $4.75 | $3.81 |
| 0405 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 669 | $4.90 | $5.25 | $6.00 | $5.71 |
| 0410 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 7,106 | $6.80 | $6.25 | $7.00 | $7.62 |
| 0415 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.30 | $3,040.00 | $4,500.00 | $3,500.00 | $3,014.22 |
| 0420 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 17 | $134.00 | $255.00 | $213.00 | $106.10 |
| 0425 | Thermoplastic, standard, arrow (0711-11170) | EACH | 253 | $97.50 | $95.00 | $95.00 | $73.54 |
| 0430 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 1,288 | $4.90 | $5.50 | $6.00 | $5.33 |
| 0435 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 1.52 | $3,170.00 | $4,500.00 | $3,500.00 | $3,014.22 |
| 0440 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 762 | $23.10 | $22.00 | $17.75 | $18.69 |
| 0445 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 21.59 | $7,180.00 | $6,000.00 | $6,950.00 | $5,971.78 |
| 0450 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.10 | $7,920.00 | $6,000.00 | $6,700.00 | $7,962.37 |
| 0455 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 6.25 | $2,680.00 | $3,000.00 | $2,200.00 | $1,493.84 |
| 0460 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 14.19 | $7,180.00 | $6,295.77 | $7,000.00 | $5,595.60 |
| 0465 | Thermoplastic, standard-other surfaces, yellow, solid, 8" (0711-16202) | GM | 0.39 | $8,040.00 | $6,050.00 | $8,200.00 | $7,460.81 |
| 0470 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 3.50 | $2,680.00 | $3,000.00 | $2,200.00 | $1,399.81 |
| 0475 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.11 | $30,500 | $26,000 | $28,000 | $65,690 |
| 0480 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.11 | $30,500 | $26,000 | $28,000 | $65,690 |
| 0485 | Preformed/permanent tape, remove (0713-107) | SF | 560 | $2.30 | $6.50 | $6.00 | $2.41 |
| 0490 | Conduit, furnish & install, open trench (0630-2-11) | LF | 95 | $44.30 | $15.00 | $41.50 | $25.00 |
| 0495 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 577 | $46.20 | $42.00 | $43.25 | $27.00 |
| 0500 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 12 | $2,330.00 | $1,400.00 | $2,200.00 | $478.63 |
| 0505 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 1 | $5,660.00 | $5,600.00 | $5,300.00 | $6,000.00 |
| 0510 | Electrical service wire, & install (0639-2-1) | LF | 293 | $11.90 | $15.50 | $11.15 | $15.00 |
| 0515 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 1 | $3,290.00 | $2,350.00 | $3,100.00 | $4,000.00 |
| 0520 | Prestressed concrete pole, type P-II pedestal (0641-2-11) | EACH | 1 | $3,400.00 | $2,800.00 | $3,100.00 | $3,000.00 |
| 0525 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $2,840.00 | $2,500.00 | $2,700.00 | $4,000.00 |
| 0530 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 1,793 | $2.80 | $2.75 | $2.50 | $4.00 |
| 0535 | Luminaire & bracket arm, luminaire and arm; pole remains (0715-5-51) | EACH | 1 | $375.00 | $980.00 | $350.00 | $700.00 |
| 0540 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 1 | $22,300 | $18,000 | $21,000 | $24,000 |
| 0545 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211) | EACH | 3 | $1,800.00 | $1,250.00 | $1,700.00 | $3,000.00 |
| 0550 | Light pole complete, F&I, standard pole standard foundation, 35' mounting height, 8' arm length (0715-61211) | EACH | 2 | $12,100 | $15,000 | $11,000 | $18,000 |
| 0555 | Light pole complete, F&I, utility conflict pole standard foundation, 45' mounting height, 16' arm length (0715-65466) | EACH | 1 | $14,700 | $16,000 | $14,000 | $18,000 |
| 0560 | Light pole complete, F&I, utility conflict pole special foundation, 45' mounting height, 16' arm length (0715-66466) | EACH | 1 | $18,900 | $21,000 | $18,000 | $28,000 |
| 0565 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 4 | $1,410.00 | $960.00 | $1,300.00 | $1,200.00 |
| 0570 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 1.69 | $3,810.00 | $6,350.00 | $3,500.00 | $5,000.00 |
| 0575 | Conduit, furnish & install, open trench (0630-2-11) | LF | 591 | $39.90 | $15.00 | $37.25 | $36.00 |
| 0580 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 414 | $46.20 | $42.00 | $43.25 | $80.00 |
| 0585 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 1 | $16,600 | $9,900.00 | $15,500 | $20,000 |
| 0590 | Signal cable, remove- intersection (0632-7-6) | PI | 1 | $2,240.00 | $950.00 | $2,100.00 | $3,200.00 |
| 0595 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 25 | $2,330.00 | $1,400.00 | $2,200.00 | $478.63 |
| 0600 | Aluminum signals pole, (0646-1-11) | EACH | 8 | $4,080.00 | $3,400.00 | $3,800.00 | $6,000.00 |
| 0605 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 8 | $2,730.00 | $2,300.00 | $2,500.00 | $4,000.00 |
| 0610 | Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16) | AS | 2 | $2,990.00 | $3,000.00 | $2,700.00 | $5,000.00 |
| 0615 | Vehicular traffic signal, remove- poles to remain (0650-1-60) | AS | 8 | $375.00 | $275.00 | $350.00 | $500.00 |
| 0620 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 8 | $1,400.00 | $1,390.00 | $1,300.00 | $3,000.00 |
| 0625 | Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60) | AS | 8 | $93.50 | $126.00 | $87.50 | $500.00 |
| 0630 | Loop assembly, F&I, type B (0660-2102) | AS | 40 | $2,060.00 | $1,200.00 | $1,930.00 | $3,000.00 |
| 0635 | Loop assembly, F&I, type F (0660-2106) | AS | 25 | $2,530.00 | $1,650.00 | $2,400.00 | $5,000.00 |
| 0640 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 8 | $388.00 | $560.00 | $360.00 | $1,000.00 |
| 0645 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 8 | $46.80 | $110.00 | $44.00 | $250.00 |
| 0650 | Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13) | EACH | 1 | $16,600 | $15,000 | $15,500 | $22,000 |
| 0655 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 2 | $1,380.00 | $665.00 | $1,300.00 | $2,000.00 |
| 0660 | Internally illuminated sign, furnish & install overhead mount, UP to 12 SF (0700-5-21) | EACH | 3 | $12,800 | $5,445.00 | $12,000 | $10,000 |
| 0665 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 1 | $13,500 | $7,265.00 | $12,600 | $12,000 |