FDOT contract T4699 bid tabulation
CR 510 (85TH ST) FROM CR 512 TO 87TH ST. Let by Florida DOT on March 26, 2025, Indian River, District 4. 4 bids received; low bid $24,890,809 by Timothy Rose Contracting, Inc..
- Owner
- Florida DOT
- Letting
- 26 MAR 2025
- Pay items
- 259
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Timothy Rose Contracting, Inc. | $24,890,809 | Low |
| 2 | Ranger Construction Industries, Inc. | $27,113,820 | +9.0% |
| 3 | Ohla USA Inc | $28,727,366 | +15% |
| 4 | Halley Engineering Contractors, Inc. | $29,071,876 | +17% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Timothy Rose Contracting, Inc. | 2. Ranger Construction Industries, Inc. | 3. Ohla USA Inc | 4. Halley Engineering Contractors, Inc. |
|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $2,443,344 | $2,710,000 | $2,860,000 | $2,900,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $425,226 | $660,655 | $2,255,000 | $3,700,000 |
| 0015 | Special detour- temporary pavement (0102-2200) | SY | 1 | $1,120,000 | $631,000 | $415,000 | $600,000 |
| 0020 | Special detour- temporary earthwork/base (0102-2300) | CY | 1 | $367,000 | $114,000 | $110,000 | $140,000 |
| 0025 | Commercial material for temporary driveway maintenance (0102-3) | CY | 33.10 | $85.59 | $184.10 | $355.00 | $100.00 |
| 0030 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $16,991 | $68,800 | $40,000 | $17,000 |
| 0035 | Traffic control officer (0102-14) | HR | 850 | $83.65 | $86.80 | $70.00 | $90.00 |
| 0040 | Work zone sign (0102-60) | ED | 46,076 | $0.23 | $0.20 | $0.20 | $0.19 |
| 0045 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 6,252 | $7.25 | $68.30 | $0.01 | $38.50 |
| 0050 | Temporary barrier, relocate, low profile concrete (0102-71-23) | LF | 8,448 | $7.25 | $20.85 | $0.01 | $14.00 |
| 0055 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 165,379 | $0.10 | $0.15 | $0.12 | $0.25 |
| 0060 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 3,192,588 | $0.17 | $0.05 | $0.03 | $0.04 |
| 0065 | Arrow board / advance warning arrow panel (0102-76) | ED | 123 | $6.69 | $6.95 | $6.00 | $5.00 |
| 0070 | Portable changeable message sign, temporary (0102-99) | ED | 2,945 | $12.27 | $10.60 | $9.00 | $9.00 |
| 0075 | Temporary signalization and maintenance, intersection (0102-104) | ED | 3,764 | $29.21 | $22.30 | $47.00 | $19.25 |
| 0080 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 3,764 | $4.21 | $9.85 | $10.30 | $8.50 |
| 0085 | Type III barricade (0102-115) | ED | 27,299 | $0.31 | $0.30 | $0.25 | $0.23 |
| 0090 | Portable regulatory, sign (0102-150-1) | ED | 966 | $6.69 | $6.35 | $6.00 | $4.50 |
| 0095 | Radar speed display unit (0102-150-2) | ED | 966 | $6.69 | $6.35 | $5.50 | $5.00 |
| 0100 | Sediment barrier (0104-10-3) | LF | 13,510 | $1.42 | $2.55 | $3.00 | $3.00 |
| 0105 | Floating turbidity barrier (0104-11) | LF | 509 | $11.15 | $23.65 | $25.00 | $20.00 |
| 0110 | Soil tracking prevention device (0104-15) | EACH | 1 | $3,563.18 | $5,860.00 | $5,000.00 | $6,000.00 |
| 0115 | Inlet protection system (0104-18) | EACH | 18 | $167.30 | $261.60 | $250.00 | $200.00 |
| 0120 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $6,346.31 | $12,600 | $11,000 | $8,000.00 |
| 0125 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $69,346 | $68,400 | $25,000 | $20,000 |
| 0130 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $843,819 | $1,090,000 | $2,800,000 | $1,800,000 |
| 0135 | Removal of existing concrete (0110-4-10) | SY | 4,584 | $27.07 | $12.65 | $22.00 | $30.00 |
| 0140 | Mailbox, F&I single (0110-7-1) | EACH | 3 | $295.50 | $547.50 | $250.00 | $500.00 |
| 0145 | Regular excavation (0120-1) | CY | 53,538.80 | $10.04 | $12.65 | $22.00 | $7.50 |
| 0150 | Subsoil excavation (0120-4) | CY | 1,732.40 | $17.39 | $27.45 | $32.00 | $20.00 |
| 0155 | Embankment (0120-6) | CY | 28,440.30 | $7.60 | $4.20 | $35.00 | $14.00 |
| 0160 | Reinforcement grid for soil stabilization (0145-71) | SY | 3,074 | $7.67 | $7.70 | $9.00 | $12.00 |
| 0165 | Type B stabilization (0160-4) | SY | 56,292 | $6.94 | $2.85 | $0.01 | $10.00 |
| 0170 | Optional base, base group 01 (0285-701) | SY | 137 | $21.32 | $10.30 | $70.00 | $85.00 |
| 0175 | Optional base, base group 09 (0285-709) | SY | 48,248 | $16.64 | $16.50 | $21.00 | $21.00 |
| 0180 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 12,467 | $2.62 | $4.90 | $3.50 | $4.70 |
| 0185 | Superpave asphaltic conc, traffic B (0334-1-12) | TN | 395.20 | $152.10 | $146.40 | $190.00 | $238.00 |
| 0190 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 4,900 | $158.49 | $148.50 | $210.00 | $190.00 |
| 0195 | Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81) | TN | 307 | $202.04 | $212.40 | $250.00 | $276.00 |
| 0200 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 4,697.10 | $200.05 | $202.90 | $211.00 | $230.00 |
| 0205 | Miscellaneous asphalt (0339-1) | TN | 53.40 | $330.91 | $527.00 | $350.00 | $250.00 |
| 0210 | Concrete class IV, culverts (0400-4-1) | CY | 219.80 | $6,961.94 | $6,740.00 | $1,800.00 | $5,440.00 |
| 0215 | Conc class IV, bulkhead (0400-4-8) | CY | 223.40 | $2,007.62 | $1,260.00 | $1,400.00 | $1,800.00 |
| 0220 | Reinforcing steel- roadway (0415-1-1) | LB | 30,888 | $1.68 | $1.40 | $3.70 | $1.00 |
| 0225 | Reinforcing steel- bulkhead (0415-1-8) | LB | 21,353 | $3.18 | $2.00 | $2.00 | $1.50 |
| 0230 | Inlets, curb, type 9, <10' (0425-1201) | EACH | 2 | $6,138.78 | $7,600.00 | $6,700.00 | $6,114.00 |
| 0235 | Inlets, curb, type P-5, <10' (0425-1351) | EACH | 20 | $7,517.02 | $9,210.00 | $8,100.00 | $7,410.00 |
| 0240 | Inlets, curb, type P-5, partial (0425-1355) | EACH | 1 | $4,368.18 | $6,370.00 | $5,700.00 | $5,130.00 |
| 0245 | Inlets, curb, type P-6, <10' (0425-1361) | EACH | 13 | $7,924.36 | $9,370.00 | $8,300.00 | $7,542.00 |
| 0250 | Inlets, curb, type J-5, <10' (0425-1451) | EACH | 2 | $13,080 | $14,500 | $12,800 | $11,682 |
| 0255 | Inlets, curb, type J-6, <10' (0425-1461) | EACH | 2 | $14,269 | $13,900 | $12,300 | $11,222 |
| 0260 | Inlets, DT bot, type D, <10' (0425-1541) | EACH | 7 | $6,404.94 | $7,070.00 | $6,300.00 | $5,694.00 |
| 0265 | Inlets, ditch bottom, type D, J bot, <10' (0425-1543) | EACH | 3 | $16,521 | $14,900 | $13,200 | $12,086 |
| 0270 | Inlets, ditch bottom, type D, partial (0425-1545) | EACH | 1 | $3,812.26 | $6,580.00 | $5,800.00 | $5,294.00 |
| 0275 | Inlets, DT bot, type D, modify (0425-1549) | EACH | 2 | $6,062.46 | $11,000 | $9,800.00 | $8,890.00 |
| 0280 | Inlets, barrier wall, rigid, curb & gutter, <=10' (0425-1881) | EACH | 1 | $9,588.57 | $8,230.00 | $7,300.00 | $6,626.00 |
| 0285 | Manholes, P-8, <10' (0425-2-61) | EACH | 4 | $6,280.89 | $8,140.00 | $7,200.00 | $6,554.00 |
| 0290 | Manholes, J-7, <10' (0425-2-71) | EACH | 3 | $14,652 | $23,300 | $20,600 | $18,782 |
| 0295 | Manholes, J-8, <10' (0425-2-91) | EACH | 1 | $11,576 | $13,100 | $11,600 | $10,538 |
| 0300 | Manhole, adjust (0425-5) | EACH | 5 | $1,169.64 | $831.00 | $730.00 | $2,854.00 |
| 0305 | Manhole, adjust, utilities (0425-5-1) | EACH | 1 | $1,312.41 | $1,660.00 | $1,500.00 | $1,338.00 |
| 0310 | Valve boxes, adjust (0425-6) | EACH | 9 | $529.96 | $1,170.00 | $1,100.00 | $944.00 |
| 0315 | Pipe culvert,optional material,round, 15"S/CD (0430-175115) | LF | 3 | $390.71 | $199.10 | $170.00 | $147.00 |
| 0320 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 2,916 | $135.58 | $151.60 | $135.00 | $121.00 |
| 0325 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 2,699 | $141.26 | $165.50 | $145.00 | $133.00 |
| 0330 | Pipe culvert, opt material, round, 30"S/CD (0430-175130) | LF | 719 | $195.73 | $216.50 | $190.00 | $176.00 |
| 0335 | Pipe culvert, opt material, round, 36"S/CD (0430-175136) | LF | 271 | $242.73 | $311.50 | $275.00 | $253.00 |
| 0340 | Pipe culvert, opt material, round, 48"S/CD (0430-175148) | LF | 232 | $270.52 | $443.50 | $390.00 | $360.00 |
| 0345 | Pipe culvert,optional material,other-elip/arch, (0430-175218) | LF | 43 | $157.92 | $178.30 | $158.00 | $147.00 |
| 0350 | Pipe culvert,optional material,other shape-elip/arch, 24"S/CD (0430-175224) | LF | 427 | $197.90 | $231.50 | $205.00 | $188.00 |
| 0355 | Pipe culvert, opt material, shape - elip/arch, 36"S/CD (0430-175236) | LF | 48 | $368.97 | $375.00 | $330.00 | $302.00 |
| 0360 | Straight concrete endwalls, single, 0 degrees, round (0430-518100) | EACH | 5 | $3,710.77 | $3,550.00 | $3,125.00 | $670.00 |
| 0365 | Straight concrete endwalls, single, 0 degrees, elliptical (0430-518102) | EACH | 3 | $3,566.37 | $3,380.00 | $3,000.00 | $2,722.00 |
| 0370 | Straight concrete endwalls, single, 0 degrees, round (0430-530100) | EACH | 1 | $7,330.89 | $5,490.00 | $4,800.00 | $4,416.00 |
| 0375 | Straight concrete endwalls, single, 0 degrees, round (0430-536100) | EACH | 1 | $8,414.51 | $7,320.00 | $6,500.00 | $5,890.00 |
| 0380 | Straight concrete endwalls, double, 0 degrees, round (0430-548200) | EACH | 2 | $12,982 | $28,400 | $25,100 | $22,897 |
| 0385 | Mitered end section, optional round, 24" CD (0430-982129) | EACH | 1 | $3,001.68 | $3,270.00 | $2,900.00 | $2,634.00 |
| 0390 | Mitered end section, optional round, 36" CD (0430-982138) | EACH | 1 | $5,890.66 | $8,680.00 | $7,650.00 | $6,990.00 |
| 0395 | Mitered end section, optional round, 18" SD (0430-984125) | EACH | 11 | $2,654.72 | $2,970.00 | $2,600.00 | $2,390.00 |
| 0400 | Mitered end sect, optional - elliptical / arch, 18" SD (0430-984625) | EACH | 3 | $2,749.06 | $3,270.00 | $2,900.00 | $2,632.00 |
| 0405 | Anchor bar, steel (0455-87) | EACH | 47 | $2,899.90 | $2,100.00 | $2,580.00 | $2,600.00 |
| 0410 | Sheet piling steel, temporary- critical (0455-133-2) | SF | 6,796 | $94.80 | $120.40 | $100.00 | $85.00 |
| 0415 | Sheet piling steel, F&I (0455-133-3) | SF | 29,060 | $49.08 | $55.80 | $50.00 | $44.00 |
| 0420 | Struct steel, carbon (0460-2-1) | LB | 1 | $278,836 | $302,000 | $250,000 | $250,000 |
| 0425 | Pipe handrail - guiderail, aluminum (0515-1-2) | LF | 107 | $88.94 | $92.30 | $58.00 | $58.00 |
| 0430 | Bullet rail, double rail (0515-4-2) | LF | 754 | $50.19 | $52.10 | $88.00 | $89.00 |
| 0435 | Concrete curb & gutter, type E (0520-1-7) | LF | 10,351 | $22.81 | $36.20 | $33.00 | $31.00 |
| 0440 | Concrete curb & gutter, type F (0520-1-10) | LF | 10,842 | $22.45 | $31.95 | $30.00 | $31.00 |
| 0445 | Concrete curb, type A (0520-2-1) | LF | 47 | $28.30 | $46.05 | $45.00 | $65.00 |
| 0450 | Concrete traffic separator, special- variable width (0520-70) | SY | 88 | $112.85 | $114.60 | $87.00 | $127.00 |
| 0455 | Concrete parapet, pedestrian/bicycle, 27" height (0521-6-11) | LF | 754 | $140.13 | $141.00 | $225.00 | $225.00 |
| 0460 | Shoulder concrete barrier, curb and gutter barrier (0521-72-43) | LF | 696 | $252.24 | $451.00 | $400.00 | $350.00 |
| 0465 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 8,174 | $92.09 | $109.00 | $95.00 | $83.00 |
| 0470 | Concrete ditch pavement, non reinforced, 4" (0524-1-2) | SY | 131 | $101.63 | $174.10 | $112.00 | $110.00 |
| 0475 | Concrete ditch pavement, non reinforced, 6" (0524-1-4) | SY | 75 | $111.06 | $172.10 | $130.00 | $118.00 |
| 0480 | Detectable warnings (0527-2) | SF | 290 | $37.83 | $50.90 | $45.00 | $65.00 |
| 0485 | Riprap, rubble, F&I, ditch lining (0530-3-4) | TN | 222.40 | $130.28 | $173.60 | $100.00 | $140.00 |
| 0490 | Bedding stone (0530-74) | TN | 95.90 | $98.17 | $99.60 | $250.00 | $80.00 |
| 0495 | Guardrail -roadway, general (0536-1-1) | LF | 486 | $26.04 | $22.85 | $20.00 | $20.00 |
| 0500 | Guardrail transition to rigid barrier, F&I- index 536- 001, approach TL-3 (0536-8112) | EACH | 2 | $2,970.69 | $3,530.00 | $3,050.00 | $3,052.00 |
| 0505 | Guardrail removal (0536-73) | LF | 1,086 | $3.35 | $2.85 | $2.45 | $2.45 |
| 0510 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 1 | $1,597.28 | $1,580.00 | $1,400.00 | $1,364.00 |
| 0515 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 1 | $3,218.63 | $3,740.00 | $3,200.00 | $3,231.00 |
| 0520 | Fencing, type B, 0.0-5.0', standard features (0550-10210) | LF | 1,792 | $22.93 | $26.00 | $19.00 | $19.00 |
| 0525 | Fencing, special type, 6.1-7.0', reset existing (0550-10938) | LF | 12 | $22.31 | $14.10 | $12.20 | $13.00 |
| 0530 | Fence gate, type B, single, 6.1 - 12.0' opening (0550-60212) | EACH | 2 | $2,007.62 | $2,730.00 | $2,400.00 | $2,362.00 |
| 0535 | Fence gate, type B, sliding/cantilever, greater than 30' openning (0550-60237) | EACH | 1 | $4,349.84 | $8,470.00 | $7,400.00 | $7,320.00 |
| 0540 | Performance turf (0570-1-1) | SY | 18,836 | $1.90 | $4.90 | $6.10 | $3.50 |
| 0545 | Performance turf, sod (0570-1-2) | SY | 27,609 | $3.83 | $4.85 | $6.00 | $5.40 |
| 0550 | Conduit, furnish & install, embedded concrete barriers and traffic railings (0630-2-16) | LF | 2,262 | $39.89 | $25.45 | $15.30 | $14.00 |
| 0555 | Raised pavement marker, type B (0706-1-3) | EACH | 5,968 | $5.02 | $5.20 | $4.00 | $4.50 |
| 0560 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 15.72 | $1,413.14 | $1,465.00 | $1,665.00 | $1,267.00 |
| 0565 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 4,989 | $0.84 | $0.90 | $1.90 | $0.75 |
| 0570 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 1,278 | $1.51 | $1.55 | $1.90 | $1.35 |
| 0575 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 1.36 | $353.34 | $366.70 | $2.00 | $317.00 |
| 0580 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.62 | $471.12 | $482.60 | $700.00 | $423.00 |
| 0585 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 8 | $61.34 | $63.65 | $44.00 | $55.00 |
| 0590 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 241 | $39.04 | $40.50 | $32.25 | $35.00 |
| 0595 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 9.39 | $1,413.14 | $1,465.00 | $1,665.00 | $1,267.00 |
| 0600 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.54 | $471.12 | $488.95 | $700.00 | $423.00 |
| 0605 | Partnering, DO not bid (0999-16) | LS | 1 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 |
| 0610 | Disputes review board, meeting- DO not bid (0999-20-1) | DA | 31 | $3,900.00 | $3,900.00 | $3,900.00 | $3,900.00 |
| 0615 | Disputes review board, hearing- DO not bid (0999-20-2) | EACH | 2 | $4,500.00 | $4,500.00 | $4,500.00 | $4,500.00 |
| 0620 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $150,000 | $150,000 | $150,000 | $150,000 |
| 0625 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 84 | $496.33 | $515.00 | $425.00 | $445.00 |
| 0630 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 7 | $1,784.55 | $1,850.00 | $1,900.00 | $1,600.00 |
| 0635 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 1 | $2,119.15 | $2,200.00 | $2,450.00 | $1,900.00 |
| 0640 | Single column ground sign assembly, F&I barrier less than 12 SF (0700-1211) | EACH | 2 | $1,081.88 | $1,120.00 | $7,000.00 | $970.00 |
| 0645 | Single column ground sign assembly, remove (0700-1600) | EACH | 36 | $11.15 | $11.60 | $52.00 | $10.00 |
| 0650 | Multi-column ground sign assembly, F&I ground mount, 20.0 SF (0700-2112) | EACH | 1 | $3,011.43 | $3,130.00 | $4,550.00 | $2,700.00 |
| 0655 | Multi-column ground sign assembly, F&I ground mount, 30.0 SF (0700-2113) | EACH | 4 | $4,572.91 | $4,750.00 | $5,700.00 | $4,100.00 |
| 0660 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 1 | $1,226.88 | $1,270.00 | $620.00 | $1,100.00 |
| 0665 | Sign panel, relocate, UP to 12 SF (0700-3501) | EACH | 1 | $234.22 | $243.10 | $135.00 | $210.00 |
| 0670 | Retroreflective sign strip- furnish and install, 2' (0700-13-12) | EACH | 13 | $33.46 | $34.75 | $68.00 | $30.00 |
| 0675 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 24 | $33.46 | $34.75 | $80.00 | $30.00 |
| 0680 | Tubular marker, 36" yellow (0704-1-4) | EACH | 15 | $55.77 | $57.90 | $235.00 | $50.00 |
| 0685 | Object marker, type 1 (0705-10-1) | EACH | 13 | $329.03 | $341.50 | $204.00 | $295.00 |
| 0690 | Raised pavement marker, type B (0706-1-3) | EACH | 1,222 | $4.46 | $4.65 | $4.00 | $4.00 |
| 0695 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 255 | $6.69 | $6.95 | $4.30 | $6.00 |
| 0700 | Painted pavement markings, surface (0710-90) | LS | 1 | $20,443 | $21,220 | $26,725 | $18,329 |
| 0705 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 2,217 | $4.46 | $4.63 | $3.40 | $4.00 |
| 0710 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 191 | $5.58 | $5.80 | $5.00 | $5.00 |
| 0715 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 544 | $6.97 | $7.25 | $6.70 | $6.25 |
| 0720 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.95 | $2,453.76 | $2,545.00 | $2,525.00 | $2,200.00 |
| 0725 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 9 | $139.42 | $144.70 | $95.00 | $125.00 |
| 0730 | Thermoplastic, standard, arrow (0711-11170) | EACH | 69 | $100.38 | $104.20 | $56.00 | $90.00 |
| 0735 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 568 | $5.58 | $5.80 | $4.75 | $5.00 |
| 0740 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.15 | $2,453.76 | $2,410.00 | $2,400.00 | $2,200.00 |
| 0745 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 1,180 | $24.54 | $25.50 | $18.00 | $22.00 |
| 0750 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 24 | $223.07 | $231.50 | $220.00 | $200.00 |
| 0755 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 24 | $223.07 | $231.50 | $92.00 | $200.00 |
| 0760 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 5.14 | $6,022.86 | $6,250.00 | $5,200.00 | $5,400.00 |
| 0765 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.08 | $7,026.67 | $6,460.00 | $6,100.00 | $6,300.00 |
| 0770 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 1.85 | $2,676.83 | $1,380.00 | $1,285.00 | $2,400.00 |
| 0775 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 2.86 | $6,022.86 | $6,235.00 | $4,900.00 | $5,400.00 |
| 0780 | Green-colored pavement markings, bike lane (0714-10) | SF | 8,606 | $9.36 | $9.70 | $10.00 | $8.39 |
| 0785 | Conduit, furnish & install, open trench (0630-2-11) | LF | 587 | $12.98 | $24.60 | $19.00 | $21.25 |
| 0790 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 29 | $1,510.23 | $2,080.00 | $1,270.00 | $1,801.00 |
| 0795 | Electrical service wire, & install (0639-2-1) | LF | 40 | $9.72 | $11.25 | $10.00 | $9.70 |
| 0800 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 4 | $494.41 | $3,960.00 | $2,400.00 | $3,425.00 |
| 0805 | Prestressed concrete pole, type P-II pedestal (0641-2-11) | EACH | 4 | $1,646.14 | $2,680.00 | $1,925.00 | $2,317.00 |
| 0810 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 7,461 | $2.42 | $3.35 | $4.00 | $2.90 |
| 0815 | Luminaire & bracket arm- aluminum, furnish & install new luminaire and arm on new/existing pole (0715-5-31) | EACH | 7 | $1,236.01 | $1,550.00 | $3,000.00 | $1,339.00 |
| 0820 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 4 | $25,350 | $29,900 | $11,400 | $25,825 |
| 0825 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 10' arm length (0715-61321) | EACH | 8 | $11,700 | $12,200 | $9,200.00 | $10,582 |
| 0830 | Light pole complete, F&I, standard pole special foundation, 40' mounting height, 10' arm length (0715-62321) | EACH | 4 | $22,880 | $15,700 | $29,000 | $13,521 |
| 0835 | Light pole complete, F&I, utility conflict pole standard foundation, 35' mounting height, 16' arm length (0715-65266) | EACH | 1 | $11,702 | $13,700 | $9,600.00 | $11,825 |
| 0840 | Light pole complete, F&I, utility conflict pole special foundation, 35' mounting height, 16' arm length (0715-66266) | EACH | 1 | $22,405 | $17,100 | $29,000 | $14,763 |
| 0845 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 14 | $820.26 | $1,330.00 | $590.00 | $1,149.00 |
| 0850 | Conduit, furnish & install, open trench (0630-2-11) | LF | 903 | $26.97 | $28.35 | $30.00 | $24.50 |
| 0855 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 997 | $60.68 | $66.00 | $73.00 | $57.00 |
| 0860 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 4 | $14,203 | $19,700 | $5,300.00 | $17,029 |
| 0865 | Signal cable, remove- intersection (0632-7-6) | PI | 4 | $4,421.55 | $2,180.00 | $506.00 | $1,884.00 |
| 0870 | Pull & splice box, F&I, 17" X 30" cover size (0635-2-14) | EACH | 84 | $1,903.50 | $2,690.00 | $1,800.00 | $2,327.00 |
| 0875 | Electrical power service, F&I, overhead meter purchased by contractor from power company (0639-1112) | AS | 4 | $2,472.03 | $6,970.00 | $4,325.00 | $6,025.00 |
| 0880 | Electrical power service, remove overhead (0639-1610) | AS | 4 | $1,050.61 | $10.90 | $506.00 | $9.40 |
| 0885 | Electrical service wire, & install (0639-2-1) | LF | 285 | $9.83 | $11.35 | $7.15 | $9.80 |
| 0890 | Prestressed concrete pole, type P-II pedestal (0641-2-11) | EACH | 4 | $1,646.14 | $2,680.00 | $2,000.00 | $2,317.00 |
| 0895 | Prestressed concrete pole, complete pole removal- pole 30' and greater (0641-2-80) | EACH | 14 | $16,799 | $7,320.00 | $12,900 | $6,324.00 |
| 0900 | Aluminum signals pole, (0646-1-11) | EACH | 16 | $2,393.37 | $3,760.00 | $2,500.00 | $3,247.00 |
| 0905 | Aluminum signals pole, remove (0646-1-60) | EACH | 1 | $421.37 | $727.00 | $1,000.00 | $628.00 |
| 0910 | Steel mast arm assembly, and install, single arm 50' (0649-21-6) | EACH | 2 | $86,251 | $93,400 | $63,000 | $80,669 |
| 0915 | Steel mast arm assembly, and install, single arm 60' (0649-21-10) | EACH | 1 | $94,476 | $112,000 | $78,000 | $96,564 |
| 0920 | Steel mast arm assembly, and install, double arm 78'-50' (0649-21-24) | EACH | 2 | $142,535 | $182,000 | $123,000 | $157,500 |
| 0925 | Steel mast arm assembly, and install, double arm 78'-70' (0649-21-26) | EACH | 1 | $150,704 | $194,000 | $128,000 | $167,300 |
| 0930 | Steel mast arm assembly, and install, double arm 78'-78' (0649-21-27) | EACH | 2 | $170,115 | $215,000 | $150,000 | $185,700 |
| 0935 | Steel mast arm assembly, remove, remove arm and attachments; pole remains (0649-26-7) | EACH | 2 | $5,056.42 | $8,000.00 | $11,500 | $6,913.00 |
| 0940 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 31 | $1,533.78 | $2,470.00 | $1,500.00 | $2,133.00 |
| 0945 | Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16) | AS | 6 | $2,011.33 | $2,980.00 | $1,910.00 | $2,577.00 |
| 0950 | Vehicular traffic signal, furnish & install aluminum, 5 section straight, 1 way (0650-1-18) | AS | 3 | $2,320.33 | $3,090.00 | $2,400.00 | $2,666.00 |
| 0955 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 16 | $1,134.88 | $1,320.00 | $1,250.00 | $1,139.00 |
| 0960 | Vehicle detection system- microwave, furnish & install cabinet equipment (0660-3-11) | EACH | 4 | $11,180 | $10,800 | $8,300.00 | $9,335.00 |
| 0965 | Vehicle detection system- microwave, furnish & install, above ground equipment (0660-3-12) | EACH | 10 | $14,349 | $12,700 | $9,800.00 | $10,985 |
| 0970 | Vehicle detection system- furnish & install cabinet equipment (0660-4-11) | EACH | 4 | $4,578.86 | $6,400.00 | $4,425.00 | $5,529.00 |
| 0975 | Vehicle detection system- furnish & install above ground equipment (0660-4-12) | EACH | 13 | $10,793 | $13,300 | $8,700.00 | $11,491 |
| 0980 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 16 | $292.15 | $386.50 | $425.00 | $334.00 |
| 0985 | Traffic controller assembly, F&I, NEMA, 1 preemption (0670-5111) | AS | 4 | $48,688 | $67,400 | $43,200 | $58,221 |
| 0990 | Traffic controller assembly, remove controller with (0670-5600) | AS | 3 | $1,146.12 | $1,090.00 | $665.00 | $942.00 |
| 0995 | ITS CCTV camera, F&I, dome PTZ enclosure - pressurized, IP, definition (0682-1113) | EACH | 4 | $9,837.54 | $8,050.00 | $9,000.00 | $6,950.00 |
| 1000 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 4 | $5,618.24 | $4,600.00 | $4,470.00 | $3,975.00 |
| 1005 | Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13) | EACH | 4 | $12,225 | $16,900 | $8,690.00 | $14,591 |
| 1010 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 13 | $3,640.62 | $6,130.00 | $3,430.00 | $5,295.00 |
| 1015 | Flowable fill (0121-70) | CY | 14 | $379.85 | $620.50 | $550.00 | $502.00 |
| 1020 | Local agency initial amount (DO not bid) (0999-26) | LS | 1 | $129,446 | $129,446 | $129,446 | $129,446 |
| 1025 | Utility pipe,remove & dispose, 8- 19.9" (1050-16004) | LF | 1,542 | $15.23 | $46.30 | $41.00 | $38.00 |
| 1030 | Utility pipe,plug & place out of service, 5- 7.9" (1050-18003) | LF | 15 | $60.08 | $53.30 | $47.00 | $44.00 |
| 1035 | Utility pipe,plug & place out of service, 8-19.9" (1050-18004) | LF | 5,820 | $2.59 | $59.70 | $53.00 | $47.60 |
| 1040 | Utility pipe- poly vinyl chloride, furnish & install, water/sewer, (1050-31206) | LF | 27 | $35.47 | $71.80 | $65.00 | $58.00 |
| 1045 | Utility pipe- poly vinyl chloride, furnish & install, water/sewer, (1050-31208) | LF | 505 | $88.05 | $92.60 | $82.00 | $74.00 |
| 1050 | Utility pipe- poly vinyl chloride, furnish & install, water/sewer, 12" (1050-31212) | LF | 1,590 | $116.21 | $136.60 | $120.00 | $110.00 |
| 1055 | Utility pipe- poly vinyl chloride, furnish & install, water/sewer, 16" (1050-31216) | LF | 5,130 | $140.06 | $148.20 | $130.00 | $120.00 |
| 1060 | Utility pipe- polyethylene, furnish & install, water/sewer, (1050-41202) | LF | 280 | $34.46 | $82.20 | $72.00 | $67.00 |
| 1065 | Utility pipe- ductile iron/cast iron, furnish & install, water/sewer, 6" (1050-51206) | LF | 28 | $117.19 | $104.20 | $92.00 | $82.00 |
| 1070 | Utility pipe- ductile iron/cast iron, furnish & install, water/sewer, 8" (1050-51208) | LF | 35 | $88.35 | $148.20 | $130.00 | $120.00 |
| 1075 | Utility pipe- ductile iron/cast iron, furnish & install, water/sewer, 12" (1050-51212) | LF | 420 | $173.09 | $262.80 | $230.00 | $211.00 |
| 1080 | Utility pipe- ductile iron/cast iron, furnish & install, water/sewer, 16" (1050-51216) | LF | 290 | $196.51 | $288.20 | $260.00 | $231.00 |
| 1085 | Utility fittings, ductile iron, furnish & install elbow, 8" (1055-51108) | EACH | 12 | $1,083.88 | $1,030.00 | $910.00 | $830.00 |
| 1090 | Utility fittings, ductile iron, furnish & install elbow, (1055-51112) | EACH | 21 | $3,010.14 | $3,700.00 | $3,250.00 | $2,974.00 |
| 1095 | Utility fittings, ductile iron, furnish & install elbow, (1055-51116) | EACH | 35 | $3,440.98 | $4,060.00 | $3,600.00 | $3,270.00 |
| 1100 | Utility fittings, ductile iron, furnish & install tee, 8" (1055-51208) | EACH | 1 | $1,307.64 | $1,400.00 | $1,235.00 | $1,128.00 |
| 1105 | Utility fittings, ductile iron, furnish & install tee, 16" (1055-51216) | EACH | 7 | $4,021.90 | $4,560.00 | $4,000.00 | $3,668.00 |
| 1110 | Utility fittings, ductile iron, furnish & install reducer, 8" (1055-51308) | EACH | 2 | $975.71 | $893.50 | $800.00 | $718.00 |
| 1115 | Utility fittings, ductile iron, furnish & install, 8" (1055-51508) | EACH | 4 | $860.17 | $792.00 | $700.00 | $636.00 |
| 1120 | Utility fittings, ductile iron, furnish & install, 12" (1055-51512) | EACH | 5 | $2,061.78 | $2,440.00 | $2,150.00 | $1,960.00 |
| 1125 | Utility fittings, ductile iron, furnish & install, 16" (1055-51516) | EACH | 3 | $1,900.71 | $2,460.00 | $2,175.00 | $1,982.00 |
| 1130 | Utility structure, below ground, F&I, water/sewer, 0 - 80 FT3, 0 - 6' (1060-11211) | EACH | 2 | $7,613.05 | $17,600 | $12,525 | $14,153 |
| 1135 | Utility fixture, valve/meter box, furnish & install, 2" (1080-21102) | EACH | 1 | $3,274.71 | $4,600.00 | $4,060.00 | $3,706.00 |
| 1140 | Utility fixture, valve/meter box, relocate (1080-21400) | EACH | 1 | $894.48 | $2,590.00 | $2,290.00 | $2,084.00 |
| 1145 | Utility fixture- tapping saddle/sleeve, furnish & 6" (1080-23106) | EACH | 1 | $1,204.92 | $14,500 | $12,750 | $11,642 |
| 1150 | Utility fixture- tapping saddle/sleeve, furnish & 8" (1080-23108) | EACH | 4 | $6,018.62 | $17,400 | $15,400 | $14,026 |
| 1155 | Utility fixture- tapping saddle/sleeve, furnish & 12" (1080-23112) | EACH | 6 | $8,847.47 | $28,200 | $24,900 | $22,664 |
| 1160 | Utility fixture- tapping saddle/sleeve, furnish & 16" (1080-23116) | EACH | 1 | $26,902 | $42,900 | $37,800 | $34,510 |
| 1165 | Utility fixture- tapping saddle/sleeve, furnish & 20" (1080-23120) | EACH | 1 | $28,487 | $46,700 | $41,200 | $37,568 |
| 1170 | Utility fixture, valve assembly, furnish and install, 6" (1080-24106) | EACH | 4 | $2,818.63 | $3,040.00 | $2,675.00 | $2,444.00 |
| 1175 | Utility fixture, valve assembly, furnish and install, 8" (1080-24108) | EACH | 7 | $4,143.71 | $4,220.00 | $3,720.00 | $3,398.00 |
| 1180 | Utility fixture, valve assembly, furnish and install, 12" (1080-24112) | EACH | 8 | $7,451.21 | $7,550.00 | $6,650.00 | $6,076.00 |
| 1185 | Utility fixture, valve assembly, furnish and install, 16" (1080-24116) | EACH | 9 | $10,966 | $13,900 | $12,225 | $11,150 |
| 1190 | Utility fixture- blowoff assembly, furnish and install, (1080-25102) | EACH | 1 | $5,042.65 | $5,340.00 | $4,700.00 | $4,298.00 |
| 1195 | Utility fixture, vac/air furnish and INSTALL12" (1080-26112) | EACH | 3 | $12,660 | $18,800 | $16,600 | $15,122 |
| 1200 | Utility fixture, vac/air furnish and install, 16" (1080-26116) | EACH | 1 | $3,259.64 | $6,280.00 | $5,550.00 | $5,054.00 |
| 1205 | Utility fixture, vac/air remove (1080-26600) | EACH | 1 | $1,210.10 | $2,790.00 | $2,450.00 | $2,250.00 |
| 1210 | Utility fixture- line stop assembly, furnish and install, (1080-27112) | EACH | 2 | $22,166 | $28,900 | $25,500 | $23,260 |
| 1215 | Utility fixture- sample point, furnish & install, 8" (1080-32108) | EACH | 3 | $1,198.85 | $1,660.00 | $1,450.00 | $1,334.00 |
| 1220 | Utility fixture- sample point, furnish & install, 16" (1080-32116) | EACH | 3 | $1,588.68 | $1,820.00 | $1,600.00 | $1,468.00 |
| 1225 | Fire hydrant, standard, F&I, 3 2 hose, 1 pumper, 6" (1644-116-08) | EACH | 4 | $6,163.80 | $9,490.00 | $8,400.00 | $7,500.00 |
| 1230 | Fire hydrant, remove (1644-900) | EACH | 1 | $1,847.28 | $2,600.00 | $2,550.00 | $1,800.00 |
| 1235 | Itsfm location documentation- intersection (0611-2-1) | EACH | 6 | $3,680.64 | $3,040.00 | $3,000.00 | $2,625.00 |
| 1240 | Conduit, furnish & install, open trench (0630-2-11) | LF | 4,208 | $16.01 | $28.35 | $25.00 | $24.50 |
| 1245 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 1,327 | $32.12 | $52.10 | $36.00 | $45.00 |
| 1250 | Fiber optic cable, F&I, underground,2-12 fibers (0633-1121) | LF | 1,376 | $6.25 | $4.05 | $4.00 | $3.50 |
| 1255 | Fiber optic cable, F&I, underground,49-96 fibers (0633-1123) | LF | 9,113 | $6.92 | $4.65 | $4.00 | $4.00 |
| 1260 | Fiber optic connection, install, splice (0633-2-31) | EACH | 324 | $63.24 | $52.10 | $51.00 | $45.00 |
| 1265 | Fiber optic connection hardware, F&I, splice (0633-3-11) | EACH | 6 | $1,717.63 | $1,420.00 | $1,375.00 | $1,225.00 |
| 1270 | Fiber optic connection hardware, F&I, splice tray (0633-3-12) | EACH | 20 | $66.92 | $57.90 | $56.00 | $50.00 |
| 1275 | Fiber optic connection hardware, F&I, preterminated patch panel (0633-3-15) | EACH | 6 | $2,788.36 | $2,300.00 | $2,225.00 | $1,985.00 |
| 1280 | Fiber optic cable locator (0633-6) | DA | 941 | $412.68 | $130.80 | $330.00 | $113.00 |
| 1285 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 8 | $2,478.27 | $3,990.00 | $2,425.00 | $3,449.00 |
| 1290 | Pull & splice box, F&I, 17" X 30" cover size (0635-2-14) | EACH | 23 | $1,892.71 | $3,110.00 | $1,680.00 | $2,688.00 |
| 1295 | Junction box, furnish & install, embedded (0635-3-13) | EACH | 3 | $658.05 | $550.00 | $1,335.00 | $475.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of March 26, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.