FDOT contract T4738 bid tabulation
SR 5 (US 1 / FEDERAL HWY) FROM SR A1A (SE DIXIE HWY) TO SE.. Let by Florida DOT on April 29, 2026, Martin, District 4. 7 bids received; low bid $15,994,701 by Ohla USA Inc.
- Owner
- Florida DOT
- Letting
- 29 APR 2026
- Pay items
- 208
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Ohla USA Inc | $15,994,701 | Low |
| 2 | C.W. Roberts Contracting, Inc. | $18,517,415 | +16% |
| 3 | Halley Engineering Contractors, Inc. | $19,286,056 | +21% |
| 4 | Timothy Rose Contracting, Inc. | $19,453,372 | +22% |
| 5 | Florida Engineering & Development Corp | $20,740,653 | +30% |
| 6 | Roadway Construction, LLC | $20,997,111 | +31% |
| 7 | Ranger Construction Industries, Inc. | $21,399,648 | +34% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ohla USA Inc | 2. C.W. Roberts Contracting, Inc. | 3. Halley Engineering Contractors, Inc. | 4. Timothy Rose Contracting, Inc. | 5. Florida Engineering & Development Corp | 6. Roadway Construction, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Methacrylate monomer (0413-151) | GA | 2 | $150.00 | $17.35 | $550.00 | $272.57 | $150.11 | $150.00 |
| 0010 | Cleaning & sealing concrete surfaces - penetrant sealer or methacrylates (0413-154) | SF | 336 | $10.00 | $11.50 | $11.00 | $21.81 | $12.01 | $10.00 |
| 0015 | Bridge deck expansion joint, rehabilitation, poured joint backer rod (0458-1-21) | LF | 540 | $46.00 | $81.00 | $63.00 | $103.57 | $70.55 | $70.00 |
| 0020 | Polymer nosing for bridge expansion joint (0458-2) | CF | 78.70 | $960.00 | $982.00 | $1,075.00 | $1,635.39 | $1,358.44 | $850.00 |
| 0025 | Bridge drains (0506-3) | EACH | 3 | $4,000.00 | $7,500.00 | $1,650.00 | $18,595 | $7,438.90 | $5,000.00 |
| 0030 | Concrete ditch pavement, 6", reinforced (0524-1-49) | SY | 43 | $216.50 | $74.50 | $182.00 | $112.89 | $193.08 | $395.32 |
| 0035 | Fencing, type R, 5.1-6.0', vertical (0550-10325) | LF | 1,016 | $98.00 | $109.25 | $104.00 | $102.48 | $171.67 | $98.00 |
| 0040 | Mobilization (0101-1) | LS | 1 | $1,000,000 | $1,000,000 | $1,400,000 | $1,339,670 | $1,000,000 | $1,860,206 |
| 0045 | Mobilization (0101-1) | LS | 1 | $593,882 | $340,000 | $500,000 | $695,305 | $675,000 | $203,598 |
| 0050 | Maintenance of traffic (0102-1) | DA | 1 | $410,000 | $435,000 | $1,350,000 | $492,665 | $251,141 | $381,397 |
| 0055 | Maintenance of traffic (0102-1) | DA | 1 | $250,000 | $200,000 | $300,000 | $142,513 | $100,891 | $54,031 |
| 0060 | Special detour- temporary pavement (0102-2200) | SY | 1 | $1.00 | $30,000 | $1,000.00 | $70,105 | $56,444 | $41,665 |
| 0065 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $1.00 | $95,000 | $15,000 | $50,266 | $96,338 | $69,428 |
| 0070 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $1.00 | $118,000 | $15,000 | $85,301 | $210,970 | $68,420 |
| 0075 | Traffic control officer (0102-14) | HR | 400 | $85.00 | $185.00 | $90.00 | $81.77 | $97.96 | $75.00 |
| 0080 | Work zone sign (0102-60) | ED | 115,593 | $0.18 | $0.20 | $0.18 | $0.01 | $0.21 | $0.18 |
| 0085 | Business sign (0102-61) | EACH | 28 | $30.00 | $35.25 | $30.00 | $49.06 | $52.38 | $30.00 |
| 0090 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 3,972 | $0.01 | $23.25 | $62.00 | $43.61 | $52.38 | $0.01 |
| 0095 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 274,052 | $0.09 | $0.10 | $0.25 | $0.01 | $0.09 | $0.09 |
| 0100 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 693,679 | $0.10 | $0.05 | $0.03 | $0.01 | $0.05 | $0.03 |
| 0105 | Temporary separator, F&I remove (0102-75-1) | LF | 700 | $21.00 | $24.50 | $21.00 | $17.72 | $18.92 | $21.00 |
| 0110 | Arrow board / advance warning arrow panel (0102-76) | ED | 2,024 | $5.00 | $5.85 | $5.00 | $0.01 | $5.53 | $5.00 |
| 0115 | Portable changeable message sign, temporary (0102-99) | ED | 1,305 | $9.00 | $10.50 | $9.00 | $9.27 | $9.90 | $9.00 |
| 0120 | Temporary signalization and maintenance, intersection (0102-104) | ED | 2,805 | $7.56 | $27.75 | $8.50 | $26.32 | $8.62 | $8.50 |
| 0125 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 2,805 | $7.56 | $5.00 | $8.50 | $4.66 | $8.62 | $8.50 |
| 0130 | Type III barricade (0102-115) | ED | 4,443 | $0.23 | $0.25 | $0.23 | $0.01 | $0.27 | $0.23 |
| 0135 | Temporary raised rumble per day, includes all sets and relocations (0102-909) | DA | 266 | $30.00 | $35.25 | $30.00 | $32.71 | $34.92 | $30.00 |
| 0140 | Sediment barrier (0104-10-3) | LF | 58,283 | $0.01 | $2.65 | $2.50 | $1.41 | $2.85 | $2.81 |
| 0145 | Inlet protection system (0104-18) | EACH | 233 | $210.00 | $145.00 | $150.00 | $140.96 | $112.74 | $215.32 |
| 0150 | Litter removal (0107-1) | ACRE | 1,802.30 | $15.27 | $30.00 | $50.00 | $28.35 | $33.62 | $0.01 |
| 0155 | Mowing (0107-2) | ACRE | 1,660.20 | $25.56 | $90.00 | $130.00 | $85.04 | $106.06 | $0.01 |
| 0160 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $15,600 | $2,000.00 | $5,000.00 | $13,793 | $7,381.67 | $5,750.00 |
| 0165 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $6,000.00 | $2,000.00 | $5,000.00 | $11,449 | $7,381.67 | $3,450.00 |
| 0170 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $5,000.00 | $3,000.00 | $5,000.00 | $3,885.89 | $1,602.23 | $2,700.00 |
| 0175 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $2,500.00 | $3,000.00 | $5,000.00 | $3,885.89 | $1,602.23 | $2,700.00 |
| 0180 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $200,000 | $128,000 | $360,000 | $342,964 | $238,015 | $158,389 |
| 0185 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $148,000 | $18,000 | $110,000 | $328,623 | $275,773 | $481,098 |
| 0190 | Selective clearing and areas with trees to remain (0110-2-2) | ACRE | 3.09 | $13,027 | $7,300.00 | $4,400.00 | $17,739 | $8,172.02 | $14,615 |
| 0195 | Removal of existing concrete (0110-4-10) | SY | 11,984 | $25.00 | $12.50 | $25.00 | $34.23 | $5.07 | $17.69 |
| 0200 | Mailbox, F&I single (0110-7-1) | EACH | 9 | $648.12 | $340.00 | $400.00 | $394.53 | $573.38 | $967.13 |
| 0205 | Tree protection barrier (0110-21) | LF | 5,372 | $3.00 | $3.50 | $3.00 | $6.74 | $12.19 | $9.35 |
| 0210 | Tree root and branch pruning (0110-22) | EACH | 92 | $2,000.00 | $2,350.00 | $330.00 | $2,206.81 | $2,288.89 | $817.38 |
| 0215 | Borrow excavation, truck measure (0120-2-2) | CY | 3,915.40 | $30.00 | $13.25 | $4.00 | $6.58 | $131.00 | $14.63 |
| 0220 | Regular excavation (3-R projects only) (0120-71) | LS | 1 | $180,000 | $48,500 | $11,016 | $50,376 | $197,867 | $13,120 |
| 0225 | Regular excavation (3-R projects only) (0120-71) | LS | 1 | $100,000 | $49,000 | $60,912 | $73,032 | $48,998 | $144,444 |
| 0230 | Type B stabilization (0160-4) | SY | 35,806 | $0.01 | $17.00 | $0.01 | $13.25 | $8.33 | $20.74 |
| 0235 | Reworking limerock base, 6" (0210-1-1) | SY | 406 | $0.08 | $8.65 | $18.00 | $12.65 | $14.25 | $35.04 |
| 0240 | Reworking limerock base, 3" (0210-1-9) | SY | 5,841 | $0.01 | $16.25 | $10.00 | $3.85 | $13.43 | $25.51 |
| 0245 | Limerock-new material for reworking base (0210-2) | CY | 486.70 | $40.00 | $59.00 | $10.00 | $36.03 | $53.47 | $71.79 |
| 0250 | Optional base, base group 01 (0285-701) | SY | 20,679 | $6.50 | $10.50 | $14.00 | $13.11 | $18.82 | $25.91 |
| 0255 | Optional base, base group 09 (0285-709) | SY | 8,182 | $37.00 | $31.75 | $31.00 | $35.35 | $31.47 | $56.14 |
| 0260 | Optional base, shared use path with tree root bridging system (0285-775) | SY | 933 | $20.00 | $18.00 | $23.00 | $15.92 | $39.53 | $36.18 |
| 0265 | Turnout base- optional materials (0286-1) | SY | 459 | $45.00 | $36.35 | $40.00 | $43.69 | $27.21 | $28.64 |
| 0270 | Milling existing asphalt pavement, 3" avg depth (0327-70-4) | SY | 59,403 | $2.90 | $3.25 | $5.75 | $3.92 | $3.31 | $3.50 |
| 0275 | Milling existing asphalt pavement, 2" avg depth (0327-70-5) | SY | 1,870 | $2.70 | $5.70 | $7.00 | $3.18 | $12.18 | $6.00 |
| 0280 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 10,447 | $2.80 | $9.00 | $4.30 | $6.44 | $3.10 | $9.50 |
| 0285 | Milling existing asphalt pavement, 2 1/2" avg depth (0327-70-8) | SY | 137,149 | $3.35 | $3.00 | $4.70 | $3.48 | $3.84 | $3.20 |
| 0290 | Milling existing asphalt pavement, 1 1/4" avg depth (0327-70-12) | SY | 32,105 | $5.22 | $8.50 | $4.88 | $6.44 | $6.42 | $9.00 |
| 0295 | Milling existing asphalt pavement, 3/4" avg depth (0327-70-19) | SY | 465 | $20.00 | $44.00 | $5.00 | $2.29 | $21.74 | $46.00 |
| 0300 | Asphalt pavement grooving (0328-1) | SY | 45,525 | $2.31 | $3.00 | $2.70 | $2.81 | $3.20 | $3.45 |
| 0305 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 17,100.60 | $147.00 | $198.35 | $193.00 | $188.69 | $214.51 | $207.00 |
| 0310 | Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25) | TN | 565.20 | $202.00 | $265.00 | $278.00 | $249.91 | $264.36 | $276.50 |
| 0315 | Asphalt concrete friction course,traffic C, FC-9.5, PG 76-22 (0337-7-82) | TN | 12,043.20 | $165.00 | $201.65 | $233.00 | $221.01 | $224.31 | $210.00 |
| 0320 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 4,862.90 | $148.00 | $199.50 | $232.00 | $200.51 | $206.00 | $208.25 |
| 0325 | Miscellaneous asphalt (0339-1) | TN | 143.30 | $330.50 | $516.00 | $250.00 | $292.11 | $1,055.84 | $371.88 |
| 0330 | Inlets, curb, type P-5, <10' (0425-1351) | EACH | 4 | $11,500 | $9,500.00 | $8,190.00 | $8,934.81 | $12,210 | $12,947 |
| 0335 | Inlets, curb, type P-6, <10' (0425-1361) | EACH | 3 | $13,000 | $11,000 | $8,013.00 | $14,452 | $12,437 | $29,754 |
| 0340 | Inlets, curb, type 8, <10' (0425-1481) | EACH | 29 | $10,000 | $8,900.00 | $5,540.00 | $8,786.53 | $12,600 | $12,474 |
| 0345 | Inlets, DT bot, type A, <10' (0425-1501) | EACH | 1 | $10,000 | $8,200.00 | $4,890.00 | $10,160 | $10,425 | $10,259 |
| 0350 | Inlets, DT bot, type C,<10' (0425-1521) | EACH | 7 | $9,000.00 | $8,100.00 | $4,480.00 | $6,184.71 | $10,433 | $10,679 |
| 0355 | Inlets, ditch bottom, type C modified- back of sidewalk, >10' (0425-1532) | EACH | 2 | $10,000 | $11,000 | $5,470.00 | $5,845.90 | $8,752.84 | $16,920 |
| 0360 | Inlets, DT bot, type D, <10' (0425-1541) | EACH | 4 | $10,000 | $8,500.00 | $5,060.00 | $6,500.00 | $11,151 | $12,247 |
| 0365 | Inlets, DT bot, type F, <10' (0425-1561) | EACH | 1 | $9,000.00 | $8,300.00 | $5,050.00 | $5,331.24 | $11,398 | $9,284.78 |
| 0370 | Inlets, gutter, type V, <10' (0425-1711) | EACH | 5 | $10,000 | $8,400.00 | $5,920.00 | $6,402.05 | $12,097 | $11,103 |
| 0375 | Manholes, P-8, <10' (0425-2-61) | EACH | 4 | $9,000.00 | $8,500.00 | $5,430.00 | $6,434.23 | $12,037 | $15,898 |
| 0380 | Manhole, adjust (0425-5) | EACH | 8 | $2,500.00 | $2,400.00 | $3,010.00 | $1,083.03 | $1,239.02 | $650.00 |
| 0385 | Pipe culvert, optional material, round, 18"SD (0430-174118) | LF | 43 | $300.00 | $112.00 | $120.00 | $160.17 | $216.28 | $297.84 |
| 0390 | Pipe culvert,optional material,round, 15"S/CD (0430-175115) | LF | 8 | $490.00 | $100.00 | $230.00 | $200.22 | $458.28 | $399.90 |
| 0395 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 3,428 | $220.00 | $116.00 | $96.00 | $147.48 | $224.59 | $218.59 |
| 0400 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 240 | $270.00 | $160.00 | $120.00 | $166.86 | $213.16 | $271.23 |
| 0405 | Pipe culvert, opt material, round, 36"S/CD (0430-175136) | LF | 211 | $320.00 | $276.00 | $180.00 | $232.61 | $334.80 | $431.04 |
| 0410 | Pipe filling and plugging- place out of service (0430-830) | CY | 10.40 | $1,150.00 | $430.00 | $860.00 | $656.55 | $966.66 | $232.56 |
| 0415 | Mitered end section, optional round, 18" SD (0430-984125) | EACH | 2 | $2,900.00 | $3,100.00 | $2,560.00 | $3,055.36 | $4,370.39 | $6,626.00 |
| 0420 | French drain, 24" (0443-70-4) | LF | 830 | $300.00 | $312.25 | $190.00 | $381.50 | $297.08 | $512.50 |
| 0425 | Pipe handrail - guiderail, steel (0515-1-1) | LF | 11 | $264.87 | $305.00 | $265.00 | $227.86 | $148.10 | $14.45 |
| 0430 | Bollards (0519-78) | EACH | 37 | $1,000.00 | $2,300.00 | $550.00 | $1,250.63 | $1,006.70 | $695.65 |
| 0435 | Concrete curb & gutter, type E (0520-1-7) | LF | 68 | $31.93 | $97.50 | $66.00 | $55.79 | $67.15 | $169.18 |
| 0440 | Concrete curb & gutter, type F (0520-1-10) | LF | 3,561 | $41.17 | $62.00 | $55.00 | $45.16 | $42.58 | $84.29 |
| 0445 | Concrete curb, type B (0520-2-2) | LF | 69 | $48.71 | $59.00 | $66.00 | $57.02 | $34.74 | $88.39 |
| 0450 | Concrete curb, type D (0520-2-4) | LF | 454 | $50.38 | $47.00 | $55.00 | $45.35 | $36.20 | $87.10 |
| 0455 | Valley gutter- concrete (0520-3) | LF | 336 | $51.47 | $60.00 | $53.00 | $43.77 | $44.52 | $73.89 |
| 0460 | Traffic separator concrete- type I, 4' wide (0520-5-11) | LF | 37 | $202.63 | $105.00 | $60.00 | $49.06 | $123.58 | $172.81 |
| 0465 | Traffic separator concrete- type I, 6' wide (0520-5-12) | LF | 50 | $190.52 | $110.00 | $75.00 | $63.24 | $95.86 | $161.58 |
| 0470 | Traffic separator concrete- type IV, 4' wide (0520-5-41) | LF | 3,375 | $70.36 | $65.00 | $60.00 | $49.06 | $90.14 | $95.44 |
| 0475 | Shoulder gutter- concrete (0520-6) | LF | 896 | $48.96 | $47.00 | $50.00 | $39.04 | $56.52 | $78.89 |
| 0480 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 1,203 | $90.35 | $90.00 | $76.00 | $65.63 | $81.95 | $102.34 |
| 0485 | Sidewalk with tree root bridging system, 4" thick (0522-1112) | SY | 85 | $188.85 | $109.00 | $92.00 | $79.59 | $108.28 | $184.37 |
| 0490 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 2,277 | $132.91 | $113.00 | $92.00 | $80.97 | $96.62 | $165.76 |
| 0495 | Concrete ditch pavement, non reinforced, 4" (0524-1-2) | SY | 17 | $129.90 | $161.00 | $119.00 | $107.63 | $268.90 | $408.68 |
| 0500 | Detectable warnings (0527-2) | SF | 2,511 | $45.46 | $65.00 | $72.00 | $59.96 | $40.68 | $63.24 |
| 0505 | Guardrail -roadway, general (0536-1-1) | LF | 3,164 | $21.30 | $24.00 | $22.00 | $23.22 | $24.35 | $21.28 |
| 0510 | Pipe rail for guardrail (0536-6) | LF | 209 | $26.61 | $31.00 | $27.00 | $29.01 | $16.54 | $14.45 |
| 0515 | Guardrail transition to rigid barrier, F&I- index 536- 002, approach TL-3 (0536-8122) | EACH | 4 | $3,096.10 | $3,600.00 | $3,100.00 | $3,375.56 | $3,386.94 | $2,959.46 |
| 0520 | Guardrail transition to rigid barrier, F&I- index 536- 002, trailing (0536-8123) | EACH | 1 | $1,654.31 | $1,900.00 | $1,655.00 | $1,803.63 | $1,984.28 | $1,733.84 |
| 0525 | Guardrail removal (0536-73) | LF | 3,136 | $1.00 | $1.15 | $1.00 | $1.09 | $2.38 | $2.08 |
| 0530 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 2 | $1,254.35 | $1,400.00 | $1,255.00 | $1,367.57 | $1,441.61 | $1,259.66 |
| 0535 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 5 | $2,881.32 | $3,400.00 | $2,882.00 | $3,141.39 | $3,229.64 | $2,822.01 |
| 0540 | Bumper guards, concrete (0542-70) | EACH | 75 | $101.00 | $100.00 | $65.00 | $70.87 | $286.11 | $326.58 |
| 0545 | Performance turf, sod (0570-1-2) | SY | 67,309 | $3.20 | $6.15 | $5.00 | $3.70 | $4.84 | $5.62 |
| 0550 | Conduit, furnish & install, open trench (0630-2-11) | LF | 200 | $22.05 | $18.75 | $23.25 | $17.82 | $25.10 | $23.25 |
| 0555 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 82 | $40.64 | $32.00 | $44.50 | $31.25 | $46.27 | $44.50 |
| 0560 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 4 | $1,624.37 | $1,100.00 | $1,809.00 | $1,636.06 | $1,907.09 | $1,809.00 |
| 0565 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 4 | $2,174.94 | $2,900.00 | $3,046.00 | $2,686.45 | $2,476.29 | $3,046.00 |
| 0570 | Traffic monitoring site inductive loop assembly, & install, 1 loop (0695-6-11) | EACH | 4 | $1,626.67 | $1,600.00 | $1,473.00 | $1,535.12 | $1,852.06 | $1,473.00 |
| 0575 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 8 | $2,071.94 | $3,200.00 | $1,982.00 | $3,042.82 | $2,359.02 | $1,982.00 |
| 0580 | Raised pavement marker, type B (0706-1-3) | EACH | 4,268 | $4.06 | $4.50 | $4.00 | $4.36 | $4.58 | $4.00 |
| 0585 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 17.94 | $1,522.84 | $1,800.00 | $1,372.00 | $1,495.84 | $1,716.66 | $1,500.00 |
| 0590 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 6,047 | $1.02 | $1.15 | $0.72 | $0.78 | $1.15 | $1.00 |
| 0595 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 4,417 | $2.03 | $2.30 | $1.05 | $1.14 | $2.29 | $2.00 |
| 0600 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 2,003 | $3.05 | $3.50 | $1.55 | $1.69 | $3.43 | $3.00 |
| 0605 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 10.98 | $710.08 | $820.00 | $360.00 | $392.49 | $801.11 | $699.43 |
| 0610 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 2.91 | $708.46 | $820.00 | $500.00 | $545.13 | $801.11 | $697.83 |
| 0615 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 483 | $40.61 | $47.00 | $40.00 | $43.61 | $45.78 | $40.00 |
| 0620 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 15.00 | $1,522.23 | $1,800.00 | $1,372.00 | $1,495.84 | $1,716.66 | $1,499.40 |
| 0625 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 215 | $2.03 | $2.35 | $1.05 | $1.14 | $2.29 | $2.00 |
| 0630 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.48 | $700.23 | $810.00 | $500.00 | $545.13 | $801.13 | $689.73 |
| 0635 | Partnering, DO not bid (0999-16) | LS | 1 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 |
| 0640 | Disputes review board, meeting- DO not bid (0999-20-1) | DA | 19 | $4,800.00 | $4,800.00 | $4,800.00 | $4,800.00 | $4,800.00 | $4,800.00 |
| 0645 | Disputes review board, hearing- DO not bid (0999-20-2) | EACH | 2 | $5,750.00 | $5,750.00 | $5,750.00 | $5,750.00 | $5,750.00 | $5,750.00 |
| 0650 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $111,150 | $111,150 | $111,150 | $111,150 | $111,150 | $111,150 |
| 0655 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $38,850 | $38,850 | $38,850 | $38,850 | $38,850 | $38,850 |
| 0660 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 4.71 | $3,502.23 | $6,000.00 | $5,400.00 | $7,752.79 | $607.85 | $4,909.13 |
| 0665 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 180 | $430.95 | $500.00 | $427.00 | $763.18 | $543.61 | $430.95 |
| 0670 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 31 | $2,235.53 | $2,500.00 | $1,900.00 | $2,245.94 | $2,403.33 | $2,235.53 |
| 0675 | Single column ground sign assembly, relocate (0700-1500) | EACH | 29 | $338.51 | $390.00 | $125.00 | $436.10 | $286.11 | $338.51 |
| 0680 | Single column ground sign assembly, remove (0700-1600) | EACH | 129 | $25.00 | $29.00 | $10.00 | $76.32 | $22.89 | $25.00 |
| 0685 | Multi-column ground sign assembly, F&I ground mount, 30.0 SF (0700-2113) | EACH | 1 | $4,560.83 | $5,300.00 | $6,800.00 | $7,086.70 | $9,155.56 | $4,560.83 |
| 0690 | Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114) | EACH | 5 | $7,579.91 | $8,800.00 | $8,000.00 | $7,849.88 | $10,300 | $7,579.91 |
| 0695 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 6 | $750.00 | $870.00 | $1,100.00 | $1,308.31 | $1,716.67 | $750.00 |
| 0700 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 5 | $24.78 | $29.00 | $10.00 | $70.87 | $11.44 | $24.78 |
| 0705 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 71 | $70.23 | $81.00 | $40.00 | $109.03 | $114.45 | $70.23 |
| 0710 | Tubular marker, 36" yellow (0704-1-4) | EACH | 16 | $177.67 | $100.00 | $65.00 | $70.87 | $200.28 | $175.00 |
| 0715 | Object marker, type 1 (0705-10-1) | EACH | 23 | $303.66 | $350.00 | $225.00 | $272.57 | $343.33 | $303.66 |
| 0720 | Object marker, type 3 (0705-10-3) | EACH | 2 | $170.77 | $197.00 | $250.00 | $327.08 | $343.34 | $170.77 |
| 0725 | Raised pavement marker, type B (0706-1-3) | EACH | 4,619 | $4.06 | $4.70 | $4.00 | $4.36 | $4.58 | $4.00 |
| 0730 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 76 | $10.15 | $11.75 | $7.00 | $7.63 | $11.44 | $10.00 |
| 0735 | Painted pavement markings, surface (0710-90) | LS | 1 | $91,371 | $106,000 | $63,100 | $68,794 | $103,000 | $90,000 |
| 0740 | Painted pavement markings, surface (0710-90) | LS | 1 | $7,614.21 | $8,800.00 | $8,302.00 | $9,051.35 | $8,583.35 | $7,500.00 |
| 0745 | Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102) | GM | 0.27 | $7,028.50 | $8,100.00 | $6,200.00 | $6,759.62 | $8,011.13 | $6,923.08 |
| 0750 | Thermoplastic, standard, solid, 6" for parking spaces (0711-11121) | LF | 2,621 | $1.52 | $1.75 | $1.35 | $1.47 | $1.72 | $1.50 |
| 0755 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 4,989 | $4.06 | $4.70 | $2.00 | $2.18 | $4.58 | $4.00 |
| 0760 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 4,417 | $5.08 | $5.90 | $3.50 | $3.82 | $5.72 | $5.00 |
| 0765 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 1,933 | $6.09 | $7.00 | $4.50 | $4.91 | $6.87 | $6.00 |
| 0770 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 2.25 | $3,033.50 | $3,500.00 | $2,400.00 | $2,616.63 | $3,433.35 | $2,987.99 |
| 0775 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 9 | $253.81 | $295.00 | $135.00 | $147.19 | $286.11 | $250.00 |
| 0780 | Thermoplastic, standard, arrow (0711-11170) | EACH | 352 | $81.22 | $94.00 | $85.00 | $92.67 | $91.56 | $80.00 |
| 0785 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 215 | $5.08 | $6.00 | $3.50 | $3.82 | $5.72 | $5.00 |
| 0790 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.41 | $2,993.29 | $3,500.00 | $2,400.00 | $2,616.63 | $3,433.39 | $2,948.40 |
| 0795 | Thermoplastic, standard, blue, solid,6" (0711-11421) | LF | 353 | $10.15 | $11.75 | $1.50 | $1.64 | $11.44 | $10.00 |
| 0800 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 1,522 | $16.24 | $18.75 | $18.00 | $19.62 | $18.31 | $16.00 |
| 0805 | Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101) | GM | 0.77 | $6,091.38 | $7,100.00 | $6,200.00 | $6,759.62 | $6,866.68 | $6,000.00 |
| 0810 | Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131) | GM | 0.74 | $3,538.95 | $4,100.00 | $2,400.00 | $2,616.63 | $4,005.57 | $3,485.87 |
| 0815 | Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201) | GM | 0.77 | $6,020.08 | $6,900.00 | $6,200.00 | $6,759.62 | $6,866.69 | $5,929.78 |
| 0820 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 10.94 | $5,073.36 | $5,900.00 | $6,200.00 | $6,759.62 | $5,722.23 | $4,997.26 |
| 0825 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 4.03 | $5,575.43 | $6,500.00 | $7,000.00 | $7,631.83 | $6,294.45 | $5,491.80 |
| 0830 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 8.88 | $2,536.36 | $3,000.00 | $2,400.00 | $2,616.63 | $2,861.11 | $2,498.31 |
| 0835 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 10.38 | $5,073.21 | $5,900.00 | $6,200.00 | $6,759.62 | $5,722.23 | $4,997.11 |
| 0840 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 2.69 | $2,534.30 | $2,900.00 | $6,200.00 | $6,759.62 | $2,861.12 | $2,496.29 |
| 0845 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.07 | $30,731 | $35,000 | $27,720 | $30,222 | $36,622 | $30,270 |
| 0850 | Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181) | GM | 0.07 | $11,844 | $13,000 | $7,260.00 | $7,915.30 | $13,733 | $11,667 |
| 0855 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.07 | $30,731 | $35,000 | $27,720 | $30,222 | $36,622 | $30,270 |
| 0860 | Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381) | GM | 0.07 | $11,844 | $13,000 | $7,920.00 | $8,634.87 | $13,733 | $11,667 |
| 0865 | Conduit, furnish & install, open trench (0630-2-11) | LF | 1,175 | $17.39 | $18.75 | $13.75 | $17.82 | $19.80 | $13.75 |
| 0870 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 1,102 | $37.30 | $29.00 | $32.50 | $27.41 | $42.47 | $32.50 |
| 0875 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 22 | $1,624.37 | $1,500.00 | $1,884.00 | $1,636.06 | $1,907.09 | $1,884.00 |
| 0880 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 2 | $5,981.40 | $1,850.00 | $6,538.00 | $1,754.42 | $6,810.18 | $6,538.00 |
| 0885 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 2 | $2,682.31 | $1,600.00 | $2,204.00 | $1,535.12 | $3,053.97 | $2,204.00 |
| 0890 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 7,631 | $3.49 | $2.95 | $2.70 | $2.80 | $3.99 | $2.70 |
| 0895 | Lighting conductors, remove & dispose, contractor owns (0715-1-60) | LF | 7,699 | $0.44 | $0.90 | $0.40 | $0.88 | $0.49 | $0.40 |
| 0900 | Load center, rework, voltage (0715-7-21) | EACH | 2 | $2,108.34 | $2,800.00 | $1,327.00 | $2,741.28 | $2,400.47 | $1,327.00 |
| 0905 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 11 | $907.42 | $1,000.00 | $1,189.00 | $981.38 | $1,033.15 | $1,189.00 |
| 0910 | Light pole complete- special design, relocate (0715-540000) | EACH | 7 | $3,838.57 | $7,500.00 | $6,533.00 | $7,694.29 | $4,370.43 | $6,533.00 |
| 0915 | Conduit, furnish & install, open trench (0630-2-11) | LF | 356 | $17.39 | $18.75 | $37.25 | $17.82 | $19.80 | $37.25 |
| 0920 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 885 | $45.38 | $37.00 | $32.50 | $35.09 | $51.67 | $32.50 |
| 0925 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 4 | $8,381.68 | $5,700.00 | $8,623.00 | $5,427.73 | $9,543.01 | $8,623.00 |
| 0930 | Signal cable, remove- intersection (0632-7-6) | PI | 4 | $1,513.48 | $1,700.00 | $1,751.00 | $1,644.77 | $1,723.18 | $1,751.00 |
| 0935 | Fiber optic cable locator (0633-6) | DA | 561 | $0.01 | $255.00 | $100.00 | $241.23 | $236.32 | $0.01 |
| 0940 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 43 | $1,624.37 | $1,300.00 | $1,809.00 | $1,636.06 | $1,907.09 | $1,809.00 |
| 0945 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 4 | $5,765.19 | $2,700.00 | $6,201.00 | $2,576.80 | $6,564.00 | $6,201.00 |
| 0950 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 4 | $2,682.31 | $1,700.00 | $2,204.00 | $1,589.94 | $3,053.97 | $2,204.00 |
| 0955 | Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60) | EACH | 4 | $648.64 | $612.00 | $584.00 | $581.15 | $738.51 | $584.00 |
| 0960 | Aluminum signals pole, (0646-1-11) | EACH | 22 | $2,421.44 | $2,800.00 | $3,265.00 | $2,631.63 | $2,756.95 | $3,265.00 |
| 0965 | Aluminum signals pole, remove (0646-1-60) | EACH | 5 | $540.53 | $440.00 | $584.00 | $422.16 | $615.43 | $584.00 |
| 0970 | Vehicular traffic signal, furnish & install 3 section, 1 way (0650-1-34) | AS | 26 | $1,638.58 | $1,700.00 | $2,032.00 | $1,617.35 | $1,865.61 | $2,032.00 |
| 0975 | Vehicular traffic signal, furnish & install 5 section cluster, 1 way (0650-1-39) | AS | 6 | $2,574.20 | $2,800.00 | $3,129.00 | $2,686.45 | $2,930.87 | $3,129.00 |
| 0980 | Vehicular traffic signal, remove- poles to remain (0650-1-60) | AS | 32 | $216.21 | $213.00 | $146.00 | $202.85 | $246.17 | $146.00 |
| 0985 | Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109) | EACH | 32 | $843.44 | $980.00 | $344.00 | $932.03 | $960.30 | $344.00 |
| 0990 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 20 | $1,014.01 | $1,000.00 | $1,083.00 | $975.89 | $1,154.50 | $1,083.00 |
| 0995 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 2 | $1,890.57 | $1,900.00 | $2,228.00 | $1,842.14 | $2,152.52 | $2,228.00 |
| 1000 | Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60) | AS | 14 | $216.21 | $213.00 | $73.00 | $202.85 | $246.17 | $73.00 |
| 1005 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 24 | $443.39 | $270.00 | $343.00 | $257.68 | $504.83 | $343.00 |
| 1010 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 12 | $108.10 | $92.00 | $36.50 | $87.72 | $123.09 | $36.50 |
| 1015 | Traffic controller assembly, modify only - no components added (0670-5710) | AS | 4 | $2,108.34 | $1,700.00 | $2,334.00 | $1,644.77 | $2,400.47 | $2,334.00 |
| 1020 | Relocate trees and <14' of clear trunk, sabal palm only (0581-1-7) | EACH | 10 | $1,000.00 | $1,100.00 | $450.00 | $1,103.40 | $1,144.45 | $1,000.00 |
| 1025 | Relocate trees and palms, >=14' of clear trunk, sabal palm only (0581-1-8) | EACH | 22 | $1,000.00 | $1,200.00 | $450.00 | $1,103.40 | $1,144.45 | $1,000.00 |
| 1030 | Relocate trees and palms, palms, <10.0" DBH, <14.0' of clear trunk (0581-1271) | EACH | 1 | $1,500.00 | $1,750.00 | $2,000.00 | $1,655.10 | $1,716.68 | $1,500.00 |
| 1035 | Relocate trees and palms, 6.1" to 8.0" DBH (0581-1330) | EACH | 1 | $20,000 | $24,000 | $2,000.00 | $22,068 | $22,889 | $3,000.00 |
| 1040 | Relocate trees and palms, 8.1" to 14.0" DBH (0581-1340) | EACH | 5 | $20,000 | $24,000 | $2,500.00 | $22,068 | $22,889 | $3,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of April 29, 2026. Compiled by Mirage Metrics.