FDOT contract T5850 bid tabulation

SR 5 (US 1) FROM N OF CENTURY OAKS CR TO N OF MYERS DR. Let by Florida DOT on April 30, 2025, Brevard, District 5. 7 bids received; low bid $7,139,022 by V.A. Paving, Inc..

Owner
Florida DOT
Letting
30 APR 2025
Pay items
135
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1V.A. Paving, Inc.$7,139,022Low
2Timothy Rose Contracting, Inc.$7,562,013+6.0%
3Carr Construction, LLC$7,675,773+8.0%
4Ohla USA Inc$7,738,303+8.0%
5Pigott Asphalt and Sitework LLC$7,941,003+11%
6Ranger Construction Industries, Inc.$8,050,663+13%
7Preferred Materials Inc.$8,132,156+14%
FDOT contract T5850: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. V.A. Paving, Inc.2. Timothy Rose Contracting, Inc.3. Carr Construction, LLC4. Ohla USA Inc5. Pigott Asphalt and Sitework LLC6. Ranger Construction Industries, Inc.
0005Mobilization (0101-1)LS1$522,170$494,230$321,500$750,000$565,000$793,000
0010Maintenance of traffic (0102-1)DA1$216,730$147,000$227,750$650,000$396,000$194,983
0015Traffic control officer (0102-14)HR192$68.00$81.97$111.00$75.00$100.00$111.80
0020Work zone sign (0102-60)ED12,540$0.28$0.01$0.20$0.26$0.30$0.25
0025Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED16,910$0.14$0.01$0.09$0.15$0.10$0.10
0030Arrow board / advance warning arrow panel (0102-76)ED190$6.25$5.46$5.50$5.75$7.00$5.90
0035Portable changeable message sign, temporary (0102-99)ED260$13.75$10.93$11.00$12.75$10.00$11.75
0040Temporary signalization and maintenance, intersection (0102-104)ED570$26.93$15.14$15.00$20.00$25.00$17.65
0045Temporary traffic detection and maintenance, intersection (0102-107-1)ED570$26.93$1.09$15.00$29.00$25.00$17.65
0050Type III barricade (0102-115)ED760$0.40$0.35$0.40$0.40$1.00$0.40
0055Artificial coverings /rolled erosion control products (0104-1)SY115$15.00$10.11$83.00$15.50$1.00$12.65
0060Sediment barrier (0104-10-3)LF3,621$2.63$1.75$5.30$3.25$3.00$3.30
0065Inlet protection system (0104-18)EACH118$147.50$81.97$461.00$150.00$250.00$147.10
0070Litter removal (0107-1)ACRE231.99$54.38$76.51$50.00$75.00$10.00$82.40
0075Mowing (0107-2)ACRE193.54$85.94$98.37$80.00$95.00$25.00$105.90
0080Clearing & grubbing (0110-1-1)ACRE1$85,864$484,464$50,853$360,000$100,000$63,000
0085Removal of existing concrete (0110-4-10)SY201$69.23$46.50$40.50$52.00$65.00$42.55
0090Mailbox, F&I single (0110-7-1)EACH4$417.00$254.31$461.00$350.00$350.00$264.70
0095Regular excavation (0120-1)CY289.30$30.00$68.52$40.00$85.00$20.00$33.80
0100Embankment (0120-6)CY133.60$44.00$63.09$75.00$115.00$10.00$18.30
0105Type B stabilization (0160-4)SY1,757$18.00$42.85$26.50$35.00$12.50$17.50
0110Optional base, base group 04 (0285-704)SY516$53.00$62.43$37.25$55.00$100.00$87.30
0115Optional base, base group 09 (0285-709)SY735$65.00$76.54$56.00$47.00$150.00$67.80
0120Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY60,183$3.25$3.72$4.90$3.75$3.00$4.20
0125Milling existing asphalt pavement, 2 1/2" avg depth (0327-70-8)SY22,226$3.75$2.65$4.27$3.75$3.00$4.25
0130Milling existing asphalt pavement, 3 1/4" avg depth (0327-70-17)SY64,673$4.65$3.60$5.40$3.60$2.50$5.60
0135Superpave asphaltic conc, traffic C (0334-1-13)TN7,504$132.17$148.83$186.00$134.00$190.00$153.50
0140Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN12,232.80$165.22$191.93$200.00$186.00$205.00$201.00
0145Miscellaneous asphalt (0339-1)TN10.60$925.00$701.40$460.00$560.00$300.00$911.00
0150Inlets, DT bot, type A, <10' (0425-1501)EACH1$7,479.00$14,328$10,530$7,820.00$7,500.00$11,200
0155Inlets, DT bot, type C,<10' (0425-1521)EACH1$7,684.00$14,366$10,197$7,820.00$7,500.00$10,800
0160Pipe culvert,optional material,round, 15"S/CD (0430-175115)LF29$220.00$263.37$687.00$275.00$200.00$729.50
0165Mitered end sect, optional /ellip/arch, 36" SD (0430-984638)EACH1$12,160$9,670.88$20,505$7,820.00$3,500.00$21,800
0170Concrete curb & gutter, type E (0520-1-7)LF20$247.19$89.99$86.00$95.00$150.00$233.60
0175Concrete curb & gutter, type F (0520-1-10)LF130$103.41$42.84$86.00$60.00$150.00$78.50
0180Concrete sidewalk and driveways, 6" thick (0522-2)SY78$213.94$118.09$194.00$335.00$125.00$226.40
0185Concrete ditch pavement, non reinforced, 6" (0524-1-4)SY12$629.81$881.87$194.00$300.00$100.00$643.50
0190Detectable warnings (0527-2)SF212$49.80$39.90$27.75$45.00$35.00$46.85
0195Guardrail -roadway, general (0536-1-1)LF275$32.50$29.73$31.75$23.00$35.00$26.75
0200Special guardrail post- special steel post for concrete structure mount (0536-7-2)EACH7$281.25$245.91$383.00$372.00$350.00$437.00
0205Guardrail removal (0536-73)LF179$4.38$5.51$4.80$2.75$10.00$3.20
0210Guardrail end treatment- trailing anchorage (0536-85-20)EACH1$2,343.75$2,049.29$1,894.00$1,710.00$2,000.00$2,010.00
0215Guardrail end treatment- parallel approach terminal (0536-85-24)EACH1$4,812.50$4,207.87$3,974.00$4,005.00$3,600.00$4,710.00
0220Performance turf, sod (0570-1-2)SY11,492$4.50$4.64$8.00$8.20$4.00$6.05
0225Conduit, furnish & install, directional bore (0630-2-12)LF353$32.34$56.07$58.00$31.35$50.00$68.20
0230Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH8$1,876.73$1,865.19$1,803.00$1,190.00$1,250.00$2,120.00
0235Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1)EACH12$3,748.48$3,042.78$3,574.00$2,535.00$2,500.00$4,200.00
0240Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12)EACH12$3,404.68$1,949.83$1,965.00$2,365.00$1,300.00$2,310.00
0245Traffic monitoring site cabinet, furnish & install, type 3, pedestal mount (0695-7132)EACH3$10,842$7,606.96$8,239.00$6,440.00$6,500.00$9,690.00
0250Traffic monitoring site cabinet, remove existing cabinet (0695-7600)EACH3$885.00$1,032.84$869.00$445.00$650.00$1,020.00
0255Raised pavement marker, type B (0706-1-3)EACH4,195$5.63$4.66$4.40$4.15$5.00$4.65
0260Painted pavement markings, standard, white, solid, 6" (0710-11101)GM8.47$2,312.50$1,536.37$1,464.00$1,515.00$3,000.00$1,860.00
0265Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102)GM0.04$2,750.00$1,536.37$1,523.25$5,075.00$10,000$2,800.00
0270Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF585$2.75$0.70$0.70$2.10$3.00$0.90
0275Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124)LF411$4.13$1.05$1.04$3.10$4.00$1.30
0280Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF781$5.50$1.45$1.40$4.10$5.00$1.60
0285Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM6.97$937.50$384.09$366.00$670.00$1,000.00$930.50
0290Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM0.79$2,062.50$576.14$5,257.00$760.00$2,500.00$631.50
0295Painted pavement markings, standard, white, message or symbol (0710-11160)EACH15$100.00$52.38$50.00$86.00$85.00$147.10
0300Painted pavement markings, standard, white, arrows (0710-11170)EACH168$56.25$40.74$38.75$46.00$50.00$41.20
0305Painted pavement markings, standard, white, yield line (0710-11180)LF259$11.25$6.98$6.70$5.10$5.00$4.00
0310Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM6.09$2,312.50$1,536.37$1,465.00$1,515.00$3,300.00$1,860.00
0315Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224)LF398$4.50$1.16$1.10$3.05$5.00$1.30
0320Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241)GM1.45$2,062.50$768.18$732.00$755.00$2,000.00$629.00
0325Painted pavement markings, durable paint, yellow, island nose (0710-12290)SF1,070$3.13$4.66$44.25$5.10$5.00$4.65
0330Initial contingency amount, DO not bid (0999-25)LS1$74,000$74,000$74,000$74,000$74,000$74,000
0335Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH96$718.75$541.01$549.00$590.00$600.00$500.00
0340Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH15$2,625.00$1,858.02$1,884.00$2,150.00$1,800.00$1,710.00
0345Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113)EACH14$2,875.00$2,295.20$2,328.00$2,350.00$2,500.00$2,120.00
0350Single column ground sign assembly, F&I ground mount, SF sheeting area for back to back signs (0700-1114)EACH3$2,625.00$2,950.97$2,993.00$2,145.00$500.00$2,590.00
0355Single column ground sign assembly, relocate (0700-1500)EACH5$500.00$245.91$249.00$410.00$250.00$264.70
0360Single column ground sign assembly, remove (0700-1600)EACH38$31.25$54.65$55.00$26.00$100.00$29.40
0365Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH1$437.50$229.52$233.00$360.00$250.00$229.40
0370Sign panel, relocate, UP to 12 SF (0700-3501)EACH81$125.00$191.27$194.00$103.00$250.00$156.60
0375Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH107$125.00$120.22$122.00$103.00$300.00$35.30
0380Tubular marker, 36" yellow (0704-1-4)EACH62$281.25$103.83$105.00$233.00$150.00$111.80
0385Object marker, type 1 (0705-10-1)EACH53$406.25$289.63$294.00$333.00$150.00$264.70
0390Object marker, type 4 (0705-10-4)EACH3$406.25$289.63$294.00$333.00$150.00$229.40
0395Delineator, non-flexible (0705-11-2)EACH102$150.00$139.67$133.00$133.00$100.00$147.10
0400Raised pavement marker, type B (0706-1-3)EACH4,195$5.63$4.66$4.40$4.33$5.00$4.65
0405Painted pavement markings, durable paint, yellow, island nose (0710-12290)SF1,070$3.13$3.49$3.30$5.33$5.00$4.65
0410Painted pavement markings, surface (0710-90)LS1$85,000$36,736$34,983$90,000$125,000$56,600
0415Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF585$5.00$2.33$2.20$4.30$5.00$2.65
0420Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF411$7.50$3.49$3.30$5.33$7.00$3.80
0425Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF438$10.00$5.82$5.50$7.33$10.00$7.35
0430Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.79$3,125.00$2,560.61$3,048.00$2,520.33$5,000.00$2,110.00
0435Thermoplastic, standard, message or symbol (0711-11160)EACH8$300.00$128.03$122.00$155.00$150.00$529.50
0440Thermoplastic, standard, arrow (0711-11170)EACH161$93.75$104.75$100.00$105.00$100.00$88.20
0445Thermoplastic, standard, yield line (0711-11180)LF259$12.50$8.15$7.80$15.50$10.00$7.05
0450Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF398$7.50$3.49$3.30$5.50$8.00$3.80
0455Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM1.45$3,125.00$2,560.61$2,440.00$2,510.00$5,000.00$2,100.00
0460Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF343$26.25$24.44$23.25$20.50$20.00$13.55
0465Thermoplastic, preformed, white, message (0711-14160)EACH7$325.00$221.14$211.00$205.00$200.00$264.70
0470Thermoplastic, preformed, white, arrow (0711-14170)EACH7$187.50$221.14$211.00$105.00$100.00$264.70
0475Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM8.47$6,875.00$7,216.28$6,876.00$5,000.00$7,500.00$7,140.00
0480Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102)GM0.04$9,625.00$7,449.06$7,094.00$9,000.00$7,500.00$7,140.00
0485Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM6.97$3,000.00$2,560.61$2,439.00$1,500.00$6,000.00$2,110.00
0490Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM6.09$6,875.00$7,216.28$6,881.00$5,000.00$7,500.00$7,140.00
0495Permanent tape, white, solid, 6" for concrete bridges (0713-103101)GM0.10$68,750$31,426$30,229$45,000$100,000$33,900
0500Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181)GM0.10$31,250$6,145.48$5,912.00$16,000$100,000$12,500
0505Permanent tape, yellow, solid, for concrete bridges (0713-103201)GM0.10$68,750$31,426$30,229$45,000$100,000$33,900
0510Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381)GM0.10$35,000$6,145.48$5,912.00$20,000$100,000$11,300
0515Preformed/permanent tape, remove (0713-107)SF392$7.50$4.66$4.40$6.00$6.00$7.65
0520Luminaire & bracket arm, luminaire and arm on existing pole (0715-5-21)EACH1$4,394.76$3,044.97$3,862.00$3,800.00$7,500.00$4,540.00
0525Luminaire & bracket arm, luminaire and arm; pole remains (0715-5-51)EACH80$553.13$284.17$290.00$225.00$600.00$341.00
0530Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211)EACH134$1,872.26$1,419.75$1,444.00$1,320.00$1,500.00$1,700.00
0535Itsfm location documentation- intersection (0611-2-1)EACH4$3,222.88$1,800.09$2,450.00$3,020.00$2,500.00$2,590.00
0540Conduit, furnish & install, open trench (0630-2-11)LF151$23.65$40.00$23.00$33.00$30.00$27.05
0545Conduit, furnish & install, directional bore (0630-2-12)LF622$35.29$46.56$36.25$43.00$50.00$42.65
0550Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI4$14,926$9,701.06$18,500$19,033$6,000.00$21,800
0555Signal cable, remove- intersection (0632-7-6)PI3$2,950.00$1,647.08$2,500.00$933.00$3,500.00$2,940.00
0560Multi-conductor cable, furnish & install, cat 6 (0633-8-11)LF635$6.94$3.44$4.70$5.00$3.00$5.55
0565Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH37$1,876.73$1,894.99$1,803.00$1,300.00$1,500.00$2,120.00
0570Electrical power service, F&I, underground, meter by contractor (0639-1122)AS3$5,663.28$6,224.37$4,440.00$3,100.00$6,500.00$5,220.00
0575Electrical service wire, & install (0639-2-1)LF265$6.93$8.60$9.20$12.50$3.00$10.80
0580Prestressed concrete pole, type P-II service pole (0641-2-12)EACH3$2,746.94$2,726.92$2,178.00$3,090.00$1,500.00$2,560.00
0585Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60)EACH2$737.50$330.07$1,800.00$650.00$600.00$2,120.00
0590Aluminum signals pole, (0646-1-11)EACH4$4,474.46$3,224.21$3,060.00$2,350.00$3,500.00$3,600.00
0595Steel mast arm assembly, and install, double arm 40'-40' (0649-21-5)EACH2$107,239$120,735$89,585$0.01$100,000$105,000
0600Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS5$2,877.78$2,024.15$2,460.00$2,450.00$2,400.00$2,900.00
0605Vehicular traffic signal, remove- poles to remain (0650-1-60)AS1$553.13$219.68$360.00$465.00$750.00$426.00
0610Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS4$1,410.56$980.38$1,070.00$875.00$750.00$1,260.00
0615Midblock crosswalk: rectangular rapid flashing beacon, remove complete sign assembly (0654-2-60)AS4$1,475.00$1,353.08$1,600.00$1,325.00$750.00$1,880.00
0620Vehicle detection system- furnish & install cabinet equipment (0660-4-11)EACH1$43,746$42,161$43,250$39,000$65,000$50,900
0625Vehicle detection system- furnish & install above ground equipment (0660-4-12)EACH9$13,501$11,875$14,900$11,000$10,500$17,500
0630Traffic data detection system- video, furnish and install, cabinet equipment (0660-9-11)EACH3$43,746$42,161$43,250$10,000$15,000$50,900
0635Traffic data detection system- video, furnish and install, ground equipment (0660-9-12)EACH4$22,946$11,875$12,500$11,000$30,000$14,700
0640Pedestrian detector, furnish & install, standard (0665-1-11)EACH4$813.39$345.37$325.00$450.00$500.00$380.00
0645Traffic controller assembly, F&I, NEMA (0670-5110)AS3$57,251$63,018$47,300$55,000$50,000$55,600
0650Traffic controller assembly, remove controller with (0670-5600)AS2$3,466.25$1,031.75$870.00$890.00$1,500.00$1,020.00
0655Managed field ethernet switch, furnish & install (0684-1-1)EACH4$5,494.38$6,464.82$3,730.00$5,200.00$3,500.00$4,390.00
0660Network device, cellular (0684-90102)EACH4$5,730.38$7,076.87$3,900.00$5,400.00$1,000.00$4,590.00
0665Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13)EACH3$14,236$23,335$22,800$35,000$18,000$26,800
0670Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH2$1,500.00$979.29$1,000.00$1,100.00$1,500.00$1,170.00
0675Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH2$5,004.43$3,692.00$4,700.00$3,500.00$4,000.00$5,530.00
FDOT contract T5850: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of April 30, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy