FDOT contract T5850 bid tabulation
SR 5 (US 1) FROM N OF CENTURY OAKS CR TO N OF MYERS DR. Let by Florida DOT on April 30, 2025, Brevard, District 5. 7 bids received; low bid $7,139,022 by V.A. Paving, Inc..
- Owner
- Florida DOT
- Letting
- 30 APR 2025
- Pay items
- 135
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | V.A. Paving, Inc. | $7,139,022 | Low |
| 2 | Timothy Rose Contracting, Inc. | $7,562,013 | +6.0% |
| 3 | Carr Construction, LLC | $7,675,773 | +8.0% |
| 4 | Ohla USA Inc | $7,738,303 | +8.0% |
| 5 | Pigott Asphalt and Sitework LLC | $7,941,003 | +11% |
| 6 | Ranger Construction Industries, Inc. | $8,050,663 | +13% |
| 7 | Preferred Materials Inc. | $8,132,156 | +14% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. V.A. Paving, Inc. | 2. Timothy Rose Contracting, Inc. | 3. Carr Construction, LLC | 4. Ohla USA Inc | 5. Pigott Asphalt and Sitework LLC | 6. Ranger Construction Industries, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $522,170 | $494,230 | $321,500 | $750,000 | $565,000 | $793,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $216,730 | $147,000 | $227,750 | $650,000 | $396,000 | $194,983 |
| 0015 | Traffic control officer (0102-14) | HR | 192 | $68.00 | $81.97 | $111.00 | $75.00 | $100.00 | $111.80 |
| 0020 | Work zone sign (0102-60) | ED | 12,540 | $0.28 | $0.01 | $0.20 | $0.26 | $0.30 | $0.25 |
| 0025 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 16,910 | $0.14 | $0.01 | $0.09 | $0.15 | $0.10 | $0.10 |
| 0030 | Arrow board / advance warning arrow panel (0102-76) | ED | 190 | $6.25 | $5.46 | $5.50 | $5.75 | $7.00 | $5.90 |
| 0035 | Portable changeable message sign, temporary (0102-99) | ED | 260 | $13.75 | $10.93 | $11.00 | $12.75 | $10.00 | $11.75 |
| 0040 | Temporary signalization and maintenance, intersection (0102-104) | ED | 570 | $26.93 | $15.14 | $15.00 | $20.00 | $25.00 | $17.65 |
| 0045 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 570 | $26.93 | $1.09 | $15.00 | $29.00 | $25.00 | $17.65 |
| 0050 | Type III barricade (0102-115) | ED | 760 | $0.40 | $0.35 | $0.40 | $0.40 | $1.00 | $0.40 |
| 0055 | Artificial coverings /rolled erosion control products (0104-1) | SY | 115 | $15.00 | $10.11 | $83.00 | $15.50 | $1.00 | $12.65 |
| 0060 | Sediment barrier (0104-10-3) | LF | 3,621 | $2.63 | $1.75 | $5.30 | $3.25 | $3.00 | $3.30 |
| 0065 | Inlet protection system (0104-18) | EACH | 118 | $147.50 | $81.97 | $461.00 | $150.00 | $250.00 | $147.10 |
| 0070 | Litter removal (0107-1) | ACRE | 231.99 | $54.38 | $76.51 | $50.00 | $75.00 | $10.00 | $82.40 |
| 0075 | Mowing (0107-2) | ACRE | 193.54 | $85.94 | $98.37 | $80.00 | $95.00 | $25.00 | $105.90 |
| 0080 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $85,864 | $484,464 | $50,853 | $360,000 | $100,000 | $63,000 |
| 0085 | Removal of existing concrete (0110-4-10) | SY | 201 | $69.23 | $46.50 | $40.50 | $52.00 | $65.00 | $42.55 |
| 0090 | Mailbox, F&I single (0110-7-1) | EACH | 4 | $417.00 | $254.31 | $461.00 | $350.00 | $350.00 | $264.70 |
| 0095 | Regular excavation (0120-1) | CY | 289.30 | $30.00 | $68.52 | $40.00 | $85.00 | $20.00 | $33.80 |
| 0100 | Embankment (0120-6) | CY | 133.60 | $44.00 | $63.09 | $75.00 | $115.00 | $10.00 | $18.30 |
| 0105 | Type B stabilization (0160-4) | SY | 1,757 | $18.00 | $42.85 | $26.50 | $35.00 | $12.50 | $17.50 |
| 0110 | Optional base, base group 04 (0285-704) | SY | 516 | $53.00 | $62.43 | $37.25 | $55.00 | $100.00 | $87.30 |
| 0115 | Optional base, base group 09 (0285-709) | SY | 735 | $65.00 | $76.54 | $56.00 | $47.00 | $150.00 | $67.80 |
| 0120 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 60,183 | $3.25 | $3.72 | $4.90 | $3.75 | $3.00 | $4.20 |
| 0125 | Milling existing asphalt pavement, 2 1/2" avg depth (0327-70-8) | SY | 22,226 | $3.75 | $2.65 | $4.27 | $3.75 | $3.00 | $4.25 |
| 0130 | Milling existing asphalt pavement, 3 1/4" avg depth (0327-70-17) | SY | 64,673 | $4.65 | $3.60 | $5.40 | $3.60 | $2.50 | $5.60 |
| 0135 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 7,504 | $132.17 | $148.83 | $186.00 | $134.00 | $190.00 | $153.50 |
| 0140 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 12,232.80 | $165.22 | $191.93 | $200.00 | $186.00 | $205.00 | $201.00 |
| 0145 | Miscellaneous asphalt (0339-1) | TN | 10.60 | $925.00 | $701.40 | $460.00 | $560.00 | $300.00 | $911.00 |
| 0150 | Inlets, DT bot, type A, <10' (0425-1501) | EACH | 1 | $7,479.00 | $14,328 | $10,530 | $7,820.00 | $7,500.00 | $11,200 |
| 0155 | Inlets, DT bot, type C,<10' (0425-1521) | EACH | 1 | $7,684.00 | $14,366 | $10,197 | $7,820.00 | $7,500.00 | $10,800 |
| 0160 | Pipe culvert,optional material,round, 15"S/CD (0430-175115) | LF | 29 | $220.00 | $263.37 | $687.00 | $275.00 | $200.00 | $729.50 |
| 0165 | Mitered end sect, optional /ellip/arch, 36" SD (0430-984638) | EACH | 1 | $12,160 | $9,670.88 | $20,505 | $7,820.00 | $3,500.00 | $21,800 |
| 0170 | Concrete curb & gutter, type E (0520-1-7) | LF | 20 | $247.19 | $89.99 | $86.00 | $95.00 | $150.00 | $233.60 |
| 0175 | Concrete curb & gutter, type F (0520-1-10) | LF | 130 | $103.41 | $42.84 | $86.00 | $60.00 | $150.00 | $78.50 |
| 0180 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 78 | $213.94 | $118.09 | $194.00 | $335.00 | $125.00 | $226.40 |
| 0185 | Concrete ditch pavement, non reinforced, 6" (0524-1-4) | SY | 12 | $629.81 | $881.87 | $194.00 | $300.00 | $100.00 | $643.50 |
| 0190 | Detectable warnings (0527-2) | SF | 212 | $49.80 | $39.90 | $27.75 | $45.00 | $35.00 | $46.85 |
| 0195 | Guardrail -roadway, general (0536-1-1) | LF | 275 | $32.50 | $29.73 | $31.75 | $23.00 | $35.00 | $26.75 |
| 0200 | Special guardrail post- special steel post for concrete structure mount (0536-7-2) | EACH | 7 | $281.25 | $245.91 | $383.00 | $372.00 | $350.00 | $437.00 |
| 0205 | Guardrail removal (0536-73) | LF | 179 | $4.38 | $5.51 | $4.80 | $2.75 | $10.00 | $3.20 |
| 0210 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 1 | $2,343.75 | $2,049.29 | $1,894.00 | $1,710.00 | $2,000.00 | $2,010.00 |
| 0215 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 1 | $4,812.50 | $4,207.87 | $3,974.00 | $4,005.00 | $3,600.00 | $4,710.00 |
| 0220 | Performance turf, sod (0570-1-2) | SY | 11,492 | $4.50 | $4.64 | $8.00 | $8.20 | $4.00 | $6.05 |
| 0225 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 353 | $32.34 | $56.07 | $58.00 | $31.35 | $50.00 | $68.20 |
| 0230 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 8 | $1,876.73 | $1,865.19 | $1,803.00 | $1,190.00 | $1,250.00 | $2,120.00 |
| 0235 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 12 | $3,748.48 | $3,042.78 | $3,574.00 | $2,535.00 | $2,500.00 | $4,200.00 |
| 0240 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 12 | $3,404.68 | $1,949.83 | $1,965.00 | $2,365.00 | $1,300.00 | $2,310.00 |
| 0245 | Traffic monitoring site cabinet, furnish & install, type 3, pedestal mount (0695-7132) | EACH | 3 | $10,842 | $7,606.96 | $8,239.00 | $6,440.00 | $6,500.00 | $9,690.00 |
| 0250 | Traffic monitoring site cabinet, remove existing cabinet (0695-7600) | EACH | 3 | $885.00 | $1,032.84 | $869.00 | $445.00 | $650.00 | $1,020.00 |
| 0255 | Raised pavement marker, type B (0706-1-3) | EACH | 4,195 | $5.63 | $4.66 | $4.40 | $4.15 | $5.00 | $4.65 |
| 0260 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 8.47 | $2,312.50 | $1,536.37 | $1,464.00 | $1,515.00 | $3,000.00 | $1,860.00 |
| 0265 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.04 | $2,750.00 | $1,536.37 | $1,523.25 | $5,075.00 | $10,000 | $2,800.00 |
| 0270 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 585 | $2.75 | $0.70 | $0.70 | $2.10 | $3.00 | $0.90 |
| 0275 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 411 | $4.13 | $1.05 | $1.04 | $3.10 | $4.00 | $1.30 |
| 0280 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 781 | $5.50 | $1.45 | $1.40 | $4.10 | $5.00 | $1.60 |
| 0285 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 6.97 | $937.50 | $384.09 | $366.00 | $670.00 | $1,000.00 | $930.50 |
| 0290 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.79 | $2,062.50 | $576.14 | $5,257.00 | $760.00 | $2,500.00 | $631.50 |
| 0295 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 15 | $100.00 | $52.38 | $50.00 | $86.00 | $85.00 | $147.10 |
| 0300 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 168 | $56.25 | $40.74 | $38.75 | $46.00 | $50.00 | $41.20 |
| 0305 | Painted pavement markings, standard, white, yield line (0710-11180) | LF | 259 | $11.25 | $6.98 | $6.70 | $5.10 | $5.00 | $4.00 |
| 0310 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 6.09 | $2,312.50 | $1,536.37 | $1,465.00 | $1,515.00 | $3,300.00 | $1,860.00 |
| 0315 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 398 | $4.50 | $1.16 | $1.10 | $3.05 | $5.00 | $1.30 |
| 0320 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 1.45 | $2,062.50 | $768.18 | $732.00 | $755.00 | $2,000.00 | $629.00 |
| 0325 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 1,070 | $3.13 | $4.66 | $44.25 | $5.10 | $5.00 | $4.65 |
| 0330 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $74,000 | $74,000 | $74,000 | $74,000 | $74,000 | $74,000 |
| 0335 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 96 | $718.75 | $541.01 | $549.00 | $590.00 | $600.00 | $500.00 |
| 0340 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 15 | $2,625.00 | $1,858.02 | $1,884.00 | $2,150.00 | $1,800.00 | $1,710.00 |
| 0345 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 14 | $2,875.00 | $2,295.20 | $2,328.00 | $2,350.00 | $2,500.00 | $2,120.00 |
| 0350 | Single column ground sign assembly, F&I ground mount, SF sheeting area for back to back signs (0700-1114) | EACH | 3 | $2,625.00 | $2,950.97 | $2,993.00 | $2,145.00 | $500.00 | $2,590.00 |
| 0355 | Single column ground sign assembly, relocate (0700-1500) | EACH | 5 | $500.00 | $245.91 | $249.00 | $410.00 | $250.00 | $264.70 |
| 0360 | Single column ground sign assembly, remove (0700-1600) | EACH | 38 | $31.25 | $54.65 | $55.00 | $26.00 | $100.00 | $29.40 |
| 0365 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 1 | $437.50 | $229.52 | $233.00 | $360.00 | $250.00 | $229.40 |
| 0370 | Sign panel, relocate, UP to 12 SF (0700-3501) | EACH | 81 | $125.00 | $191.27 | $194.00 | $103.00 | $250.00 | $156.60 |
| 0375 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 107 | $125.00 | $120.22 | $122.00 | $103.00 | $300.00 | $35.30 |
| 0380 | Tubular marker, 36" yellow (0704-1-4) | EACH | 62 | $281.25 | $103.83 | $105.00 | $233.00 | $150.00 | $111.80 |
| 0385 | Object marker, type 1 (0705-10-1) | EACH | 53 | $406.25 | $289.63 | $294.00 | $333.00 | $150.00 | $264.70 |
| 0390 | Object marker, type 4 (0705-10-4) | EACH | 3 | $406.25 | $289.63 | $294.00 | $333.00 | $150.00 | $229.40 |
| 0395 | Delineator, non-flexible (0705-11-2) | EACH | 102 | $150.00 | $139.67 | $133.00 | $133.00 | $100.00 | $147.10 |
| 0400 | Raised pavement marker, type B (0706-1-3) | EACH | 4,195 | $5.63 | $4.66 | $4.40 | $4.33 | $5.00 | $4.65 |
| 0405 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 1,070 | $3.13 | $3.49 | $3.30 | $5.33 | $5.00 | $4.65 |
| 0410 | Painted pavement markings, surface (0710-90) | LS | 1 | $85,000 | $36,736 | $34,983 | $90,000 | $125,000 | $56,600 |
| 0415 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 585 | $5.00 | $2.33 | $2.20 | $4.30 | $5.00 | $2.65 |
| 0420 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 411 | $7.50 | $3.49 | $3.30 | $5.33 | $7.00 | $3.80 |
| 0425 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 438 | $10.00 | $5.82 | $5.50 | $7.33 | $10.00 | $7.35 |
| 0430 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.79 | $3,125.00 | $2,560.61 | $3,048.00 | $2,520.33 | $5,000.00 | $2,110.00 |
| 0435 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 8 | $300.00 | $128.03 | $122.00 | $155.00 | $150.00 | $529.50 |
| 0440 | Thermoplastic, standard, arrow (0711-11170) | EACH | 161 | $93.75 | $104.75 | $100.00 | $105.00 | $100.00 | $88.20 |
| 0445 | Thermoplastic, standard, yield line (0711-11180) | LF | 259 | $12.50 | $8.15 | $7.80 | $15.50 | $10.00 | $7.05 |
| 0450 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 398 | $7.50 | $3.49 | $3.30 | $5.50 | $8.00 | $3.80 |
| 0455 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 1.45 | $3,125.00 | $2,560.61 | $2,440.00 | $2,510.00 | $5,000.00 | $2,100.00 |
| 0460 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 343 | $26.25 | $24.44 | $23.25 | $20.50 | $20.00 | $13.55 |
| 0465 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 7 | $325.00 | $221.14 | $211.00 | $205.00 | $200.00 | $264.70 |
| 0470 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 7 | $187.50 | $221.14 | $211.00 | $105.00 | $100.00 | $264.70 |
| 0475 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 8.47 | $6,875.00 | $7,216.28 | $6,876.00 | $5,000.00 | $7,500.00 | $7,140.00 |
| 0480 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.04 | $9,625.00 | $7,449.06 | $7,094.00 | $9,000.00 | $7,500.00 | $7,140.00 |
| 0485 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 6.97 | $3,000.00 | $2,560.61 | $2,439.00 | $1,500.00 | $6,000.00 | $2,110.00 |
| 0490 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 6.09 | $6,875.00 | $7,216.28 | $6,881.00 | $5,000.00 | $7,500.00 | $7,140.00 |
| 0495 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.10 | $68,750 | $31,426 | $30,229 | $45,000 | $100,000 | $33,900 |
| 0500 | Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181) | GM | 0.10 | $31,250 | $6,145.48 | $5,912.00 | $16,000 | $100,000 | $12,500 |
| 0505 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.10 | $68,750 | $31,426 | $30,229 | $45,000 | $100,000 | $33,900 |
| 0510 | Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381) | GM | 0.10 | $35,000 | $6,145.48 | $5,912.00 | $20,000 | $100,000 | $11,300 |
| 0515 | Preformed/permanent tape, remove (0713-107) | SF | 392 | $7.50 | $4.66 | $4.40 | $6.00 | $6.00 | $7.65 |
| 0520 | Luminaire & bracket arm, luminaire and arm on existing pole (0715-5-21) | EACH | 1 | $4,394.76 | $3,044.97 | $3,862.00 | $3,800.00 | $7,500.00 | $4,540.00 |
| 0525 | Luminaire & bracket arm, luminaire and arm; pole remains (0715-5-51) | EACH | 80 | $553.13 | $284.17 | $290.00 | $225.00 | $600.00 | $341.00 |
| 0530 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211) | EACH | 134 | $1,872.26 | $1,419.75 | $1,444.00 | $1,320.00 | $1,500.00 | $1,700.00 |
| 0535 | Itsfm location documentation- intersection (0611-2-1) | EACH | 4 | $3,222.88 | $1,800.09 | $2,450.00 | $3,020.00 | $2,500.00 | $2,590.00 |
| 0540 | Conduit, furnish & install, open trench (0630-2-11) | LF | 151 | $23.65 | $40.00 | $23.00 | $33.00 | $30.00 | $27.05 |
| 0545 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 622 | $35.29 | $46.56 | $36.25 | $43.00 | $50.00 | $42.65 |
| 0550 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 4 | $14,926 | $9,701.06 | $18,500 | $19,033 | $6,000.00 | $21,800 |
| 0555 | Signal cable, remove- intersection (0632-7-6) | PI | 3 | $2,950.00 | $1,647.08 | $2,500.00 | $933.00 | $3,500.00 | $2,940.00 |
| 0560 | Multi-conductor cable, furnish & install, cat 6 (0633-8-11) | LF | 635 | $6.94 | $3.44 | $4.70 | $5.00 | $3.00 | $5.55 |
| 0565 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 37 | $1,876.73 | $1,894.99 | $1,803.00 | $1,300.00 | $1,500.00 | $2,120.00 |
| 0570 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 3 | $5,663.28 | $6,224.37 | $4,440.00 | $3,100.00 | $6,500.00 | $5,220.00 |
| 0575 | Electrical service wire, & install (0639-2-1) | LF | 265 | $6.93 | $8.60 | $9.20 | $12.50 | $3.00 | $10.80 |
| 0580 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 3 | $2,746.94 | $2,726.92 | $2,178.00 | $3,090.00 | $1,500.00 | $2,560.00 |
| 0585 | Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60) | EACH | 2 | $737.50 | $330.07 | $1,800.00 | $650.00 | $600.00 | $2,120.00 |
| 0590 | Aluminum signals pole, (0646-1-11) | EACH | 4 | $4,474.46 | $3,224.21 | $3,060.00 | $2,350.00 | $3,500.00 | $3,600.00 |
| 0595 | Steel mast arm assembly, and install, double arm 40'-40' (0649-21-5) | EACH | 2 | $107,239 | $120,735 | $89,585 | $0.01 | $100,000 | $105,000 |
| 0600 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 5 | $2,877.78 | $2,024.15 | $2,460.00 | $2,450.00 | $2,400.00 | $2,900.00 |
| 0605 | Vehicular traffic signal, remove- poles to remain (0650-1-60) | AS | 1 | $553.13 | $219.68 | $360.00 | $465.00 | $750.00 | $426.00 |
| 0610 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 4 | $1,410.56 | $980.38 | $1,070.00 | $875.00 | $750.00 | $1,260.00 |
| 0615 | Midblock crosswalk: rectangular rapid flashing beacon, remove complete sign assembly (0654-2-60) | AS | 4 | $1,475.00 | $1,353.08 | $1,600.00 | $1,325.00 | $750.00 | $1,880.00 |
| 0620 | Vehicle detection system- furnish & install cabinet equipment (0660-4-11) | EACH | 1 | $43,746 | $42,161 | $43,250 | $39,000 | $65,000 | $50,900 |
| 0625 | Vehicle detection system- furnish & install above ground equipment (0660-4-12) | EACH | 9 | $13,501 | $11,875 | $14,900 | $11,000 | $10,500 | $17,500 |
| 0630 | Traffic data detection system- video, furnish and install, cabinet equipment (0660-9-11) | EACH | 3 | $43,746 | $42,161 | $43,250 | $10,000 | $15,000 | $50,900 |
| 0635 | Traffic data detection system- video, furnish and install, ground equipment (0660-9-12) | EACH | 4 | $22,946 | $11,875 | $12,500 | $11,000 | $30,000 | $14,700 |
| 0640 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 4 | $813.39 | $345.37 | $325.00 | $450.00 | $500.00 | $380.00 |
| 0645 | Traffic controller assembly, F&I, NEMA (0670-5110) | AS | 3 | $57,251 | $63,018 | $47,300 | $55,000 | $50,000 | $55,600 |
| 0650 | Traffic controller assembly, remove controller with (0670-5600) | AS | 2 | $3,466.25 | $1,031.75 | $870.00 | $890.00 | $1,500.00 | $1,020.00 |
| 0655 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 4 | $5,494.38 | $6,464.82 | $3,730.00 | $5,200.00 | $3,500.00 | $4,390.00 |
| 0660 | Network device, cellular (0684-90102) | EACH | 4 | $5,730.38 | $7,076.87 | $3,900.00 | $5,400.00 | $1,000.00 | $4,590.00 |
| 0665 | Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13) | EACH | 3 | $14,236 | $23,335 | $22,800 | $35,000 | $18,000 | $26,800 |
| 0670 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 2 | $1,500.00 | $979.29 | $1,000.00 | $1,100.00 | $1,500.00 | $1,170.00 |
| 0675 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 2 | $5,004.43 | $3,692.00 | $4,700.00 | $3,500.00 | $4,000.00 | $5,530.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of April 30, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.