FDOT contract T5854 bid tabulation

SR 500 (E IRLO BRONSON MEMORIAL HWY) FROM CR 532 (NOVA RD).. Let by Florida DOT on May 28, 2025, Osceola, District 5. 5 bids received; low bid $11,154,437 by JR. Davis Construction Co., Inc..

Owner
Florida DOT
Letting
28 MAY 2025
Pay items
152
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1JR. Davis Construction Co., Inc.$11,154,437Low
2Ranger Construction Industries, Inc.$13,147,776+18%
3Hubbard Construction Company$14,624,665+31%
4Middlesex Corporation (the)$15,851,318+42%
5Preferred Materials Inc.$16,018,741+44%
FDOT contract T5854: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. JR. Davis Construction Co., Inc.2. Ranger Construction Industries, Inc.3. Hubbard Construction Company4. Middlesex Corporation (the)5. Preferred Materials Inc.
0005Mobilization (0101-1)LS1$718,000$1,299,000$1,401,107$1,550,000$1,512,775
0010Maintenance of traffic (0102-1)DA1$50,000$317,899$712,793$330,000$838,664
0015Traffic control officer (0102-14)HR320$225.00$120.70$128.59$120.00$112.50
0020Work zone sign (0102-60)ED55,028$0.25$0.20$0.21$0.20$0.21
0025Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED50,133$0.15$0.10$0.10$0.10$0.10
0030Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD2,450$0.05$0.05$0.04$0.05$0.05
0035Arrow board / advance warning arrow panel (0102-76)ED704$5.50$5.75$5.41$5.25$5.00
0040Portable changeable message sign, temporary (0102-99)ED3,500$9.50$10.35$9.75$9.50$9.50
0045Temporary signalization and maintenance, intersection (0102-104)ED1,360$17.60$19.30$18.19$17.25$16.80
0050Temporary traffic detection and maintenance, intersection (0102-107-1)ED1,360$17.60$19.30$18.19$17.25$16.80
0055Existing ITS maintenance (0102-112)DA340$228.00$251.00$236.50$275.00$218.40
0060Type III barricade (0102-115)ED1,016$0.30$0.25$0.25$0.25$0.25
0065Portable regulatory, sign (0102-150-1)ED1,252$4.50$4.60$4.33$4.20$4.00
0070Radar speed display unit (0102-150-2)ED1,252$5.50$5.15$4.87$4.75$4.00
0075Sediment barrier (0104-10-3)LF40,966$2.75$1.70$0.81$2.00$1.15
0080Staked turbidity barrier- nylon reinforced PVC (0104-12)LF1,612$5.00$6.20$5.14$9.00$4.75
0085Inlet protection system (0104-18)EACH77$75.00$74.70$70.39$200.00$65.00
0090Litter removal (0107-1)ACRE1,326.08$25.00$23.00$22.72$21.00$18.50
0095Mowing (0107-2)ACRE1,124.42$45.00$69.00$68.16$61.00$56.00
0100Clearing & grubbing (0110-1-1)ACRE1$150,000$69,300$664,011$250,000$810,671
0105Removal of existing concrete (0110-4-10)SY104$55.00$23.90$60.62$35.00$61.51
0110Regular excavation (0120-1)CY4,277.20$18.50$7.10$38.58$16.00$31.74
0115Embankment (0120-6)CY11,085.30$21.50$21.25$33.06$16.00$38.09
0120Type B stabilization (0160-4)SY2,468$28.10$20.45$24.25$31.00$40.71
0125Optional base, base group 01 (0285-701)SY717$18.10$29.70$30.86$31.00$40.57
0130Optional base, base group 09 (0285-709)SY832$73.00$39.75$41.88$58.00$67.88
0135Milling existing asphalt pavement, 2" avg depth (0327-70-5)SY250,270$1.00$2.75$3.83$8.50$3.60
0140Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY4,190$3.45$8.70$35.24$10.00$11.03
0145Superpave asphaltic conc, traffic C (0334-1-13)TN327.50$312.00$229.10$352.47$325.00$426.90
0150Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN28,171$163.00$155.00$152.99$200.00$199.76
0155Miscellaneous asphalt (0339-1)TN418.30$168.00$324.00$320.60$350.00$365.55
0160Inlets, DT bot, type C,<10' (0425-1521)EACH3$4,800.00$7,580.00$11,022$7,000.00$7,770.97
0165Inlets, DT bot, type C,jbot, <10' (0425-1523)EACH1$6,600.00$12,100$17,083$13,000$14,495
0170Inlets, ditch bottom, type D, J bot, <10' (0425-1543)EACH2$6,300.00$12,900$18,737$12,500$14,974
0175Manholes, P-7, <10' (0425-2-41)EACH3$4,900.00$8,430.00$12,124$7,000.00$8,097.58
0180Manholes, J-7, <10' (0425-2-71)EACH1$11,300$18,100$18,186$18,000$20,229
0185Manholes, J-7, partial (0425-2-73)EACH1$2,700.00$3,620.00$8,817.23$3,000.00$6,892.27
0190Manhole, adjust (0425-5)EACH4$1,300.00$1,290.00$3,857.54$1,500.00$1,735.35
0195Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF82$187.00$194.20$143.28$425.00$213.14
0200Pipe culvert,optional material,round, 24"S/CD (0430-175124)LF1,193$164.00$160.30$143.28$175.00$213.59
0205Pipe culvert, opt material, round, 30"S/CD (0430-175130)LF11$475.00$554.00$551.08$1,455.50$489.49
0210Pipe culvert,optional material,other-elip/arch, (0430-175218)LF306$202.00$178.60$154.30$215.00$197.32
0215Pipe culvert,optional material,other shape-elip/arch, 24"S/CD (0430-175224)LF254$200.00$220.90$154.30$300.00$260.00
0220Mitered end section, optional round, 18" CD (0430-982125)EACH1$2,600.00$3,150.00$1,983.88$2,800.00$3,032.79
0225Mitered end section, optional round, 24" CD (0430-982129)EACH3$3,300.00$3,400.00$1,983.88$2,500.00$3,911.72
0230Mitered end section, optional round, 18" SD (0430-984125)EACH3$2,600.00$3,150.00$1,983.88$2,600.00$3,032.79
0235Mitered end section, optional round, 24" SD (0430-984129)EACH7$3,300.00$3,400.00$1,983.88$2,800.00$3,831.83
0240Mitered end sect, optional - elliptical / arch, 18" SD (0430-984625)EACH6$2,800.00$4,520.00$1,983.88$2,800.00$3,062.97
0245Mitered end sect, optional - elliptical / arch, 24" SD (0430-984629)EACH4$3,700.00$6,690.00$1,983.88$3,800.00$4,006.80
0250Pipe handrail - guiderail, aluminum (0515-1-2)LF34$105.00$88.70$85.71$69.00$98.00
0255Concrete curb & gutter, type E (0520-1-7)LF47$75.00$71.30$82.66$98.00$58.95
0260Concrete sidewalk and driveways, 4" thick (0522-1)SY18,432$43.00$72.20$71.64$56.00$59.79
0265Concrete sidewalk and driveways, 6" thick (0522-2)SY278$140.00$97.60$137.77$80.00$136.63
0270Detectable warnings (0527-2)SF648$54.00$34.50$49.60$41.00$29.40
0275Guardrail -roadway, general (0536-1-1)LF4,911$24.60$24.75$23.91$26.50$23.50
0280Guardrail- roadway, double (0536-1-3)LF424$35.00$51.40$49.63$39.50$31.00
0285Pipe rail for guardrail (0536-6)LF3,460$18.30$20.20$19.52$17.50$17.50
0290Guardrail transition to rigid barrier, F&I- index 536- 001, approach TL-3 (0536-8112)EACH6$3,760.00$3,210.00$3,096.89$4,300.00$3,600.00
0295Guardrail removal (0536-73)LF2,208$3.25$2.60$2.50$3.00$3.00
0300Guardrail end treatment- trailing anchorage (0536-85-20)EACH5$1,780.00$1,430.00$1,386.46$1,800.00$1,700.00
0305Guardrail end treatment- parallel approach terminal (0536-85-24)EACH5$3,760.00$3,400.00$3,283.94$4,200.00$3,600.00
0310Guardrail end treatment- type CRT (0536-85-26)EACH2$3,760.00$3,330.00$3,217.48$3,000.00$3,600.00
0312Crash cushion, TL-3, wide (0544-3-2)EACH2$35,000$52,100$57,847$40,000$36,936
0315Fencing, type B, 5.1-6.0, reset existing (0550-10228)LF907$14.00$15.40$14.89$23.00$17.08
0320Performance turf (0570-1-1)SY49,965$3.90$7.20$7.35$4.60$7.94
0325Performance turf, sod (0570-1-2)SY12,274$5.65$10.25$7.01$4.60$7.94
0330Performance turf, sod and shoulder treatment index (0570-1-3)SY32,072$6.70$9.30$5.63$7.50$7.94
0335Conduit, furnish & install, open trench (0630-2-11)LF300$14.00$15.35$14.47$15.00$13.36
0340Conduit, furnish & install, directional bore (0630-2-12)LF95$20.30$22.35$21.07$22.00$19.46
0345Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH10$1,510.00$1,660.00$1,560.21$1,598.00$1,440.81
0350Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1)EACH8$2,870.00$3,160.00$2,972.73$3,000.00$2,745.24
0355Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12)EACH16$2,190.00$2,410.00$2,268.41$2,300.00$2,094.82
0360Traffic monitoring site cabinet, F&I, type 3, 2 pane back, pedestal mount (0695-7162)EACH2$7,100.00$7,760.00$7,315.17$7,700.00$6,755.37
0365Initial contingency amount, DO not bid (0999-25)LS1$150,000$150,000$150,000$150,000$150,000
0370Ground-in rumble strips, 8" sinusoidal (0546-72-3)GM18.54$1,790.00$2,020.00$1,454.25$2,300.00$1,525.08
0375Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH108$740.00$493.00$764.14$475.00$705.66
0380Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH28$1,320.00$2,030.00$1,367.46$2,000.00$1,262.81
0385Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113)EACH2$2,590.00$2,150.00$2,679.44$2,250.00$2,474.39
0390Single column ground sign assembly, relocate (0700-1500)EACH15$520.00$379.50$537.04$385.00$495.94
0395Single column ground sign assembly, remove (0700-1600)EACH45$234.00$57.50$242.56$60.00$224.00
0400Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114)EACH13$5,200.00$7,320.00$5,355.96$7,200.00$4,946.09
0405Multi-column ground sign assembly, F&I ground mount, 100.0 SF (0700-2115)EACH2$6,500.00$8,370.00$6,717.14$8,500.00$6,203.10
0410Multi-column ground sign assembly, relocate (0700-2500)EACH1$3,970.00$6,900.00$4,114.59$7,000.00$3,799.71
0415Multi-column ground sign assembly, remove (0700-2600)EACH6$1,870.00$1,150.00$1,940.50$1,200.00$1,792.00
0420Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH7$720.00$330.00$742.77$330.00$685.93
0425Sign panel, furnish & install ground mount, 12-20 SF (0700-3102)EACH11$790.00$519.50$821.94$520.00$759.04
0430Sign panel, relocate, UP to 12 SF (0700-3501)EACH2$376.00$152.90$389.80$155.00$359.97
0435Sign panel, remove, UP to 12 SF (0700-3601)EACH14$234.00$34.50$242.56$35.00$224.00
0440Sign panel, remove, 12-20 SF (0700-3602)EACH11$351.00$57.50$363.84$57.00$336.00
0445Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH92$131.00$100.00$135.55$100.00$125.18
0450Enhanced highway sign solar powered, relocate - ground mount (0700-142802)EACH1$2,030.00$2,230.00$2,104.23$2,500.00$1,943.20
0455Tubular marker, 36" yellow (0704-1-4)EACH3$261.00$270.10$270.72$270.00$221.00
0460Object marker, type 1 (0705-10-1)EACH15$314.00$229.90$379.00$225.00$259.00
0465Raised pavement marker, type B (0706-1-3)EACH4,519$4.45$4.90$4.74$6.00$4.75
0470Painted pavement markings, surface (0710-90)LS1$82,000$90,500$122,270$155,000$125,000
0475Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF1,765$3.15$3.45$4.47$4.00$3.25
0480Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF1,521$5.20$5.75$6.70$6.50$5.25
0485Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF543$6.30$6.90$8.93$10.00$7.75
0490Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM1.14$1,830.00$2,010.00$1,664.22$3,000.00$2,456.46
0495Thermoplastic, standard, message or symbol (0711-11160)EACH3$225.00$229.90$167.45$225.00$175.00
0500Thermoplastic, standard, arrow (0711-11170)EACH171$105.00$114.90$111.64$100.00$80.00
0505Thermoplastic, standard, yield line (0711-11180)LF120$8.40$9.20$11.16$12.50$10.00
0510Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF557$5.20$5.75$6.70$6.50$5.25
0515Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.54$1,810.00$1,990.00$1,649.65$3,000.00$2,459.11
0520Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF733$15.70$17.25$15.63$17.00$13.50
0525Thermoplastic, preformed, white, message (0711-14160)EACH13$261.00$287.40$362.82$325.00$250.00
0530Thermoplastic, preformed, white, arrow (0711-14170)EACH13$1.55$1.70$290.25$250.00$190.00
0535Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM14.69$5,500.00$6,070.00$6,482.49$4,400.00$3,501.67
0540Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102)GM1.34$6,600.00$7,270.00$8,239.83$6,000.00$5,029.81
0545Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM11.50$1,380.00$1,520.00$1,674.39$1,600.00$1,250.98
0550Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM11.29$5,500.00$6,070.00$6,481.51$4,400.00$3,501.86
0555Permanent tape, white, solid, 6" for concrete bridges (0713-103101)GM0.05$39,000$42,800$43,779$47,000$47,059
0560Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181)GM0.05$21,000$23,000$16,745$25,000$20,000
0565Permanent tape, yellow, solid, for concrete bridges (0713-103201)GM0.05$39,000$42,800$43,779$47,000$47,059
0570Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381)GM0.05$21,000$23,000$16,745$25,000$20,000
0575Preformed/permanent tape, remove (0713-107)SF403$4.20$4.60$4.47$2.50$2.00
0580Conduit, furnish & install, directional bore (0630-2-12)LF1,010$20.40$22.40$21.09$22.00$19.48
0585Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH8$2,790.00$3,070.00$2,894.30$3,300.00$2,672.81
0590Luminaire & bracket arm, luminaire and arm; pole remains (0715-5-51)EACH1$468.00$515.00$485.12$500.00$448.00
0595Conduit, furnish & install, open trench (0630-2-11)LF265$14.00$15.35$14.47$15.00$13.36
0600Conduit, furnish & install, directional bore (0630-2-12)LF640$24.40$26.85$25.32$25.50$23.38
0605Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI1$7,700.00$8,440.00$7,953.89$10,000$7,345.21
0610Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH21$1,510.00$1,660.00$1,560.21$1,600.00$1,440.81
0615Aluminum signals pole, (0646-1-11)EACH4$3,820.00$4,210.00$3,963.40$4,000.00$3,660.10
0620Steel mast arm assembly, and install, single arm 50' (0649-21-6)EACH1$72,000$79,500$74,918$77,000$69,184
0625Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS1$1,910.00$2,100.00$1,979.74$2,100.00$1,828.24
0630Vehicular traffic signal, furnish & install aluminum, 5 section cluster, 1 way (0650-1-19)AS1$2,870.00$3,150.00$2,968.96$3,000.00$2,741.76
0635Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109)EACH7$520.00$571.00$538.09$550.00$496.91
0640Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS4$1,230.00$1,360.00$1,279.21$1,300.00$1,181.32
0645Pedestrian detector, furnish & install, standard (0665-1-11)EACH4$479.00$526.50$496.22$500.00$458.24
0650Itsfm subsurface documentation- project length (0611-1-1)MI6.70$3,070.00$3,380.00$3,183.63$3,300.00$2,940.00
0655Itsfm location documentation- intersection (0611-2-1)EACH5$2,320.00$2,550.00$2,401.37$5,000.00$2,217.60
0660Itsfm location documentation- ITS site (0611-2-2)EACH2$2,050.00$2,250.00$2,122.42$2,500.00$1,960.00
0665Conduit, furnish & install, open trench (0630-2-11)LF32,165$14.00$15.35$14.47$14.25$13.36
0670Conduit, furnish & install, directional bore (0630-2-12)LF3,625$20.30$22.35$21.07$21.50$19.46
0675Conduit, furnish & install, mount (0630-2-15)LF430$49.80$54.80$51.63$52.00$47.68
0680Fiber optic cable, F&I, underground,2-12 fibers (0633-1121)LF1,080$4.25$4.70$4.42$5.00$4.08
0685Fiber optic cable, F&I, underground,49-96 fibers (0633-1123)LF33,735$4.50$4.95$4.66$4.85$4.30
0690Fiber optic connection, install, splice (0633-2-31)EACH120$53.00$57.90$54.58$55.00$50.40
0695Fiber optic connection hardware, F&I, splice (0633-3-11)EACH7$1,390.00$1,530.00$1,437.18$1,500.00$1,327.20
0700Fiber optic connection hardware, F&I, splice tray (0633-3-12)EACH12$59.00$64.40$60.64$62.00$56.00
0705Fiber optic connection hardware, F&I, preterminated connector assembly (0633-3-13)EACH60$64.00$70.80$66.70$66.00$61.60
0710Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16)EACH5$1,320.00$1,450.00$1,364.41$1,450.00$1,260.00
0715Fiber optic connection hardware, F&I, connector panel (0633-3-17)EACH5$117.00$128.70$121.28$125.00$112.00
0720Fiber optic cable locator (0633-6)DA225$293.00$322.00$303.20$325.00$280.00
0725Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH19$2,860.00$3,150.00$2,967.31$3,200.00$2,740.23
0730Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13)EACH6$4,970.00$5,460.00$5,145.44$5,200.00$4,751.68
0735Traffic controller, modify (0671-2-40)EACH5$2,340.00$2,570.00$2,425.62$2,500.00$2,240.00
0740Traffic signal controller cabinet, adjust/modify (0676-1500)EACH5$1,760.00$1,930.00$1,819.22$1,850.00$1,680.00
0745Managed hub ethernet switch, furnish & install (0684-7-1)EACH3$4,420.00$4,860.00$4,578.36$4,600.00$4,228.00
0750Remote power management rpmu, furnish and install (0685-2-1)EACH3$1,100.00$1,210.00$1,142.47$1,200.00$1,055.04
0755Connected vehicle road side unit (0920-681100)EACH3$15,000$16,000$15,118$16,000$13,961
FDOT contract T5854: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of May 28, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy