FDOT contract T5843 bid tabulation

SR 530 (US 192/VINE ST) FROM BAMBOO LN TO MAIN ST (US 441). Let by Florida DOT on January 29, 2025, Osceola, District 5. 5 bids received; low bid $26,048,427 by Hubbard Construction Company.

Owner
Florida DOT
Letting
29 JAN 2025
Pay items
183
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Hubbard Construction Company$26,048,427Low
2Middlesex Paving, LLC$27,927,001+7.0%
3Preferred Materials Inc.$32,997,895+27%
4Ranger Construction Industries, Inc.$33,230,602+28%
5JR. Davis Construction Co., Inc.$33,999,401+31%
FDOT contract T5843: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Hubbard Construction Company2. Middlesex Paving, LLC3. Preferred Materials Inc.4. Ranger Construction Industries, Inc.5. JR. Davis Construction Co., Inc.
0005Mobilization (0101-1)LS1$1,823,838$2,400,000$3,250,000$3,251,000$3,300,000
0010Maintenance of traffic (0102-1)DA1$1,914,849$1,750,000$1,973,000$2,444,000$2,389,000
0015Commercial material for temporary driveway maintenance (0102-3)CY34$323.86$800.00$332.00$958.50$500.00
0020Pedestrian or bicycle special detour (0102-4-1)SY1$40,538$50,000$24,400$30,100$95,000
0025Traffic control officer (0102-14)HR1,776$115.29$94.00$112.50$97.70$185.00
0030Pedestrian escort operation (0102-25100)HR1,120$33.15$60.00$400.00$38.00$75.00
0035Work zone sign (0102-60)ED36,949$0.22$0.25$0.19$0.25$0.30
0040Business sign (0102-61)EACH46$27.96$61.00$25.00$28.75$30.00
0045Temporary barrier, F&I, low profile, concrete (0102-71-13)LF451$51.41$71.00$43.00$49.45$50.00
0050Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED116,157$0.10$0.15$0.09$0.10$0.15
0055Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD46,068$0.06$0.10$0.04$0.05$0.10
0060Arrow board / advance warning arrow panel (0102-76)ED278$5.59$8.00$5.00$5.75$6.00
0065Portable changeable message sign, temporary (0102-99)ED860$11.18$13.00$9.00$11.50$12.00
0070Temporary signalization and maintenance, intersection (0102-104)ED6,020$28.10$29.00$26.00$25.10$30.00
0075Temporary traffic detection and maintenance, intersection (0102-107-1)ED6,020$27.02$1.40$25.00$25.10$1.00
0080Type III barricade (0102-115)ED692$0.28$0.40$0.25$0.30$0.50
0085Inlet protection system (0104-18)EACH253$149.45$360.00$152.46$160.90$125.00
0090Litter removal (0107-1)ACRE736.64$53.38$20.00$45.00$57.50$95.00
0095Mowing (0107-2)ACRE736.64$101.41$45.00$65.00$109.20$155.00
0100Clearing & grubbing (0110-1-1)ACRE1$159,489$220,000$555,650$550,000$207,000
0105Removal of existing concrete (0110-4-10)SY9,832$32.60$62.00$77.69$57.20$12.00
0110Regular excavation (0120-1)CY2,293.50$48.89$53.00$57.29$58.80$45.00
0115Embankment (0120-6)CY798.70$43.46$98.00$53.71$11.75$52.00
0120Type B stabilization (0160-4)SY1,233$48.89$67.00$146.76$31.50$125.00
0125Optional base, base group 02 (0285-702)SY63$195.43$74.95$103.06$88.60$100.00
0130Optional base, base group 09 (0285-709)SY2,653$73.13$60.00$126.13$70.80$129.00
0135Milling existing asphalt pavement, 4 1/2" avg depth (0327-70-3)SY161,538$5.98$8.00$7.55$9.40$11.80
0140Milling existing asphalt pavement, 2" avg depth (0327-70-5)SY53,592$9.29$5.00$8.00$6.80$8.25
0145Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY20,641$10.80$11.00$4.05$9.85$8.00
0150Milling existing asphalt pavement, 4" avg depth (0327-70-7)SY78,963$6.20$7.00$6.60$8.45$11.00
0155Superpave asphaltic conc, traffic C (0334-1-13)TN39,630.20$124.46$120.00$180.25$157.00$185.00
0160Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN27,628.80$171.14$165.00$254.00$200.00$240.00
0165Inlets, curb, type 9, partial (0425-1205)EACH1$12,709$9,500.00$6,629.47$8,710.00$9,500.00
0170Inlets, curb, type J-5, <10' (0425-1451)EACH1$20,445$22,000$24,056$22,900$16,400
0175Inlets, curb, type J-6, <10' (0425-1461)EACH1$2,541.77$24,000$26,573$25,100$17,000
0180Inlets, curb, type J-6, partial (0425-1465)EACH1$14,919$11,000$7,836.01$9,720.00$8,500.00
0185Inlets, ditch bottom type C modified- back of sidewalk, partial (0425-1535)EACH3$14,146$9,000.00$5,908.99$8,480.00$10,500
0190Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF4$303.91$1,200.00$445.69$1,180.00$1,600.00
0195Pipe culvert,optional material,round, 24"S/CD (0430-175124)LF8$386.79$1,200.00$419.80$1,370.00$1,800.00
0200Pipe culvert, opt material, round, 30"S/CD (0430-175130)LF4$552.56$1,500.00$603.87$1,370.00$2,000.00
0205Trench drain, standard (0436-1-1)LF277$806.74$690.00$600.12$716.00$425.00
0210Pipe handrail - guiderail, aluminum (0515-1-2)LF50$81.28$116.00$117.60$137.90$96.00
0215Concrete curb & gutter, type E (0520-1-7)LF679$52.42$38.00$47.27$135.40$95.00
0220Concrete curb & gutter, type F (0520-1-10)LF6,200$50.75$30.00$46.19$67.50$112.00
0225Concrete curb, type D (0520-2-4)LF263$49.81$45.00$53.95$87.20$46.00
0230Traffic separator concrete- type I, 4' wide (0520-5-11)LF573$130.38$58.00$46.99$105.90$130.00
0235Concrete traffic separator, special- variable width (0520-70)SY4$271.63$240.00$363.49$3,150.00$1,500.00
0240Concrete sidewalk and driveways, 4" thick (0522-1)SY5,478$76.06$79.00$95.09$100.20$50.00
0245Concrete sidewalk and driveways, 6" thick (0522-2)SY5,423$97.79$93.00$131.41$152.50$80.00
0247Pavers, architectural, remove existing and reinstall (0526-1101)SY47$271.63$160.00$141.07$345.00$225.00
0250Detectable warnings (0527-2)SF2,117$48.89$42.00$29.40$37.45$55.00
0255Performance turf, sod (0570-1-2)SY3,904$12.57$13.00$5.45$10.60$8.25
0260Performance turf, sod and shoulder treatment index (0570-1-3)SY44$20.41$20.00$38.00$35.45$65.00
0265Raised pavement marker, type B (0706-1-3)EACH1,295$4.40$6.00$4.50$4.60$5.50
0270Painted pavement markings, standard, white, solid, 6" (0710-11101)GM22.17$1,397.24$1,200.00$1,500.20$1,460.00$1,550.00
0275Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102)GM0.55$0.45$1,450.00$2,550.00$0.45$2,750.00
0280Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF6,829$1.65$1.25$0.80$1.70$1.00
0285Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF1,620$2.59$2.50$2.50$2.70$4.50
0290Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM20.18$550.16$600.00$400.12$575.00$520.00
0295Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM3.51$604.26$650.00$700.80$631.50$775.00
0300Painted pavement markings, standard, white, arrows (0710-11170)EACH38$38.52$36.00$45.00$40.25$55.00
0305Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM6.38$1,396.58$1,200.00$1,501.18$1,460.00$1,650.00
0310Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241)GM0.56$707.63$225.00$705.04$739.50$800.00
0315Disputes review board, meeting- DO not bid (0999-20-1)DA10$4,800.00$4,800.00$4,800.00$4,800.00$4,800.00
0320Disputes review board, hearing- DO not bid (0999-20-2)EACH1$5,750.00$5,750.00$5,750.00$5,750.00$5,750.00
0325Initial contingency amount, DO not bid (0999-25)LS1$150,000$150,000$150,000$150,000$150,000
0330Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH92$544.76$600.00$500.00$569.00$540.00
0335Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH24$1,705.83$2,000.00$1,800.00$1,780.00$2,000.00
0340Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113)EACH4$2,256.10$2,600.00$2,300.00$2,360.00$2,500.00
0345Single column ground sign assembly, relocate (0700-1500)EACH5$214.60$450.00$300.00$224.10$325.00
0350Single column ground sign assembly, remove (0700-1600)EACH37$33.02$70.00$20.00$34.50$22.00
0355Multi-column ground sign assembly, F&I ground mount, 30.0 SF (0700-2113)EACH1$5,392.63$6,000.00$6,000.00$5,630.00$6,500.00
0360Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114)EACH1$6,823.31$7,000.00$8,000.00$7,130.00$8,600.00
0365Multi-column ground sign assembly, remove (0700-2600)EACH2$1,650.80$1,500.00$1,350.00$1,720.00$1,500.00
0370Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH154$247.62$250.00$175.00$258.60$190.00
0375Sign panel, furnish & install ground mount, 12-20 SF (0700-3102)EACH2$324.66$920.00$575.00$339.00$615.00
0380Sign panel, remove, UP to 12 SF (0700-3601)EACH152$11.01$38.00$50.00$11.50$55.00
0385Sign panel, remove, 12-20 SF (0700-3602)EACH2$11.01$62.00$75.00$11.50$80.00
0390Tubular marker, durable, 36" white post (0704-1-1)EACH5$247.62$120.00$225.00$258.60$245.00
0395Tubular marker, 36" yellow (0704-1-4)EACH8$247.62$120.00$225.00$258.60$245.00
0400Object marker, type 1 (0705-10-1)EACH13$137.57$60.00$325.00$143.70$350.00
0405Raised pavement marker, type B (0706-1-3)EACH6,700$4.40$6.00$4.50$4.60$5.50
0410Painted pavement markings, standard, yellow, island nose (0710-11290)SF800$4.40$4.00$3.00$4.60$5.50
0415Painted pavement markings, surface (0710-90)LS1$182,670$135,000$150,000$119,000$165,000
0420Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102)GM1.40$6,433.53$8,800.00$5,736.62$6,720.00$6,400.00
0425Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF12,195$3.85$5.00$2.60$4.00$3.75
0430Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF1,196$4.95$6.50$5.35$5.15$6.25
0435Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF2,900$6.60$7.50$8.25$6.90$9.00
0440Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM3.63$1,451.11$2,250.00$2,604.29$1,520.00$2,800.00
0445Thermoplastic, standard, message or symbol (0711-11160)EACH37$275.13$225.00$145.00$287.50$175.00
0450Thermoplastic, standard, arrow (0711-11170)EACH386$82.54$100.00$65.00$86.20$78.00
0455Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF2,588$4.95$7.00$5.35$5.15$6.00
0460Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.60$2,451.28$4,000.00$2,617.45$2,560.00$3,100.00
0465Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF10,341$15.96$19.00$13.50$16.65$16.25
0470Thermoplastic, preformed, white, message (0711-14160)EACH72$357.67$300.00$205.00$373.50$240.00
0475Thermoplastic, preformed, white, arrow (0711-14170)EACH72$286.14$275.00$145.00$299.00$170.00
0480Thermoplastic, preformed, 24" white with 4" black contrast stop line on concrete 32" (0711-14527)LF16$46.22$35.00$15.00$48.30$36.00
0485Thermoplastic, preformed, 12" white with 4" black contrast crosswalk on concrete pavement, 20" (0711-14528)LF4,241$17.61$16.00$5.00$18.40$25.00
0490Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM22.06$5,348.60$7,500.00$3,700.00$5,590.00$4,000.00
0495Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM19.35$1,595.45$2,300.00$1,600.50$1,670.00$1,800.00
0500Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM11.23$5,347.65$7,500.00$3,702.64$5,590.00$4,200.00
0505Permanent tape, white, solid, 6" for concrete bridges (0713-103101)GM0.12$53,685$32,000$39,106$56,100$40,000
0510Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181)GM0.12$13,421$17,000$21,138$14,000$21,000
0515Permanent tape, yellow, solid, for concrete bridges (0713-103201)GM0.06$54,125$33,000$42,459$56,500$40,000
0520Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381)GM0.12$13,421$17,000$21,138$14,000$21,000
0525Preformed/permanent tape, remove (0713-107)SF652$3.14$8.00$5.00$3.30$10.00
0530Conduit, furnish & install, open trench (0630-2-11)LF433$23.78$27.00$22.00$20.00$24.00
0535Conduit, furnish & install, directional bore (0630-2-12)LF32$47.56$85.00$44.00$25.80$44.00
0540Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH9$989.04$2,900.00$915.00$1,910.00$2,000.00
0545Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12)LF1,828$2.16$4.00$2.00$3.55$3.50
0550Light pole complete, relocate (0715-68000)EACH9$3,919.40$9,500.00$3,626.00$9,420.00$6,500.00
0555Itsfm subsurface documentation- project length (0611-1-1)MI6.08$2,968.60$3,300.00$2,750.90$3,960.00$4,600.00
0560Itsfm location documentation- intersection (0611-2-1)EACH15$2,229.93$2,200.00$2,063.00$2,660.00$3,100.00
0565Conduit, furnish & install, open trench (0630-2-11)LF766$30.27$29.00$28.00$30.50$25.00
0570Conduit, furnish & install, directional bore (0630-2-12)LF5,973$59.45$39.00$55.00$38.95$42.50
0575Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI14$8,623.54$14,500$7,978.00$18,600$15,500
0580Signal cable, adjust (0632-7-4)PI1$193.49$1,600.00$179.00$4,440.00$1,700.00
0585Signal cable, remove- intersection (0632-7-6)PI11$1,754.32$5,000.00$1,623.00$2,960.00$1,950.00
0590Fiber optic cable, F&I, underground,2-12 fibers (0633-1121)LF1,022$4.32$7.00$4.00$6.00$6.25
0595Fiber optic connection, install, splice (0633-2-31)EACH36$59.45$82.00$55.00$68.40$80.00
0600Fiber optic connection, install, termination (0633-2-32)EACH36$89.72$135.00$83.00$102.60$125.00
0605Fiber optic connection hardware, F&I, splice (0633-3-11)EACH3$1,421.40$2,200.00$1,315.00$1,630.00$1,900.00
0610Fiber optic connection hardware, F&I, splice tray (0633-3-12)EACH3$59.45$90.00$55.00$68.40$80.00
0615Fiber optic connection hardware, F&I, buffer tube fan out kit (0633-3-14)EACH3$101.61$135.00$94.00$116.30$135.00
0620Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16)EACH3$1,457.07$2,200.00$1,348.00$1,680.00$1,950.00
0625Fiber optic connection hardware, F&I, connector panel (0633-3-17)EACH3$118.90$160.00$110.00$136.80$160.00
0630Fiber optic cable locator (0633-6)DA430$351.30$320.00$325.00$403.50$380.00
0635Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH84$1,031.19$1,900.00$954.00$1,840.00$2,000.00
0640Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH2$2,354.23$4,500.00$2,178.00$3,160.00$3,800.00
0645Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13)EACH3$6,644.38$9,300.00$6,147.00$6,870.00$7,600.00
0650Electrical power service, F&I, underground, meter by contractor (0639-1122)AS3$6,263.90$7,500.00$5,795.00$6,060.00$5,100.00
0655Electrical service wire, & install (0639-2-1)LF328$4.32$11.00$4.00$7.10$12.50
0660Prestressed concrete pole, type P-II service pole (0641-2-12)EACH3$1,694.88$3,500.00$1,568.00$3,150.00$4,300.00
0665Aluminum signals pole, (0646-1-11)EACH89$3,462.17$3,500.00$3,203.00$4,553.00$2,500.00
0670Aluminum signals pole, remove (0646-1-60)EACH9$944.72$400.00$874.00$1,480.00$325.00
0675Steel strain pole, remove pedestal or service pole- complete removal (0649-1-61)EACH4$1,889.44$390.00$1,748.00$3,550.00$325.00
0680Steel strain pole, remove, shallow foundation removal, bolt on attachment (0649-1-63)EACH14$8,710.01$9,500.00$8,058.00$13,500$5,600.00
0685Steel mast arm assembly, and install, single arm 30' (0649-21-1)EACH1$55,774$80,000$51,599$71,400$62,500
0690Steel mast arm assembly, and install, single arm 40' (0649-21-3)EACH2$63,347$88,000$58,605$78,200$65,800
0695Steel mast arm assembly, and install, single arm 50' (0649-21-6)EACH2$72,387$99,000$66,968$85,700$75,100
0700Steel mast arm assembly, and install, single arm 60' (0649-21-10)EACH8$85,067$117,000$78,699$103,796$88,900
0705Steel mast arm assembly, and install, double arm 60'-40' (0649-21-12)EACH1$100,282$139,000$92,775$118,300$106,100
0710Steel mast arm assembly, and install, single arm 70' (0649-21-15)EACH3$85,361$123,000$78,971$99,500$91,500
0715Steel mast arm assembly, and install, double arm 70'-50' (0649-21-18)EACH1$113,698$156,000$105,187$128,000$121,100
0720Steel mast arm assembly, and install, double arm 70'-60' (0649-21-19)EACH1$126,915$170,000$117,414$137,000$133,300
0725Steel mast arm assembly, and install, single arm 78' (0649-21-21)EACH3$102,258$139,000$94,603$118,000$108,200
0730Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS73$1,797.56$2,300.00$1,663.00$2,550.00$1,500.00
0735Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16)AS16$2,481.78$2,750.00$2,296.00$3,040.00$1,850.00
0740Vehicular traffic signal, remove- poles to remain (0650-1-60)AS3$566.40$150.00$524.00$369.50$160.00
0745Vehicular traffic signal, relocate- includes removal reinstallation (0650-1-70)AS9$1,453.83$1,200.00$1,345.00$1,750.00$845.00
0750Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- black with reflect border (0650-2102)EACH27$737.18$550.00$682.00$1,240.00$278.00
0755Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109)EACH21$775.02$900.00$717.00$1,250.00$490.00
0760Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS94$984.71$1,400.00$911.00$1,590.00$825.00
0765Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60)AS17$148.08$75.00$137.00$295.70$160.00
0767Midblock crosswalk: hybrid beacon assembly, & install complete assembly (0654-3-10)AS12$2,154.26$2,700.00$1,993.00$2,360.00$1,945.00
0770Vehicle detection system- furnish & install cabinet equipment (0660-4-11)EACH12$27,083$32,000$25,056$28,900$30,800
0775Vehicle detection system- furnish & install above ground equipment (0660-4-12)EACH57$9,388.82$12,000$8,686.00$13,774$10,100
0780Vehicle detection system- relocate above ground equipment (0660-4-42)EACH4$1,208.46$2,200.00$1,118.00$4,320.00$2,950.00
0785Vehicle detection system- adjust/modify cabinet (0660-4-51)EACH11$1,476.53$1,400.00$1,366.00$3,270.00$325.00
0790Vehicle detection system- remove cabinet equipment (0660-4-61)EACH5$593.42$800.00$549.00$887.00$160.00
0795Vehicle detection system- remove above ground (0660-4-62)EACH21$1,416.00$900.00$1,310.00$1,480.00$325.00
0800Signal priority and preemption system, furnish and install, detector (0663-1122)EACH10$7,600.99$10,000$7,032.00$9,270.00$8,350.00
0805Signal priority and preemption system, furnish and install, cabinet electronics (0663-1123)EACH6$8,357.63$13,000$7,732.00$10,944$9,600.00
0810Signal priority & preemption system, relocate (0663-1400)EACH1$2,650.40$1,750.00$2,452.00$2,500.00$2,000.00
0815Signal priority & preemption system, adjust/modify (0663-1500)EACH5$1,416.00$1,600.00$1,310.00$3,900.00$325.00
0820Pedestrian detector, furnish & install, accessible (0665-1-12)EACH93$1,973.75$2,200.00$1,826.00$2,390.00$1,720.00
0825Pedestrian detector, adjust/modify on existing pole (0665-1-50)EACH1$297.25$300.00$275.00$702.00$160.00
0830Pedestrian detector, remove- pole/pedestal to remain (0665-1-60)EACH17$74.58$70.00$69.00$147.90$55.00
0835Traffic controller assembly, F&I, NEMA, 1 preemption (0670-5111)AS3$46,692$65,000$43,197$60,400$53,000
0840ITS CCTV camera, relocate (0682-1400)EACH2$3,916.15$6,000.00$3,623.00$2,500.00$3,850.00
0845Managed field ethernet switch, furnish & install (0684-1-1)EACH3$5,083.54$7,500.00$4,703.00$5,850.00$4,350.00
0850Uninterruptible power supply, furnish and install, line interactive (0685-1-11)EACH7$11,071$15,000$10,242$10,200$8,550.00
0855Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13)EACH8$6,037.99$24,000$5,586.00$15,100$12,500
0860Uninterruptible power supply, remove- pole/cabinet remains (0685-1-60)EACH7$593.42$550.00$549.00$1,770.00$160.00
0865Remote power management rpmu, furnish and install (0685-2-1)EACH15$1,132.80$1,600.00$1,048.00$1,160.00$1,400.00
0870Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1)EACH24$2,063.47$2,600.00$1,909.00$3,390.00$2,900.00
0875Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12)EACH24$1,290.61$2,400.00$1,194.00$2,220.00$2,400.00
0880Traffic monitoring site cabinet, F&I, type 3, 2 pane back, pedestal mount (0695-7162)EACH3$6,829.22$3,200.00$6,318.00$12,900$8,900.00
0885Traffic monitoring site cabinet, remove existing cabinet (0695-7600)EACH3$593.42$1,500.00$549.00$1,180.00$325.00
0890Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH24$3,708.62$1,200.00$3,431.00$907.00$880.00
0895Sign panel, furnish & install overhead mount, 12-20 SF (0700-3202)EACH4$1,730.55$1,800.00$1,601.00$1,770.00$1,400.00
0900Sign panel, relocate, UP to 12 SF (0700-3501)EACH4$746.91$900.00$691.00$818.00$690.00
0905Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH22$7,622.61$9,000.00$7,052.00$10,350$9,800.00
FDOT contract T5843: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of January 29, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy