| 0005 | Mobilization (0101-1) | LS | 1 | $82,000 | $463,296 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $55,000 | $62,456 |
| 0015 | Traffic control officer (0102-14) | HR | 288 | $100.00 | $97.08 |
| 0020 | Work zone sign (0102-60) | ED | 3,298 | $1.10 | $0.54 |
| 0025 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 7,635 | $0.50 | $0.27 |
| 0030 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 4,110 | $0.50 | $0.21 |
| 0035 | Arrow board / advance warning arrow panel (0102-76) | ED | 198 | $20.00 | $16.05 |
| 0040 | Portable changeable message sign, temporary (0102-99) | ED | 471 | $55.00 | $26.75 |
| 0045 | Temporary signalization and maintenance, intersection (0102-104) | ED | 150 | $10.00 | $31.29 |
| 0050 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 150 | $10.00 | $31.29 |
| 0055 | Type III barricade (0102-115) | ED | 303 | $10.00 | $0.81 |
| 0060 | Sediment barrier (0104-10-3) | LF | 286 | $10.00 | $3.17 |
| 0065 | Inlet protection system (0104-18) | EACH | 1 | $300.00 | $268.55 |
| 0070 | Litter removal (0107-1) | ACRE | 0.75 | $1,000.00 | $109.99 |
| 0075 | Mowing (0107-2) | ACRE | 0.11 | $1,000.00 | $181.10 |
| 0080 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $12,000 | $5,006.09 |
| 0085 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $16,500 | $5,006.09 |
| 0090 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $15,300 | $12,216 |
| 0095 | Removal of existing concrete (0110-4-10) | SY | 299 | $170.00 | $174.36 |
| 0100 | Borrow excavation, truck measure (0120-2-2) | CY | 96.20 | $180.00 | $131.04 |
| 0105 | Optional base, base group 09 (0285-709) | SY | 9 | $1,200.00 | $889.17 |
| 0110 | Superpave asphaltic concrete, traffic B, PG76-22 (0334-1-52) | TN | 0.70 | $13,000 | $9,566.92 |
| 0115 | Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81) | TN | 0.70 | $13,000 | $9,700.63 |
| 0120 | Inlets, curb, type J-5, partial (0425-1455) | EACH | 1 | $42,500 | $29,895 |
| 0125 | Concrete curb & gutter, type F (0520-1-10) | LF | 362 | $170.00 | $124.35 |
| 0130 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 157 | $277.00 | $205.92 |
| 0135 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 95 | $437.00 | $324.92 |
| 0140 | Detectable warnings (0527-2) | SF | 85 | $55.00 | $102.96 |
| 0145 | Performance turf, sod (0570-1-2) | SY | 174 | $20.00 | $33.23 |
| 0150 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,000 | $50,000 |
| 0155 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 1 | $1,000.00 | $2,461.27 |
| 0160 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 5 | $27.00 | $66.86 |
| 0165 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 588 | $10.00 | $10.70 |
| 0170 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.02 | $45,000 | $26,743 |
| 0175 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 490 | $25.00 | $26.75 |
| 0180 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.03 | $45,000 | $26,742 |
| 0185 | Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1) | SF | 613 | $10.00 | $6.69 |
| 0190 | Conduit, furnish & install, open trench (0630-2-11) | LF | 107 | $15.00 | $30.33 |
| 0195 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 165 | $40.00 | $100.79 |
| 0200 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 1 | $10,000 | $11,315 |
| 0205 | Fiber optic cable locator (0633-6) | DA | 150 | $110.00 | $75.22 |
| 0210 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 1 | $1,500.00 | $5,385.32 |
| 0215 | Aluminum signals pole, (0646-1-11) | EACH | 7 | $4,000.00 | $3,284.01 |
| 0220 | Aluminum signals pole, remove (0646-1-60) | EACH | 4 | $200.00 | $625.77 |
| 0225 | Steel mast arm assembly, and install, single arm 60' (0649-21-10) | EACH | 1 | $113,000 | $101,665 |
| 0230 | Steel mast arm assembly, and install, single arm 70' (0649-21-15) | EACH | 1 | $115,000 | $115,537 |
| 0235 | Steel mast arm assembly, and install, double arm 78'-50' (0649-21-24) | EACH | 1 | $160,000 | $148,086 |
| 0240 | Steel mast arm assembly, remove, shallow foundation- bolt on attachment (0649-26-3) | EACH | 3 | $7,500.00 | $5,475.41 |
| 0245 | Vehicular traffic signal, furnish & install 3 section, 1 way (0650-1-34) | AS | 8 | $2,000.00 | $1,768.28 |
| 0250 | Vehicular traffic signal, furnish & install 4 section, 1 way (0650-1-36) | AS | 4 | $2,500.00 | $2,208.95 |
| 0255 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 6 | $1,200.00 | $1,152.57 |
| 0260 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 1 | $2,500.00 | $2,196.50 |
| 0265 | Vehicle detection system- relocate above ground equipment (0660-4-42) | EACH | 1 | $1,500.00 | $4,014.06 |
| 0270 | Pedestrian detector, relocate (0665-1-40) | EACH | 8 | $500.00 | $353.12 |
| 0275 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 4 | $5,200.00 | $5,214.25 |