| 0005 | Mobilization (0101-1) | LS | 1 | $120,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $25,000 |
| 0015 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $15,000 |
| 0020 | Traffic control officer (0102-14) | HR | 32 | $110.00 |
| 0025 | Work zone sign (0102-60) | ED | 12,140 | $1.00 |
| 0030 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 14,004 | $0.20 |
| 0035 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 19,740 | $0.50 |
| 0040 | Arrow board / advance warning arrow panel (0102-76) | ED | 100 | $25.00 |
| 0045 | Portable changeable message sign, temporary (0102-99) | ED | 776 | $35.00 |
| 0050 | Temporary signalization and maintenance, intersection (0102-104) | ED | 180 | $10.00 |
| 0055 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 180 | $10.00 |
| 0060 | Type III barricade (0102-115) | ED | 40 | $20.00 |
| 0065 | Sediment barrier (0104-10-3) | LF | 127 | $5.00 |
| 0070 | Inlet protection system (0104-18) | EACH | 4 | $300.00 |
| 0075 | Litter removal (0107-1) | ACRE | 1.86 | $500.00 |
| 0080 | Mowing (0107-2) | ACRE | 0.98 | $500.00 |
| 0085 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $5,000.00 |
| 0090 | Removal of existing concrete (0110-4-10) | SY | 195 | $150.00 |
| 0095 | Regular excavation (0120-1) | CY | 1.90 | $530.00 |
| 0100 | Borrow excavation, truck measure (0120-2-2) | CY | 4 | $250.00 |
| 0105 | Concrete curb & gutter, type F (0520-1-10) | LF | 296 | $170.00 |
| 0110 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 97 | $250.00 |
| 0115 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 39 | $280.00 |
| 0120 | Detectable warnings (0527-2) | SF | 83 | $50.00 |
| 0125 | Performance turf, sod (0570-1-2) | SY | 144 | $10.00 |
| 0130 | Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130) | LS | 1 | $14,420 |
| 0135 | Raised pavement marker, type B (0706-1-3) | EACH | 6 | $20.00 |
| 0140 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 0.02 | $20,000 |
| 0145 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 400 | $6.00 |
| 0150 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 70 | $10.00 |
| 0155 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,000 |
| 0160 | Raised pavement marker, type B (0706-1-3) | EACH | 19 | $20.00 |
| 0165 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 494 | $14.00 |
| 0170 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 140 | $20.00 |
| 0175 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.11 | $10,000 |
| 0180 | Thermoplastic, standard, arrow (0711-11170) | EACH | 2 | $310.00 |
| 0185 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.06 | $10,000 |
| 0190 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 381 | $30.00 |
| 0195 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 2 | $400.00 |
| 0200 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 2 | $300.00 |
| 0205 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.10 | $13,000 |
| 0210 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.02 | $13,000 |
| 0215 | Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1) | SF | 1,155 | $10.00 |
| 0220 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 0.09 | $4,000.00 |
| 0225 | Itsfm location documentation- intersection (0611-2-1) | EACH | 1 | $3,000.00 |
| 0230 | Conduit, furnish & install, open trench (0630-2-11) | LF | 105 | $15.00 |
| 0235 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 413 | $37.00 |
| 0240 | Conduit, furnish & install, aboveground (0630-2-14) | LF | 20 | $21.00 |
| 0245 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 1 | $10,000 |
| 0250 | Signal cable, remove- intersection (0632-7-6) | PI | 1 | $800.00 |
| 0255 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 19 | $1,555.00 |
| 0260 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 1 | $3,000.00 |
| 0265 | Electrical service wire, & install (0639-2-1) | LF | 55 | $10.00 |
| 0270 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $2,500.00 |
| 0275 | Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60) | EACH | 1 | $800.00 |
| 0280 | Aluminum signals pole, (0646-1-11) | EACH | 6 | $3,800.00 |
| 0285 | Aluminum signals pole, remove (0646-1-60) | EACH | 6 | $600.00 |
| 0290 | Steel mast arm assembly, and install, double arm 60'-50' (0649-21-13) | EACH | 1 | $144,000 |
| 0295 | Steel mast arm assembly, and install, double arm 70'-60' (0649-21-19) | EACH | 1 | $160,000 |
| 0300 | Steel mast arm assembly, remove, shallow foundation- bolt on attachment (0649-26-3) | EACH | 2 | $8,000.00 |
| 0305 | Vehicular traffic signal, furnish & install 3 section, 1 way (0650-1-34) | AS | 11 | $2,300.00 |
| 0310 | Vehicular traffic signal, furnish & install 4 section, 1 way (0650-1-36) | AS | 2 | $2,800.00 |
| 0315 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 4 | $1,500.00 |
| 0320 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 2 | $2,500.00 |
| 0325 | Vehicle detection system- furnish & install cabinet equipment (0660-4-11) | EACH | 1 | $53,000 |
| 0330 | Vehicle detection system- furnish & install above ground equipment (0660-4-12) | EACH | 2 | $15,500 |
| 0335 | Signal priority and preemption system, furnish and install, detector (0663-1122) | EACH | 1 | $7,500.00 |
| 0340 | Signal priority and preemption system, furnish and install, cabinet electronics (0663-1123) | EACH | 1 | $7,300.00 |
| 0345 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 8 | $800.00 |
| 0350 | Traffic controller assembly, F&I, NEMA, 1 preemption (0670-5111) | AS | 1 | $54,000 |
| 0355 | Traffic controller assembly, remove controller with (0670-5600) | AS | 1 | $1,000.00 |
| 0360 | ITS CCTV camera, F&I, dome PTZ enclosure - pressurized, IP, definition (0682-1113) | EACH | 1 | $6,000.00 |
| 0365 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 1 | $5,100.00 |
| 0370 | Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13) | EACH | 1 | $14,500 |
| 0375 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 6 | $4,800.00 |