FDOT contract T2A48 bid tabulation
SR A1A (MAYPORT ROAD) FROM ATLANTIC BLVD TO DUTTON ISLAND.. Let by Florida DOT on December 3, 2025, Duval, District 2. 5 bids received; low bid $9,645,577 by Coxwell, J.B. Contracting, Inc..
- Owner
- Florida DOT
- Letting
- 03 DEC 2025
- Pay items
- 202
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Coxwell, J.B. Contracting, Inc. | $9,645,577 | Low |
| 2 | Watson Civil Construction, Inc. | $10,020,888 | +4.0% |
| 3 | Maer Homes, LLC | $11,199,116 | +16% |
| 4 | Hubbard Construction Company | $12,731,848 | +32% |
| 5 | Superior Construction Company Southeast, LLC | $13,410,519 | +39% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Coxwell, J.B. Contracting, Inc. | 2. Watson Civil Construction, Inc. | 3. Maer Homes, LLC | 4. Hubbard Construction Company | 5. Superior Construction Company Southeast, LLC |
|---|---|---|---|---|---|---|---|---|
| 0005 | Cleaning & coating concrete surface, class 5 (0400-143) | SF | 12,000 | $1.40 | $1.45 | $5.00 | $1.30 | $2.00 |
| 0010 | Restore spalled areas, latex modified mortar- styrene butadiene (0401-70-2) | CF | 10 | $1,500.00 | $3,300.00 | $1,300.00 | $2,241.42 | $995.00 |
| 0015 | Anti-graffiti coating, non- sacrificial (0563-4) | SF | 5,000 | $1.50 | $1.50 | $7.00 | $1.35 | $1.50 |
| 0020 | Mobilization (0101-1) | LS | 1 | $400,600 | $850,000 | $624,000 | $1,000,000 | $833,696 |
| 0025 | Mobilization (0101-1) | LS | 1 | $601,000 | $150,000 | $318,822 | $270,000 | $536,400 |
| 0030 | Maintenance of traffic (0102-1) | DA | 1 | $375,000 | $728,000 | $105,000 | $1,823,000 | $804,220 |
| 0035 | Maintenance of traffic (0102-1) | DA | 1 | $562,500 | $128,000 | $85,000 | $300,000 | $353,145 |
| 0040 | Special detour- temporary pavement (0102-2200) | SY | 1 | $6,535.00 | $8,400.00 | $12,700 | $40,000 | $238,070 |
| 0045 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $11,610 | $22,000 | $21,000 | $20,000 | $103,340 |
| 0050 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $19,690 | $39,500 | $27,000 | $30,000 | $119,148 |
| 0055 | Traffic control officer (0102-14) | HR | 316 | $130.00 | $135.00 | $70.00 | $125.00 | $110.00 |
| 0060 | Work zone sign (0102-60) | ED | 48,276 | $0.20 | $0.30 | $0.50 | $0.21 | $0.20 |
| 0065 | Business sign (0102-61) | EACH | 25 | $31.50 | $32.00 | $55.00 | $15.49 | $31.50 |
| 0070 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 798 | $46.00 | $50.00 | $52.00 | $47.95 | $43.05 |
| 0075 | Temporary barrier, relocate, low profile concrete (0102-71-23) | LF | 905 | $17.25 | $20.00 | $22.00 | $18.71 | $16.80 |
| 0080 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 36,563 | $0.09 | $0.14 | $0.20 | $0.09 | $0.10 |
| 0085 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 23,789 | $0.03 | $0.05 | $0.15 | $0.04 | $0.05 |
| 0090 | Arrow board / advance warning arrow panel (0102-76) | ED | 905 | $5.25 | $7.50 | $7.00 | $5.16 | $5.25 |
| 0095 | Portable changeable message sign, temporary (0102-99) | ED | 2,154 | $9.45 | $13.00 | $13.00 | $9.29 | $9.45 |
| 0100 | Temporary signalization and maintenance, intersection (0102-104) | ED | 2,000 | $27.53 | $43.00 | $28.00 | $31.81 | $33.40 |
| 0105 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 2,000 | $37.97 | $25.00 | $20.00 | $5.13 | $5.40 |
| 0110 | Type III barricade (0102-115) | ED | 604 | $0.24 | $0.33 | $0.35 | $0.21 | $0.25 |
| 0115 | Sediment barrier (0104-10-3) | LF | 3,004 | $4.50 | $1.35 | $7.00 | $3.85 | $10.00 |
| 0120 | Inlet protection system (0104-18) | EACH | 71 | $105.00 | $105.00 | $1,200.00 | $207.91 | $310.00 |
| 0125 | Litter removal (0107-1) | ACRE | 137.30 | $97.00 | $95.00 | $400.00 | $125.00 | $375.00 |
| 0130 | Mowing (0107-2) | ACRE | 62.79 | $200.00 | $105.00 | $300.00 | $250.00 | $800.00 |
| 0135 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $262,900 | $500,000 | $75,000 | $410,300 | $2,040,000 |
| 0140 | Removal of existing concrete (0110-4-10) | SY | 7,392 | $28.00 | $24.00 | $25.00 | $31.76 | $25.00 |
| 0145 | Tree protection barrier (0110-21) | LF | 214 | $12.00 | $8.00 | $45.00 | $29.02 | $18.00 |
| 0150 | Regular excavation (0120-1) | CY | 1,183 | $22.00 | $23.00 | $30.00 | $51.09 | $30.00 |
| 0155 | Embankment (0120-6) | CY | 1,825 | $34.00 | $26.00 | $55.00 | $111.12 | $25.00 |
| 0160 | Type B stabilization (0160-4) | SY | 2,267 | $26.50 | $32.00 | $17.00 | $19.03 | $60.00 |
| 0165 | Optional base, base group 09 (0285-709) | SY | 957 | $84.00 | $55.00 | $100.00 | $33.36 | $82.00 |
| 0170 | Optional base, base group 14 (0285-714) | SY | 892 | $82.00 | $89.00 | $110.00 | $103.12 | $82.00 |
| 0175 | Milling existing asphalt pavement, 3 1/2" avg depth (0327-70-2) | SY | 16,240 | $5.25 | $5.20 | $7.00 | $8.15 | $5.25 |
| 0180 | Milling existing asphalt pavement, 3" avg depth (0327-70-4) | SY | 9,572 | $5.80 | $5.75 | $6.00 | $12.85 | $6.00 |
| 0185 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 36,247 | $3.00 | $3.00 | $3.50 | $4.50 | $3.00 |
| 0190 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 2,855.70 | $200.00 | $199.00 | $250.00 | $320.60 | $200.00 |
| 0195 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 5,264.60 | $202.00 | $201.00 | $280.00 | $242.30 | $205.00 |
| 0200 | Concrete pavement for roundabout apron, 12" depth (0350-30-13) | SY | 56 | $235.00 | $167.00 | $215.00 | $117.41 | $125.00 |
| 0205 | Concrete class NS, steps (0400-0-13) | CY | 7.20 | $2,900.00 | $1,750.00 | $1,800.00 | $1,650.00 | $1,000.00 |
| 0210 | Cleaning & coating concrete surface, class 5 (0400-143) | SF | 46,450 | $1.40 | $1.45 | $4.00 | $1.30 | $2.00 |
| 0215 | Restore spalled areas, latex modified mortar- styrene butadiene (0401-70-2) | CF | 16 | $1,500.00 | $3,600.00 | $1,200.00 | $3,605.00 | $915.00 |
| 0220 | Inlets, curb, type 9, <10' (0425-1201) | EACH | 1 | $5,600.00 | $5,700.00 | $14,000 | $9,133.46 | $11,400 |
| 0225 | Inlets, curb, type P-1, <10' (0425-1311) | EACH | 10 | $10,220 | $8,000.00 | $14,300 | $9,917.10 | $13,040 |
| 0230 | Inlets, curb, type P-2, <10' (0425-1321) | EACH | 1 | $17,100 | $9,200.00 | $14,000 | $10,088 | $10,900 |
| 0235 | Inlets, curb, type P-3, <10' (0425-1331) | EACH | 1 | $7,750.00 | $7,700.00 | $13,900 | $9,695.28 | $9,510.00 |
| 0240 | Inlets, curb, type P-5, <10' (0425-1351) | EACH | 1 | $7,475.00 | $7,700.00 | $12,500 | $9,183.29 | $9,330.00 |
| 0245 | Inlets, curb, type J-2, <10' (0425-1421) | EACH | 1 | $14,675 | $14,000 | $23,000 | $14,306 | $15,310 |
| 0250 | Inlets, curb, type J-5, <10' (0425-1451) | EACH | 2 | $11,000 | $15,000 | $21,000 | $11,587 | $15,105 |
| 0255 | Inlets, curb, type J-6, <10' (0425-1461) | EACH | 3 | $14,600 | $14,500 | $17,000 | $11,642 | $20,075 |
| 0260 | Inlets, curb, type 8, <10' (0425-1481) | EACH | 7 | $4,550.00 | $7,100.00 | $13,500 | $10,675 | $14,275 |
| 0265 | Inlets, DT bot, type C,jbot, <10' (0425-1523) | EACH | 1 | $18,500 | $11,500 | $17,800 | $15,469 | $18,820 |
| 0270 | Inlets, ditch bottom, type C, partial (0425-1525) | EACH | 1 | $3,700.00 | $7,000.00 | $10,100 | $9,852.97 | $8,500.00 |
| 0275 | Inlets, DT bot, type D, <10' (0425-1541) | EACH | 19 | $5,000.00 | $6,500.00 | $10,200 | $11,168 | $7,640.00 |
| 0280 | Inlets, ditch bottom, type D, J bot, <10' (0425-1543) | EACH | 6 | $8,800.00 | $11,000 | $14,600 | $14,279 | $13,600 |
| 0285 | Inlets, gutter, type V, <10' (0425-1711) | EACH | 1 | $5,850.00 | $5,700.00 | $11,500 | $8,412.63 | $9,115.00 |
| 0290 | Inlets, gutter, type V, J bot, <10' (0425-1713) | EACH | 1 | $8,100.00 | $16,500 | $12,500 | $10,929 | $9,115.00 |
| 0295 | Manholes, P-7, partial (0425-2-43) | EACH | 3 | $4,900.00 | $3,500.00 | $9,400.00 | $7,187.15 | $4,400.00 |
| 0300 | Manholes, P-8, <10' (0425-2-61) | EACH | 14 | $6,725.00 | $5,100.00 | $9,700.00 | $7,803.64 | $11,000 |
| 0305 | Manholes, P-8, partial (0425-2-63) | EACH | 9 | $5,220.00 | $4,300.00 | $9,100.00 | $7,493.39 | $4,400.00 |
| 0310 | Manholes, J-7, <10' (0425-2-71) | EACH | 1 | $7,825.00 | $6,600.00 | $13,550 | $8,623.35 | $15,700 |
| 0315 | Manholes, J-8, <10' (0425-2-91) | EACH | 1 | $7,775.00 | $7,000.00 | $21,100 | $6,266.72 | $8,640.00 |
| 0320 | Manhole, adjust (0425-5) | EACH | 21 | $1,900.00 | $1,400.00 | $4,800.00 | $2,642.11 | $2,610.00 |
| 0325 | Manhole, adjust, utilities (0425-5-1) | EACH | 16 | $1,800.00 | $1,400.00 | $5,500.00 | $2,464.06 | $2,610.00 |
| 0330 | Valve boxes, adjust (0425-6) | EACH | 33 | $1,200.00 | $1,700.00 | $2,200.00 | $1,679.66 | $1,560.00 |
| 0335 | Pipe culvert,optional material,round, 15"S/CD (0430-175115) | LF | 64 | $450.00 | $709.00 | $231.00 | $1,626.53 | $1,340.00 |
| 0340 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 1,957 | $150.00 | $160.00 | $238.00 | $401.45 | $355.00 |
| 0345 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 339 | $243.00 | $263.00 | $315.00 | $606.12 | $505.00 |
| 0350 | Pipe culvert, opt material, round, 30"S/CD (0430-175130) | LF | 40 | $865.00 | $765.00 | $330.00 | $1,699.05 | $1,170.00 |
| 0355 | Pipe culvert,optional material,other-elip/arch, (0430-175215) | LF | 8 | $260.00 | $535.00 | $255.00 | $1,325.88 | $935.00 |
| 0360 | Pipe culvert,optional material,other-elip/arch, (0430-175218) | LF | 311 | $140.00 | $196.00 | $275.00 | $408.14 | $230.00 |
| 0365 | Pipe culvert,optional material,other shape-elip/arch, 24"S/CD (0430-175224) | LF | 8 | $805.00 | $940.00 | $350.00 | $1,486.76 | $1,425.00 |
| 0370 | Pipe handrail - guiderail, aluminum (0515-1-2) | LF | 84 | $90.00 | $82.00 | $113.00 | $79.00 | $90.00 |
| 0375 | Concrete curb & gutter, type F (0520-1-10) | LF | 4,288 | $51.00 | $46.00 | $69.00 | $27.12 | $48.50 |
| 0380 | Concrete curb & gutter, type F with special gutter profile (0520-1-12) | LF | 100 | $71.00 | $53.00 | $67.00 | $30.05 | $36.00 |
| 0385 | Concrete curb, type D (0520-2-4) | LF | 210 | $61.80 | $41.00 | $61.00 | $24.83 | $29.00 |
| 0390 | Concrete curb, type RA (0520-2-8) | LF | 146 | $57.00 | $57.00 | $61.00 | $26.52 | $31.00 |
| 0395 | Traffic separator concrete- type I, 4' wide (0520-5-11) | LF | 2,640 | $55.20 | $56.00 | $72.00 | $42.51 | $80.00 |
| 0400 | Concrete traffic separator, special- variable width (0520-70) | SY | 65 | $100.00 | $115.00 | $167.00 | $88.24 | $170.00 |
| 0405 | Shoulder concrete barrier, 38" or 44" height (0521-72-40) | LF | 45 | $530.00 | $505.00 | $910.00 | $397.23 | $815.00 |
| 0410 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 6,310 | $60.75 | $71.00 | $63.00 | $49.16 | $65.00 |
| 0415 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 3,476 | $86.50 | $93.00 | $91.00 | $64.86 | $85.00 |
| 0420 | Detectable warnings (0527-2) | SF | 1,676 | $44.50 | $52.00 | $45.00 | $39.75 | $42.00 |
| 0425 | Guardrail removal (0536-73) | LF | 41 | $100.00 | $68.00 | $55.00 | $55.59 | $44.25 |
| 0430 | Anti-graffiti coating, non- sacrificial (0563-4) | SF | 17,100 | $1.42 | $1.50 | $5.20 | $1.35 | $1.50 |
| 0435 | Performance turf, sod (0570-1-2) | SY | 4,684 | $7.27 | $6.30 | $11.00 | $3.70 | $16.50 |
| 0440 | Raised pavement marker, type B (0706-1-3) | EACH | 1,837 | $5.25 | $5.40 | $7.00 | $5.00 | $5.25 |
| 0445 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 10.74 | $1,680.63 | $1,720.00 | $1,800.00 | $1,600.60 | $1,680.00 |
| 0450 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.43 | $2,241.68 | $2,250.00 | $2,100.00 | $1,808.41 | $2,231.25 |
| 0455 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 5,908 | $1.84 | $1.90 | $1.50 | $1.00 | $1.84 |
| 0460 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 672 | $2.36 | $2.45 | $4.00 | $3.00 | $2.36 |
| 0465 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 1,563 | $2.89 | $3.00 | $4.00 | $3.00 | $2.89 |
| 0470 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 1.95 | $447.17 | $455.00 | $1,200.00 | $1,002.06 | $446.25 |
| 0475 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.98 | $767.28 | $777.00 | $1,200.00 | $1,001.02 | $766.50 |
| 0480 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 41 | $89.25 | $92.00 | $110.00 | $85.00 | $89.25 |
| 0485 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 90 | $52.50 | $54.00 | $55.00 | $45.00 | $52.50 |
| 0490 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 6.78 | $1,681.24 | $1,720.00 | $1,800.00 | $1,601.18 | $1,680.00 |
| 0495 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 554 | $2.36 | $2.45 | $4.00 | $3.00 | $2.45 |
| 0500 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.06 | $814.66 | $695.00 | $1,200.00 | $1,034.48 | $862.07 |
| 0505 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 71 | $6.30 | $6.45 | $12.00 | $10.00 | $7.00 |
| 0510 | Raised crosswalk, type RC curb with plate/grate (0920-520100) | LF | 84 | $600.00 | $381.00 | $0.00 | $420.82 | $340.00 |
| 0515 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $89,191 | $89,191 | $89,191 | $89,191 | $89,191 |
| 0520 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $22,159 | $22,159 | $22,159 | $22,159 | $22,159 |
| 0525 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 31 | $515.00 | $465.00 | $600.00 | $459.00 | $525.00 |
| 0530 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 1 | $2,775.00 | $2,750.00 | $600.00 | $2,700.00 | $525.00 |
| 0535 | Single column ground sign assembly, install (0700-1400) | EACH | 1 | $485.00 | $491.00 | $600.00 | $486.00 | $525.00 |
| 0540 | Single column ground sign assembly, relocate (0700-1500) | EACH | 21 | $154.00 | $164.00 | $265.00 | $162.00 | $205.00 |
| 0545 | Single column ground sign assembly, remove (0700-1600) | EACH | 18 | $42.00 | $38.50 | $100.00 | $37.80 | $52.50 |
| 0550 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 40 | $185.00 | $273.00 | $250.00 | $270.00 | $204.75 |
| 0555 | Sign panel, furnish & install overhead mount, 51-100 SF (0700-3205) | EACH | 1 | $2,850.00 | $8,270.00 | $2,800.00 | $7,479.00 | $2,336.25 |
| 0560 | Sign panel, furnish & install overhead mount, 101-200 SF (0700-3206) | EACH | 2 | $6,760.00 | $13,300 | $4,800.00 | $11,961 | $4,147.50 |
| 0565 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 6 | $21.00 | $38.50 | $65.00 | $37.80 | $52.50 |
| 0570 | Sign panel, remove, 51-100 SF (0700-3605) | EACH | 1 | $252.00 | $382.00 | $325.00 | $378.00 | $262.50 |
| 0575 | Sign panel, remove, 101-200 SF (0700-3606) | EACH | 2 | $385.00 | $382.00 | $450.00 | $378.00 | $367.50 |
| 0580 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 33 | $87.25 | $382.00 | $110.00 | $378.00 | $94.50 |
| 0585 | Tubular marker, 36" white post (0704-1-3) | EACH | 57 | $225.75 | $137.00 | $225.00 | $135.00 | $152.25 |
| 0590 | Tubular marker, 36" yellow (0704-1-4) | EACH | 11 | $225.75 | $137.00 | $220.00 | $135.00 | $152.25 |
| 0595 | Raised pavement marker, type B (0706-1-3) | EACH | 2,157 | $5.25 | $5.40 | $6.00 | $5.00 | $5.25 |
| 0600 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 220 | $6.30 | $6.50 | $12.00 | $10.00 | $6.30 |
| 0605 | Painted pavement markings, surface (0710-90) | LS | 1 | $50,400 | $51,500 | $32,000 | $26,000 | $50,400 |
| 0610 | Painted pavement markings, surface (0710-90) | LS | 1 | $10,500 | $10,800 | $30,000 | $24,000 | $10,500 |
| 0615 | Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102) | GM | 0.43 | $19,200 | $19,200 | $9,000.00 | $7,535.05 | $19,110 |
| 0620 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 4,360 | $3.15 | $3.25 | $5.00 | $4.00 | $3.15 |
| 0625 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 672 | $5.51 | $5.65 | $6.00 | $5.00 | $5.50 |
| 0630 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 968 | $8.40 | $8.60 | $7.00 | $6.00 | $8.40 |
| 0635 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.93 | $2,665.00 | $2,700.00 | $5,500.00 | $4,524.32 | $2,650.00 |
| 0640 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 11 | $132.00 | $135.00 | $350.00 | $250.00 | $131.25 |
| 0645 | Thermoplastic, standard, arrow (0711-11170) | EACH | 88 | $73.50 | $76.00 | $155.00 | $110.00 | $73.50 |
| 0650 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 554 | $5.51 | $5.70 | $6.00 | $5.00 | $5.50 |
| 0655 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.03 | $2,595.00 | $26,500 | $5,500.00 | $3,970.59 | $29,400 |
| 0660 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 1,721 | $13.65 | $14.00 | $20.00 | $18.00 | $13.50 |
| 0665 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 28 | $231.00 | $236.00 | $250.00 | $200.00 | $231.00 |
| 0670 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 28 | $158.00 | $161.00 | $155.00 | $125.00 | $157.50 |
| 0675 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 4.89 | $3,935.00 | $4,020.00 | $6,000.00 | $5,205.32 | $3,937.36 |
| 0680 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 1.95 | $1,685.00 | $1,720.00 | $4,500.00 | $3,507.19 | $1,680.37 |
| 0685 | Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133) | GM | 0.05 | $19,905 | $16,300 | $9,500.00 | $8,510.64 | $18,723 |
| 0690 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 3.61 | $3,935.00 | $4,050.00 | $6,300.00 | $5,195.68 | $3,938.83 |
| 0695 | Thermoplastic, standard-other surfaces, yellow, solid, 8" (0711-16202) | GM | 0.01 | $17,500 | $18,000 | $7,000.00 | $5,000.00 | $21,000 |
| 0700 | Conduit, furnish & install, open trench (0630-2-11) | LF | 117 | $59.00 | $14.80 | $25.00 | $13.34 | $14.00 |
| 0705 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 3 | $1,640.00 | $2,900.00 | $2,200.00 | $1,606.77 | $1,690.00 |
| 0710 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 165 | $24.50 | $3.25 | $4.00 | $2.92 | $3.10 |
| 0715 | Luminaire & bracket arm- aluminum, furnish & install new luminaire and arm on new/existing pole (0715-5-31) | EACH | 1 | $3,080.00 | $4,100.00 | $2,850.00 | $3,683.38 | $3,870.00 |
| 0720 | Luminaire & bracket arm, luminaire and arm; pole remains (0715-5-51) | EACH | 1 | $950.00 | $1,150.00 | $800.00 | $1,026.00 | $1,080.00 |
| 0725 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211) | EACH | 2 | $2,120.00 | $1,490.00 | $1,900.00 | $1,341.81 | $1,410.00 |
| 0730 | Light pole complete, F&I, standard pole standard foundation, 30' mounting height, 8' arm length (0715-61111) | EACH | 1 | $9,200.00 | $12,700 | $15,500 | $11,504 | $12,080 |
| 0735 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 12' arm length (0715-61342) | EACH | 1 | $9,750.00 | $13,000 | $13,000 | $11,763 | $12,350 |
| 0740 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 1.60 | $4,725.00 | $2,750.00 | $5,300.00 | $2,468.57 | $2,585.21 |
| 0745 | Conduit, furnish & install, open trench (0630-2-11) | LF | 741 | $32.25 | $22.00 | $24.00 | $19.81 | $21.00 |
| 0750 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 771 | $66.20 | $30.00 | $55.00 | $27.15 | $28.50 |
| 0755 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 5 | $15,400 | $15,700 | $15,550 | $14,099 | $15,000 |
| 0760 | Fiber optic cable, F&I, underground,2-12 fibers (0633-1121) | LF | 341 | $14.00 | $4.50 | $7.00 | $4.05 | $4.50 |
| 0765 | Fiber optic cable, F&I, underground,13-48 fibers (0633-1122) | LF | 171 | $14.50 | $4.90 | $6.50 | $4.37 | $4.50 |
| 0770 | Fiber optic connection, install, splice (0633-2-31) | EACH | 84 | $69.50 | $54.00 | $80.00 | $48.60 | $51.00 |
| 0775 | Fiber optic connection hardware, F&I, splice tray (0633-3-12) | EACH | 2 | $162.00 | $60.00 | $95.00 | $54.00 | $57.00 |
| 0780 | Fiber optic connection hardware, F&I, preterminated patch panel (0633-3-15) | EACH | 1 | $5,525.00 | $4,800.00 | $5,600.00 | $4,314.60 | $4,530.00 |
| 0785 | Fiber optic connection hardware, adjust/modify splice enclosure (0633-3-51) | EACH | 1 | $1,165.00 | $865.00 | $1,220.00 | $783.00 | $822.00 |
| 0790 | Fiber optic connection hardware, adjust/modify splice tray (0633-3-52) | EACH | 1 | $210.00 | $17.90 | $41.00 | $16.20 | $17.00 |
| 0795 | Fiber optic cable locator (0633-6) | DA | 400 | $71.19 | $198.00 | $350.00 | $178.52 | $190.00 |
| 0800 | Span wire assembly, remove- poles remain (0634-4600) | PI | 1 | $3,600.00 | $2,750.00 | $3,000.00 | $2,462.40 | $2,585.00 |
| 0805 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 84 | $1,640.00 | $2,900.00 | $2,200.00 | $1,606.77 | $1,700.00 |
| 0810 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 1 | $3,200.00 | $4,000.00 | $4,100.00 | $2,581.60 | $2,710.00 |
| 0815 | Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60) | EACH | 4 | $990.00 | $1,400.00 | $1,462.00 | $1,231.20 | $1,300.00 |
| 0820 | Strain pole, wood, remove (0643-600) | EACH | 2 | $2,865.00 | $2,300.00 | $2,310.00 | $2,052.00 | $2,155.00 |
| 0825 | Aluminum signals pole, (0646-1-11) | EACH | 18 | $3,580.00 | $2,775.00 | $3,900.00 | $2,510.32 | $2,635.00 |
| 0830 | Aluminum signals pole, furnish install pedestrian detector post (0646-1-12) | EACH | 15 | $3,475.00 | $2,550.00 | $2,840.00 | $2,300.90 | $2,415.00 |
| 0835 | Aluminum signals pole, remove (0646-1-60) | EACH | 4 | $760.00 | $1,700.00 | $675.00 | $1,539.00 | $1,615.00 |
| 0840 | Steel mast arm assembly, and install, single arm 30' (0649-21-1) | EACH | 1 | $81,200 | $61,000 | $83,000 | $55,139 | $57,900 |
| 0845 | Steel mast arm assembly, and install, single arm 40' (0649-21-3) | EACH | 2 | $82,200 | $63,500 | $85,000 | $57,214 | $60,075 |
| 0850 | Steel mast arm assembly, and install, single arm 50' (0649-21-6) | EACH | 1 | $78,200 | $67,000 | $100,000 | $60,311 | $63,325 |
| 0855 | Steel mast arm assembly, and install, single arm 70' (0649-21-15) | EACH | 1 | $91,850 | $73,000 | $133,000 | $65,709 | $69,000 |
| 0860 | Steel mast arm assembly, remove, shallow foundation- bolt on attachment (0649-26-3) | EACH | 2 | $6,150.00 | $9,400.00 | $8,000.00 | $8,478.00 | $8,900.00 |
| 0865 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 14 | $1,565.00 | $1,900.00 | $2,565.00 | $1,714.55 | $1,800.00 |
| 0870 | Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16) | AS | 1 | $1,820.00 | $2,350.00 | $3,200.00 | $2,110.79 | $2,215.00 |
| 0875 | Vehicular traffic signal, furnish & install 3 section, 1 way (0650-1-34) | AS | 1 | $1,435.00 | $1,850.00 | $2,700.00 | $1,670.64 | $1,755.00 |
| 0880 | Vehicular traffic signal, remove- poles to remain (0650-1-60) | AS | 8 | $460.00 | $570.00 | $442.00 | $513.00 | $540.00 |
| 0885 | Vehicular traffic signal, relocate- includes removal reinstallation (0650-1-70) | AS | 4 | $1,465.00 | $1,300.00 | $1,750.00 | $1,126.58 | $1,217.00 |
| 0890 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 12 | $337.00 | $890.00 | $1,550.00 | $798.93 | $799.00 |
| 0895 | Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60) | AS | 1 | $425.00 | $227.00 | $280.00 | $205.20 | $205.00 |
| 0900 | Midblock crosswalk: hybrid beacon assembly, & install complete assembly (0654-3-10) | AS | 2 | $2,255.00 | $2,470.00 | $2,727.00 | $2,222.75 | $2,222.75 |
| 0905 | Loop detector inductive, remove- cabinet to remain (0660-1600) | EACH | 28 | $95.00 | $114.00 | $95.00 | $102.60 | $103.00 |
| 0910 | Vehicle detection system- microwave, furnish & install cabinet equipment (0660-3-11) | EACH | 5 | $9,950.00 | $8,400.00 | $13,700 | $7,589.16 | $7,590.00 |
| 0915 | Vehicle detection system- microwave, furnish & install, above ground equipment (0660-3-12) | EACH | 17 | $11,800 | $11,000 | $16,255 | $9,941.40 | $9,942.00 |
| 0920 | Vehicle detection system- wireless magnetometer, cabinet equipment (0660-5-61) | EACH | 3 | $340.00 | $453.00 | $852.00 | $410.40 | $410.00 |
| 0925 | Vehicle detection system- wireless magnetometer, above ground equipment (0660-5-62) | EACH | 3 | $720.00 | $850.00 | $350.00 | $769.50 | $769.50 |
| 0930 | Signal priority and preemption system, furnish and install, detector (0663-1122) | EACH | 2 | $7,610.00 | $7,300.00 | $11,400 | $6,605.24 | $6,935.50 |
| 0935 | Signal priority and preemption system, furnish and install, cabinet electronics (0663-1123) | EACH | 1 | $8,205.00 | $8,100.00 | $12,630 | $7,318.90 | $7,685.00 |
| 0940 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 29 | $575.00 | $510.00 | $1,250.00 | $460.34 | $483.00 |
| 0945 | Pedestrian detector, adjust/modify on existing pole (0665-1-50) | EACH | 4 | $575.00 | $280.00 | $369.00 | $251.42 | $251.50 |
| 0950 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 18 | $265.00 | $114.00 | $138.00 | $102.60 | $103.00 |
| 0955 | Traffic controller assembly, F&I, NEMA W/standard lock, 1 preemption (0670-5161) | AS | 2 | $42,700 | $46,000 | $85,550 | $41,636 | $43,718 |
| 0960 | Traffic controller assembly, remove controller with (0670-5600) | AS | 1 | $1,175.00 | $2,570.00 | $2,100.00 | $2,308.50 | $2,424.00 |
| 0965 | Traffic controller assembly, modify only - no components added (0670-5710) | AS | 3 | $525.00 | $2,720.00 | $4,200.00 | $2,462.40 | $2,585.00 |
| 0970 | ITS CCTV camera, non- pressurized, IP, high definition (0682-1173) | EACH | 5 | $7,575.00 | $6,050.00 | $9,800.00 | $5,473.90 | $5,747.60 |
| 0975 | ITS CCTV camera, adjust/modify (0682-1500) | EACH | 1 | $455.00 | $543.00 | $2,500.00 | $491.29 | $491.00 |
| 0980 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 1 | $3,585.00 | $4,200.00 | $9,300.00 | $3,774.60 | $3,963.00 |
| 0985 | Uninterruptible power supply, furnish and install, line interactive (0685-1-11) | EACH | 2 | $6,460.00 | $8,700.00 | $8,115.00 | $7,862.18 | $8,255.00 |
| 0990 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 13 | $1,075.00 | $1,350.00 | $1,300.00 | $1,220.47 | $1,282.00 |
| 0995 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 4 | $190.00 | $38.50 | $100.00 | $513.00 | $538.75 |
| 1000 | Internally illuminated sign, furnish & install overhead mount, UP to 12 SF (0700-5-21) | EACH | 1 | $3,685.00 | $1,350.00 | $7,700.00 | $1,194.82 | $1,195.00 |
| 1005 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 4 | $4,545.00 | $5,300.00 | $7,600.00 | $4,798.37 | $4,798.25 |
| 1010 | Utility work- jpa/utility agreement, power (1000-7) | LS | 1 | $107,933 | $147,775 | $132,654 | $132,190 | $147,119 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of December 3, 2025. Compiled by Mirage Metrics.