FDOT contract T7559 bid tabulation

SR 400 (I-4) FROM E OF TAMPA BYPASS CANAL TO W OF I-75. Let by Florida DOT on December 3, 2025, Hillsborough, District 7. 5 bids received; low bid $8,564,850 by Watson Civil Construction, Inc..

Owner
Florida DOT
Letting
03 DEC 2025
Pay items
153
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Watson Civil Construction, Inc.$8,564,850Low
2Preferred Materials Inc.$8,700,867+2.0%
3C.W. Roberts Contracting, Inc.$8,905,115+4.0%
4De Moya Highway Infrastructure LLC$9,858,634+15%
5Ajax Paving Industries of Florida LLC$11,897,195+39%
FDOT contract T7559: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Watson Civil Construction, Inc.2. Preferred Materials Inc.3. C.W. Roberts Contracting, Inc.4. De Moya Highway Infrastructure LLC5. Ajax Paving Industries of Florida LLC
0005Mobilization (0101-1)LS1$850,000$830,988$828,361$950,000$1,190,000
0010Maintenance of traffic (0102-1)DA1$560,000$300,154$485,150$475,000$1,190,000
0015Special detour- temporary pavement (0102-2200)SY1$326,000$216,828$328,889$750,000$400,000
0020Special detour- temporary earthwork/base (0102-2300)CY1$210,000$249,817$290,396$200,000$515,000
0025Traffic control officer (0102-14)HR862$120.00$85.16$96.87$90.00$121.07
0030Work zone sign (0102-60)ED16,151$0.32$0.22$0.26$0.21$0.20
0035Barrier mounted work zone sign- index 700-012 (0102-62-12)ED112$31.00$12.77$14.70$12.00$23.06
0040Barrier mounted work zone sign- index 700-013 (0102-62-13)ED4,030$1.30$0.69$0.80$0.65$0.40
0045Temporary barrier, F&I, anchored (0102-71-15)LF6,888$36.00$59.09$44.11$37.00$40.64
0050Temporary barrier, relocate, anchored (0102-71-25)LF4,988$15.00$28.10$20.27$17.00$16.72
0055Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED61,525$0.11$0.13$0.15$0.12$0.10
0060Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD490$0.06$0.05$0.06$0.05$0.03
0065Arrow board / advance warning arrow panel (0102-76)ED396$6.00$6.39$7.35$6.00$5.77
0070Temporary crash cushion, redirective option (0102-89-1)LO9$1,110.00$1,277.45$1,430.60$2,500.00$1,124.21
0075Portable changeable message sign, temporary (0102-99)ED2,317$12.00$10.65$12.25$10.00$10.38
0080Existing ITS maintenance (0102-112)DA300$110.00$79.84$399.44$50.00$90.80
0085Type III barricade (0102-115)ED140$0.34$0.37$0.43$0.35$0.27
0090Portable regulatory, sign (0102-150-1)ED1,202$5.50$6.39$7.35$6.00$4.61
0095Radar speed display unit (0102-150-2)ED1,202$5.50$6.39$7.35$6.00$5.19
0100Sediment barrier (0104-10-3)LF10,120$1.10$1.81$1.70$3.00$5.07
0105Staked turbidity barrier- nylon reinforced PVC (0104-12)LF722$5.10$9.31$8.48$10.00$28.83
0110Soil tracking prevention device (0104-15)EACH3$4,800.00$1,596.81$1,020.89$4,500.00$7,921.34
0115Inlet protection system (0104-18)EACH12$130.00$90.49$164.10$200.00$253.67
0120Litter removal (0107-1)ACRE322.71$50.00$34.98$38.92$50.00$54.19
0125Mowing (0107-2)ACRE316.76$65.00$50.62$56.33$50.00$50.73
0130Clearing & grubbing (0110-1-1)ACRE1$381,000$436,774$280,682$750,000$1,100,000
0135Removal of existing concrete (0110-4-10)SY1,891$31.00$56.54$67.78$50.00$55.35
0140Regular excavation (0120-1)CY7,626.30$10.00$22.84$8.71$20.00$11.53
0145Subsoil excavation (0120-4)CY1,720.60$16.00$37.50$41.20$25.00$68.03
0150Embankment (0120-6)CY8,262.70$10.00$27.24$9.98$30.00$33.44
0155Type B stabilization (0160-4)SY17,334$12.00$15.80$12.51$20.00$11.53
0160Optional base, base group 08 (0285-708)SY9,113$25.00$42.31$22.65$35.00$31.13
0165Optional base, base group 12 (0285-712)SY8,225$31.00$43.33$28.18$40.00$49.58
0170Milling existing asphalt pavement, 1" avg depth (0327-70-1)SY27,338$3.55$2.30$4.31$3.40$3.99
0175Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY6,425$9.90$4.05$8.03$3.90$8.61
0180Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11)SY5,644$11.15$6.77$9.04$8.00$9.22
0185Superpave asphaltic conc, traffic E (0334-1-15)TN1,977.80$189.00$178.08$146.07$145.00$230.23
0190Superpave asphaltic concrete, traffic E, PG76-22 (0334-1-55)TN2,806.20$201.00$184.16$193.27$216.00$270.68
0195Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25)TN1,980.90$269.00$219.57$250.41$280.00$313.86
0200Miscellaneous asphalt (0339-1)TN90.50$552.00$405.31$844.53$700.00$659.22
0205Inlets, DT bot, type B, <10' (0425-1511)EACH3$7,600.00$10,842$12,918$10,000$10,954
0210Inlets, DT bot, type F, <10' (0425-1561)EACH1$7,200.00$9,341.32$11,129$8,000.00$9,939.15
0215Inlets, ditch bottom, type F, partial (0425-1565)EACH1$6,400.00$8,760.81$10,438$8,000.00$10,723
0220Inlets, gutter, type S, <10' (0425-1701)EACH4$4,300.00$11,321$13,488$8,000.00$7,494.72
0225Manholes, P-8, <10' (0425-2-61)EACH1$5,000.00$9,075.98$10,813$8,000.00$8,347.96
0230Manholes, J-7, <10' (0425-2-71)EACH1$9,400.00$13,258$15,795$13,000$12,741
0235Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF525$161.00$230.56$274.69$350.00$196.02
0240Pipe culvert,optional material,round, 24"S/CD (0430-175124)LF8$310.00$258.14$307.55$500.00$795.59
0245Pipe culvert, opt material, round, 48"S/CD (0430-175148)LF65$479.00$591.76$705.02$500.00$668.76
0250Pipe culvert,optional material,other-elip/arch, (0430-175215)LF18$183.00$229.02$272.86$500.00$184.49
0255Straight concrete endwalls, double, 0 degrees, round (0430-548200)EACH1$22,700$18,417$21,942$15,000$55,369
0260Mitered end section, optional round, 18" CD (0430-982125)EACH5$1,900.00$3,750.49$4,468.36$3,500.00$4,854.27
0265Mitered end section, optional - elliptical / arch, 15" CD (0430-982623)EACH2$1,900.00$3,305.72$3,938.46$3,000.00$4,439.18
0270Shoulder gutter- concrete (0520-6)LF497$63.00$52.68$45.13$60.00$89.94
0275Concrete ditch pavement, non reinforced, 4" (0524-1-2)SY331$177.00$105.63$116.68$150.00$161.42
0280Riprap, rubble, F&I, ditch lining (0530-3-4)TN662.30$163.00$158.84$172.78$200.00$161.42
0285Guardrail -roadway, general (0536-1-1)LF894$23.50$25.11$26.88$23.04$26.57
0290Guardrail removal (0536-73)LF354$2.10$1.79$1.91$2.42$2.79
0295Guardrail end treatment- trailing anchorage (0536-85-20)EACH2$2,000.00$1,698.37$1,818.12$1,405.00$1,616.85
0300Guardrail end treatment- parallel approach terminal (0536-85-24)EACH2$3,000.00$3,059.22$3,274.93$3,300.00$3,765.65
0305Performance turf, sod (0570-1-2)SY65,986$5.10$3.26$6.26$5.00$4.96
0310Conduit, furnish & install, open trench (0630-2-11)LF13$22.10$20.49$48.35$42.00$23.31
0315Conduit, furnish & install, directional bore (0630-2-12)LF96$43.00$39.81$33.38$29.00$45.28
0320Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH3$1,800.00$1,657.49$1,368.67$1,200.00$1,885.04
0325Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1)EACH5$4,400.00$4,068.66$2,872.03$2,500.00$4,627.78
0330Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12)EACH5$2,560.00$2,341.98$4,144.00$3,600.00$2,663.51
0335Traffic monitoring site cabinet, F&I, type 3, 2 pane back, pedestal mount (0695-7162)EACH1$8,200.00$7,554.59$8,176.35$7,105.00$8,591.74
0340Raised pavement marker, type B (0706-1-3)EACH5,005$4.20$5.85$4.35$5.00$4.79
0345Painted pavement markings, standard, white, solid, 6" (0710-11101)GM7.68$1,950.00$1,596.83$1,858.48$1,600.00$2,190.76
0350Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102)GM0.50$2,600.00$1,594.70$2,090.12$1,800.00$2,921.79
0355Painted pavement markings, standard, white, solid for interchange markings, 12" (0710-11103)GM1.83$3,850.00$3,192.25$2,319.06$2,000.00$4,381.53
0360Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124)LF1,186$1.90$2.13$3.48$3.00$2.13
0365Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM6.02$505.00$691.84$1,162.53$1,000.00$576.52
0370Painted pavement marking, standard,white, 3'-9' skip drop line and approach to toll 12" wide, (0710-11133)GM0.39$1,050.00$1,063.94$1,852.51$1,600.00$1,153.03
0375Painted pavement markings, standard, white, message or symbol (0710-11160)EACH19$41.00$85.16$98.67$85.00$46.12
0380Painted pavement markings, standard, white, arrows (0710-11170)EACH21$41.00$42.58$52.24$45.00$46.12
0385Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM6.11$1,950.00$1,596.83$1,859.10$1,600.00$2,190.76
0390Initial contingency amount, DO not bid (0999-25)LS1$98,000$98,000$98,000$98,000$98,000
0395Ground-in rumble strips, 16" (0546-72-1)GM1.32$8,000.00$4,795.24$12,282$8,000.00$4,035.62
0400Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH6$1,975.00$2,014.20$2,437.81$2,100.00$605.34
0405Single column ground sign assembly, relocate (0700-1500)EACH8$2,050.00$2,089.11$592.04$510.00$172.96
0410Single column ground sign assembly, remove (0700-1600)EACH4$103.00$105.49$482.92$416.00$51.89
0415Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114)EACH1$7,560.00$7,793.59$7,823.03$6,739.00$10,954
0420Multi-column ground sign assembly, F&I ground mount, 100.0 SF (0700-2115)EACH1$8,900.00$9,134.54$10,582$9,116.00$12,683
0425Multi-column ground sign assembly, F&I ground mount, 1-200.0 SF (0700-2116)EACH1$15,800$16,253$20,818$17,933$34,591
0430Multi-column ground sign assembly, F&I ground mount, 1-400.0 SF (0700-2118)EACH1$19,100$19,662$35,116$30,250$39,203
0435Multi-column ground sign assembly, relocate (0700-2500)EACH2$10,800$11,079$9,004.79$7,757.00$3,747.36
0440Multi-column ground sign assembly, remove (0700-2600)EACH1$740.00$761.89$2,263.68$1,950.00$2,882.58
0445Sign panel, furnish & install overhead mount, 21-30 SF (0700-3203)EACH2$1,400.00$1,445.59$1,788.88$1,541.00$1,644.05
0450Sign panel, furnish & install overhead mount, 51-100 SF (0700-3205)EACH2$3,750.00$3,857.92$6,080.59$5,238.00$4,387.56
0455Sign panel, furnish & install overhead mount, 101-200 SF (0700-3206)EACH6$5,500.00$5,662.18$6,779.42$5,840.00$6,439.53
0460Sign panel, furnish & install overhead mount, 601 SF and greater (0700-3211)EACH2$33,400$34,429$42,822$36,888$39,156
0465Sign panel, relocate, 12-20 SF (0700-3502)EACH1$500.00$511.49$370.32$319.00$581.71
0470Sign panel, remove, 21-30 SF (0700-3603)EACH2$265.00$269.88$406.30$350.00$306.93
0475Sign panel, remove, 51-100 SF (0700-3605)EACH2$685.00$703.01$578.11$498.00$799.52
0480Sign panel, remove, 101-200 SF with lighting (0700-3626)EACH3$1,750.00$1,783.77$3,879.59$3,342.00$2,028.66
0485Sign panel, remove panel, SF with lighting (0700-3627)EACH3$1,920.00$1,977.44$3,871.47$3,335.00$2,248.92
0490Overhead static sign furnish & install, span, 51-100 FT (0700-4125)EACH1$204,000$189,126$220,469$200,000$215,091
0495Overhead static sign furnish & install, span, 101-150 (0700-4126)EACH2$407,000$377,770$373,734$330,000$429,669
0500Overhead static sign deep foundation removal, cantilever (0700-4612)EACH2$13,800$12,759$18,468$16,000$14,510
0505Overhead static sign deep foundation removal, span (0700-4622)EACH1$30,500$28,212$60,467$55,000$32,085
0510Delineator, non-flexible (0705-11-2)EACH108$102.00$212.91$203.15$120.00$115.30
0515Raised pavement marker, type B (0706-1-3)EACH905$4.20$5.85$4.35$5.00$4.79
0520Painted pavement markings, surface (0710-90)LS1$22,000$18,097$19,153$20,000$27,600
0525Thermoplastic, standard, solid, 12" for interchange markings (0711-11103)GM0.15$11,600$31,936$11,455$12,000$13,369
0530Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF1,186$6.00$10.65$5.80$7.00$6.75
0535Thermoplastic, standard, message or symbol (0711-11160)EACH16$134.00$319.36$232.16$250.00$152.20
0540Thermoplastic, standard, arrow (0711-11170)EACH18$79.00$106.45$116.08$125.00$89.94
0545Thermoplastic, preformed, white, message (0711-14160)EACH1$540.00$2,129.08$1,741.19$1,500.00$613.41
0550Thermoplastic, preformed, color route shield (0711-14660)EACH12$2,000.00$3,193.61$3,134.15$4,200.00$2,269.17
0555Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101)GM1.73$6,800.00$8,517.14$6,972.83$6,500.00$7,780.67
0560Thermoplastic, standard-open graded asphalt surfaces, solid, 8" (0711-15102)GM0.50$9,050.00$10,645$8,636.87$7,500.00$10,374
0565Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131)GM2.91$1,750.00$2,661.49$3,481.19$4,500.00$1,945.17
0570Thermoplastic, standard-open graded asphalt surfaces, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-15133)GM0.39$3,400.00$6,386.83$6,946.96$8,000.00$3,890.34
0575Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201)GM1.73$6,250.00$8,516.44$6,952.71$6,500.00$7,131.51
0580Conduit, furnish & install, open trench (0630-2-11)LF4,287$11.20$10.38$14.96$13.00$11.80
0585Conduit, furnish & install, directional bore (0630-2-12)LF156$32.00$29.56$28.78$25.00$33.62
0590Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH19$1,800.00$1,657.49$2,417.34$2,100.00$1,885.04
0595Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12)LF4,868$2.90$2.66$3.17$2.75$3.03
0600Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13)LF13,840$4.35$3.99$3.34$2.90$4.54
0605Lighting conductors, remove & dispose, contractor owns (0715-1-60)LF17,898$0.60$0.53$1.15$1.00$0.61
0610Load center, rework, voltage (0715-7-21)EACH1$5,400.00$5,003.33$3,021.67$2,625.00$5,690.22
0615Itsfm subsurface documentation- project length (0611-1-1)MI0.80$4,100.00$3,747.18$4,620.28$4,015.00$4,261.61
0620Itsfm location documentation- ITS site (0611-2-2)EACH3$2,200.00$2,043.38$3,687.01$3,203.00$2,323.91
0625Conduit, furnish & install, open trench (0630-2-11)LF148$22.10$20.49$19.57$17.00$23.31
0630Fiber optic cable, F&I, underground,2-12 fibers (0633-1121)LF1,205$4.65$4.28$3.80$3.30$4.87
0635Fiber optic cable, relocate, underground (0633-1420)LF10$3.80$3.51$3.17$2.75$4.00
0640Fiber optic cable, remove, underground (0633-1620)LF908$1.90$1.76$1.44$1.25$2.00
0645Fiber optic connection, install, splice (0633-2-31)EACH4$57.00$52.70$73.67$64.00$59.93
0650Fiber optic connection, install, termination (0633-2-32)EACH12$95.00$87.82$90.94$79.00$99.88
0655Fiber optic connection hardware, F&I, splice tray (0633-3-12)EACH1$63.20$58.55$102.45$89.00$66.59
0660Fiber optic connection hardware, F&I, buffer tube fan out kit (0633-3-14)EACH1$108.00$99.53$92.09$80.00$113.20
0665Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16)EACH1$1,700.00$1,551.56$1,502.20$1,305.00$1,764.69
0670Fiber optic cable locator (0633-6)DA300$341.00$316.17$324.61$50.00$359.57
0675Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH7$1,800.00$1,657.49$1,365.22$1,186.00$1,885.04
0680Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH3$3,280.00$2,998.80$3,672.05$3,190.00$3,410.50
0685Electrical service wire, & install (0639-2-1)LF640$15.00$13.84$3.11$2.70$15.74
0690Electrical service wire, (0639-2-6)LF674$1.15$1.06$1.15$1.00$1.21
0695Prestressed concrete pole, type P-III (0641-2-13)EACH2$21,300$19,705$10,957$9,519.00$22,410
0700Prestressed concrete pole, complete pole removal- pole 30' and greater (0641-2-80)EACH1$10,900$10,113$30,381$26,393$11,502
0705Concrete CCTV pole, furnish & install with lowering device, (0641-3186)EACH1$44,500$41,248$53,591$46,556$46,911
0710Steel CCTV pole, remove pole- complete/deep foundation removal, bolt on attachment (0649-2605)EACH1$9,800.00$9,048.57$26,341$22,883$10,291
0715Vehicle detection system- avi, bluetooth relocate, cabinet equipment (0660-6421)EACH1$1,120.00$1,024.62$1,097.01$953.00$1,165.28
0720Vehicle detection system- avi, bluetooth relocate, above ground equipment (0660-6422)EACH1$1,570.00$1,434.46$1,720.91$1,495.00$1,631.40
0725Traffic data detection system- microwave, furnish and install, cabinet equipment (0660-8-11)EACH2$9,750.00$9,017.22$10,245$8,900.00$10,255
0730Traffic data detection system- microwave, furnish and install, above ground equipment (0660-8-12)EACH2$10,900$10,043$11,626$10,100$11,422
0735Traffic data detection system- microwave, remove (0660-8-60)EACH2$1,750.00$1,596.81$2,250.43$1,955.00$1,816.03
0740ITS cabinet, furnish & install, pole mount, 336S, 24" W X 46" H X D (0676-2112)EACH1$13,200$12,246$12,110$10,520$13,928
0745ITS cabinet- adjust/modify (0676-2500)EACH2$3,450.00$3,193.62$2,095.03$1,820.00$3,632.06
0750ITS CCTV camera, pressurized, high definition (0682-1163)EACH1$7,000.00$6,503.62$21,238$18,450$7,396.49
0755Managed field ethernet switch, furnish & install (0684-1-1)EACH1$5,100.00$4,667.52$5,341.16$4,640.00$5,308.31
0760Uninterruptible power supply, furnish and install, line interactive (0685-1-11)EACH1$5,800.00$5,333.33$5,824.63$5,060.00$6,065.53
0765Remote power management rpmu, furnish and install (0685-2-1)EACH1$1,140.00$1,057.68$2,164.09$1,880.00$1,202.89
FDOT contract T7559: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of December 3, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy