FDOT contract T7572 bid tabulation
SR 93 (I-275) FROM WILLOW AVE TO W OF GREEN ST. Let by Florida DOT on December 3, 2025, Hillsborough, District 7. 5 bids received; low bid $1,565,698 by Preferred Materials Inc..
- Owner
- Florida DOT
- Letting
- 03 DEC 2025
- Pay items
- 76
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Preferred Materials Inc. | $1,565,698 | Low |
| 2 | Superior Asphalt, Inc. | $2,213,001 | +41% |
| 3 | Hubbard Construction Company | $2,463,085 | +57% |
| 4 | C.W. Roberts Contracting, Inc. | $2,493,589 | +59% |
| 5 | Ajax Paving Industries of Florida LLC | $2,563,725 | +64% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Preferred Materials Inc. | 2. Superior Asphalt, Inc. | 3. Hubbard Construction Company | 4. C.W. Roberts Contracting, Inc. | 5. Ajax Paving Industries of Florida LLC |
|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $134,587 | $202,786 | $196,864 | $227,267 | $254,358 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $76,046 | $255,000 | $223,053 | $115,069 | $352,153 |
| 0015 | Traffic control officer (0102-14) | HR | 198 | $86.14 | $110.00 | $124.88 | $106.58 | $160.00 |
| 0020 | Work zone sign (0102-60) | ED | 4,858 | $0.27 | $0.30 | $0.33 | $0.36 | $0.15 |
| 0025 | Temporary barrier, F&I, anchored (0102-71-15) | LF | 924 | $23.15 | $45.50 | $54.99 | $59.19 | $40.00 |
| 0030 | Temporary barrier, relocate, anchored (0102-71-25) | LF | 396 | $15.36 | $18.50 | $21.35 | $24.28 | $17.00 |
| 0035 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 3,524 | $0.13 | $0.15 | $0.16 | $0.17 | $0.05 |
| 0040 | Arrow board / advance warning arrow panel (0102-76) | ED | 304 | $5.38 | $5.85 | $6.67 | $7.26 | $3.00 |
| 0045 | Temporary crash cushion, redirective option (0102-89-1) | LO | 3 | $1,462.51 | $1,400.00 | $1,601.50 | $1,743.59 | $1,275.00 |
| 0050 | Portable changeable message sign, temporary (0102-99) | ED | 458 | $12.92 | $14.00 | $16.02 | $19.45 | $12.00 |
| 0055 | Temporary signalization and maintenance, intersection (0102-104) | ED | 390 | $22.72 | $24.50 | $28.02 | $28.77 | $21.10 |
| 0060 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 390 | $15.13 | $16.50 | $18.66 | $19.16 | $14.05 |
| 0065 | Existing ITS maintenance (0102-112) | DA | 130 | $170.13 | $185.00 | $209.80 | $215.44 | $158.00 |
| 0070 | Type III barricade (0102-115) | ED | 78 | $0.38 | $0.40 | $0.47 | $0.51 | $0.20 |
| 0075 | Inlet protection system (0104-18) | EACH | 41 | $150.21 | $235.00 | $223.48 | $191.57 | $200.00 |
| 0080 | Litter removal (0107-1) | ACRE | 31.63 | $175.01 | $95.00 | $216.91 | $247.32 | $200.00 |
| 0085 | Mowing (0107-2) | ACRE | 18.55 | $310.53 | $116.50 | $384.88 | $438.83 | $375.00 |
| 0090 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $9,263.36 | $10,000 | $11,628 | $6,600.00 | $17,840 |
| 0095 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $1,600.95 | $1,730.00 | $5,000.00 | $1,500.00 | $3,200.00 |
| 0100 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 13,053 | $2.98 | $6.60 | $8.18 | $11.31 | $10.49 |
| 0105 | Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11) | SY | 18,356 | $3.26 | $5.75 | $6.58 | $13.37 | $7.55 |
| 0110 | Milling existing asphalt pavement, 3 3/4" avg depth (0327-70-20) | SY | 4,594 | $4.44 | $6.25 | $8.67 | $15.60 | $8.50 |
| 0115 | Superpave asphaltic concrete, traffic B, PG76-22 (0334-1-52) | TN | 511.10 | $168.98 | $237.80 | $281.22 | $248.96 | $270.00 |
| 0120 | Superpave asphaltic concrete, traffic E, PG76-22 (0334-1-55) | TN | 1,644.20 | $161.28 | $241.00 | $249.65 | $242.52 | $247.00 |
| 0125 | Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25) | TN | 629.10 | $313.20 | $338.85 | $406.27 | $352.46 | $482.00 |
| 0130 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 1,239.60 | $181.89 | $255.75 | $299.88 | $267.10 | $232.00 |
| 0135 | Miscellaneous asphalt (0339-1) | TN | 24.90 | $458.02 | $210.00 | $666.00 | $562.04 | $1,535.00 |
| 0140 | Guardrail -roadway, general (0536-1-1) | LF | 878 | $23.98 | $26.00 | $29.72 | $27.25 | $22.53 |
| 0145 | Special guardrail post- special steel post for concrete structure mount (0536-7-2) | EACH | 42 | $365.26 | $395.00 | $452.72 | $407.56 | $252.16 |
| 0150 | Guardrail transition to rigid barrier, F&I- index 536- 002, approach TL-3 (0536-8122) | EACH | 2 | $2,932.25 | $3,175.00 | $3,634.32 | $4,168.79 | $3,701.95 |
| 0155 | Guardrail transition to rigid barrier, F&I- index 536- 002, trailing (0536-8123) | EACH | 2 | $1,606.34 | $1,740.00 | $1,990.95 | $2,272.14 | $1,985.10 |
| 0160 | Guardrail removal (0536-73) | LF | 798 | $3.07 | $3.30 | $3.80 | $2.92 | $3.22 |
| 0165 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 1 | $1,739.34 | $1,885.00 | $2,155.81 | $1,690.42 | $1,824.15 |
| 0170 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 1 | $3,063.72 | $3,315.00 | $3,797.26 | $3,937.00 | $3,541.00 |
| 0175 | Performance turf, sod (0570-1-2) | SY | 551 | $9.37 | $10.15 | $17.62 | $19.98 | $12.20 |
| 0176 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 0.43 | $1,600.28 | $2,915.00 | $2,014.10 | $2,509.82 | $1,609.54 |
| 0177 | Painted pavement markings, standard, white, solid for interchange markings, 12" (0710-11103) | GM | 0.05 | $2,991.11 | $5,825.00 | $3,764.44 | $4,690.93 | $3,219.09 |
| 0178 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 1.31 | $750.85 | $905.00 | $945.02 | $1,261.73 | $751.12 |
| 0179 | Painted pavement marking, standard,white, 3'-9' skip drop line and approach to toll 12" wide, (0710-11133) | GM | 0.38 | $1,288.74 | $1,810.00 | $1,621.99 | $2,526.54 | $1,287.64 |
| 0180 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 14 | $107.68 | $52.50 | $135.52 | $126.66 | $107.30 |
| 0181 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 13 | $43.07 | $52.50 | $54.21 | $63.33 | $42.92 |
| 0182 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 0.43 | $1,600.28 | $2,915.00 | $2,014.10 | $2,509.82 | $1,609.54 |
| 0183 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $30,000 | $30,000 | $30,000 | $30,000 | $30,000 |
| 0185 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $20,000 | $20,000 | $20,000 | $20,000 | $20,000 |
| 0190 | Ground-in rumble strips, 16" (0546-72-1) | GM | 0.65 | $35,341 | $4,660.00 | $20,328 | $35,644 | $6,756.96 |
| 0195 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 1 | $679.44 | $735.00 | $1,468.04 | $1,393.24 | $677.08 |
| 0200 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 1 | $2,344.14 | $2,535.00 | $3,603.38 | $3,419.77 | $2,335.98 |
| 0205 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 37 | $349.95 | $380.00 | $633.93 | $601.63 | $348.73 |
| 0210 | Sign panel, furnish & install ground mount, 12-20 SF (0700-3102) | EACH | 10 | $774.20 | $840.00 | $800.75 | $759.95 | $771.51 |
| 0215 | Sign panel, furnish & install ground mount, 21-30 SF (0700-3103) | EACH | 1 | $2,127.70 | $2,300.00 | $1,167.76 | $1,108.26 | $2,120.31 |
| 0220 | Sign panel, furnish & install ground mount, 31-50 SF (0700-3104) | EACH | 1 | $3,840.85 | $4,155.00 | $3,336.46 | $3,166.46 | $3,827.50 |
| 0225 | Sign panel, furnish & install ground mount, 101-200 SF (0700-3106) | EACH | 1 | $9,928.93 | $10,740 | $10,009 | $9,499.39 | $9,894.40 |
| 0230 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 5 | $1,375.04 | $1,500.00 | $2,001.88 | $1,899.88 | $1,370.26 |
| 0235 | Sign panel, furnish & install overhead mount, 101-200 SF (0700-3206) | EACH | 1 | $10,397 | $11,245 | $10,009 | $9,499.39 | $10,361 |
| 0240 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 44 | $53.84 | $58.25 | $166.82 | $158.32 | $53.65 |
| 0245 | Sign panel, remove, 12-20 SF (0700-3602) | EACH | 10 | $107.68 | $116.50 | $200.19 | $189.99 | $107.30 |
| 0250 | Sign panel, remove, 21-30 SF (0700-3603) | EACH | 1 | $215.35 | $233.00 | $266.93 | $253.31 | $214.61 |
| 0255 | Sign panel, remove, 31-50 SF (0700-3604) | EACH | 1 | $269.19 | $291.00 | $667.28 | $633.29 | $268.26 |
| 0260 | Sign panel, remove, 101-200 SF (0700-3606) | EACH | 1 | $323.03 | $350.00 | $934.21 | $886.61 | $321.91 |
| 0265 | Sign panel, remove, 101-200 SF with lighting (0700-3626) | EACH | 1 | $861.42 | $930.00 | $4,003.76 | $3,799.75 | $858.42 |
| 0270 | Raised pavement marker, type B (0706-1-3) | EACH | 814 | $7.54 | $5.85 | $9.49 | $6.33 | $7.51 |
| 0275 | Painted pavement markings, surface (0710-90) | LS | 1 | $13,460 | $20,470 | $16,940 | $10,133 | $13,413 |
| 0280 | Painted pavement markings, surface (0710-90) | LS | 1 | $2,691.93 | $19,585 | $3,388.05 | $10,133 | $2,682.57 |
| 0285 | Thermoplastic, standard, solid, 12" for interchange markings (0711-11103) | GM | 0.05 | $32,303 | $13,700 | $37,645 | $14,073 | $32,191 |
| 0290 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 188 | $6.46 | $3.65 | $8.13 | $7.60 | $6.44 |
| 0295 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 55 | $12.92 | $7.30 | $16.26 | $15.20 | $12.88 |
| 0300 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.01 | $6,460.77 | $2,910.00 | $6,255.38 | $4,383.85 | $6,438.18 |
| 0305 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 36 | $323.03 | $89.50 | $406.57 | $379.98 | $321.91 |
| 0310 | Thermoplastic, standard, arrow (0711-11170) | EACH | 38 | $107.68 | $65.00 | $135.52 | $158.32 | $107.30 |
| 0315 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 153 | $19.38 | $18.50 | $24.39 | $27.86 | $19.31 |
| 0320 | Thermoplastic, preformed, color route shield (0711-14660) | EACH | 6 | $3,230.32 | $2,900.00 | $4,065.67 | $6,332.92 | $3,219.09 |
| 0325 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 1.22 | $8,075.81 | $8,735.00 | $10,122 | $9,538.47 | $8,047.72 |
| 0330 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 1.58 | $2,691.78 | $2,180.00 | $3,373.02 | $5,710.47 | $2,682.57 |
| 0335 | Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133) | GM | 0.38 | $6,459.79 | $4,365.00 | $8,110.00 | $10,106 | $6,438.18 |
| 0340 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 1.13 | $8,076.19 | $8,700.00 | $10,155 | $9,490.99 | $8,047.72 |
| 0345 | Fiber optic cable locator (0633-6) | DA | 130 | $301.50 | $325.00 | $371.80 | $381.80 | $300.45 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of December 3, 2025. Compiled by Mirage Metrics.