FDOT contract T7572 bid tabulation

SR 93 (I-275) FROM WILLOW AVE TO W OF GREEN ST. Let by Florida DOT on December 3, 2025, Hillsborough, District 7. 5 bids received; low bid $1,565,698 by Preferred Materials Inc..

Owner
Florida DOT
Letting
03 DEC 2025
Pay items
76
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Preferred Materials Inc.$1,565,698Low
2Superior Asphalt, Inc.$2,213,001+41%
3Hubbard Construction Company$2,463,085+57%
4C.W. Roberts Contracting, Inc.$2,493,589+59%
5Ajax Paving Industries of Florida LLC$2,563,725+64%
FDOT contract T7572: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Preferred Materials Inc.2. Superior Asphalt, Inc.3. Hubbard Construction Company4. C.W. Roberts Contracting, Inc.5. Ajax Paving Industries of Florida LLC
0005Mobilization (0101-1)LS1$134,587$202,786$196,864$227,267$254,358
0010Maintenance of traffic (0102-1)DA1$76,046$255,000$223,053$115,069$352,153
0015Traffic control officer (0102-14)HR198$86.14$110.00$124.88$106.58$160.00
0020Work zone sign (0102-60)ED4,858$0.27$0.30$0.33$0.36$0.15
0025Temporary barrier, F&I, anchored (0102-71-15)LF924$23.15$45.50$54.99$59.19$40.00
0030Temporary barrier, relocate, anchored (0102-71-25)LF396$15.36$18.50$21.35$24.28$17.00
0035Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED3,524$0.13$0.15$0.16$0.17$0.05
0040Arrow board / advance warning arrow panel (0102-76)ED304$5.38$5.85$6.67$7.26$3.00
0045Temporary crash cushion, redirective option (0102-89-1)LO3$1,462.51$1,400.00$1,601.50$1,743.59$1,275.00
0050Portable changeable message sign, temporary (0102-99)ED458$12.92$14.00$16.02$19.45$12.00
0055Temporary signalization and maintenance, intersection (0102-104)ED390$22.72$24.50$28.02$28.77$21.10
0060Temporary traffic detection and maintenance, intersection (0102-107-1)ED390$15.13$16.50$18.66$19.16$14.05
0065Existing ITS maintenance (0102-112)DA130$170.13$185.00$209.80$215.44$158.00
0070Type III barricade (0102-115)ED78$0.38$0.40$0.47$0.51$0.20
0075Inlet protection system (0104-18)EACH41$150.21$235.00$223.48$191.57$200.00
0080Litter removal (0107-1)ACRE31.63$175.01$95.00$216.91$247.32$200.00
0085Mowing (0107-2)ACRE18.55$310.53$116.50$384.88$438.83$375.00
0090Clearing & grubbing (0110-1-1)ACRE1$9,263.36$10,000$11,628$6,600.00$17,840
0095Clearing & grubbing (0110-1-1)ACRE1$1,600.95$1,730.00$5,000.00$1,500.00$3,200.00
0100Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY13,053$2.98$6.60$8.18$11.31$10.49
0105Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11)SY18,356$3.26$5.75$6.58$13.37$7.55
0110Milling existing asphalt pavement, 3 3/4" avg depth (0327-70-20)SY4,594$4.44$6.25$8.67$15.60$8.50
0115Superpave asphaltic concrete, traffic B, PG76-22 (0334-1-52)TN511.10$168.98$237.80$281.22$248.96$270.00
0120Superpave asphaltic concrete, traffic E, PG76-22 (0334-1-55)TN1,644.20$161.28$241.00$249.65$242.52$247.00
0125Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25)TN629.10$313.20$338.85$406.27$352.46$482.00
0130Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN1,239.60$181.89$255.75$299.88$267.10$232.00
0135Miscellaneous asphalt (0339-1)TN24.90$458.02$210.00$666.00$562.04$1,535.00
0140Guardrail -roadway, general (0536-1-1)LF878$23.98$26.00$29.72$27.25$22.53
0145Special guardrail post- special steel post for concrete structure mount (0536-7-2)EACH42$365.26$395.00$452.72$407.56$252.16
0150Guardrail transition to rigid barrier, F&I- index 536- 002, approach TL-3 (0536-8122)EACH2$2,932.25$3,175.00$3,634.32$4,168.79$3,701.95
0155Guardrail transition to rigid barrier, F&I- index 536- 002, trailing (0536-8123)EACH2$1,606.34$1,740.00$1,990.95$2,272.14$1,985.10
0160Guardrail removal (0536-73)LF798$3.07$3.30$3.80$2.92$3.22
0165Guardrail end treatment- trailing anchorage (0536-85-20)EACH1$1,739.34$1,885.00$2,155.81$1,690.42$1,824.15
0170Guardrail end treatment- parallel approach terminal (0536-85-24)EACH1$3,063.72$3,315.00$3,797.26$3,937.00$3,541.00
0175Performance turf, sod (0570-1-2)SY551$9.37$10.15$17.62$19.98$12.20
0176Painted pavement markings, standard, white, solid, 6" (0710-11101)GM0.43$1,600.28$2,915.00$2,014.10$2,509.82$1,609.54
0177Painted pavement markings, standard, white, solid for interchange markings, 12" (0710-11103)GM0.05$2,991.11$5,825.00$3,764.44$4,690.93$3,219.09
0178Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM1.31$750.85$905.00$945.02$1,261.73$751.12
0179Painted pavement marking, standard,white, 3'-9' skip drop line and approach to toll 12" wide, (0710-11133)GM0.38$1,288.74$1,810.00$1,621.99$2,526.54$1,287.64
0180Painted pavement markings, standard, white, message or symbol (0710-11160)EACH14$107.68$52.50$135.52$126.66$107.30
0181Painted pavement markings, standard, white, arrows (0710-11170)EACH13$43.07$52.50$54.21$63.33$42.92
0182Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM0.43$1,600.28$2,915.00$2,014.10$2,509.82$1,609.54
0183Initial contingency amount, DO not bid (0999-25)LS1$30,000$30,000$30,000$30,000$30,000
0185Initial contingency amount, DO not bid (0999-25)LS1$20,000$20,000$20,000$20,000$20,000
0190Ground-in rumble strips, 16" (0546-72-1)GM0.65$35,341$4,660.00$20,328$35,644$6,756.96
0195Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH1$679.44$735.00$1,468.04$1,393.24$677.08
0200Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH1$2,344.14$2,535.00$3,603.38$3,419.77$2,335.98
0205Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH37$349.95$380.00$633.93$601.63$348.73
0210Sign panel, furnish & install ground mount, 12-20 SF (0700-3102)EACH10$774.20$840.00$800.75$759.95$771.51
0215Sign panel, furnish & install ground mount, 21-30 SF (0700-3103)EACH1$2,127.70$2,300.00$1,167.76$1,108.26$2,120.31
0220Sign panel, furnish & install ground mount, 31-50 SF (0700-3104)EACH1$3,840.85$4,155.00$3,336.46$3,166.46$3,827.50
0225Sign panel, furnish & install ground mount, 101-200 SF (0700-3106)EACH1$9,928.93$10,740$10,009$9,499.39$9,894.40
0230Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH5$1,375.04$1,500.00$2,001.88$1,899.88$1,370.26
0235Sign panel, furnish & install overhead mount, 101-200 SF (0700-3206)EACH1$10,397$11,245$10,009$9,499.39$10,361
0240Sign panel, remove, UP to 12 SF (0700-3601)EACH44$53.84$58.25$166.82$158.32$53.65
0245Sign panel, remove, 12-20 SF (0700-3602)EACH10$107.68$116.50$200.19$189.99$107.30
0250Sign panel, remove, 21-30 SF (0700-3603)EACH1$215.35$233.00$266.93$253.31$214.61
0255Sign panel, remove, 31-50 SF (0700-3604)EACH1$269.19$291.00$667.28$633.29$268.26
0260Sign panel, remove, 101-200 SF (0700-3606)EACH1$323.03$350.00$934.21$886.61$321.91
0265Sign panel, remove, 101-200 SF with lighting (0700-3626)EACH1$861.42$930.00$4,003.76$3,799.75$858.42
0270Raised pavement marker, type B (0706-1-3)EACH814$7.54$5.85$9.49$6.33$7.51
0275Painted pavement markings, surface (0710-90)LS1$13,460$20,470$16,940$10,133$13,413
0280Painted pavement markings, surface (0710-90)LS1$2,691.93$19,585$3,388.05$10,133$2,682.57
0285Thermoplastic, standard, solid, 12" for interchange markings (0711-11103)GM0.05$32,303$13,700$37,645$14,073$32,191
0290Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF188$6.46$3.65$8.13$7.60$6.44
0295Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF55$12.92$7.30$16.26$15.20$12.88
0300Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.01$6,460.77$2,910.00$6,255.38$4,383.85$6,438.18
0305Thermoplastic, standard, message or symbol (0711-11160)EACH36$323.03$89.50$406.57$379.98$321.91
0310Thermoplastic, standard, arrow (0711-11170)EACH38$107.68$65.00$135.52$158.32$107.30
0315Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF153$19.38$18.50$24.39$27.86$19.31
0320Thermoplastic, preformed, color route shield (0711-14660)EACH6$3,230.32$2,900.00$4,065.67$6,332.92$3,219.09
0325Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM1.22$8,075.81$8,735.00$10,122$9,538.47$8,047.72
0330Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM1.58$2,691.78$2,180.00$3,373.02$5,710.47$2,682.57
0335Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133)GM0.38$6,459.79$4,365.00$8,110.00$10,106$6,438.18
0340Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM1.13$8,076.19$8,700.00$10,155$9,490.99$8,047.72
0345Fiber optic cable locator (0633-6)DA130$301.50$325.00$371.80$381.80$300.45
FDOT contract T7572: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of December 3, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy