FDOT contract T3958 bid tabulation
VICTORIA AVE OVER TIDAL BRANCH, BRIDGE NO 514060. Let by Florida DOT on December 3, 2025, Gulf, District 3. 2 bids received; low bid $1,165,588 by Murphree Bridge Corporation.
- Owner
- Florida DOT
- Letting
- 03 DEC 2025
- Pay items
- 42
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Murphree Bridge Corporation | $1,165,588 | Low |
| 2 | Anderson Columbia Co., Inc. | $1,228,880 | +5.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Murphree Bridge Corporation | 2. Anderson Columbia Co., Inc. |
|---|---|---|---|---|---|
| 0005 | Removal of existing structures/bridges (0110-3) | SF | 1 | $88,100 | $125,000 |
| 0010 | Concrete class IV, culverts (0400-4-1) | CY | 177 | $3,100.00 | $2,000.00 |
| 0015 | Fiber reinforced polymer bars, #4 bar (0415-10-4) | LF | 1,182 | $1.90 | $5.00 |
| 0020 | Fiber reinforced polymer bars, #5 bar (0415-10-5) | LF | 8,846 | $2.50 | $5.00 |
| 0025 | Fiber reinforced polymer bars, #6 bar (0415-10-6) | LF | 384 | $3.15 | $5.00 |
| 0030 | Fiber reinforced polymer bars, #7 bar (0415-10-7) | LF | 6,456 | $3.25 | $6.00 |
| 0035 | Fiber reinforced polymer bars, #8 bar (0415-10-8) | LF | 16,416 | $4.00 | $6.00 |
| 0040 | Riprap- rubble, bank and shore (0530-3-3) | TN | 193.90 | $150.00 | $165.00 |
| 0045 | Bedding stone (0530-74) | TN | 72.20 | $160.00 | $220.00 |
| 0050 | Mobilization (0101-1) | LS | 1 | $131,144 | $130,000 |
| 0055 | Maintenance of traffic (0102-1) | DA | 1 | $25,000 | $10,000 |
| 0060 | Work zone sign (0102-60) | ED | 8,190 | $0.30 | $0.38 |
| 0065 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 2,520 | $0.12 | $0.50 |
| 0070 | Portable changeable message sign, temporary (0102-99) | ED | 630 | $13.00 | $20.00 |
| 0075 | Type III barricade (0102-115) | ED | 2,520 | $0.30 | $0.45 |
| 0080 | Sediment barrier (0104-10-3) | LF | 378 | $5.00 | $20.00 |
| 0085 | Floating turbidity barrier (0104-11) | LF | 214 | $25.00 | $15.00 |
| 0090 | Staked turbidity barrier- nylon reinforced PVC (0104-12) | LF | 126 | $5.54 | $65.00 |
| 0095 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $25,000 | $64,500 |
| 0100 | Regular excavation (0120-1) | CY | 98.20 | $100.00 | $90.00 |
| 0105 | Borrow excavation, truck measure (0120-2-2) | CY | 51.80 | $100.00 | $225.00 |
| 0110 | Type B stabilization (0160-4) | SY | 521 | $55.00 | $85.00 |
| 0115 | Optional base, base group 01 (0285-701) | SY | 163 | $52.00 | $75.00 |
| 0120 | Optional base, base group 06 (0285-706) | SY | 339 | $75.00 | $110.00 |
| 0125 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 102 | $53.50 | $120.00 |
| 0130 | Superpave asphaltic concrete, traffic B, PG76-22 (0334-1-52) | TN | 27.60 | $300.00 | $625.00 |
| 0135 | Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81) | TN | 48.60 | $400.00 | $425.00 |
| 0140 | Miscellaneous asphalt (0339-1) | TN | 2.50 | $500.00 | $2,500.00 |
| 0145 | Metal traffic railing, culvert headwall attached (0460-71101) | LF | 131 | $250.00 | $465.00 |
| 0150 | Guardrail -roadway, general/low speed TL-2 (0536-1-0) | LF | 106 | $20.00 | $23.00 |
| 0155 | Special guardrail post- special steel post for concrete structure mount (0536-7-2) | EACH | 44 | $50.00 | $55.00 |
| 0160 | Guardrail transition to rigid barrier, F&I- index 536- 001, approach TL-2 (0536-8111) | EACH | 4 | $2,400.00 | $2,900.00 |
| 0165 | Guardrail removal (0536-73) | LF | 231 | $5.00 | $5.00 |
| 0170 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 2 | $2,000.00 | $1,800.00 |
| 0175 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 2 | $2,750.00 | $3,800.00 |
| 0180 | Performance turf, sod (0570-1-2) | SY | 32 | $12.00 | $13.00 |
| 0185 | Performance turf, sod and shoulder treatment index (0570-1-3) | SY | 99 | $15.00 | $55.00 |
| 0190 | Single column ground sign assembly, remove (0700-1600) | EACH | 5 | $100.00 | $125.00 |
| 0195 | Raised pavement marker, type B (0706-1-3) | EACH | 10 | $10.00 | $11.00 |
| 0200 | Painted pavement markings, surface (0710-90) | LS | 1 | $2,009.60 | $2,500.00 |
| 0205 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.07 | $10,000 | $12,000 |
| 0210 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.07 | $10,000 | $12,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of December 3, 2025. Compiled by Mirage Metrics.