FDOT contract T2A56 bid tabulation

SR 202 AND SR 5 (US 1) FROM E OF I-95 TO US 1 AND FROM S OF. Let by Florida DOT on January 28, 2026, Duval, District 2. 5 bids received; low bid $10,949,338 by De Moya Contracting LLC.

Owner
Florida DOT
Letting
28 JAN 2026
Pay items
200
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1De Moya Contracting LLC$10,949,338Low
2Coxwell, J.B. Contracting, Inc.$12,108,205+11%
3C.W. Matthews Contracting Co., Inc.$12,821,930+17%
4Watson Civil Construction, Inc.$13,805,236+26%
5Hubbard Construction Company$15,191,592+39%
FDOT contract T2A56: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. De Moya Contracting LLC2. Coxwell, J.B. Contracting, Inc.3. C.W. Matthews Contracting Co., Inc.4. Watson Civil Construction, Inc.5. Hubbard Construction Company
0005Mobilization (0101-1)LS1$1,000,000$1,929,980$1,245,443$1,380,000$1,519,000
0010Maintenance of traffic (0102-1)DA1$750,000$1,172,800$1,075,810$1,675,000$3,452,000
0015Special detour- temporary pavement (0102-2200)SY1$100,000$109,925$177,253$163,000$350,000
0020Special detour- temporary earthwork/base (0102-2300)CY1$25,000$154,880$170,493$239,000$250,000
0025Pedestrian or bicycle special detour (0102-4-1)SY1$20,000$51,100$75,812$55,000$100,000
0030Traffic control officer (0102-14)HR200$90.00$135.00$77.86$120.00$125.00
0035Work zone sign (0102-60)ED65,830$0.10$0.18$0.24$0.31$0.20
0040Business sign (0102-61)EACH7$25.00$32.25$29.94$27.00$25.00
0045Barrier mounted work zone sign- index 700-013 (0102-62-13)ED660$0.35$0.43$0.42$0.48$0.35
0050Temporary barrier, F&I, low profile, concrete (0102-71-13)LF5,118$20.00$44.00$51.83$41.50$39.00
0055Temporary barrier, F&I, free standing (0102-71-16)LF454$15.00$21.50$42.15$33.00$33.65
0060Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED191,580$0.12$0.10$0.14$0.18$0.12
0065Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD815,172$0.05$0.03$0.05$0.08$0.05
0070Temporary separator, F&I remove (0102-75-1)LF2,127$14.00$22.58$16.77$15.00$14.00
0075Arrow board / advance warning arrow panel (0102-76)ED750$6.00$5.38$7.19$9.00$6.00
0080Temporary crash cushion, redirective option (0102-89-1)LO2$1,900.00$1,090.00$2,874.66$2,800.00$1,200.00
0085Portable changeable message sign, temporary (0102-99)ED3,948$10.00$9.41$11.98$15.00$10.00
0090Temporary signalization and maintenance, intersection (0102-104)ED750$7.45$8.00$8.92$13.00$7.45
0095Temporary traffic detection and maintenance, intersection (0102-107-1)ED750$7.45$8.00$8.92$13.00$7.45
0105Type III barricade (0102-115)ED2,125$0.25$0.32$0.30$0.34$0.25
0110Artificial coverings /rolled erosion control products (0104-1)SY121$6.00$5.29$41.21$3.90$3.75
0115Sediment barrier (0104-10-3)LF10,859$3.00$4.98$3.30$1.20$3.86
0125Soil tracking prevention device (0104-15)EACH4$4,200.00$4,675.00$7,274.71$5,000.00$6,200.00
0127Staked turbidity barrier- nylon reinforced PVC (0104-12)LF1,674$10.00$10.38$10.90$5.50$9.47
0130Inlet protection system (0104-18)EACH43$200.00$107.50$356.80$100.00$168.63
0135Litter removal (0107-1)ACRE131.56$35.00$92.00$172.10$90.00$200.00
0140Mowing (0107-2)ACRE139.61$50.00$100.00$372.69$100.00$200.00
0145Monitor existing structures- inspection and settlement monitoring (0108-1)LS1$25,000$10,750$59,028$25,000$8,900.00
0150Clearing & grubbing (0110-1-1)ACRE1$565,000$262,120$462,611$370,000$525,000
0155Removal of existing concrete (0110-4-10)SY4,741$80.00$30.00$58.34$23.00$13.41
0160Regular excavation (0120-1)CY21,619.90$15.00$7.50$6.76$34.00$14.69
0165Subsoil excavation (0120-4)CY2,104.20$25.00$34.00$44.52$58.00$56.14
0170Embankment (0120-6)CY25,837.40$27.00$18.00$15.39$29.00$21.51
0175Type B stabilization (0160-4)SY14,973$29.00$23.00$18.61$20.00$4.68
0180Optional base, base group 01 (0285-701)SY1,656$37.10$39.88$44.44$43.00$49.07
0185Optional base, base group 04 (0285-704)SY594$55.90$60.09$66.96$65.00$50.42
0190Optional base, base group 11 (0285-711)SY3,638$63.25$67.99$75.76$72.00$86.37
0195Optional base, base group 13 (0285-713)SY9,972$68.75$73.91$82.35$78.00$83.87
0200Turnout construction- asphalt/driveway base- asphalt material (0286-2)TN8.60$445.00$478.38$533.01$500.00$186.60
0205Milling existing asphalt pavement, 1" avg depth (0327-70-1)SY1,012$6.00$6.45$7.19$6.40$15.35
0210Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY7,133$2.50$2.69$2.99$2.65$17.40
0215Milling existing asphalt pavement, 2 1/2" avg depth (0327-70-8)SY5,802$5.50$5.91$6.59$5.80$13.40
0220Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53)TN3,328.60$203.00$218.00$243.15$214.00$293.10
0225Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN2,169.50$184.00$198.00$220.39$194.00$249.80
0230Miscellaneous asphalt (0339-1)TN50.70$311.50$335.00$373.11$328.00$433.90
0235Plain cement concrete 9" (0350-3-7)SY1,656$120.00$125.00$145.71$241.00$128.39
0240Inlets, curb, type P-1, <10' (0425-1311)EACH9$11,000$11,950$16,461$7,900.00$7,652.39
0245Inlets, curb, type P-2, <10' (0425-1321)EACH1$12,500$10,835$17,983$10,000$10,388
0250Inlets, curb, type P-5, <10' (0425-1351)EACH1$10,000$11,615$21,854$8,900.00$10,269
0255Inlets, curb, type P-6, partial (0425-1365)EACH1$10,000$4,390.00$9,233.39$3,900.00$6,992.36
0260Inlets, curb type J-1, <10' (0425-1411)EACH1$16,000$18,875$32,028$14,500$13,030
0265Inlets, curb, type J-1, >10' (0425-1412)EACH1$20,000$18,180$27,372$13,000$17,523
0270Inlets, DT bot, type D, <10' (0425-1541)EACH4$10,000$7,050.00$11,575$6,700.00$6,961.34
0275Inlets, ditch bottom, type D, J bot, <10' (0425-1543)EACH1$12,000$14,135$15,465$8,700.00$9,633.48
0280Inlets, ditch bottom, type D, partial (0425-1545)EACH1$5,000.00$4,800.00$11,199$7,200.00$7,463.37
0285Inlets, DT bot, type D, modify (0425-1549)EACH1$10,000$10,365$14,646$11,700$8,553.88
0290Inlets, DT bot, type E, J bot, <10' (0425-1553)EACH1$15,000$11,895$14,248$10,300$8,649.01
0295Inlets, closed flume (0425-1910)EACH1$10,000$6,990.00$3,774.01$8,000.00$2,816.90
0300Manholes, P-8, <10' (0425-2-61)EACH6$8,000.00$6,895.00$13,257$5,800.00$4,870.12
0305Manholes, P-8, partial (0425-2-63)EACH1$6,500.00$5,850.00$13,383$3,850.00$5,179.64
0310Manholes, J-8, <10' (0425-2-91)EACH1$13,500$11,705$14,471$10,600$8,431.00
0315Manhole, adjust, utilities (0425-5-1)EACH1$2,000.00$1,415.00$2,050.62$2,100.00$804.21
0320Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF995$120.00$134.00$114.92$148.00$163.55
0325Pipe culvert,optional material,round, 24"S/CD (0430-175124)LF689$130.00$172.00$159.36$200.00$181.67
0330Pipe culvert, opt material, round, 30"S/CD (0430-175130)LF98$160.00$267.00$172.67$302.00$231.26
0335Pipe culvert, opt material, round, 36"S/CD (0430-175136)LF341$180.00$271.00$332.84$334.00$280.00
0340Pipe culvert, opt material, shape - elip/arch, 30"S/CD (0430-175230)LF709$300.00$279.00$242.10$335.00$278.34
0345Pipe culvert, opt material, shape - elip/arch, 36"S/CD (0430-175236)LF12$350.00$696.00$496.94$791.00$514.11
0350Straight concrete endwalls, single, 45 degrees, round (0430-536130)EACH1$10,000$6,645.00$20,900$13,000$10,997
0355Mitered end section, optional round, 36" CD (0430-982138)EACH2$5,000.00$5,715.00$12,107$7,000.00$6,397.02
0360Mitered end section, optional - elliptical / arch, 30" CD (0430-982633)EACH1$5,000.00$2,720.00$10,040$5,500.00$4,402.92
0365Mitered end section, optional round, 24" SD (0430-984129)EACH1$5,000.00$2,385.00$6,243.56$3,000.00$3,427.03
0370Edgedrain draincrete, (0446-1-1)LF207$50.00$110.00$105.83$114.00$44.08
0375Edgedrain outlet pipe, 4" (0446-71-1)LF45$150.00$116.00$51.35$73.00$106.94
0380Concrete curb & gutter, type E (0520-1-7)LF5,081$33.00$41.19$45.14$53.00$55.34
0385Concrete curb & gutter, type F (0520-1-10)LF1,907$37.00$48.12$40.06$54.00$53.32
0390Concrete curb, type B (0520-2-2)LF119$35.00$21.33$25.69$40.00$21.45
0395Concrete curb, type D (0520-2-4)LF284$30.00$20.77$39.53$35.50$21.45
0400Curb-concrete pavement joint (0520-4)LF335$10.00$7.53$20.66$12.50$17.25
0405Traffic separator concrete- type I, 4' wide (0520-5-11)LF309$50.00$53.21$102.58$51.00$106.14
0410Concrete traffic separator, special- variable width (0520-70)SY876$80.00$60.55$212.81$82.00$81.50
0415Median concrete barrier, grade-separated (0521-1-12)LF82$350.00$320.00$665.46$276.00$575.65
0420Median concrete barrier, tall grade-separated (0521-1-13)LF76$600.00$397.00$900.00$561.00$777.68
0425Concrete sidewalk and driveways, 6" thick (0522-2)SY1,735$70.00$71.13$81.95$82.00$61.60
0430Concrete ditch pavement, non reinforced, 4" (0524-1-2)SY34$150.00$97.00$131.74$77.00$87.50
0435Detectable warnings (0527-2)SF520$39.00$29.00$42.52$46.00$35.50
0440Guardrail -roadway, general (0536-1-1)LF275$24.00$34.13$28.75$26.00$24.00
0445Guardrail- roadway, double (0536-1-3)LF25$33.00$249.40$39.53$35.00$33.00
0450Guardrail end treatment- trailing anchorage (0536-85-20)EACH1$2,000.00$3,005.00$2,395.55$2,120.00$2,000.00
0455Guardrail end treatment- parallel approach terminal (0536-85-24)EACH1$3,200.00$4,545.00$3,832.88$3,400.00$3,200.00
0460Crash cushion, TL-3, narrow (0544-3-1)EACH1$30,000$4,100.00$28,148$25,000$29,313
0465Fencing, type B, 5.1-6.0', standard (0550-10220)LF83$50.00$83.85$93.43$45.50$35.53
0470Performance turf, sod (0570-1-2)SY12,055$3.00$5.31$5.77$6.10$2.55
0475Raised pavement marker, type B (0706-1-3)EACH3,499$5.00$5.64$5.99$6.00$5.25
0480Painted pavement markings, standard, white, solid, 6" (0710-11101)GM6.06$1,600.00$2,258.99$1,914.54$2,400.00$2,101.39
0485Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF1,926$1.00$2.15$1.20$2.30$2.00
0490Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124)LF163$2.00$2.96$2.40$3.15$2.75
0495Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF2,203$3.00$3.23$3.59$3.45$3.00
0500Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM2.08$1,000.00$477.46$1,195.48$505.00$444.15
0505Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM0.26$1,000.00$830.97$1,202.39$845.00$772.97
0510Painted pavement markings, standard, white, message or symbol (0710-11160)EACH11$85.00$140.00$101.81$148.00$130.00
0515Painted pavement markings, standard, white, arrows (0710-11170)EACH125$45.00$56.00$53.90$59.00$52.00
0520Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM3.28$1,600.00$2,254.75$1,914.11$2,400.00$2,097.44
0525Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224)LF704$3.00$2.96$3.59$3.15$2.75
0530Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241)GM0.05$1,000.00$735.78$1,330.89$780.00$855.56
0535Initial contingency amount, DO not bid (0999-25)LS1$147,911$147,911$147,911$147,911$147,911
0540Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH46$709.83$765.00$850.22$475.00$709.83
0545Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH9$2,708.70$2,915.00$3,244.41$2,100.00$2,708.70
0550Single column ground sign assembly, relocate (0700-1500)EACH4$626.40$673.00$750.29$103.00$626.40
0555Single column ground sign assembly, remove (0700-1600)EACH21$280.80$302.00$336.34$51.50$280.80
0560Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH1$321.84$345.00$385.49$205.00$321.84
0565Sign panel, furnish & install overhead mount, 21-30 SF (0700-3203)EACH1$1,075.87$1,160.00$1,288.65$1,300.00$1,075.87
0570Sign panel, furnish & install overhead mount, 51-100 SF (0700-3205)EACH1$4,248.45$4,570.00$5,088.69$5,000.00$4,248.45
0575Sign panel, furnish & install overhead mount, 101-200 SF (0700-3206)EACH4$7,235.73$7,780.00$8,666.78$8,500.00$7,235.73
0580Sign panel, furnish & install overhead mount, 201-300 SF (0700-3207)EACH1$9,450.00$10,160$11,319$11,100$9,450.00
0585Overhead static sign furnish & install, cantilever, 50 FT (0700-4114)EACH2$104,077$111,885$124,660$123,000$104,077
0590Overhead static sign furnish & install, span, 51-100 FT (0700-4125)EACH1$171,192$184,035$205,050$201,000$171,192
0595Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH21$64.80$70.00$77.62$76.70$64.80
0600Tubular marker, 36" white post (0704-1-3)EACH5$135.00$145.00$161.70$154.00$135.00
0605Delineator, flexible tubular (0705-11-1)EACH12$135.00$145.00$161.70$150.00$135.00
0610Delineator, non-flexible (0705-11-2)EACH2$135.00$145.00$161.70$150.00$135.00
0615Raised pavement marker, type B (0706-1-3)EACH954$5.00$5.64$5.99$6.00$5.25
0620Painted pavement markings, durable paint, yellow, island nose (0710-12290)SF69$10.00$8.33$11.98$8.80$7.75
0625Painted pavement markings, surface (0710-90)LS1$35,000$34,400$41,922$33,000$32,000
0630Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF567$4.00$4.30$4.79$4.55$4.00
0635Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF863$6.00$5.64$7.19$6.00$5.25
0640Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF333$8.00$9.68$9.58$10.30$9.00
0645Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.16$3,500.00$2,831.71$4,089.94$3,000.00$2,634.15
0650Thermoplastic, standard, message or symbol (0711-11160)EACH56$225.00$170.00$269.50$176.00$155.00
0655Thermoplastic, standard, arrow (0711-11170)EACH63$90.00$97.00$107.80$103.00$90.00
0660Thermoplastic, standard, yield line (0711-11180)LF58$10.00$11.02$11.98$11.70$10.25
0665Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF567$6.00$5.64$7.19$6.00$5.25
0670Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.05$3,500.00$2,852.04$4,277.76$2,420.00$2,653.06
0675Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF737$20.00$15.32$23.96$16.30$14.25
0680Thermoplastic, preformed, white, message (0711-14160)EACH7$225.00$295.00$269.50$312.00$275.00
0685Thermoplastic, preformed, white, arrow (0711-14170)EACH7$125.00$220.00$149.72$233.00$205.00
0690Thermoplastic, preformed, color route shield (0711-14660)EACH41$2,950.00$1,885.00$3,533.44$2,000.00$1,750.00
0695Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM2.15$5,200.00$5,043.12$6,216.87$5,400.00$4,691.27
0700Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102)GM0.42$6,000.00$19,117$7,100.07$20,300$18,217
0705Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM0.77$3,500.00$3,743.06$4,170.54$4,000.00$3,481.91
0710Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133)GM0.10$7,000.00$17,374$8,469.09$16,600$16,162
0715Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM1.38$5,200.00$5,059.83$6,237.47$5,350.00$4,706.82
0720Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1)SF301$16.00$5.38$19.16$5.70$5.00
0725Green-colored pavement markings, bike lane (0714-10)SF727$13.50$16.13$16.17$17.10$15.00
0730Prestressed concrete pole, complete pole removal- pole 30' and greater (0641-2-80)EACH4$9,823.68$10,560$11,767$11,600$9,823.68
0735Lighting conductors, remove & dispose, contractor owns (0715-1-60)LF959$0.50$0.54$0.60$0.60$0.50
0740Light pole complete, remove pole and foundation (0715-69000)EACH4$993.60$1,070.00$1,190.11$1,170.00$993.60
0745Conduit, furnish & install, open trench (0630-2-11)LF230$14.40$15.48$17.25$16.95$14.40
0750Conduit, furnish & install, directional bore (0630-2-12)LF1,311$31.04$33.37$37.18$36.50$31.04
0755Conduit, furnish & install, aboveground (0630-2-14)LF10$31.77$34.15$38.05$37.50$31.77
0760Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI1$12,639$13,585$15,138$14,900$12,639
0765Signal cable, remove- intersection (0632-7-6)PI1$2,583.36$2,780.00$3,094.29$3,050.00$2,583.36
0770Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH42$1,392.82$1,500.00$1,668.29$1,650.00$1,392.82
0775Electrical power service, F&I, underground, meter not required (0639-1123)AS1$5,194.00$5,585.00$6,221.25$6,100.00$5,194.00
0780Electrical power service, remove underground (0639-1620)AS1$794.88$855.00$952.09$935.00$794.88
0785Electrical service wire, & install (0639-2-1)LF224$6.83$7.34$8.18$8.05$6.83
0790Electrical service wire, (0639-2-6)LF200$0.50$0.54$0.60$0.60$0.50
0795Prestressed concrete pole, type P-II service pole (0641-2-12)EACH1$1,648.87$1,775.00$1,974.98$1,950.00$1,648.87
0800Aluminum signals pole, (0646-1-11)EACH8$2,286.67$2,460.00$2,738.92$2,700.00$2,286.67
0805Aluminum signals pole, remove (0646-1-60)EACH4$397.44$430.00$476.05$470.00$397.44
0810Aluminum pole- index 695-001, furnish & install, 12' (0646-2112)EACH1$3,311.60$3,560.00$3,966.55$3,900.00$3,311.60
0815Aluminum pole- index 695-001, furnish & install, 20' (0646-2120)EACH1$3,610.90$3,885.00$4,325.05$4,250.00$3,610.90
0820Steel mast arm assembly, and install, single arm 40' (0649-21-3)EACH2$49,933$53,680$59,808$59,000$49,933
0825Steel mast arm assembly, and install, single arm 60' (0649-21-10)EACH3$59,137$63,575$70,833$70,000$59,137
0830Steel mast arm assembly, and install, double arm 70'-50' (0649-21-18)EACH1$85,981$92,430$102,986$101,000$85,981
0835Steel mast arm assembly, remove, shallow foundation- bolt on attachment (0649-26-3)EACH4$7,443.36$8,000.00$8,915.48$8,800.00$7,443.36
0840Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS22$1,667.36$1,800.00$1,997.12$2,000.00$1,667.36
0845Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS8$775.34$835.00$928.68$910.00$775.34
0850Vehicle detection system- microwave, furnish & install cabinet equipment (0660-3-11)EACH2$10,530$11,320$12,613$12,400$10,530
0855Vehicle detection system- microwave, furnish & install, above ground equipment (0660-3-12)EACH8$12,123$13,035$14,521$14,300$12,123
0860Pedestrian detector, furnish & install, standard (0665-1-11)EACH8$280.78$302.00$336.31$330.00$280.78
0865Traffic controller assembly, F&I, NEMA W/standard lock, W/concrete riser (0670-5165)AS1$45,929$49,375$55,013$54,000$45,929
0870Traffic controller assembly, remove controller with (0670-5600)AS1$2,086.56$2,245.00$2,499.23$2,500.00$2,086.56
0875ITS CCTV camera, non- pressurized, IP, high definition (0682-1173)EACH2$7,155.00$7,695.00$8,570.09$8,400.00$7,155.00
0880Uninterruptible power supply, furnish and install, line interactive (0685-1-11)EACH1$9,365.64$10,070$11,218$11,000$9,365.64
0885Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH16$854.49$919.00$1,023.49$1,510.00$854.49
0890Sign panel, furnish & install overhead mount, 12-20 SF (0700-3202)EACH3$970.05$1,045.00$1,161.90$3,050.00$970.05
0895Internally illuminated sign, furnish & install overhead mount, UP to 12 SF (0700-5-21)EACH1$3,382.27$3,635.00$4,051.20$4,000.00$3,382.27
0900Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH2$6,447.36$6,930.00$7,722.49$7,600.00$6,447.36
0905Utility work- jpa/utility agreement, power (1000-7)LS1$310,665$333,964$310,665$365,000$310,665
0910Itsfm subsurface documentation- project length (0611-1-1)MI1.02$3,564.00$3,835.00$4,185.17$4,200.00$3,564.00
0915Itsfm location documentation- intersection (0611-2-1)EACH4$2,646.00$2,845.00$3,169.32$3,150.00$2,646.00
0920Conduit, furnish & install, open trench (0630-2-11)LF1,282$15.17$16.31$18.17$17.90$15.17
0925Conduit, furnish & install, directional bore (0630-2-12)LF1,798$23.81$25.60$28.52$28.00$23.81
0930Fiber optic cable, F&I, underground,2-12 fibers (0633-1121)LF2,852$5.80$6.24$6.95$6.80$5.80
0935Fiber optic cable, F&I, underground,13-48 fibers (0633-1122)LF100$4.66$5.01$5.58$5.50$4.66
0940Fiber optic cable, F&I, underground, 97 - 144 fibers (0633-1124)LF2,949$5.53$5.94$6.62$6.50$5.53
0945Fiber optic cable, remove, underground (0633-1620)LF6,948$1.08$1.16$1.29$1.30$1.08
0950Fiber optic connection, install, splice (0633-2-31)EACH204$48.60$52.25$58.21$57.10$48.60
0955Fiber optic connection, install, termination (0633-2-32)EACH24$81.00$87.00$97.02$95.10$81.00
0960Fiber optic connection hardware, F&I, splice (0633-3-11)EACH5$1,398.60$1,503.00$1,675.21$1,650.00$1,398.60
0965Fiber optic connection hardware, F&I, splice tray (0633-3-12)EACH8$54.00$58.00$64.68$64.00$54.00
0970Fiber optic connection hardware, F&I, buffer tube fan out kit (0633-3-14)EACH3$91.80$99.00$109.96$108.00$91.80
0975Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16)EACH3$1,290.60$1,390.00$1,545.85$1,520.00$1,290.60
0980Fiber optic connection hardware, adjust/modify splice enclosure (0633-3-51)EACH1$783.00$842.00$937.86$920.00$783.00
0985Fiber optic cable locator (0633-6)DA750$30.00$187.00$208.27$205.00$173.88
0990Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH10$2,970.10$3,200.00$3,557.51$3,500.00$2,970.10
0995Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13)EACH1$5,143.68$5,530.00$6,160.97$6,100.00$5,143.68
1000Managed field ethernet switch, furnish & install (0684-1-1)EACH1$4,206.60$4,525.00$5,038.56$4,950.00$4,206.60
1005Managed field ethernet switch, adjust / modify (0684-1-5)EACH3$1,134.00$1,220.00$1,358.28$1,350.00$1,134.00
FDOT contract T2A56: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of January 28, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy