FDOT contract T5884 bid tabulation
SR 400 FROM MP 22.660 TO MP 23.475. Let by Florida DOT on June 10, 2026, Volusia, District 5. 6 bids received; low bid $38,087,832 by C.W. Roberts Contracting, Inc..
- Owner
- Florida DOT
- Letting
- 10 JUN 2026
- Pay items
- 183
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | C.W. Roberts Contracting, Inc. | $38,087,832 | Low |
| 2 | Masci General Contractors, Inc | $39,757,750 | +4.0% |
| 3 | C.W. Matthews Contracting Co., Inc. | $39,920,000 | +5.0% |
| 4 | Southland Construction, Inc. | $40,060,000 | +5.0% |
| 5 | Superior Construction Company Southeast, LLC | $44,597,522 | +17% |
| 6 | Halifax Paving, Inc. | $44,655,697 | +17% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. C.W. Roberts Contracting, Inc. | 2. Masci General Contractors, Inc | 3. C.W. Matthews Contracting Co., Inc. | 4. Southland Construction, Inc. | 5. Superior Construction Company Southeast, LLC | 6. Halifax Paving, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $2,050,000 | $3,800,000 | $3,232,726 | $1,896,000 | $4,454,315 | $3,560,388 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $135,000 | $430,000 | $669,822 | $334,000 | $135,000 | $271,500 |
| 0015 | Special detour- temporary pavement (0102-2200) | SY | 1 | $195,000 | $133,905 | $295,112 | $258,000 | $360,000 | $389,000 |
| 0021 | Traffic control officer (0102-14) | HR | 66 | $110.00 | $95.00 | $82.81 | $91.00 | $250.00 | $200.00 |
| 0025 | Work zone sign (0102-60) | ED | 3,720 | $0.31 | $0.27 | $0.23 | $0.24 | $0.21 | $0.25 |
| 0030 | Temporary barrier, F&I, anchored (0102-71-15) | LF | 4,336 | $41.25 | $20.50 | $41.96 | $43.30 | $38.00 | $39.00 |
| 0035 | Temporary barrier, F&I, free standing (0102-71-16) | LF | 4,395 | $36.20 | $36.00 | $25.39 | $26.20 | $23.00 | $24.00 |
| 0040 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 26,024 | $0.14 | $0.12 | $0.12 | $0.13 | $0.11 | $0.11 |
| 0045 | Arrow board / advance warning arrow panel (0102-76) | ED | 6 | $12.75 | $12.00 | $13.25 | $5.70 | $5.00 | $10.00 |
| 0050 | Temporary crash cushion, redirective option (0102-89-1) | LO | 2 | $1,580.00 | $1,500.00 | $1,104.13 | $1,190.00 | $1,800.00 | $1,500.00 |
| 0055 | Portable changeable message sign, temporary (0102-99) | ED | 33 | $14.00 | $15.00 | $19.32 | $11.40 | $100.00 | $11.00 |
| 0060 | Type III barricade (0102-115) | ED | 860 | $0.44 | $0.40 | $0.33 | $0.29 | $1.00 | $0.35 |
| 0065 | Portable regulatory, sign (0102-150-1) | ED | 12 | $12.75 | $12.00 | $18.22 | $5.70 | $10.00 | $10.00 |
| 0070 | Radar speed display unit (0102-150-2) | ED | 12 | $12.75 | $12.00 | $18.22 | $5.70 | $10.00 | $10.00 |
| 0075 | Removable tape, white, solid 6" (0102-913-21) | GM | 1.79 | $13,670 | $13,650 | $13,287 | $14,000 | $14,000 | $14,250 |
| 0080 | Removable tape, white, 10'-30', 6'-10', or 2'-4' skip, 6" wide (0102-913-22) | GM | 1.84 | $3,685.00 | $3,674.72 | $9,369.83 | $3,800.00 | $4,500.00 | $6,650.00 |
| 0085 | Removable tape, yellow, solid, (0102-913-31) | GM | 1.21 | $13,606 | $13,650 | $13,261 | $14,000 | $14,000 | $14,250 |
| 0090 | Sediment barrier (0104-10-3) | LF | 4,425 | $2.00 | $1.75 | $3.51 | $1.45 | $5.00 | $2.00 |
| 0095 | Staked turbidity barrier- nylon reinforced PVC (0104-12) | LF | 3,122 | $5.30 | $5.95 | $9.02 | $5.90 | $11.00 | $9.50 |
| 0100 | Soil tracking prevention device (0104-15) | EACH | 1 | $14,000 | $3,900.00 | $12,477 | $3,700.00 | $14,890 | $15,000 |
| 0105 | Litter removal (0107-1) | ACRE | 772.91 | $22.22 | $24.00 | $54.57 | $26.00 | $20.00 | $55.00 |
| 0110 | Mowing (0107-2) | ACRE | 433.16 | $66.65 | $63.00 | $124.07 | $90.00 | $60.00 | $85.00 |
| 0115 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $425,000 | $275,500 | $1,116,141 | $1,440,000 | $3,327,565 | $584,000 |
| 0120 | Removal of existing concrete (0110-4-10) | SY | 1,108 | $21.00 | $19.65 | $82.60 | $33.50 | $35.00 | $65.00 |
| 0125 | Regular excavation (0120-1) | CY | 79,232.70 | $3.90 | $5.50 | $5.81 | $8.35 | $23.00 | $6.50 |
| 0130 | Subsoil excavation (0120-4) | CY | 80,332.20 | $8.15 | $5.50 | $11.72 | $15.30 | $17.00 | $15.00 |
| 0135 | Embankment (0120-6) | CY | 393,068.90 | $14.90 | $19.50 | $18.92 | $20.60 | $15.00 | $23.50 |
| 0140 | Type B stabilization (0160-4) | SY | 81,077 | $4.75 | $10.50 | $9.22 | $5.50 | $9.00 | $9.50 |
| 0145 | Optional base, base group 01 (0285-701) | SY | 693 | $29.75 | $15.29 | $44.00 | $19.45 | $21.00 | $22.00 |
| 0150 | Optional base, base group 02 (0285-702) | SY | 7,630 | $28.00 | $22.59 | $44.00 | $32.00 | $34.00 | $50.00 |
| 0155 | Optional base, base group 04 (0285-704) | SY | 3,602 | $19.50 | $24.50 | $17.95 | $21.60 | $27.00 | $24.00 |
| 0160 | Optional base, base group 11 (0285-711) | SY | 64,430 | $28.50 | $31.29 | $28.42 | $31.70 | $34.00 | $34.00 |
| 0165 | Milling existing asphalt pavement, 1" avg depth (0327-70-1) | SY | 7,165 | $1.75 | $2.35 | $3.50 | $1.95 | $2.00 | $4.00 |
| 0170 | Superpave asphaltic conc, traffic B (0334-1-12) | TN | 898.30 | $185.00 | $159.85 | $172.75 | $188.20 | $194.00 | $200.00 |
| 0175 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 15,730 | $126.00 | $163.50 | $144.90 | $126.40 | $130.00 | $140.00 |
| 0180 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 206.40 | $220.00 | $235.15 | $313.20 | $220.90 | $228.00 | $225.00 |
| 0185 | Plain cement concrete 12" (0350-3-13) | SY | 7,537 | $160.00 | $161.29 | $131.75 | $127.90 | $125.00 | $137.00 |
| 0190 | Cleaning & sealing joints- concrete pavement (0350-5) | LF | 14,772 | $4.65 | $6.15 | $3.69 | $5.85 | $2.50 | $3.75 |
| 0195 | Grinding concrete pavement (0352-70) | SY | 7,516 | $5.75 | $7.15 | $9.90 | $10.65 | $4.00 | $3.85 |
| 0200 | Conc class IV, retaining walls (0400-4-11) | CY | 34.50 | $1,800.00 | $1,350.00 | $1,768.40 | $1,650.00 | $4,000.00 | $1,450.00 |
| 0205 | Reinforcing steel- miscellaneous (0415-1-6) | LB | 4,132 | $4.75 | $1.65 | $1.71 | $1.76 | $2.00 | $2.00 |
| 0210 | Inlets, DT bot, type D, <10' (0425-1541) | EACH | 3 | $11,200 | $9,547.00 | $12,963 | $10,800 | $11,975 | $10,000 |
| 0215 | Inlets, DT bot, type D, modify (0425-1549) | EACH | 1 | $31,400 | $25,720 | $32,419 | $26,600 | $33,400 | $28,000 |
| 0220 | Manholes, P-7, partial (0425-2-43) | EACH | 1 | $4,492.00 | $4,425.00 | $15,221 | $11,800 | $6,890.00 | $4,000.00 |
| 0225 | Manholes, J-7, <10' (0425-2-71) | EACH | 1 | $8,989.00 | $9,999.00 | $12,847 | $10,600 | $13,740 | $8,000.00 |
| 0230 | Pipe culvert, optional material, other shape - ellip/arch, 30"SD (0430-174230) | LF | 54 | $230.00 | $275.30 | $253.72 | $254.00 | $400.00 | $205.00 |
| 0235 | Pipe culvert, optional material, other shape - ellip/arch, 36"SD (0430-174236) | LF | 54 | $306.00 | $352.75 | $329.73 | $306.00 | $530.00 | $272.00 |
| 0240 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 47 | $146.00 | $199.15 | $135.57 | $216.00 | $280.00 | $130.00 |
| 0245 | Pipe culvert, opt material, round, 36"S/CD (0430-175136) | LF | 955 | $162.00 | $259.15 | $223.38 | $262.30 | $270.00 | $145.00 |
| 0250 | Pipe culvert, opt material, round, 42"S/CD (0430-175142) | LF | 22 | $931.00 | $399.54 | $501.07 | $763.00 | $920.00 | $829.00 |
| 0255 | Straight concrete endwalls, single, 0 degrees, round (0430-542100) | EACH | 1 | $8,760.00 | $9,370.00 | $13,871 | $9,200.00 | $10,500 | $7,800.00 |
| 0260 | Mitered end section, optional round, 24" CD (0430-982129) | EACH | 1 | $4,155.00 | $4,150.00 | $4,130.97 | $3,900.00 | $6,170.00 | $3,700.00 |
| 0265 | Mitered end sect, optional /ellip/arch, 30" SD (0430-984633) | EACH | 2 | $5,050.00 | $5,350.00 | $5,307.60 | $4,400.00 | $8,012.00 | $4,500.00 |
| 0270 | Mitered end sect, optional /ellip/arch, 36" SD (0430-984638) | EACH | 2 | $8,425.00 | $7,200.00 | $8,715.81 | $7,100.00 | $11,275 | $7,500.00 |
| 0275 | Edgedrain draincrete, (0446-1-1) | LF | 3,850 | $30.00 | $49.29 | $43.08 | $46.40 | $50.00 | $39.00 |
| 0280 | Edgedrain outlet pipe, 4" (0446-71-1) | LF | 321 | $49.00 | $55.25 | $45.80 | $54.00 | $58.00 | $33.00 |
| 0285 | Concrete curb & gutter, type F (0520-1-10) | LF | 1,038 | $25.00 | $43.59 | $30.14 | $39.00 | $44.00 | $23.10 |
| 0290 | Concrete curb, type D (0520-2-4) | LF | 4,310 | $23.00 | $44.00 | $28.62 | $40.00 | $43.00 | $22.05 |
| 0295 | Concrete curb, toll header curb (0520-2-10) | LF | 388 | $28.00 | $49.00 | $31.88 | $35.00 | $43.00 | $36.20 |
| 0300 | Concrete traffic separator, special- variable width (0520-70) | SY | 1,622 | $78.25 | $82.50 | $84.68 | $71.00 | $71.00 | $74.28 |
| 0305 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 3,382 | $43.00 | $49.00 | $57.32 | $69.00 | $102.00 | $46.35 |
| 0310 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 1,540 | $57.50 | $73.00 | $73.95 | $72.80 | $76.00 | $60.39 |
| 0315 | Detectable warnings (0527-2) | SF | 77 | $25.00 | $32.50 | $42.51 | $30.00 | $35.00 | $38.50 |
| 0320 | Riprap, rubble, F&I, ditch lining (0530-3-4) | TN | 19.80 | $350.00 | $535.25 | $163.79 | $338.00 | $568.00 | $300.00 |
| 0321 | Bedding stone (0530-74) | TN | 14.80 | $351.00 | $539.95 | $175.79 | $271.00 | $696.00 | $300.00 |
| 0325 | Fencing, type A, 0.0-5.0', standard (0550-10110) | LF | 42 | $23.50 | $44.00 | $12.22 | $14.90 | $21.00 | $22.50 |
| 0330 | Fencing, type A, 10.1-12.0', special features (0550-10169) | LF | 4,367 | $55.30 | $76.85 | $70.12 | $30.90 | $57.00 | $52.50 |
| 0335 | Fencing, type B, 0.0-5.0', standard features (0550-10210) | LF | 405 | $35.00 | $35.26 | $30.39 | $24.50 | $24.00 | $33.41 |
| 0340 | Fencing, type B, 5.1-6.0', standard (0550-10220) | LF | 974 | $32.00 | $28.50 | $26.44 | $26.60 | $24.00 | $30.50 |
| 0345 | Fencing, type B, 5.1-6.0', W/ barb wire attmt (0550-10221) | LF | 378 | $44.00 | $35.00 | $35.18 | $27.70 | $28.00 | $41.96 |
| 0350 | Fence gate, type B, single, 0- 6.0' opening (0550-60211) | EACH | 6 | $410.00 | $2,150.00 | $1,783.22 | $2,600.00 | $1,600.00 | $389.25 |
| 0355 | Fence gate, type B, double, 6.1- 12.0' opening (0550-60222) | EACH | 3 | $1,100.00 | $3,500.00 | $2,946.42 | $3,700.00 | $2,480.00 | $1,047.75 |
| 0360 | Fence gate, type B, sliding/cantilever, 6.1-12' (0550-60232) | EACH | 1 | $3,450.00 | $7,500.00 | $6,378.10 | $4,700.00 | $4,600.00 | $3,278.16 |
| 0365 | Fence gate,special, single, 6.1- 12.0' opening (0550-60912) | EACH | 3 | $1,898.00 | $3,124.00 | $2,577.12 | $3,700.00 | $3,260.00 | $1,800.75 |
| 0370 | Performance turf, sod (0570-1-2) | SY | 133,396 | $3.20 | $4.25 | $3.81 | $2.96 | $6.00 | $4.00 |
| 0375 | Conduit, furnish & install, open trench (0630-2-11) | LF | 40,784 | $33.00 | $26.90 | $29.78 | $27.30 | $29.70 | $25.62 |
| 0380 | Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13) | EACH | 2 | $4,808.00 | $5,293.29 | $4,146.71 | $5,370.00 | $4,135.00 | $5,041.23 |
| 0385 | Pull box, HS-20, furnish & 24" X 36" (0635-2219) | EACH | 42 | $3,905.00 | $2,743.68 | $3,375.34 | $2,780.00 | $3,355.00 | $2,613.03 |
| 0390 | Pull box, HS-20, furnish & 13" X 24" (0635-2220) | EACH | 42 | $1,271.00 | $1,691.40 | $1,099.78 | $1,710.00 | $1,093.00 | $1,610.86 |
| 0395 | EV power conduit vault, 11' X 21' 9.5' (10' X 20' X 8') (0635-2221) | EACH | 5 | $82,133 | $113,472 | $70,789 | $115,000 | $70,765 | $108,068 |
| 0400 | Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130) | LS | 1 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 |
| 0405 | Loop assembly, F&I, type B (0660-2102) | AS | 1 | $2,340.00 | $2,496.20 | $2,034.36 | $2,500.00 | $2,025.00 | $2,377.33 |
| 0410 | Raised pavement marker, type B (0706-1-3) | EACH | 1,466 | $4.90 | $4.73 | $6.05 | $4.80 | $4.50 | $5.00 |
| 0415 | Disputes review board, meeting- DO not bid (0999-20-1) | DA | 10 | $4,800.00 | $4,800.00 | $4,800.00 | $4,800.00 | $4,800.00 | $4,800.00 |
| 0420 | Disputes review board, hearing- DO not bid (0999-20-2) | EACH | 2 | $5,750.00 | $5,750.00 | $5,750.00 | $5,750.00 | $5,750.00 | $5,750.00 |
| 0425 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $150,000 | $150,000 | $150,000 | $150,000 | $150,000 | $150,000 |
| 0430 | Ground-in rumble strips, 16" (0546-72-1) | GM | 1.18 | $17,095 | $3,342.53 | $16,064 | $6,700.00 | $3,756.37 | $16,200 |
| 0435 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 28 | $655.00 | $625.00 | $504.15 | $890.00 | $500.00 | $837.55 |
| 0440 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 10 | $2,728.00 | $2,500.00 | $2,005.00 | $2,370.00 | $2,000.00 | $2,231.82 |
| 0445 | Single column ground sign assembly, relocate (0700-1500) | EACH | 3 | $273.00 | $550.00 | $505.00 | $550.00 | $500.00 | $518.58 |
| 0450 | Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114) | EACH | 2 | $8,200.00 | $9,500.00 | $9,045.00 | $6,750.00 | $9,000.00 | $6,335.43 |
| 0455 | Multi-column ground sign assembly, F&I ground mount, 100.0 SF (0700-2115) | EACH | 2 | $13,000 | $14,000 | $12,075 | $8,600.00 | $12,000 | $8,154.25 |
| 0460 | Multi-column ground sign assembly, F&I ground mount, 1-200.0 SF (0700-2116) | EACH | 1 | $20,000 | $16,000 | $15,086 | $11,000 | $15,000 | $10,350 |
| 0465 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 19 | $105.00 | $135.00 | $125.66 | $77.00 | $250.00 | $73.07 |
| 0470 | Enhanced highway sign AC powered, F&I ground mount, highlighted sign <12 SF (0700-141140) | EACH | 4 | $11,000 | $10,200 | $9,821.90 | $3,450.00 | $9,801.90 | $3,247.06 |
| 0475 | Delineator, non-flexible (0705-11-2) | EACH | 40 | $125.00 | $120.00 | $100.95 | $340.00 | $100.00 | $318.14 |
| 0480 | Raised pavement marker, type B (0706-1-3) | EACH | 1,286 | $4.90 | $4.73 | $6.06 | $4.80 | $4.50 | $5.25 |
| 0485 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 244 | $5.40 | $5.25 | $16.05 | $5.35 | $5.00 | $2.85 |
| 0490 | Painted pavement markings, surface (0710-90) | LS | 1 | $22,000 | $21,000 | $36,441 | $21,000 | $20,000 | $32,250 |
| 0495 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 266 | $4.20 | $4.10 | $5.80 | $4.20 | $3.90 | $5.00 |
| 0500 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 3,347 | $4.90 | $4.78 | $6.80 | $4.85 | $4.55 | $6.00 |
| 0505 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 1.33 | $1,951.00 | $1,890.00 | $2,352.63 | $1,920.00 | $1,800.00 | $2,800.00 |
| 0510 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 22 | $218.00 | $210.00 | $185.70 | $214.00 | $200.00 | $225.00 |
| 0515 | Thermoplastic, standard, arrow (0711-11170) | EACH | 43 | $109.00 | $105.00 | $85.25 | $107.00 | $100.00 | $85.00 |
| 0520 | Thermoplastic, standard, yield line (0711-11180) | LF | 34 | $16.40 | $15.75 | $12.15 | $16.00 | $15.00 | $15.00 |
| 0525 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 923 | $5.00 | $4.78 | $5.80 | $4.85 | $4.55 | $6.25 |
| 0530 | Thermoplastic, standard, blue, solid,6" (0711-11421) | LF | 1,129 | $4.40 | $4.25 | $8.10 | $4.35 | $4.05 | $6.25 |
| 0535 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 465 | $16.00 | $15.75 | $16.12 | $16.00 | $15.00 | $17.00 |
| 0540 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 5.96 | $5,300.00 | $5,145.00 | $5,209.75 | $5,221.00 | $4,900.00 | $5,500.00 |
| 0545 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.43 | $9,100.00 | $8,925.00 | $6,961.50 | $9,058.00 | $8,500.00 | $6,800.00 |
| 0550 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 1.97 | $4,500.00 | $4,410.00 | $5,199.96 | $4,475.00 | $4,200.00 | $5,500.00 |
| 0555 | Permanent tape, white, 3-9 dotted, 6" wide, for concrete surfaces (0713-103171) | GM | 0.49 | $11,000 | $11,025 | $16,109 | $11,190 | $10,500 | $12,500 |
| 0560 | Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181) | GM | 2.42 | $10,000 | $9,975.00 | $13,010 | $10,120 | $9,500.00 | $12,500 |
| 0565 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.03 | $50,000 | $51,450 | $36,794 | $52,200 | $49,000 | $50,000 |
| 0570 | Permanent tape, black, 3-9 dotted, 6" wide, for concrete surfaces (0713-103371) | GM | 0.49 | $11,000 | $11,025 | $16,101 | $11,190 | $10,500 | $12,500 |
| 0575 | Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381) | GM | 2.42 | $9,800.00 | $9,975.00 | $13,015 | $10,120 | $9,500.00 | $12,500 |
| 0580 | Conduit, furnish & install, open trench (0630-2-11) | LF | 16,827 | $11.85 | $12.17 | $10.70 | $12.35 | $10.70 | $11.59 |
| 0585 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 141 | $1,092.00 | $1,329.21 | $974.00 | $1,340.00 | $975.00 | $1,265.91 |
| 0590 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 1 | $2,189.00 | $2,376.02 | $1,952.78 | $2,410.00 | $1,955.00 | $2,262.88 |
| 0595 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 79,578 | $2.32 | $2.10 | $2.14 | $2.13 | $2.15 | $2.00 |
| 0600 | Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13) | LF | 32,874 | $4.40 | $3.69 | $4.08 | $3.74 | $4.05 | $3.51 |
| 0605 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 1 | $20,108 | $24,291 | $17,946 | $24,600 | $17,930 | $23,135 |
| 0610 | Light pole complete, F&I, standard pole standard foundation, 30' mounting height, 8' arm length (0715-61111) | EACH | 16 | $11,717 | $12,451 | $10,458 | $12,600 | $10,450 | $11,858 |
| 0615 | Light pole complete, F&I, standard pole standard foundation, 35' mounting height, 8' arm length (0715-61211) | EACH | 30 | $11,925 | $12,612 | $10,646 | $12,700 | $10,635 | $12,011 |
| 0620 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 0' arm length (0715-61300) | EACH | 15 | $11,965 | $12,649 | $10,678 | $12,800 | $10,670 | $12,046 |
| 0625 | Light pole complete, F&I, STD pole STD foundation, wildlife sensitive luminaire, 25' mounting height, 8' arm length (0715-61811) | EACH | 15 | $11,380 | $12,191 | $10,153 | $12,300 | $10,150 | $11,611 |
| 0630 | Light pole complete, F&I, double arm pole, median barrier or traffic railing mount, 40' mounting height, 12' arm (0715-63342) | EACH | 17 | $20,500 | $20,163 | $18,888 | $20,400 | $18,880 | $19,203 |
| 0635 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 93 | $697.00 | $735.70 | $622.38 | $745.00 | $625.00 | $700.67 |
| 0640 | Bollards (0519-78) | EACH | 16 | $3,215.00 | $1,150.00 | $873.87 | $2,465.00 | $1,775.00 | $1,300.00 |
| 0645 | Architectural, building, new, rest area (0750-1-11) | SF | 1 | $9,435,000 | $4,821,577 | $6,251,024 | $8,223,300 | $6,692,225 | $8,762,721 |
| 0650 | Architectural, building, new, storage/mechanical (0750-1-17) | SF | 1 | $435,000 | $1,131,145 | $989,580 | $416,000 | $1,059,215 | $528,753 |
| 0655 | Architectural-water, sanitary sewer/sewage treatment (0751-5) | LS | 1 | $2,825,000 | $3,259,620 | $2,429,108 | $1,857,000 | $2,751,920 | $3,481,331 |
| 0660 | Architectural, picnic pavilion, small (0751-30-1) | EACH | 4 | $69,000 | $49,755 | $46,334 | $66,000 | $94,140 | $89,293 |
| 0665 | Trash receptacle (0751-37) | EACH | 40 | $3,100.00 | $4,200.00 | $3,589.78 | $2,965.00 | $3,760.00 | $1,425.00 |
| 0670 | Trash receptacle- ash urn (0751-37-1) | EACH | 38 | $1,065.00 | $2,150.00 | $569.88 | $990.00 | $850.00 | $640.00 |
| 0675 | Trash receptacle- dog waste (0751-37-2) | EACH | 2 | $1,713.00 | $2,900.00 | $539.31 | $1,570.00 | $1,925.00 | $3,000.00 |
| 0680 | Bench, F&I, concrete (0751-38-13) | EACH | 2 | $2,970.00 | $2,989.00 | $1,339.52 | $2,720.00 | $10,210 | $4,100.00 |
| 0685 | Flag pole, 26-35' (0751-44-2) | EACH | 3 | $11,884 | $30,890 | $13,689 | $12,000 | $22,860 | $14,350 |
| 0690 | Existing ITS maintenance (0102-112) | DA | 430 | $193.00 | $165.00 | $172.41 | $169.90 | $175.00 | $159.50 |
| 0695 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 1.45 | $4,540.00 | $180.00 | $3,994.38 | $3,900.00 | $4,065.00 | $3,767.50 |
| 0700 | Itsfm location documentation- ITS site (0611-2-2) | EACH | 34 | $2,522.00 | $2,180.00 | $2,259.36 | $2,220.00 | $2,250.00 | $2,084.50 |
| 0705 | Itsfm location documentation- communications building (0611-2-3) | EACH | 1 | $4,619.00 | $4,065.00 | $4,129.89 | $4,065.00 | $4,120.00 | $3,817.00 |
| 0710 | Conduit, furnish & install, open trench (0630-2-11) | LF | 11,988 | $12.00 | $16.12 | $10.74 | $16.30 | $10.70 | $15.35 |
| 0715 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 2,862 | $31.00 | $25.18 | $27.88 | $25.50 | $27.75 | $23.98 |
| 0720 | Conduit, furnish & install, aboveground (0630-2-14) | LF | 500 | $24.50 | $54.34 | $21.99 | $55.10 | $21.90 | $51.75 |
| 0725 | Fiber optic cable, F&I, underground,2-12 fibers (0633-1121) | LF | 5,995 | $4.70 | $4.82 | $4.16 | $4.80 | $4.10 | $4.59 |
| 0730 | Fiber optic cable, F&I, underground,13-48 fibers (0633-1122) | LF | 3,899 | $5.20 | $5.28 | $4.62 | $5.30 | $4.60 | $5.03 |
| 0735 | Fiber optic cable, F&I, underground,49-96 fibers (0633-1123) | LF | 2,658 | $5.70 | $5.74 | $5.12 | $5.80 | $5.05 | $5.47 |
| 0740 | Fiber optic cable, relocate, underground (0633-1420) | LF | 945 | $3.30 | $3.72 | $2.99 | $3.75 | $3.00 | $3.54 |
| 0745 | Fiber optic cable, remove, underground (0633-1620) | LF | 1,984 | $2.00 | $1.73 | $1.82 | $1.75 | $1.80 | $1.65 |
| 0750 | Fiber optic connection, install, splice (0633-2-31) | EACH | 472 | $60.00 | $51.98 | $53.51 | $52.75 | $53.50 | $49.50 |
| 0755 | Fiber optic connection hardware, F&I, splice enclosure (0633-3-11) | EACH | 4 | $1,630.00 | $1,414.88 | $1,458.07 | $1,430.00 | $1,455.00 | $1,347.50 |
| 0760 | Fiber optic connection hardware, F&I, splice tray (0633-3-12) | EACH | 39 | $66.00 | $57.75 | $59.52 | $58.50 | $59.35 | $55.00 |
| 0765 | Fiber optic connection hardware, F&I, preterminated connector assembly (0633-3-13) | EACH | 300 | $87.00 | $75.08 | $77.26 | $76.20 | $77.15 | $71.50 |
| 0770 | Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16) | EACH | 12 | $1,524.00 | $1,322.48 | $1,360.19 | $1,340.00 | $1,360.00 | $1,259.50 |
| 0775 | Fiber optic connection hardware, F&I, connector panel (0633-3-17) | EACH | 25 | $133.00 | $115.50 | $131.06 | $117.00 | $118.50 | $110.00 |
| 0780 | Fiber optic connection hardware, adjust/modify patch panel (0633-3-56) | EACH | 2 | $566.00 | $490.88 | $505.47 | $498.00 | $504.50 | $467.50 |
| 0785 | Fiber optic cable locator (0633-6) | DA | 430 | $180.00 | $142.40 | $160.64 | $144.00 | $160.25 | $135.62 |
| 0790 | Multi-conductor cable, furnish & install, cat 6 (0633-8-11) | LF | 7,084 | $3.70 | $6.74 | $3.29 | $6.80 | $3.25 | $6.42 |
| 0795 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 103 | $1,092.00 | $1,570.67 | $974.85 | $1,590.00 | $973.85 | $1,495.88 |
| 0800 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 32 | $2,490.00 | $2,629.40 | $2,221.26 | $2,660.00 | $2,220.00 | $2,504.19 |
| 0805 | Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13) | EACH | 3 | $3,763.00 | $4,845.77 | $3,365.14 | $4,900.00 | $3,355.00 | $4,615.02 |
| 0810 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 2 | $8,115.00 | $5,844.83 | $7,246.13 | $5,900.00 | $7,235.00 | $5,566.66 |
| 0815 | Electrical power service, remove underground (0639-1620) | AS | 1 | $720.00 | $965.44 | $642.89 | $970.00 | $640.00 | $919.47 |
| 0820 | Electrical service wire, & install (0639-2-1) | LF | 4,846 | $8.20 | $9.64 | $7.28 | $9.70 | $7.25 | $9.18 |
| 0825 | Electrical service wire, (0639-2-6) | LF | 529 | $0.48 | $0.97 | $0.44 | $0.98 | $0.45 | $0.92 |
| 0830 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 13 | $2,012.00 | $27,902 | $1,796.65 | $2,820.00 | $1,795.00 | $2,650.01 |
| 0835 | Electrical power service- transformer, F&I, <5 kva, single phase, copper windings (0639-6111) | EACH | 8 | $1,523.00 | $2,275.44 | $1,359.46 | $2,300.00 | $1,360.00 | $2,167.09 |
| 0840 | Electrical power service- transformer, F&I, 5-10 kva, phase, copper windings (0639-6121) | EACH | 4 | $3,048.00 | $3,932.22 | $2,724.66 | $3,990.00 | $2,720.00 | $3,744.97 |
| 0845 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 9 | $1,555.00 | $2,633.72 | $1,389.22 | $2,673.00 | $1,385.00 | $2,508.30 |
| 0850 | Prestressed concrete pole, type P-III (0641-2-13) | EACH | 30 | $14,153 | $5,655.65 | $12,622 | $5,740.00 | $12,620 | $5,386.33 |
| 0855 | Vehicle detection system- wrong way for exit ramp, 1 or 2 lanes, AC powered (0660-7-21) | EACH | 1 | $54,790 | $44,890 | $48,866 | $45,000 | $48,860 | $42,752 |
| 0860 | Vehicle detection system- parking detection system, furnish & install, sensor- camera (0660-12-11) | EACH | 48 | $4,583.00 | $2,989.27 | $4,090.00 | $3,075.00 | $4,090.00 | $2,888.59 |
| 0865 | Vehicle detection system- parking detection system, furnish & install, central software (0660-12-14) | EACH | 1 | $49,437 | $40,480 | $44,100 | $41,000 | $44,085 | $38,552 |
| 0870 | ITS cabinet, furnish & install, pole mount with sunshield, 24" W X 46" H X 22" D (0676-2122) | EACH | 6 | $11,580 | $8,623.25 | $10,331 | $8,750.00 | $10,325 | $8,212.62 |
| 0875 | ITS cabinet, furnish & install, base mount, 334, 24" W X 66" H X 30" D (0676-2143) | EACH | 6 | $13,940 | $13,994 | $12,430 | $14,200 | $12,425 | $13,328 |
| 0880 | Small equipment enclosure, furnish and install, less than 10"W X 13"H X 11" D (0676-3-10) | EACH | 25 | $2,229.00 | $1,421.47 | $1,991.60 | $1,440.00 | $1,990.00 | $1,353.78 |
| 0885 | ITS CCTV camera, non- pressurized, IP, high definition (0682-1173) | EACH | 6 | $9,966.00 | $8,316.00 | $8,891.40 | $8,440.00 | $8,890.00 | $7,920.00 |
| 0890 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 13 | $9,284.00 | $8,056.13 | $8,284.67 | $8,175.00 | $8,280.00 | $7,672.50 |
| 0895 | Managed field ethernet switch, adjust / modify (0684-1-5) | EACH | 2 | $300.00 | $259.88 | $268.42 | $263.00 | $267.00 | $247.50 |
| 0900 | Uninterruptible power supply, furnish and install, online/double conversion (0685-1-12) | EACH | 12 | $9,327.00 | $6,007.79 | $8,319.12 | $6,097.00 | $8,317.00 | $5,721.70 |
| 0905 | Remote power management rpmu, furnish and install (0685-2-1) | EACH | 12 | $890.00 | $862.56 | $795.64 | $875.00 | $795.00 | $821.49 |
| 0910 | Embedded dynamic message furnish & install- without UPS, full color, UP to 12 SF (0700-7231) | EACH | 1 | $18,391 | $16,095 | $24,504 | $16,000 | $16,400 | $15,329 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of June 10, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.