FDOT contract T7502 bid tabulation

SR 60 (USB 41 / SR 685 / W KENNEDY BLVD) FROM W OF S WOOD... Let by Florida DOT on January 29, 2025, Hillsborough, District 7. 2 bids received; low bid $23,013,040 by Watson Civil Construction, Inc..

Owner
Florida DOT
Letting
29 JAN 2025
Pay items
202
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Watson Civil Construction, Inc.$23,013,040Low
2Superior Construction Company Southeast, LLC$28,000,000+22%
FDOT contract T7502: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Watson Civil Construction, Inc.2. Superior Construction Company Southeast, LLC
0005Mobilization (0101-1)LS1$400,000$1,120,795
0010Mobilization (0101-1)LS1$1,480,000$1,321,255
0015Mobilization (0101-1)LS1$210,000$154,125
0020Mobilization (0101-1)LS1$210,000$203,570
0025Maintenance of traffic (0102-1)DA1$570,000$100,000
0030Maintenance of traffic (0102-1)DA1$1,982,000$500,000
0035Maintenance of traffic (0102-1)DA1$350,000$10,000
0040Maintenance of traffic (0102-1)DA1$350,000$500,000
0045Special detour- temporary pavement (0102-2200)SY1$49,000$320,000
0050Special detour- temporary earthwork/base (0102-2300)CY1$31,000$340,000
0055Commercial material for temporary driveway maintenance (0102-3)CY285.80$133.00$485.00
0060Pedestrian or bicycle special detour (0102-4-1)SY1$43,000$50,000
0065Traffic control officer (0102-14)HR1,548$100.00$130.00
0070Work zone sign (0102-60)ED262,116$0.33$0.20
0075Business sign (0102-61)EACH93$44.00$30.00
0080Temporary barrier, F&I, low profile, concrete (0102-71-13)LF3,295$40.00$38.00
0085Temporary barrier, relocate, low profile concrete (0102-71-23)LF3,246$12.50$24.00
0090Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED428,120$0.15$0.10
0095Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD3,249,809$0.06$0.05
0100Arrow board / advance warning arrow panel (0102-76)ED1,100$7.50$5.00
0105Portable changeable message sign, temporary (0102-99)ED2,588$15.00$9.00
0110Temporary signalization and maintenance, intersection (0102-104)ED4,600$45.00$60.30
0115Temporary traffic detection and maintenance, intersection (0102-107-1)ED4,600$40.00$1.00
0120Type III barricade (0102-115)ED30,420$0.30$0.25
0125Sediment barrier (0104-10-3)LF10,599$5.50$4.00
0130Inlet protection system (0104-18)EACH126$125.00$450.00
0135Litter removal (0107-1)ACRE48.41$145.00$1,250.00
0140Mowing (0107-2)ACRE20.03$270.00$1,350.00
0145Monitor existing structures- inspection and settlement monitoring (0108-1)LS1$30,000$350,000
0150Clearing & grubbing (0110-1-1)ACRE1$1,325,000$2,888,235
0155Clearing & grubbing (0110-1-1)ACRE1$250,000$1,258,730
0160Removal of existing concrete (0110-4-10)SY12,437$26.00$30.00
0165Regular excavation (0120-1)CY4,081.40$30.00$27.00
0170Embankment (0120-6)CY2,727.50$15.00$39.00
0175Optional base, base group 15 (0285-715)SY5,659$105.00$110.00
0180Milling existing asphalt pavement, 3" avg depth (0327-70-4)SY19,809$3.55$3.60
0185Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY24,352$2.90$3.00
0190Milling existing asphalt pavement, 5" avg depth (0327-70-10)SY7,133$6.55$7.00
0195Superpave asphaltic conc, traffic B (0334-1-12)TN0.10$132,000$151,000
0200Superpave asphaltic concrete, traffic B, PG76-22 (0334-1-52)TN3,940.90$211.00$236.00
0205Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81)TN4,680.20$217.00$220.00
0210Restore spalled areas, latex modified mortar- acrylic (0401-70-3)CF93.10$260.00$2,310.00
0215Inlets, curb, type 9, <10' (0425-1201)EACH3$7,900.00$17,600
0220Inlets, curb, type P-1, <10' (0425-1311)EACH16$12,000$22,360
0225Inlets, curb, type P-2, <10' (0425-1321)EACH3$11,000$21,200
0230Inlets, curb, type P-3, <10' (0425-1331)EACH2$9,700.00$19,775
0235Inlets, curb, type P-4, <10' (0425-1341)EACH2$9,700.00$20,400
0240Inlets, curb, type P-5, <10' (0425-1351)EACH26$10,500$22,600
0245Inlets, curb, type P-6, <10' (0425-1361)EACH9$11,000$23,000
0250Inlets, curb, type J-4, <10' (0425-1441)EACH1$26,000$152,060
0255Inlets, curb, type J-5, <10' (0425-1451)EACH5$14,500$24,600
0260Inlets, curb, type J-6, <10' (0425-1461)EACH2$17,000$27,400
0265Inlets, curb, type 7, J bot , <10' (0425-1473)EACH1$25,000$93,300
0270Inlets, DT bot, type C,<10' (0425-1521)EACH3$7,800.00$17,200
0275Inlets, gutter, type V, <10' (0425-1711)EACH6$8,800.00$16,205
0280Inlets, gutter, type V, J bot, <10' (0425-1713)EACH2$15,000$21,300
0285Manholes, P-7, <10' (0425-2-41)EACH7$7,000.00$18,300
0290Manholes, J-7, <10' (0425-2-71)EACH5$17,500$53,400
0295Manhole, adjust (0425-5)EACH13$1,900.00$5,220.00
0300Manhole, type 7, partial, cast in place (0425-100-22)EACH5$67,000$151,800
0305Pipe culvert,optional material,round, 15"S/CD (0430-175115)LF4$590.00$1,875.00
0310Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF4,477$191.00$305.00
0315Pipe culvert,optional material,round, 24"S/CD (0430-175124)LF1,474$236.00$390.00
0320Pipe culvert, opt material, round, 30"S/CD (0430-175130)LF496$314.00$510.00
0325Pipe culvert, opt material, round, 36"S/CD (0430-175136)LF432$377.00$445.00
0330Pipe culvert, opt material, round, 42"S/CD (0430-175142)LF379$463.00$515.00
0335Pipe culvert,optional material,other-elip/arch, (0430-175215)LF29$312.00$575.00
0340Pipe culvert,optional material,other-elip/arch, (0430-175218)LF671$268.00$400.00
0345Pipe culvert,optional material,other shape-elip/arch, 24"S/CD (0430-175224)LF4$909.00$2,850.00
0350Pipe culvert, opt material, shape - elip/arch, 30"S/CD (0430-175230)LF215$427.00$830.00
0355Pipe culvert, opt material, shape - elip/arch, 36"S/CD (0430-175236)LF98$552.00$535.00
0360Pipe culvert, opt material, shape - elip/arch, 42"S/CD (0430-175242)LF470$669.00$690.00
0365Pipe culvert, opt material, shape - elip/arch, 48"S/CD (0430-175248)LF4$1,890.00$5,320.00
0370Pipe filling and plugging- place out of service (0430-830)CY10$2,300.00$1,100.00
0375Pipe liner, cured in place, 15" (0431-1115)LF21$510.00$845.00
0380Pipe liner, cured in place, 18" (0431-1118)LF263$230.00$365.00
0385Pipe liner, cured in place, 24" (0431-1124)LF164$280.00$385.00
0390Sheet piling steel, temporary- critical (0455-133-2)SF7,395$67.00$15.00
0395Concrete curb & gutter, type E (0520-1-7)LF5,139$52.00$57.25
0400Concrete curb & gutter, type F (0520-1-10)LF7,230$53.00$57.50
0405Concrete curb & gutter, variable height type F (0520-1-11)LF704$96.00$85.50
0410Concrete curb & gutter, type F with special gutter profile (0520-1-12)LF3,226$61.00$60.00
0415Concrete curb, type D (0520-2-4)LF364$103.00$96.00
0420Traffic separator concrete- type I, 4' wide (0520-5-11)LF1,175$87.00$45.85
0425Concrete traffic separator, special- variable width (0520-70)SY995$145.00$94.35
0430Concrete sidewalk and driveways, 4" thick (0522-1)SY8,503$60.00$94.65
0435Concrete sidewalk and driveways, 6" thick (0522-2)SY5,206$82.00$115.00
0440Patterned pavement (0523-3)SY1,616$177.00$225.00
0445Pavers, architectural, (0526-1-2)SY1,983$220.00$215.00
0450Detectable warnings (0527-2)SF1,905$44.00$30.00
0455Performance turf, sod (0570-1-2)SY2,891$11.00$20.00
0460Conduit, furnish & install, directional bore (0630-2-12)LF35$41.00$43.65
0465Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH2$1,900.00$1,220.00
0470Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1)EACH4$2,750.00$2,403.00
0475Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12)EACH4$2,700.00$1,791.00
0480Raised pavement marker, type B (0706-1-3)EACH2,167$3.90$3.75
0485Painted pavement markings, standard, white, solid, 6" (0710-11101)GM7.65$1,600.00$1,500.00
0490Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF22,727$1.15$1.10
0495Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124)LF182$1.25$1.20
0500Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF22,205$1.60$1.50
0505Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM5.77$520.00$500.00
0510Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM4.02$670.00$650.00
0515Painted pavement markings, standard, white, message or symbol (0710-11160)EACH21$37.00$35.00
0520Painted pavement markings, standard, white, arrows (0710-11170)EACH205$37.00$35.00
0525Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM9.31$1,600.00$1,500.00
0530Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224)LF4,158$1.45$1.40
0535Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241)GM0.23$675.00$650.00
0540Single component injection (0906-173100)GA1,155$124.00$110.00
0545Initial contingency amount, DO not bid (0999-25)LS1$40,000$40,000
0550Initial contingency amount, DO not bid (0999-25)LS1$90,000$90,000
0555Initial contingency amount, DO not bid (0999-25)LS1$10,000$10,000
0560Initial contingency amount, DO not bid (0999-25)LS1$10,000$10,000
0565Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH108$910.00$616.00
0570Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH52$2,400.00$2,282.00
0575Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113)EACH4$2,800.00$3,248.00
0580Single column ground sign assembly, relocate (0700-1500)EACH10$690.00$319.00
0585Single column ground sign assembly, remove (0700-1600)EACH103$245.00$107.00
0590Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH1$255.00$458.00
0595Sign panel, furnish & install overhead mount, 21-30 SF (0700-3203)EACH4$2,200.00$1,995.00
0600Sign panel, furnish & install overhead mount, 101-200 SF (0700-3206)EACH2$8,100.00$8,939.00
0605Sign panel, relocate, UP to 12 SF (0700-3501)EACH12$410.00$319.00
0610Sign panel, remove, UP to 12 SF (0700-3601)EACH1$27.00$105.00
0615Sign panel, remove, 21-30 SF (0700-3603)EACH4$55.00$201.00
0620Sign panel, remove, 101-200 SF (0700-3606)EACH2$325.00$1,422.00
0625Retroreflective sign strip- furnish and install, 2' (0700-13-12)EACH1$155.00$85.00
0630Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH34$165.00$193.00
0635Tubular marker, 36" white post (0704-1-3)EACH6$160.00$215.00
0640Tubular marker, 36" yellow (0704-1-4)EACH25$160.00$215.00
0645Object marker, type 1 (0705-10-1)EACH1$236.00$200.00
0650Raised pavement marker, type B (0706-1-3)EACH1,271$4.00$3.75
0655Painted pavement markings, standard, yellow, island nose (0710-11290)SF76$5.20$5.00
0660Painted pavement markings, surface (0710-90)LS1$27,000$28,950
0665Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF5,437$3.25$3.15
0670Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF331$4.90$4.70
0675Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF1,295$6.45$6.25
0680Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.34$2,100.00$2,000.00
0685Thermoplastic, standard, message or symbol (0711-11160)EACH11$190.00$185.00
0690Thermoplastic, standard, arrow (0711-11170)EACH120$49.00$47.00
0695Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF207$4.60$4.40
0700Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.08$1,900.00$2,000.00
0705Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF3,300$16.50$15.60
0710Thermoplastic, preformed, white, arrow (0711-14170)EACH1$245.00$233.00
0715Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM5.06$4,800.00$4,632.00
0720Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102)GM0.10$6,100.00$6,176.00
0725Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM2.44$1,200.00$1,158.00
0730Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM3.38$4,500.00$4,340.00
0735Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231)GM0.30$1,200.00$1,085.00
0740Itsfm subsurface documentation- project length (0611-1-1)MI1.71$5,100.00$1,665.00
0745Itsfm location documentation- intersection (0611-2-1)EACH5$4,000.00$1,655.00
0750Conduit, furnish & install, open trench (0630-2-11)LF970$32.00$35.95
0755Conduit, furnish & install, directional bore (0630-2-12)LF2,395$52.00$38.70
0760Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI5$12,800$24,008
0765Fiber optic cable, F&I, underground,2-12 fibers (0633-1121)LF1,945$6.70$4.75
0770Fiber optic connection, install, splice (0633-2-31)EACH60$80.00$57.00
0775Fiber optic connection, install, termination (0633-2-32)EACH60$115.00$82.00
0780Fiber optic connection hardware, F&I, splice (0633-3-11)EACH4$2,000.00$1,422.00
0785Fiber optic connection hardware, F&I, splice tray (0633-3-12)EACH4$88.00$62.00
0790Fiber optic connection hardware, F&I, preterminated patch panel (0633-3-15)EACH5$3,400.00$2,434.00
0795Fiber optic cable locator (0633-6)DA550$400.00$379.00
0800Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH28$1,900.00$1,220.00
0805Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH14$3,900.00$3,283.00
0810Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13)EACH5$7,500.00$6,723.00
0815Pull & splice box, F&I, 17" X 30" cover size (0635-2-14)EACH53$2,700.00$1,849.00
0820Electrical power service, F&I, underground, meter by contractor (0639-1122)AS5$5,700.00$5,740.00
0825Electrical service wire, & install (0639-2-1)LF305$12.60$7.95
0830Electrical service disconnect, F&I, pole mount (0639-3-11)EACH3$1,550.00$1,848.00
0835Prestressed concrete pole, type P-II service pole (0641-2-12)EACH8$2,600.00$2,514.00
0840Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60)EACH1$515.00$303.00
0845Prestressed concrete pole, shallow pole removal- pole 30' and greater (0641-2-70)EACH1$5,450.00$10,232
0850Aluminum signals pole, (0646-1-11)EACH42$2,800.00$2,587.00
0855Aluminum signals pole, remove (0646-1-60)EACH15$345.00$303.00
0860Steel mast arm assembly, and install, double arm 40'-40' (0649-21-5)EACH1$103,000$86,379
0865Steel mast arm assembly, and install, double arm 50'-30' (0649-21-7)EACH1$109,000$91,769
0870Steel mast arm assembly, and install, double arm 50'-40' (0649-21-8)EACH2$114,000$94,930
0875Steel mast arm assembly, and install, double arm 60'-40' (0649-21-12)EACH2$125,000$102,027
0880Steel mast arm assembly, and install, single arm 70' (0649-21-15)EACH2$97,000$83,919
0885Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS38$1,600.00$1,523.00
0890Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16)AS6$2,100.00$2,019.00
0895Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS36$875.00$907.00
0900Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12)AS8$1,900.00$1,848.00
0905Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60)AS5$260.00$51.00
0910Vehicle detection system- microwave, furnish & install cabinet equipment (0660-3-11)EACH2$13,600$5,922.00
0915Vehicle detection system- microwave, furnish & install, above ground equipment (0660-3-12)EACH8$14,200$10,707
0920Vehicle detection system- furnish & install cabinet equipment (0660-4-11)EACH1$37,000$30,272
0925Vehicle detection system- furnish & install above ground equipment (0660-4-12)EACH1$7,300.00$6,107.00
0930Pedestrian detector, furnish & install, standard (0665-1-11)EACH52$485.00$347.00
0935Pedestrian detector, remove- pole/pedestal to remain (0665-1-60)EACH5$57.00$51.00
0940Traffic controller assembly, F&I, NEMA (0670-5110)AS5$59,500$55,306
0945Traffic controller assembly, remove controller with (0670-5600)AS1$2,350.00$949.00
0950ITS CCTV camera, F&I, dome PTZ enclosure - pressurized, IP, definition (0682-1113)EACH1$7,900.00$8,661.00
0955Managed field ethernet switch, furnish & install (0684-1-1)EACH4$4,200.00$23,275
0960Managed field ethernet switch, relocate (0684-1-4)EACH1$750.00$1,437.00
0965Uninterruptible power supply, furnish and install, online/double conversion with cabinet (0685-1-14)EACH5$14,500$13,755
0970Remote power management rpmu, furnish and install (0685-2-1)EACH5$1,150.00$2,137.00
0975Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH6$960.00$904.00
0980Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH12$5,300.00$3,304.00
0985Local agency initial amount (DO not bid) (0999-26)LS1$11,540$11,540
0990Utility pipe,remove & dispose, 2- 4.9" (1050-16002)LF80$125.00$48.00
0995Utility pipe,remove & dispose, 5- 7.9" (1050-16003)LF90$115.00$42.75
1000Utility pipe,remove & dispose, 8- 19.9" (1050-16004)LF992$81.00$27.00
1005Utility fixture, valve/meter box, adjust (1080-21500)EACH96$2,400.00$3,000.00
1010Utility fixture, valve/meter box, remove (1080-21600)EACH2$1,700.00$500.00
FDOT contract T7502: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of January 29, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy