FDOT contract T1922 bid tabulation

SR 684 (CORTEZ RD) FROM 86TH ST W TO W OF 30TH ST W. Let by Florida DOT on January 28, 2026, Manatee, District 1. 4 bids received; low bid $12,497,735 by Superior Asphalt, Inc..

Owner
Florida DOT
Letting
28 JAN 2026
Pay items
190
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Superior Asphalt, Inc.$12,497,735Low
2Watson Civil Construction, Inc.$12,817,585+3.0%
3Ajax Paving Industries of Florida LLC$13,035,158+4.0%
4Preferred Materials Inc.$13,275,277+6.0%
FDOT contract T1922: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Superior Asphalt, Inc.2. Watson Civil Construction, Inc.3. Ajax Paving Industries of Florida LLC4. Preferred Materials Inc.
0005Mobilization (0101-1)LS1$760,000$1,280,000$873,927$1,178,949
0010Maintenance of traffic (0102-1)DA1$795,000$565,000$629,759$572,620
0015Special detour- temporary pavement (0102-2200)SY1$414,200$168,000$389,869$289,656
0020Pedestrian or bicycle special detour (0102-4-1)SY1$7,200.00$18,500$76,027$16,176
0025Traffic control officer (0102-14)HR460$97.35$120.00$111.42$87.05
0030Work zone sign (0102-60)ED123,129$0.20$0.27$0.18$0.20
0035Temporary barrier, F&I, low profile, concrete (0102-71-13)LF1,104$36.80$35.10$34.43$37.00
0040Temporary barrier, relocate, low profile concrete (0102-71-23)LF1,548$17.30$16.50$16.20$17.41
0045Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED591,000$0.10$0.14$0.09$0.10
0050Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD46,190$0.03$0.05$0.03$0.03
0055Temporary separator, F&I remove (0102-75-1)LF3,253$19.00$19.00$17.72$19.04
0060Arrow board / advance warning arrow panel (0102-76)ED750$4.35$7.50$4.05$4.35
0065Portable changeable message sign, temporary (0102-99)ED2,340$10.85$14.00$10.13$10.88
0070Temporary signalization and maintenance, intersection (0102-104)ED3,750$26.00$35.00$21.22$21.76
0075Temporary traffic detection and maintenance, intersection (0102-107-1)ED3,750$24.35$28.00$15.92$16.32
0080Type III barricade (0102-115)ED10,480$0.30$0.33$0.32$0.33
0085Sediment barrier (0104-10-3)LF556$10.35$1.15$5.84$3.95
0090Inlet protection system (0104-18)EACH97$210.00$114.00$185.70$181.36
0095Litter removal (0107-1)ACRE270.78$30.00$69.00$68.98$81.61
0100Mowing (0107-2)ACRE199.07$130.00$70.00$68.98$84.44
0105Monitor existing structures- vibration monitoring (0108-2)LS1$1,055.00$20,000$26,847$6,484.48
0110Clearing & grubbing (0110-1-1)ACRE1$287,500$183,000$97,915$258,994
0115Clearing & grubbing (0110-1-1)ACRE1$6,100.00$28,000$27,583$53,021
0120Removal of existing concrete (0110-4-10)SY4,165$48.75$29.00$27.06$37.82
0125Regular excavation (0120-1)CY739.50$40.00$47.00$21.22$28.40
0130Embankment (0120-6)CY1,417$29.80$25.00$53.06$48.87
0135Type B stabilization (0160-4)SY3,224$24.90$34.00$30.77$32.97
0140Optional base, base group 01 (0285-701)SY14$435.00$83.00$335.50$31.45
0145Optional base, base group 11 (0285-711)SY3,210$52.35$46.00$71.10$60.52
0150Milling existing asphalt pavement, 3 1/2" avg depth (0327-70-2)SY907$7.75$12.00$17.84$22.24
0155Milling existing asphalt pavement, 3" avg depth (0327-70-4)SY383$10.25$14.40$38.06$25.55
0160Milling existing asphalt pavement, 2 1/2" avg depth (0327-70-8)SY99,106$1.60$3.75$3.91$3.04
0165Milling existing asphalt pavement, 1 1/4" avg depth (0327-70-12)SY35,247$4.50$6.40$7.97$4.84
0170Superpave asphaltic conc, traffic C (0334-1-13)TN7,348.50$138.50$171.00$170.34$172.18
0175Asphalt concrete friction course,traffic C, FC-9.5, PG 76-22 (0337-7-82)TN9,534.20$160.00$189.00$188.11$217.33
0180Miscellaneous asphalt (0339-1)TN3.40$1,875.00$2,300.00$360.04$592.50
0185Inlets, curb, type P-5, <10' (0425-1351)EACH5$8,500.00$7,600.00$11,554$8,552.51
0190Inlets, curb, type P-5, partial (0425-1355)EACH6$8,670.00$2,050.00$6,977.04$8,721.04
0195Inlets, curb, type P-6, <10' (0425-1361)EACH5$9,415.00$8,200.00$11,583$10,558
0200Inlets, curb, type P-6, partial (0425-1365)EACH1$11,080$3,100.00$9,810.05$11,148
0205Inlets, curb, type J-5, <10' (0425-1451)EACH2$20,610$10,600$14,875$20,733
0210Inlets, curb, type J-5, >10' (0425-1452)EACH2$27,100$22,000$18,701$27,237
0215Inlets, curb, type J-5, partial (0425-1455)EACH5$9,270.00$2,800.00$10,119$9,323.96
0220Inlets, curb, type J-6, <10' (0425-1461)EACH2$18,740$11,000$14,769$18,855
0225Inlets, curb, type J-6, partial (0425-1465)EACH1$11,070$2,800.00$11,187$11,136
0230Inlets, DT bot, type C,jbot, <10' (0425-1523)EACH1$14,110$9,300.00$15,312$14,196
0235Inlets, gutter, type V, <10' (0425-1711)EACH1$8,115.00$5,700.00$10,239$8,161.50
0240Inlets, gutter, type V, partial (0425-1715)EACH2$6,335.00$3,900.00$8,743.66$6,370.81
0245Manholes, P-8, <10' (0425-2-61)EACH2$8,820.00$5,400.00$9,899.42$8,872.11
0250Manholes, J-7, <10' (0425-2-71)EACH1$16,835$9,000.00$35,442$16,936
0255Manholes, J-8, <10' (0425-2-91)EACH3$17,580$8,800.00$26,514$17,685
0260Manholes, J-8, >10' (0425-2-92)EACH1$17,325$8,300.00$15,175$17,431
0265Manholes, J-8, partial (0425-2-93)EACH1$5,660.00$4,000.00$9,795.41$5,696.27
0280Pipe culvert,optional material,round, 15"S/CD (0430-175115)LF417$127.00$168.00$368.88$127.97
0285Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF311$207.10$176.00$391.56$208.32
0290Pipe culvert, opt material, round, 42"S/CD (0430-175142)LF13$585.00$900.00$1,152.65$586.12
0295Pipe culvert, opt material, round, 48"S/CD (0430-175148)LF187$919.00$514.00$958.35$924.76
0300Pipe culvert, opt material, round, 54"S/CD (0430-175154)LF65$1,018.00$793.00$921.74$1,023.58
0305Pipe culvert, opt material, shape - elip/arch, 30"S/CD (0430-175230)LF4$602.00$790.00$1,152.46$605.97
0310Cleaning & sealing existing pipe joint, 18" storm sewer (0430-821-25)EACH1$1,190.00$2,450.00$344.94$1,088.10
0315Cleaning & sealing existing pipe joint, 24" storm sewer (0430-821-29)EACH1$1,190.00$2,500.00$583.74$1,360.12
0320Cleaning & sealing existing pipe joint, 48", storm sewer (0430-821-41)EACH9$973.00$4,100.00$742.95$2,176.20
0321Pipe liner, cured in place, 15" (0431-1115)LF357$119.00$207.00$160.53$190.42
0322Pipe liner, cured in place, 18" (0431-1118)LF74$119.00$283.00$173.53$217.62
0325Underdrain, type I (0440-1-10)LF250$66.00$34.00$135.46$66.30
0330Underdrain inspection box (0440-70)EACH2$4,985.00$3,800.00$3,731.17$5,014.97
0335Underdrain outlet pipe, 6" (0440-73-2)LF30$90.00$35.00$135.46$90.23
0340Concrete curb & gutter, type E (0520-1-7)LF5,646$36.00$42.00$29.18$36.01
0345Concrete curb & gutter, type F (0520-1-10)LF2,614$40.50$41.00$26.53$40.79
0350Concrete curb, type A (0520-2-1)LF458$35.00$43.00$24.94$35.37
0355Concrete curb, type B (0520-2-2)LF178$41.50$47.00$26.00$41.59
0360Concrete curb, type D (0520-2-4)LF42$58.00$54.00$24.94$58.42
0365Valley gutter- concrete (0520-3)LF79$65.00$68.00$31.83$65.61
0370Traffic separator concrete- type I, 4' wide (0520-5-11)LF1,183$60.00$65.00$127.34$60.37
0375Traffic separator concrete- type I, 6' wide (0520-5-12)LF240$44.30$92.00$185.70$44.57
0380Concrete traffic separator, special- variable width (0520-70)SY290$134.60$127.00$244.07$135.42
0385Concrete sidewalk and driveways, 4" thick (0522-1)SY619$78.00$69.00$74.28$78.63
0390Concrete sidewalk and driveways, 6" thick (0522-2)SY1,011$111.50$97.00$89.67$112.30
0395Detectable warnings (0527-2)SF1,019$33.00$34.00$42.45$33.28
0400Performance turf, sod (0570-1-2)SY6,427$8.50$6.10$5.04$6.17
0405Raised pavement marker, type B (0706-1-3)EACH9,808$5.40$4.25$4.24$4.35
0410Painted pavement markings, standard, white, solid, 6" (0710-11101)GM20.24$1,300.00$1,900.00$2,387.62$1,958.00
0415Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102)GM1.04$1,500.00$2,520.00$3,183.49$2,601.44
0420Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF7,489$1.10$1.60$1.91$1.63
0425Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124)LF626$2.20$1.70$2.02$1.74
0430Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF7,430$2.15$1.80$2.12$1.85
0435Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM10.04$650.00$555.00$583.64$570.74
0440Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM2.95$650.00$685.00$795.87$706.31
0445Painted pavement markings, standard, white, message or symbol (0710-11160)EACH13$65.00$47.50$47.75$48.96
0450Painted pavement markings, standard, white, arrows (0710-11170)EACH323$32.50$39.00$40.32$40.26
0455Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM13.47$1,300.00$1,900.00$2,387.62$1,958.29
0460Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224)LF524$2.20$1.80$2.02$1.85
0465Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241)GM2.31$650.00$720.00$716.29$732.55
0470Initial contingency amount, DO not bid (0999-25)LS1$120,040$120,040$120,040$120,040
0475Initial contingency amount, DO not bid (0999-25)LS1$7,000.00$7,000.00$7,000.00$7,000.00
0480Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH88$568.00$381.00$610.17$625.66
0485Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH16$1,950.00$1,500.00$2,122.33$2,176.20
0490Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113)EACH4$2,270.00$1,720.00$2,705.97$2,774.65
0495Single column ground sign assembly, F&I ground mount, SF sheeting area for back to back signs (0700-1114)EACH1$3,460.00$2,550.00$3,979.37$4,080.37
0500Single column ground sign assembly, relocate (0700-1500)EACH12$216.00$127.00$265.29$272.03
0505Single column ground sign assembly, remove (0700-1600)EACH25$43.25$80.00$68.98$70.73
0510Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH9$432.60$148.00$424.47$435.24
0515Sign panel, remove, UP to 12 SF (0700-3601)EACH10$32.45$70.00$47.75$48.96
0520Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH88$108.00$317.00$132.65$136.01
0525Tubular marker, 36" white post (0704-1-3)EACH6$216.00$160.00$127.34$130.57
0530Tubular marker, 36" yellow (0704-1-4)EACH55$216.00$275.00$127.34$130.57
0535Object marker, type 1 (0705-10-1)EACH14$216.00$275.00$212.23$217.62
0540Raised pavement marker, type B (0706-1-3)EACH3,552$5.40$4.25$4.24$4.35
0545Painted pavement markings, standard, yellow, island nose (0710-11290)SF310$5.40$4.25$4.24$4.35
0550Painted pavement markings, surface (0710-90)LS1$60,600$55,000$59,909$61,430
0555Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF6,967$5.40$3.30$3.28$3.36
0560Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF626$7.60$4.90$4.93$5.06
0565Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF1,524$8.65$6.55$6.56$6.72
0570Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM1.59$5,400.00$2,450.00$2,440.68$2,499.48
0575Thermoplastic, standard, message or symbol (0711-11160)EACH9$220.00$107.00$107.18$109.90
0580Thermoplastic, standard, arrow (0711-11170)EACH241$97.50$58.00$58.36$59.85
0585Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF260$7.60$4.90$4.93$5.06
0590Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.93$5,400.00$2,420.00$2,440.68$2,483.73
0595Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF4,646$17.30$16.55$16.66$17.08
0600Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM8.67$7,500.00$5,100.00$5,093.59$5,217.45
0605Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102)GM0.99$9,750.00$6,800.00$6,874.22$7,034.50
0610Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM6.09$2,150.00$1,300.00$1,289.31$1,321.61
0615Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM6.05$7,500.00$4,700.00$4,738.10$4,857.56
0620Conduit, furnish & install, open trench (0630-2-11)LF68$14.05$11.00$10.61$10.88
0625Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH9$1,460.00$1,750.00$1,688.56$1,731.17
0630Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12)LF276$2.80$3.90$3.71$3.81
0635Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211)EACH1$1,700.00$1,800.00$1,723.28$1,767.02
0640Light pole complete, relocate (0715-68000)EACH1$5,950.00$10,500$10,081$10,337
0645Conduit, furnish & install, open trench (0630-2-11)LF1,156$16.75$21.20$20.43$20.95
0650Conduit, furnish & install, directional bore (0630-2-12)LF2,561$43.25$36.00$33.96$34.82
0655Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI8$12,870$11,900$11,458$11,749
0660Signal cable- repair/replace/other, furnish & install (0632-7-2)LF14$50.30$27.50$26.53$27.20
0665Signal cable, remove- intersection (0632-7-6)PI8$1,352.00$1,700.00$1,379.51$1,414.53
0670Pull & splice box, F&I, 17" X 30" cover size (0635-2-14)EACH133$1,757.00$2,000.00$1,882.55$1,930.33
0675Electrical power service, F&I, underground, meter by contractor (0639-1122)AS8$3,082.00$5,200.00$4,987.47$5,114.07
0680Electrical power service, remove underground (0639-1620)AS7$3,255.00$3,900.00$3,714.07$3,808.35
0685Electrical service wire, & install (0639-2-1)LF115$16.75$14.50$13.80$14.15
0690Electrical service wire, (0639-2-6)LF84$1.70$3.30$3.18$3.26
0695Prestressed concrete pole, type P-II service pole (0641-2-12)EACH1$2,325.00$3,300.00$3,181.37$3,262.12
0700Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60)EACH1$590.00$880.00$424.47$435.24
0705Aluminum signals pole, (0646-1-11)EACH39$2,380.00$3,200.00$3,079.08$3,157.24
0710Aluminum signals pole, (0646-1-40)EACH5$1,217.00$1,800.00$1,714.46$1,757.98
0715Aluminum signals pole, remove (0646-1-60)EACH13$320.00$770.00$742.81$761.67
0720Steel mast arm assembly, and install, single arm 30' (0649-21-1)EACH2$73,550$53,000$50,575$51,858
0725Steel mast arm assembly, and install, single arm 50' (0649-21-6)EACH2$82,200$72,000$68,987$70,738
0730Steel mast arm assembly, and install, single arm 60' (0649-21-10)EACH1$88,700$78,000$74,822$76,721
0735Steel mast arm assembly, and install, single arm 70' (0649-21-15)EACH2$135,200$84,000$80,615$82,661
0740Steel mast arm assembly, remove, deep foundation- bolt on attachment (0649-26-5)EACH7$34,600$17,800$16,979$17,410
0745Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS63$1,895.00$1,560.00$1,491.83$1,529.69
0750Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16)AS18$2,380.00$1,900.00$1,816.62$1,862.73
0755Vehicular traffic signal, furnish & install aluminum, 5 section cluster, 1 way (0650-1-19)AS4$2,920.00$2,400.00$2,289.99$2,348.12
0760Vehicular traffic signal, remove- poles to remain (0650-1-60)AS56$335.00$165.00$159.17$163.21
0765Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS34$895.00$1,230.00$1,169.88$1,199.58
0770Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12)AS5$1,760.00$2,100.00$1,998.00$2,048.72
0775Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60)AS17$168.00$82.50$79.59$81.61
0780Vehicle detection system- microwave, furnish & install cabinet equipment (0660-3-11)EACH7$11,790$12,500$12,057$12,363
0785Vehicle detection system- microwave, furnish & install, above ground equipment (0660-3-12)EACH48$13,625$12,000$11,486$11,778
0790Vehicle detection system- microwave, adjust & modify, cabinet equipment (0660-3-51)EACH3$438.00$11,000$10,526$10,793
0795Vehicle detection system- remove above ground (0660-4-62)EACH7$216.00$6,750.00$6,508.08$6,673.27
0800Traffic data detection system- video, relocate, cabinet equipment (0660-9-41)EACH1$440.00$1,650.00$1,591.75$1,632.15
0805Traffic data detection system- video, relocate, above ground equipment (0660-9-42)EACH1$690.00$1,100.00$1,061.16$1,088.10
0810Pedestrian detector, furnish & install, standard (0665-1-11)EACH56$390.00$1,650.00$1,570.61$1,610.47
0815Pedestrian detector, relocate (0665-1-40)EACH2$146.00$275.00$265.29$272.03
0820Pedestrian detector, remove- pole/pedestal to remain (0665-1-60)EACH29$146.00$330.00$318.35$326.43
0825Traffic controller assembly, F&I, NEMA W/standard lock (0670-5160)AS8$59,500$51,000$49,275$50,526
0830Traffic controller assembly, remove controller with (0670-5600)AS8$920.00$6,050.00$5,836.40$5,984.55
0835Traffic controller, modify (0671-2-40)EACH2$750.00$5,000.00$4,775.24$4,896.45
0840Traffic signal controller cabinet, adjust/modify (0676-1500)EACH2$3,730.00$4,600.00$4,456.89$4,570.02
0845Uninterruptible power supply, furnish and install, online/double conversion with cabinet (0685-1-14)EACH8$16,980$13,600$13,177$13,512
0850Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH19$1,135.00$920.00$875.44$897.66
0855Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH30$5,200.00$4,100.00$3,960.39$4,060.92
0860Internally illuminated sign, remove (0700-5-60)EACH23$362.00$275.00$265.29$272.02
0865Itsfm location documentation- intersection (0611-2-1)EACH10$3,515.00$2,800.00$2,708.09$2,776.83
0870Conduit, furnish & install, open trench (0630-2-11)LF263$12.00$11.00$10.61$10.88
0875Conduit, furnish & install, directional bore (0630-2-12)LF502$32.50$24.50$23.56$24.16
0880Fiber optic cable, F&I, underground,2-12 fibers (0633-1121)LF1,786$5.50$4.45$4.22$4.33
0885Fiber optic connection, install, splice (0633-2-31)EACH32$68.00$55.00$52.05$53.37
0890Fiber optic connection, install, termination (0633-2-32)EACH96$114.00$91.00$86.75$88.95
0895Fiber optic connection hardware, F&I, buffer tube fan out kit (0633-3-14)EACH8$130.00$103.00$98.32$100.81
0900Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16)EACH8$1,810.00$1,450.00$1,382.22$1,417.30
0905Fiber optic connection hardware, adjust/modify splice enclosure (0633-3-51)EACH8$1,030.00$840.00$803.88$824.29
0910Fiber optic cable locator (0633-6)DA375$162.00$214.00$206.93$212.18
0915Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH14$1,680.00$1,750.00$1,688.56$1,731.42
0920Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH8$3,110.00$3,400.00$3,290.77$3,374.29
0925Vehicle detection system- avi, bluetooth, furnish & install, cabinet equipment (0660-6121)EACH3$2,490.00$2,700.00$2,597.20$2,663.12
0930Vehicle detection system- avi, bluetooth, furnish & install, above ground equipment (0660-6122)EACH3$8,815.00$12,200$11,667$11,963
0935ITS CCTV camera, pressurized, high definition (0682-1163)EACH4$10,140$8,100.00$7,803.27$8,001.34
0940Managed field ethernet switch, furnish & install (0684-1-1)EACH10$5,680.00$7,800.00$7,558.14$7,749.99
0945Managed field ethernet switch, remove- cabinet to remain (0684-1-6)EACH2$180.00$241.00$233.46$239.38
0950Connected vehicle roadside equipment, rsu (0924-681-1)EACH10$10,550$13,800$13,301$13,639
FDOT contract T1922: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of January 28, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy