FDOT contract T3988 bid tabulation

SR 8 (I-10) FROM W OF OLD BAINBRIDGE RD TO W OF OLSON RD. Let by Florida DOT on January 28, 2026, Leon, District 3. 3 bids received; low bid $14,399,889 by Anderson Columbia Co., Inc..

Owner
Florida DOT
Letting
28 JAN 2026
Pay items
140
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Anderson Columbia Co., Inc.$14,399,889Low
2C.W. Roberts Contracting, Inc.$17,644,184+23%
3Capital Asphalt Inc$26,978,020+87%
FDOT contract T3988: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Anderson Columbia Co., Inc.2. C.W. Roberts Contracting, Inc.3. Capital Asphalt Inc
0005Mobilization (0101-1)LS1$798,108$1,216,000$4,000,000
0010Maintenance of traffic (0102-1)DA1$253,379$1,128,000$2,000,000
0015Traffic control officer (0102-14)HR600$99.49$125.00$150.00
0020Work zone sign (0102-60)ED22,475$0.29$0.30$0.30
0025Barrier mounted work zone sign- index 700-013 (0102-62-13)ED180$5.53$5.60$5.50
0030Temporary barrier, F&I, anchored (0102-71-15)LF1,059$85.00$42.50$42.00
0035Temporary barrier, relocate, anchored (0102-71-25)LF329$15.50$15.65$15.50
0040Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED45,354$0.10$0.10$0.15
0045Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD7,085$0.05$0.05$0.10
0050Arrow board / advance warning arrow panel (0102-76)ED130$5.53$5.60$5.50
0055Temporary crash cushion, redirective option (0102-89-1)LO8$1,105.41$1,117.95$1,100.00
0060Portable changeable message sign, temporary (0102-99)ED3,045$13.82$13.95$14.00
0065Temporary signalization and maintenance, intersection (0102-104)ED1,125$11.06$48.65$11.00
0070Temporary traffic detection and maintenance, intersection (0102-107-1)ED1,125$11.06$1.10$11.00
0075Type III barricade (0102-115)ED100$1.11$1.10$1.25
0080Portable regulatory, sign (0102-150-1)ED1,500$5.53$5.60$5.50
0085Radar speed display unit (0102-150-2)ED1,500$5.53$5.60$5.50
0090Sediment barrier (0104-10-3)LF17,646$2.36$2.30$5.00
0095Inlet protection system (0104-18)EACH58$386.90$195.65$500.00
0100Litter removal (0107-1)ACRE2,672.58$60.80$61.50$75.00
0105Mowing (0107-2)ACRE2,672.58$49.75$50.30$75.00
0110Clearing & grubbing (0110-1-1)ACRE1$40,945$271,857$100,000
0115Regular excavation (3-R projects only) (0120-71)LS1$54,951$70,830$100,000
0120Optional base, base group 09 (0285-709)SY2,244$46.09$73.10$80.00
0125Optional base, base group 11 (0285-711)SY53$95.13$263.05$250.00
0130Milling existing asphalt pavement, 2" avg depth (0327-70-5)SY39,823$1.00$4.60$5.00
0135Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY134,104$0.75$2.10$5.00
0140Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11)SY251,368$0.75$2.65$5.00
0145Milling existing asphalt pavement, 1 1/4" avg depth (0327-70-12)SY20,389$1.00$3.15$5.00
0150Milling existing asphalt pavement, 3 1/4" avg depth (0327-70-17)SY8,249$2.00$4.30$5.00
0155Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53)TN12,282.70$125.59$140.55$225.00
0160Superpave asphaltic concrete, traffic E, PG76-22 (0334-1-55)TN20,096.90$141.83$138.30$235.00
0165Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25)TN10,859.70$165.00$211.20$285.00
0170Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN6,623.50$130.52$157.95$250.00
0175Miscellaneous asphalt (0339-1)TN673.90$342.66$415.30$400.00
0180Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF4$883.51$847.15$5,000.00
0185Pipe culvert,optional material,round, 24"S/CD (0430-175124)LF10$392.67$377.30$2,000.00
0190Straight concrete endwalls, single, 0 degrees, round (0430-524100)EACH1$3,547.20$9,779.00$35,000
0195Mitered end section, optional round, 18" CD (0430-982125)EACH1$4,492.41$2,876.60$5,000.00
0200Bridge deck expansion joint, rehabilitation, poured joint backer rod (0458-1-21)LF762$99.49$58.45$125.00
0205Shoulder concrete barrier, 56" pier protection barrier/crash wall (0521-72-56)LF1,282$809.15$864.70$800.00
0210Concrete sidewalk and driveways, 6" thick (0522-2)SY26$365.62$452.00$350.00
0215Guardrail -roadway, general (0536-1-1)LF12,055$25.49$26.85$26.50
0220Special guardrail post- post for shallow mount (0536-7-3)EACH4$106.23$111.80$110.00
0225Guardrail transition to rigid barrier, F&I- index 536- 001, approach TL-3 (0536-8112)EACH16$3,186.78$3,353.85$3,300.00
0230Guardrail transition to rigid barrier, F&I- index 536- 002, approach TL-3 (0536-8122)EACH17$3,399.24$3,577.40$3,520.00
0235Guardrail removal (0536-73)LF11,810$1.06$1.10$1.25
0240Guardrail end treatment- trailing anchorage (0536-85-20)EACH35$2,124.52$2,235.90$2,200.00
0245Guardrail end treatment- parallel approach terminal (0536-85-24)EACH36$3,186.78$3,353.85$3,300.00
0250Guardrail end treatment- double face approach terminal (0536-85-27)EACH2$9,597.53$10,101$10,000
0255Performance turf, sod (0570-1-2)SY31,374$3.72$5.25$5.00
0260Conduit, furnish & install, open trench (0630-2-11)LF125$21.25$34.65$22.00
0265Conduit, furnish & install, directional bore (0630-2-12)LF403$43.55$26.85$45.00
0270Conduit, furnish & install, aboveground (0630-2-14)LF10$17.00$39.15$18.00
0275Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH1$1,991.74$1,749.90$2,062.00
0280Loop assembly, F&I, type F (0660-2106)AS12$3,186.78$1,878.15$3,300.00
0285Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1)EACH6$4,249.05$2,951.35$4,400.00
0290Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12)EACH6$1,763.35$2,599.20$1,825.00
0295Raised pavement marker, type B (0706-1-3)EACH6,800$5.31$5.60$5.50
0300Painted pavement markings, standard, white, solid, 6" (0710-11101)GM76.59$1,380.95$1,676.90$1,650.00
0305Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM0.65$2,124.54$1,605.95$1,600.00
0310Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM29.86$1,380.95$1,676.45$1,650.00
0315Lighting conductors, F&I, insulated, no. 10 or < (0715-1-11)LF54$5.31$1.90$5.50
0320Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12)LF1,533$5.58$3.70$5.75
0325Lighting conductors, remove & dispose, contractor owns (0715-1-60)LF370$1.06$2.05$1.25
0330Pole cable distribution system, wall mount (0715-500-3)EACH1$690.47$1,442.15$715.00
0335High friction surface course (0908-333100)SY5,385$23.37$24.60$26.50
0340Initial contingency amount, DO not bid (0999-25)LS1$143,996$143,996$143,996
0345Ground-in rumble strips, 16" (0546-72-1)GM17.66$1,327.83$3,027.40$1,375.00
0350Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH19$478.02$503.05$500.00
0355Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH6$2,124.52$2,235.90$2,200.00
0360Single column ground sign assembly, F&I ground mount, SF sheeting area for back to back signs (0700-1114)EACH1$3,101.80$3,264.40$3,212.00
0365Single column ground sign assembly, F&I barrier less than 12 SF (0700-1211)EACH2$3,399.24$3,577.40$3,520.00
0370Single column ground sign assembly, remove (0700-1600)EACH18$53.11$55.90$55.00
0375Sign panel, furnish & install ground mount, 12-20 SF (0700-3102)EACH3$318.68$335.40$330.00
0380Sign panel, furnish & install ground mount, 31-50 SF (0700-3104)EACH3$531.13$558.95$550.00
0385Sign panel, furnish & install ground mount, 51-100 SF (0700-3105)EACH2$1,168.49$1,229.75$1,210.00
0390Sign panel, furnish & install ground mount, 101-200 SF (0700-3106)EACH1$1,699.62$1,788.70$1,760.00
0395Sign panel, remove, 12-20 SF (0700-3602)EACH3$42.49$44.70$44.00
0400Sign panel, remove, 31-50 SF (0700-3604)EACH3$53.11$55.90$55.00
0405Sign panel, remove, 51-100 SF (0700-3605)EACH2$132.78$139.75$138.00
0410Sign panel, remove, 101-200 SF (0700-3606)EACH1$265.57$279.50$275.00
0415Retroreflective sign strip- furnish and install, 2' (0700-13-12)EACH11$79.67$83.85$83.00
0420Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH15$90.29$95.05$94.00
0425Enhanced highway sign AC powered, F&I ground mount, highlighted sign <12 SF (0700-141140)EACH14$10,623$10,151$11,000
0430Enhanced highway sign AC powered, F&I barrier side mount, highlighted sign <12 SF (0700-141440)EACH2$95,604$13,192$10,000
0435Delineator, non-flexible (0705-11-2)EACH136$63.74$67.10$66.00
0440Raised pavement marker, type B (0706-1-3)EACH5,566$5.31$5.05$5.00
0445Painted pavement markings, surface (0710-90)LS1$118,702$134,153$132,000
0450Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF979$6.37$6.45$6.50
0455Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF3,529$8.50$7.25$7.00
0460Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF172$12.75$8.45$8.50
0465Thermoplastic, standard, message or symbol (0711-11160)EACH31$159.34$329.80$325.00
0470Thermoplastic, standard, arrow (0711-11170)EACH65$63.74$106.20$105.00
0475Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF581$8.50$7.25$7.25
0480Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF720$15.93$18.45$18.00
0485Thermoplastic, preformed, white, message (0711-14160)EACH4$1,062.27$206.80$205.00
0490Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101)GM10.91$5,842.48$9,276.40$9,130.00
0495Thermoplastic, standard-open graded asphalt surfaces, solid, 8" (0711-15102)GM2.38$8,498.15$12,829$12,650
0500Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131)GM24.60$4,514.64$3,352.75$3,300.00
0505Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201)GM11.11$5,842.48$9,273.90$9,130.00
0510Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM3.78$5,842.48$6,143.80$6,050.00
0515Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102)GM0.29$8,498.15$8,270.50$8,250.00
0520Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM1.05$4,249.07$2,770.90$2,750.00
0525Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM3.82$5,842.48$6,145.45$6,050.00
0530Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1)SF29$21.25$11.20$11.00
0535Permanent tape, white, solid, 6" for concrete bridges (0713-103101)GM0.32$37,179$55,101$54,725
0540Permanent tape, white, solid, 8" exit lane at interchange on concrete pavement (0713-103102)GM0.04$49,927$50,787$58,300
0545Permanent tape, white, 3-9 dotted, 6" wide, for concrete surfaces (0713-103171)GM0.09$27,619$27,949$30,250
0550Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181)GM0.56$27,619$30,248$54,725
0555Permanent tape, yellow, solid, for concrete bridges (0713-103201)GM0.32$37,179$55,272$30,250
0560Permanent tape, black, 3-9 dotted, 6" wide, for concrete surfaces (0713-103371)GM0.09$21,245$27,949$30,250
0565Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381)GM0.56$21,245$30,248$30,250
0570Itsfm subsurface documentation- project length (0611-1-1)MI6$7,117.15$5,729.45$7,370.00
0575Itsfm location documentation- ITS site (0611-2-2)EACH6$3,824.14$3,436.55$3,960.00
0580Conduit, furnish & install, open trench (0630-2-11)LF4,432$42.49$25.90$44.00
0585Conduit, furnish & install, directional bore (0630-2-12)LF2,196$53.11$47.90$55.00
0590Conduit, furnish & install, aboveground (0630-2-14)LF140$21.25$51.45$22.00
0595Fiber optic cable, F&I, underground,2-12 fibers (0633-1121)LF4,811$5.31$5.95$5.50
0600Fiber optic connection, install, termination (0633-2-32)EACH120$106.23$118.50$110.00
0605Fiber optic connection hardware, F&I, buffer tube fan out kit (0633-3-14)EACH10$106.23$133.05$110.00
0610Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16)EACH8$1,593.39$2,112.90$1,650.00
0615Fiber optic connection hardware, F&I, connector panel (0633-3-17)EACH8$531.13$149.80$550.00
0620Fiber optic cable locator (0633-6)DA375$212.45$372.30$220.00
0625Multi-conductor cable, furnish & install, cat 6 (0633-8-11)LF134$10.62$4.25$11.00
0630Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH42$1,997.05$1,699.25$2,070.00
0635Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH14$2,336.97$4,508.65$2,420.00
0640Junction box, furnish & install, aerial (0635-3-11)EACH2$796.70$877.60$825.00
0645Electrical power service, F&I, underground, meter furnished by power company (0639-1121)AS1$3,717.91$12,996$3,850.00
0650Electrical service wire, & install (0639-2-1)LF6,262$9.03$9.10$9.50
0655Electrical service disconnect, F&I, pole mount (0639-3-11)EACH7$849.81$4,063.70$880.00
0660Electrical service disconnect, remove- pole or cabinet to remain (0639-3-60)EACH2$106.23$413.55$110.00
0665Electrical power service- transformer, F&I, 5-10 kva, phase, copper windings (0639-6121)EACH4$4,780.18$4,337.60$4,950.00
0670Prestressed concrete pole, type P-II service pole (0641-2-12)EACH6$1,965.18$4,052.55$2,035.00
0675Vehicle detection system- wrong way for exit ramp, 3 or more lanes, AC powered (0660-7-22)EACH5$106,226$61,867$110,000
0680ITS cabinet, furnish & install, base mount with sunshield, 24" W X 46" H X 22" D (0676-2142)EACH5$13,809$17,585$14,300
0685Managed field ethernet switch, furnish & install (0684-1-1)EACH5$3,717.91$6,651.75$3,850.00
0690Media converter, furnish & install (0684-5-1)EACH5$1,380.94$1,486.85$1,430.00
0695Uninterruptible power supply, furnish and install, online/double conversion (0685-1-12)EACH5$13,278$10,569$13,750
0700Remote power management rpmu, furnish and install (0685-2-1)EACH5$1,274.71$1,939.65$1,320.00
FDOT contract T3988: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of January 28, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy