FDOT contract T7534 bid tabulation
US 41B (N TAMPA ST) AND N FLORIDA AVE FROM JACKSON ST TO... Let by Florida DOT on June 10, 2026, Hillsborough, District 7. 4 bids received; low bid $23,563,969 by Preferred Materials Inc..
- Owner
- Florida DOT
- Letting
- 10 JUN 2026
- Pay items
- 258
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Preferred Materials Inc. | $23,563,969 | Low |
| 2 | C.W. Roberts Contracting, Inc. | $27,359,685 | +16% |
| 3 | De Moya Contracting LLC | $29,380,711 | +25% |
| 4 | Ajax Paving Industries of Florida LLC | $39,696,018 | +68% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Preferred Materials Inc. | 2. C.W. Roberts Contracting, Inc. | 3. De Moya Contracting LLC | 4. Ajax Paving Industries of Florida LLC |
|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $1,202,487 | $1,179,361 | $2,500,000 | $3,000,000 |
| 0010 | Mobilization (0101-1) | LS | 1 | $1,149,587 | $982,074 | $400,000 | $2,765,000 |
| 0015 | Maintenance of traffic (0102-1) | DA | 1 | $959,810 | $741,386 | $1,500,000 | $1,100,000 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $940,007 | $724,220 | $200,000 | $1,000,000 |
| 0025 | Traffic control officer (0102-14) | HR | 1,752 | $8.55 | $93.03 | $90.00 | $118.67 |
| 0030 | Work zone sign (0102-60) | ED | 272,236 | $0.20 | $0.21 | $0.19 | $0.22 |
| 0035 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 192 | $36.00 | $48.61 | $34.00 | $42.47 |
| 0040 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 67,211 | $0.11 | $0.11 | $0.10 | $0.11 |
| 0045 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 291,951 | $0.04 | $0.06 | $0.04 | $0.06 |
| 0050 | Arrow board / advance warning arrow panel (0102-76) | ED | 680 | $4.24 | $5.91 | $4.00 | $6.25 |
| 0055 | Portable changeable message sign, temporary (0102-99) | ED | 2,997 | $9.53 | $10.64 | $9.00 | $11.24 |
| 0060 | Temporary signalization and maintenance, intersection (0102-104) | ED | 19,040 | $18.20 | $54.10 | $45.55 | $44.86 |
| 0065 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 19,040 | $8.50 | $1.19 | $1.00 | $15.41 |
| 0070 | Existing ITS maintenance (0102-112) | DA | 1,360 | $109.29 | $225.68 | $190.00 | $107.06 |
| 0075 | Type III barricade (0102-115) | ED | 74,187 | $0.26 | $0.27 | $0.25 | $0.29 |
| 0080 | Temporary raised rumble per day, includes all sets and relocations (0102-909) | DA | 680 | $37.06 | $35.48 | $35.00 | $37.47 |
| 0085 | Artificial coverings /rolled erosion control products (0104-1) | SY | 20 | $28.12 | $225.29 | $7.00 | $6.25 |
| 0090 | Sediment barrier (0104-10-3) | LF | 15,938 | $1.50 | $1.97 | $1.00 | $3.12 |
| 0095 | Soil tracking prevention device (0104-15) | EACH | 4 | $1,238.65 | $1,470.71 | $4,500.00 | $4,371.88 |
| 0100 | Inlet protection system (0104-18) | EACH | 111 | $194.38 | $197.13 | $180.00 | $206.10 |
| 0105 | Litter removal (0107-1) | ACRE | 275.59 | $214.30 | $72.97 | $30.00 | $253.79 |
| 0110 | Mowing (0107-2) | ACRE | 8.30 | $220.06 | $112.25 | $35.00 | $253.79 |
| 0115 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $32,588 | $18,394 | $50,000 | $31,228 |
| 0120 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $126,715 | $280,636 | $78,000 | $992,963 |
| 0125 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $66,022 | $280,636 | $60,000 | $1,078,268 |
| 0130 | Removal of existing concrete (0110-4-10) | SY | 23,254 | $25.51 | $59.49 | $60.00 | $45.00 |
| 0135 | Tree root and branch pruning (0110-22) | EACH | 4 | $1,548.44 | $1,122.55 | $600.00 | $1,249.11 |
| 0140 | Regular excavation (0120-1) | CY | 921 | $29.18 | $44.90 | $20.00 | $736.74 |
| 0145 | Borrow excavation, truck measure (0120-2-2) | CY | 37.10 | $48.32 | $56.13 | $50.00 | $392.84 |
| 0150 | Embankment (0120-6) | CY | 613 | $40.52 | $56.13 | $50.00 | $529.93 |
| 0155 | Regular excavation (3-R projects only) (0120-71) | LS | 1 | $599.72 | $280,636 | $20,000 | $342,600 |
| 0160 | Optional base, base group 15 (0285-715) | SY | 5,356 | $98.72 | $69.78 | $118.21 | $362.31 |
| 0165 | Milling existing asphalt pavement, 3" avg depth (0327-70-4) | SY | 38,559 | $3.63 | $4.17 | $3.10 | $5.59 |
| 0170 | Milling existing asphalt pavement, 2" avg depth (0327-70-5) | SY | 31,712 | $3.72 | $3.62 | $3.39 | $6.68 |
| 0175 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 5,919 | $17.83 | $11.55 | $9.75 | $29.26 |
| 0180 | Milling existing asphalt pavement, 2 1/2" avg depth (0327-70-8) | SY | 51,054 | $3.53 | $3.99 | $3.84 | $5.08 |
| 0190 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 69.50 | $357.42 | $321.61 | $319.65 | $407.16 |
| 0195 | Superpave asphaltic concrete, traffic B, PG76-22 (0334-1-52) | TN | 2,478.80 | $166.49 | $189.32 | $206.17 | $373.19 |
| 0200 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 5,700.70 | $200.43 | $205.33 | $232.00 | $350.04 |
| 0205 | Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81) | TN | 4,737.30 | $203.40 | $187.54 | $203.80 | $243.64 |
| 0210 | Asphalt concrete friction course,traffic C, FC-9.5, PG 76-22 (0337-7-82) | TN | 3,491.30 | $212.78 | $221.91 | $234.01 | $319.01 |
| 0215 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 2,496.30 | $211.61 | $216.66 | $219.52 | $282.96 |
| 0220 | Concrete class II, culverts (0400-2-1) | CY | 228 | $603.46 | $654.92 | $3,000.00 | $999.29 |
| 0225 | Reinforcing steel- miscellaneous (0415-1-6) | LB | 44,456 | $4.71 | $2.25 | $2.00 | $2.50 |
| 0230 | Inlets, curb, type 10, <10' (0425-1211) | EACH | 1 | $15,138 | $11,225 | $20,000 | $43,261 |
| 0235 | Inlets, curb, type P-3, partial (0425-1335) | EACH | 1 | $10,737 | $9,541.63 | $20,000 | $18,965 |
| 0240 | Inlets, curb, type P-5, <10' (0425-1351) | EACH | 13 | $12,683 | $11,225 | $20,000 | $43,865 |
| 0245 | Inlets, curb, type P-5, partial (0425-1355) | EACH | 3 | $10,502 | $9,541.63 | $20,000 | $25,852 |
| 0250 | Inlets, curb, type P-6, <10' (0425-1361) | EACH | 1 | $16,469 | $11,225 | $20,000 | $41,252 |
| 0255 | Inlets, curb, type P-6, partial (0425-1365) | EACH | 1 | $9,785.24 | $9,541.63 | $20,000 | $24,510 |
| 0260 | Inlets, curb, type P-6, modify (0425-1369) | EACH | 1 | $10,737 | $9,541.63 | $20,000 | $24,227 |
| 0265 | Inlets, curb, type J-5, <10' (0425-1451) | EACH | 1 | $12,170 | $11,225 | $20,000 | $45,452 |
| 0270 | Inlets, curb, type 8, <10' (0425-1481) | EACH | 2 | $13,603 | $11,225 | $20,000 | $45,257 |
| 0275 | Inlets, curb, type 8, partial (0425-1485) | EACH | 1 | $9,785.24 | $9,541.63 | $20,000 | $18,520 |
| 0280 | Inlets, DT bot, type C,jbot, <10' (0425-1523) | EACH | 1 | $11,316 | $11,225 | $20,000 | $50,028 |
| 0285 | Manholes, P-7, <10' (0425-2-41) | EACH | 3 | $8,586.75 | $11,225 | $20,000 | $41,847 |
| 0290 | Manholes, P-7, partial (0425-2-43) | EACH | 3 | $5,485.64 | $9,541.63 | $20,000 | $15,501 |
| 0295 | Manholes, J-7, <10' (0425-2-71) | EACH | 1 | $12,886 | $11,225 | $20,000 | $46,217 |
| 0300 | Manhole, adjust (0425-5) | EACH | 42 | $1,164.60 | $2,469.60 | $1,000.00 | $3,905.35 |
| 0305 | Pipe culvert,optional material,round, 12"S/CD (0430-175112) | LF | 58 | $150.50 | $635.98 | $300.00 | $3,306.69 |
| 0310 | Pipe culvert,optional material,round, 15"S/CD (0430-175115) | LF | 282 | $160.24 | $640.65 | $300.00 | $919.33 |
| 0315 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 137 | $298.39 | $645.31 | $300.00 | $1,758.93 |
| 0320 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 24 | $321.28 | $649.98 | $300.00 | $1,833.94 |
| 0325 | Pipe culvert, opt material, round, 30"S/CD (0430-175130) | LF | 36 | $329.53 | $654.64 | $500.00 | $1,585.86 |
| 0330 | Pipe culvert, opt material, round, 36"S/CD (0430-175136) | LF | 5 | $551.22 | $659.73 | $500.00 | $6,550.55 |
| 0335 | Pipe culvert,optional material,other-elip/arch, (0430-175218) | LF | 189 | $232.44 | $664.40 | $500.00 | $615.52 |
| 0340 | Cleaning & sealing existing pipe joint, 15" storm sewer (0430-821-23) | EACH | 6 | $847.08 | $929.63 | $1,500.00 | $999.29 |
| 0345 | Cleaning & sealing existing pipe joint, 18" storm sewer (0430-821-25) | EACH | 9 | $1,270.61 | $1,394.44 | $1,500.00 | $1,498.93 |
| 0350 | Cleaning & sealing existing pipe joint, 24" storm sewer (0430-821-29) | EACH | 8 | $1,694.15 | $1,859.26 | $1,500.00 | $1,998.58 |
| 0355 | Cleaning & sealing existing pipe joint, >60", storm sewer (0430-821-61) | EACH | 1 | $5,294.23 | $5,810.19 | $2,500.00 | $6,245.55 |
| 0360 | PVC pipe for back of sidewalk, (0430-963-1) | LF | 128 | $44.70 | $61.29 | $55.00 | $176.13 |
| 0365 | Pipe liner, cured in place, 12" (0431-1112) | LF | 6 | $264.71 | $290.51 | $150.00 | $218.59 |
| 0370 | Pipe liner, cured in place, 15" (0431-1115) | LF | 225 | $137.65 | $151.06 | $150.00 | $237.33 |
| 0375 | Pipe liner, cured in place, 18" (0431-1118) | LF | 92 | $148.24 | $162.69 | $150.00 | $268.56 |
| 0380 | Pipe liner, cured in place, 24" (0431-1124) | LF | 663 | $227.65 | $249.84 | $200.00 | $268.56 |
| 0385 | Pipe liner, cured in place, 30" (0431-1130) | LF | 249 | $248.83 | $273.08 | $250.00 | $293.54 |
| 0390 | Pipe liner, cured in place, 36" (0431-1136) | LF | 749 | $291.18 | $319.56 | $300.00 | $343.51 |
| 0395 | Chemical grout repair, pipe, test, 15" (0432-3-1) | EACH | 23 | $847.08 | $929.63 | $1,200.00 | $999.29 |
| 0400 | Chemical grout repair, pipe, test, 24" (0432-3-4) | EACH | 7 | $1,694.15 | $1,859.26 | $2,500.00 | $1,998.58 |
| 0405 | Chemical grout repair, pipe, test, 36" (0432-3-6) | EACH | 3 | $2,541.23 | $2,788.89 | $4,200.00 | $2,997.86 |
| 0410 | Chemical grout repair, pipe, test, 60" (0432-3-11) | EACH | 1 | $5,294.23 | $5,810.19 | $8,000.00 | $6,245.55 |
| 0415 | Trench drain, standard (0436-1-1) | LF | 229 | $219.95 | $555.72 | $400.00 | $206.36 |
| 0420 | Underdrain inspection box (0440-70) | EACH | 5 | $4,651.68 | $7,602.44 | $4,500.00 | $139.90 |
| 0425 | Pipe handrail - guiderail, steel (0515-1-1) | LF | 376 | $58.24 | $75.14 | $60.00 | $68.70 |
| 0430 | Bollards (0519-78) | EACH | 3 | $1,913.60 | $1,479.72 | $3,500.00 | $1,267.26 |
| 0435 | Concrete curb & gutter, type F (0520-1-10) | LF | 662 | $53.68 | $49.53 | $60.00 | $56.36 |
| 0440 | Concrete curb, type D (0520-2-4) | LF | 16,867 | $37.64 | $47.91 | $60.00 | $36.62 |
| 0445 | Granite curb, furnish & install (0520-7-1) | LF | 3,293 | $19.56 | $94.61 | $150.00 | $185.11 |
| 0450 | Granite curb, reset (0520-7-2) | LF | 1,337 | $19.65 | $46.02 | $50.00 | $109.78 |
| 0455 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 16,045 | $57.23 | $68.45 | $100.00 | $64.64 |
| 0460 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 6,923 | $92.56 | $90.44 | $125.00 | $89.94 |
| 0465 | Bus boarding pad- concrete (0522-3) | SY | 17 | $223.56 | $102.15 | $150.00 | $106.17 |
| 0470 | Pavers, architectural, remove existing and reinstall (0526-1101) | SY | 57 | $187.25 | $113.61 | $200.00 | $124.91 |
| 0475 | Detectable warnings (0527-2) | SF | 3,793 | $35.03 | $42.66 | $38.00 | $24.98 |
| 0480 | Performance turf, sod (0570-1-2) | SY | 3,041 | $5.29 | $11.23 | $3.50 | $10.80 |
| 0485 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 40 | $77.52 | $87.90 | $74.00 | $55.52 |
| 0490 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 4 | $1,545.80 | $1,443.19 | $1,215.00 | $1,677.59 |
| 0495 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 12 | $2,553.33 | $2,838.86 | $2,390.00 | $3,335.73 |
| 0500 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 12 | $2,513.49 | $2,054.91 | $1,730.00 | $3,514.06 |
| 0505 | Traffic monitoring site cabinet, F&I, type 3, 2 pane back, pedestal mount (0695-7162) | EACH | 4 | $7,966.12 | $8,611.62 | $7,250.00 | $9,762.30 |
| 0510 | Traffic monitoring site cabinet, remove existing cabinet (0695-7600) | EACH | 2 | $812.54 | $1,234.13 | $1,039.00 | $740.43 |
| 0515 | Raised pavement marker, type B (0706-1-3) | EACH | 2,777 | $4.02 | $4.43 | $4.00 | $5.00 |
| 0520 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 8.99 | $1,905.71 | $2,099.90 | $1,500.00 | $1,873.66 |
| 0525 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.07 | $2,426.09 | $3,115.51 | $1,800.00 | $2,248.40 |
| 0530 | Painted pavement markings, standard, white, solid for parking spaces, 6" (0710-11121) | LF | 1,292 | $1.32 | $1.46 | $0.50 | $0.62 |
| 0535 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 14,644 | $1.16 | $1.28 | $0.75 | $0.94 |
| 0540 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 2,675 | $1.27 | $1.40 | $1.25 | $1.56 |
| 0545 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 15,344 | $1.38 | $1.52 | $1.50 | $1.87 |
| 0550 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 6.50 | $582.36 | $641.98 | $800.00 | $999.29 |
| 0555 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 2.35 | $712.89 | $791.37 | $800.00 | $999.29 |
| 0560 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 221 | $37.06 | $40.79 | $85.00 | $106.17 |
| 0565 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 394 | $37.06 | $40.79 | $45.00 | $56.21 |
| 0570 | Painted pavement markings, standard, white, yield line (0710-11180) | LF | 34 | $5.29 | $5.83 | $15.00 | $18.74 |
| 0575 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 5.63 | $1,902.87 | $2,098.17 | $1,500.00 | $1,873.66 |
| 0580 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 3,221 | $1.38 | $1.52 | $1.25 | $1.56 |
| 0585 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.07 | $659.69 | $847.08 | $800.00 | $999.29 |
| 0590 | Painted pavement markings, standard, blue, solid for parking lot- accessible markings, 6" (0710-11421) | LF | 74 | $2.12 | $2.33 | $5.00 | $6.25 |
| 0595 | Architectural, bus shelter, F&I, 50-100 SF (0751-35-12) | EACH | 16 | $23,342 | $36,696 | $100,000 | $48,759 |
| 0600 | Bicycle rack, furnish & install, 2 bicycles (0751-36-11) | EACH | 9 | $238.24 | $857.94 | $3,000.00 | $722.73 |
| 0605 | Bicycle rack, furnish & install, 6 bicycles (0751-36-12) | EACH | 7 | $735.90 | $1,435.35 | $5,000.00 | $1,828.56 |
| 0610 | Trash receptacle (0751-37) | EACH | 13 | $910.61 | $1,638.05 | $3,000.00 | $1,977.58 |
| 0615 | Bench, F&I, aluminum (0751-38-11) | EACH | 28 | $1,810.63 | $3,263.82 | $5,000.00 | $3,643.79 |
| 0620 | Directional indicators (0919-528100) | SF | 24 | $43.19 | $52.54 | $75.00 | $93.68 |
| 0625 | Raised crosswalk, type RC curb with plate/grate (0920-520100) | LF | 73 | $598.49 | $823.47 | $420.00 | $156.14 |
| 0635 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $60,000 | $60,000 | $60,000 | $60,000 |
| 0640 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $90,000 | $90,000 | $90,000 | $90,000 |
| 0645 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 332 | $476.48 | $673.53 | $450.00 | $562.10 |
| 0650 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 66 | $2,181.22 | $2,385.41 | $2,060.00 | $2,573.17 |
| 0655 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 86 | $2,160.04 | $2,772.69 | $2,040.00 | $2,548.18 |
| 0660 | Single column ground sign assembly, relocate (0700-1500) | EACH | 21 | $412.95 | $594.95 | $390.00 | $487.15 |
| 0665 | Single column ground sign assembly, remove (0700-1600) | EACH | 272 | $10.59 | $205.43 | $10.00 | $12.49 |
| 0670 | Single column ground sign assembly, F&I cantilever mount, 12.0-20.0 SF (0700-1912) | EACH | 5 | $2,636.53 | $2,553.79 | $2,490.00 | $3,110.28 |
| 0675 | Single column ground sign assembly, F&I cantilever mount, 20.1-30.0 SF (0700-1913) | EACH | 1 | $2,774.18 | $2,954.54 | $2,620.00 | $3,272.67 |
| 0680 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 14 | $317.65 | $454.63 | $300.00 | $374.73 |
| 0685 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 35 | $984.73 | $881.20 | $930.00 | $1,161.67 |
| 0690 | Sign panel, furnish & install overhead mount, 12-20 SF (0700-3202) | EACH | 2 | $2,011.81 | $1,487.38 | $1,900.00 | $2,373.31 |
| 0695 | Sign panel, furnish & install overhead mount, 101-200 SF (0700-3206) | EACH | 3 | $6,353.07 | $7,970.07 | $6,000.00 | $7,494.66 |
| 0700 | Sign panel, furnish & install overhead mount, 201-300 SF (0700-3207) | EACH | 1 | $9,529.61 | $12,303 | $9,000.00 | $11,242 |
| 0705 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 69 | $10.59 | $121.23 | $10.00 | $12.49 |
| 0710 | Sign panel, remove, 12-20 SF (0700-3602) | EACH | 2 | $63.53 | $179.61 | $60.00 | $74.95 |
| 0715 | Sign panel, remove, 101-200 SF with lighting (0700-3626) | EACH | 1 | $2,117.69 | $4,624.88 | $2,000.00 | $2,498.22 |
| 0720 | Sign panel, remove panel, SF with lighting (0700-3627) | EACH | 1 | $2,329.46 | $5,416.28 | $2,200.00 | $2,748.04 |
| 0725 | Overhead static sign furnish & install, cantilever, 21- 30 FT (0700-4112) | EACH | 1 | $119,438 | $119,804 | $112,800 | $166,718 |
| 0730 | Retroreflective sign strip- furnish and install, 2' (0700-13-12) | EACH | 4 | $84.71 | $67.35 | $80.00 | $99.93 |
| 0735 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 190 | $95.30 | $196.45 | $90.00 | $112.42 |
| 0740 | Enhanced highway sign solar powered, F&I ground mount, W/beacon, UP to 12 SF of static sign panels (0700-142111) | EACH | 2 | $11,224 | $10,653 | $10,600 | $14,314 |
| 0745 | Raised pavement marker, type B (0706-1-3) | EACH | 2,777 | $4.02 | $4.43 | $4.00 | $5.00 |
| 0750 | Painted pavement markings, surface (0710-90) | LS | 1 | $40,889 | $45,006 | $24,000 | $29,979 |
| 0755 | Painted pavement markings, surface (0710-90) | LS | 1 | $43,092 | $47,430 | $44,000 | $54,961 |
| 0760 | Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102) | GM | 0.06 | $6,738.36 | $7,416.89 | $7,500.00 | $9,368.32 |
| 0765 | Thermoplastic, standard, solid, 6" for parking spaces (0711-11121) | LF | 1,292 | $1.70 | $1.88 | $1.50 | $1.87 |
| 0770 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 14,625 | $3.31 | $3.65 | $4.00 | $5.00 |
| 0775 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 2,675 | $4.98 | $5.48 | $5.00 | $6.25 |
| 0780 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 3,124 | $6.65 | $7.30 | $6.00 | $7.49 |
| 0785 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 2.34 | $1,927.33 | $2,057.91 | $3,500.00 | $4,371.88 |
| 0790 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 94 | $90.00 | $99.06 | $240.00 | $299.79 |
| 0795 | Thermoplastic, standard, arrow (0711-11170) | EACH | 273 | $77.30 | $85.08 | $95.00 | $118.67 |
| 0800 | Thermoplastic, standard, yield line (0711-11180) | LF | 34 | $18.00 | $19.81 | $20.00 | $24.98 |
| 0805 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 3,221 | $4.45 | $4.89 | $5.00 | $6.25 |
| 0810 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.07 | $1,779.85 | $2,285.38 | $3,500.00 | $4,371.88 |
| 0815 | Thermoplastic, standard, blue, solid,6" (0711-11421) | LF | 74 | $3.92 | $4.31 | $10.00 | $12.49 |
| 0820 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 11,981 | $15.62 | $17.19 | $15.00 | $18.74 |
| 0825 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 127 | $206.47 | $227.26 | $250.00 | $312.28 |
| 0830 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 121 | $84.71 | $93.24 | $100.00 | $124.91 |
| 0835 | Thermoplastic, preformed, color route shield (0711-14660) | EACH | 5 | $1,863.57 | $2,051.18 | $3,000.00 | $3,747.33 |
| 0840 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 8.53 | $5,134.96 | $5,665.18 | $5,000.00 | $6,245.55 |
| 0845 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.01 | $8,563.75 | $9,425.00 | $5,500.00 | $6,870.10 |
| 0850 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 6.50 | $1,286.50 | $1,418.19 | $2,500.00 | $3,122.77 |
| 0855 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 4.53 | $4,552.29 | $5,021.67 | $5,000.00 | $6,245.55 |
| 0860 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 0.05 | $931.02 | $1,280.82 | $2,500.00 | $3,122.77 |
| 0865 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 4.02 | $4,560.67 | $4,588.60 | $3,865.00 | $5,927.32 |
| 0870 | Itsfm location documentation- intersection (0611-2-1) | EACH | 30 | $3,008.09 | $3,037.23 | $2,557.00 | $4,103.52 |
| 0875 | Conduit, furnish & install, open trench (0630-2-11) | LF | 3,697 | $94.48 | $30.41 | $25.60 | $39.42 |
| 0880 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 3,065 | $90.50 | $55.71 | $46.90 | $63.27 |
| 0885 | Conduit, furnish & install, aboveground (0630-2-14) | LF | 190 | $85.17 | $50.13 | $42.20 | $43.83 |
| 0890 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 10 | $11,691 | $15,269 | $12,855 | $30,345 |
| 0895 | Signal cable, remove- intersection (0632-7-6) | PI | 10 | $2,437.61 | $2,458.76 | $2,070.00 | $1,019.55 |
| 0900 | Fiber optic cable, F&I, underground,2-12 fibers (0633-1121) | LF | 658 | $4.88 | $4.93 | $4.15 | $7.66 |
| 0905 | Fiber optic cable, relocate, underground (0633-1420) | LF | 650 | $4.25 | $4.28 | $3.60 | $5.93 |
| 0910 | Fiber optic connection hardware, F&I, preterminated connector assembly (0633-3-13) | EACH | 2 | $106.17 | $106.91 | $90.00 | $136.79 |
| 0915 | Fiber optic connection hardware, F&I, preterminated patch panel (0633-3-15) | EACH | 2 | $3,149.64 | $3,165.51 | $2,665.00 | $4,057.93 |
| 0920 | Fiber optic connection hardware, adjust/modify splice enclosure (0633-3-51) | EACH | 2 | $1,054.60 | $1,059.53 | $892.00 | $1,459.03 |
| 0925 | Fiber optic connection hardware, adjust/modify splice tray (0633-3-52) | EACH | 2 | $35.39 | $35.64 | $30.00 | $63.83 |
| 0930 | Fiber optic cable locator (0633-6) | DA | 680 | $191.10 | $231.62 | $195.00 | $173.13 |
| 0935 | Multi-conductor cable, furnish & install, cat 6 (0633-8-11) | LF | 744 | $10.62 | $6.12 | $5.15 | $7.52 |
| 0940 | Multi-conductor cable, furnish & install, composite (0633-8-12) | LF | 40 | $28.33 | $3.86 | $3.25 | $4.36 |
| 0945 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 20 | $1,545.80 | $1,443.19 | $1,215.00 | $1,890.85 |
| 0950 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 16 | $2,520.06 | $3,896.01 | $3,280.00 | $3,188.84 |
| 0955 | Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13) | EACH | 2 | $5,466.93 | $7,839.54 | $6,600.00 | $7,550.17 |
| 0960 | Pull & splice box, F&I, 17" X 30" cover size (0635-2-14) | EACH | 187 | $1,810.87 | $2,429.07 | $2,045.00 | $2,139.92 |
| 0965 | Electrical power service, F&I, overhead meter purchased by contractor from power company (0639-1112) | AS | 8 | $5,057.12 | $8,789.79 | $7,400.00 | $8,290.69 |
| 0970 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 5 | $5,057.12 | $7,839.54 | $6,600.00 | $7,724.42 |
| 0975 | Electrical power service, remove overhead (0639-1610) | AS | 2 | $812.54 | $1,585.73 | $1,335.00 | $1,113.69 |
| 0980 | Electrical power service, remove underground (0639-1620) | AS | 5 | $812.54 | $1,205.63 | $1,015.00 | $1,114.33 |
| 0985 | Electrical service wire, & install (0639-2-1) | LF | 986 | $10.01 | $9.62 | $8.10 | $8.56 |
| 0990 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 13 | $4,940.12 | $9,631.69 | $4,945.00 | $2,544.92 |
| 0995 | Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60) | EACH | 4 | $1,625.08 | $368.22 | $310.00 | $1,990.79 |
| 1000 | Prestressed concrete pole, complete pole removal- pole 30' and greater (0641-2-80) | EACH | 3 | $18,397 | $32,873 | $27,675 | $25,437 |
| 1005 | Aluminum signals pole, (0646-1-11) | EACH | 79 | $3,333.86 | $3,171.45 | $2,670.00 | $3,703.11 |
| 1010 | Aluminum signals pole, furnish install pedestrian detector post (0646-1-12) | EACH | 9 | $2,089.74 | $2,405.31 | $2,025.00 | $3,003.25 |
| 1015 | Aluminum signals pole, remove (0646-1-60) | EACH | 66 | $812.54 | $368.22 | $310.00 | $362.54 |
| 1020 | Steel mast arm assembly, and install, single arm 30' (0649-21-1) | EACH | 7 | $62,305 | $69,087 | $80,000 | $75,666 |
| 1025 | Steel mast arm assembly, and install, single arm 40' (0649-21-3) | EACH | 8 | $67,281 | $78,590 | $80,000 | $83,681 |
| 1030 | Steel mast arm assembly, and install, double arm 40'-40' (0649-21-5) | EACH | 1 | $85,297 | $94,031 | $90,000 | $107,088 |
| 1035 | Steel mast arm assembly, and install, single arm 50' (0649-21-6) | EACH | 3 | $75,161 | $117,788 | $110,000 | $97,587 |
| 1040 | Steel mast arm assembly, and install, double arm 50'-30' (0649-21-7) | EACH | 1 | $89,361 | $110,661 | $110,000 | $124,973 |
| 1045 | Steel mast arm assembly, and install, double arm 50'-40' (0649-21-8) | EACH | 2 | $87,449 | $105,910 | $110,000 | $124,261 |
| 1050 | Steel mast arm assembly, and install, single arm 60' (0649-21-10) | EACH | 1 | $80,126 | $104,722 | $110,000 | $109,060 |
| 1055 | Steel mast arm assembly, and install, double arm 60'-50' (0649-21-13) | EACH | 1 | $100,954 | $134,417 | $140,000 | $146,769 |
| 1060 | Steel mast arm assembly, and install, double arm 60'-60' (0649-21-14) | EACH | 1 | $100,236 | $132,041 | $140,000 | $145,237 |
| 1065 | Steel mast arm assembly, and install, single arm 70' (0649-21-15) | EACH | 1 | $95,151 | $128,478 | $140,000 | $128,083 |
| 1070 | Steel mast arm assembly, and install, double arm 70'-40' (0649-21-17) | EACH | 1 | $92,833 | $120,163 | $130,000 | $135,468 |
| 1075 | Steel mast arm assembly, remove, shallow foundation- bolt on attachment (0649-26-3) | EACH | 6 | $4,792.41 | $20,387 | $14,000 | $5,438.02 |
| 1080 | Steel mast arm assembly, remove, deep foundation- bolt on attachment (0649-26-5) | EACH | 11 | $27,024 | $32,265 | $24,000 | $12,329 |
| 1085 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 70 | $1,795.29 | $1,781.71 | $1,500.00 | $2,083.00 |
| 1090 | Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16) | AS | 2 | $2,136.10 | $2,316.23 | $1,950.00 | $2,579.70 |
| 1095 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 70 | $1,087.87 | $1,039.33 | $875.00 | $1,190.68 |
| 1100 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 10 | $2,086.19 | $2,233.08 | $1,880.00 | $2,158.10 |
| 1105 | Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60) | AS | 1 | $101.56 | $123.53 | $104.00 | $185.39 |
| 1110 | Midblock crosswalk: rectangular rapid flashing beacon, furnish & install- AC, complete sign assembly- single direction (0654-2-11) | AS | 12 | $9,783.70 | $6,095.83 | $5,132.00 | $10,569 |
| 1115 | Midblock crosswalk: rectangular rapid flashing beacon, furnish/install- AC, sign assy- single dir accessible detector (0654-2-17) | AS | 12 | $10,390 | $6,889.29 | $5,800.00 | $11,103 |
| 1120 | Loop assembly, F&I, type F (0660-2106) | AS | 3 | $2,582.35 | $1,746.08 | $1,470.00 | $3,518.65 |
| 1125 | Vehicle detection system- microwave, relocate cabinet equipment (0660-3-41) | EACH | 2 | $1,446.00 | $1,763.90 | $1,485.00 | $494.72 |
| 1130 | Vehicle detection system - microwave, relocate, above ground equipment (0660-3-42) | EACH | 10 | $2,761.07 | $2,969.52 | $2,500.00 | $1,343.82 |
| 1135 | Vehicle detection system - microwave, adjust & modify, above ground equipment (0660-3-52) | EACH | 3 | $1,446.00 | $1,229.38 | $1,035.00 | $1,498.87 |
| 1140 | Vehicle detection system- furnish & install cabinet equipment (0660-4-11) | EACH | 5 | $31,918 | $23,994 | $20,200 | $36,740 |
| 1145 | Vehicle detection system- furnish & install above ground equipment (0660-4-12) | EACH | 12 | $7,032.41 | $8,552.22 | $7,200.00 | $6,665.82 |
| 1150 | Vehicle detection system- avi, bluetooth relocate, cabinet equipment (0660-6421) | EACH | 2 | $1,446.00 | $1,187.81 | $1,000.00 | $433.64 |
| 1155 | Vehicle detection system- avi, bluetooth relocate, above ground equipment (0660-6422) | EACH | 11 | $2,761.07 | $1,870.80 | $1,575.00 | $1,160.97 |
| 1160 | Signal priority and preemption system, F&I, optical, cabinet electronics (0663-1111) | EACH | 5 | $9,549.43 | $9,781.60 | $8,235.00 | $11,663 |
| 1165 | Signal priority and preemption system, F&I, optical, detector (0663-1112) | EACH | 13 | $3,211.92 | $3,052.67 | $2,570.00 | $7,663.95 |
| 1170 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 89 | $569.76 | $296.95 | $250.00 | $521.59 |
| 1175 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 1 | $101.56 | $191.67 | $155.00 | $67.84 |
| 1180 | Traffic controller assembly, F&I, NEMA W/standard lock, 1 preemption (0670-5161) | AS | 5 | $59,864 | $61,766 | $52,000 | $74,090 |
| 1185 | Traffic controller assembly, remove controller with (0670-5600) | AS | 5 | $2,437.61 | $1,805.47 | $1,520.00 | $1,345.63 |
| 1190 | Traffic controller, modify (0671-2-40) | EACH | 5 | $1,976.13 | $2,387.49 | $2,010.00 | $6,007.88 |
| 1195 | Traffic signal controller cabinet, adjust/modify (0676-1500) | EACH | 8 | $2,585.53 | $2,387.50 | $2,010.00 | $3,408.66 |
| 1200 | ITS CCTV camera, pressurized, high definition (0682-1163) | EACH | 1 | $9,746.20 | $10,060 | $8,469.37 | $8,045.19 |
| 1205 | ITS CCTV camera, relocate (0682-1400) | EACH | 7 | $1,911.02 | $5,582.70 | $4,700.00 | $2,089.15 |
| 1210 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 5 | $6,362.98 | $5,523.31 | $4,650.00 | $6,601.51 |
| 1215 | Wireless communication system device, relocate (0684-6-4) | EACH | 6 | $2,477.24 | $1,496.64 | $1,260.00 | $2,363.85 |
| 1220 | Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13) | EACH | 5 | $25,612 | $17,681 | $14,885 | $20,306 |
| 1225 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 22 | $971.15 | $873.04 | $735.00 | $1,201.59 |
| 1230 | Sign panel, furnish & install overhead mount, 12-20 SF (0700-3202) | EACH | 6 | $2,402.93 | $1,722.32 | $1,450.00 | $1,992.50 |
| 1235 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 28 | $4,514.54 | $4,234.54 | $3,565.00 | $3,729.33 |
| 1240 | Connected vehicle roadside equipment, rsu (0924-681-1) | EACH | 1 | $21,835 | $9,858.81 | $8,300.00 | $16,474 |
| 1242 | Temporary pedestrian access (0926-102-1) | SFD | 144,144 | $0.01 | $0.22 | $0.10 | $0.43 |
| 1245 | Local agency initial amount (DO not bid) (0999-26) | LS | 1 | $17,500 | $17,500 | $17,500 | $17,500 |
| 1250 | Local agency initial amount (DO not bid) (0999-26) | LS | 1 | $62,350 | $62,350 | $62,350 | $62,350 |
| 1255 | Utility pipe,remove & dispose, 0 - 1.9" (1050-16001) | LF | 100 | $100.29 | $78.42 | $50.00 | $72.67 |
| 1260 | Utility pipe,remove & dispose, 2- 4.9" (1050-16002) | LF | 100 | $100.29 | $78.42 | $50.00 | $72.67 |
| 1265 | Utility pipe,remove & dispose, 5- 7.9" (1050-16003) | LF | 300 | $100.29 | $87.22 | $50.00 | $75.54 |
| 1270 | Utility pipe,remove & dispose, 8- 19.9" (1050-16004) | LF | 300 | $125.37 | $87.22 | $50.00 | $248.54 |
| 1275 | Utility pipe- poly vinyl chloride, furnish & install, water/sewer, (1050-31206) | LF | 200 | $121.58 | $94.71 | $100.00 | $377.06 |
| 1280 | Utility pipe- poly vinyl chloride, furnish & install, water/sewer, (1050-31208) | LF | 60 | $172.88 | $89.88 | $100.00 | $390.34 |
| 1285 | Utility pipe- poly vinyl chloride, furnish & install, water/sewer, 18" (1050-31218) | LF | 40 | $339.76 | $162.84 | $200.00 | $473.97 |
| 1290 | Utility structure, below ground, adjust/modify (1060-15) | EACH | 25 | $3,762.69 | $5,632.37 | $2,500.00 | $2,665.79 |
| 1295 | Utility fixture, valve/meter box, adjust (1080-21500) | EACH | 40 | $1,546.14 | $5,238.36 | $1,200.00 | $596.41 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of June 10, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.