| 0005 | Mobilization (0101-1) | LS | 1 | $2,242.41 | $1,030.46 | $100,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $4,484.84 | $6,182.76 | $50,000 |
| 0015 | Epoxy concrete overlay for concrete bridge decks (0403-1100) | SY | 90 | $454.04 | $440.52 | $690.00 |
| 0020 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $392.99 | $392.99 | $392.99 |
| 0025 | Mobilization (0101-1) | LS | 1 | $386,844 | $339,064 | $800,000 |
| 0030 | Maintenance of traffic (0102-1) | DA | 1 | $258,494 | $479,709 | $300,000 |
| 0035 | Traffic control officer (0102-14) | HR | 3,100 | $5.61 | $5.15 | $32.00 |
| 0040 | Work zone sign (0102-60) | ED | 29,288 | $0.32 | $0.31 | $0.22 |
| 0045 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 59,012 | $0.11 | $0.10 | $0.13 |
| 0050 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 12,000 | $0.11 | $0.10 | $0.17 |
| 0055 | Arrow board / advance warning arrow panel (0102-76) | ED | 310 | $5.31 | $5.15 | $6.60 |
| 0060 | Temporary raised/retroreflective pavement marker, type B (0102-78-2) | EACH | 12,736 | $4.78 | $4.90 | $5.23 |
| 0065 | Portable changeable message sign, temporary (0102-99) | ED | 1,268 | $15.93 | $15.46 | $12.00 |
| 0070 | Temporary signalization and maintenance, intersection (0102-104) | ED | 310 | $5.31 | $5.27 | $5.50 |
| 0075 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 310 | $5.31 | $5.27 | $5.50 |
| 0080 | Portable regulatory, sign (0102-150-1) | ED | 620 | $7.43 | $7.21 | $5.50 |
| 0085 | Radar speed display unit (0102-150-2) | ED | 620 | $7.43 | $7.21 | $5.50 |
| 0090 | Sediment barrier (0104-10-3) | LF | 1,039 | $5.39 | $6.05 | $3.82 |
| 0095 | Floating turbidity barrier (0104-11) | LF | 34 | $22.43 | $38.84 | $76.40 |
| 0100 | Inlet protection system (0104-18) | EACH | 92 | $168.18 | $149.02 | $262.63 |
| 0105 | Litter removal (0107-1) | ACRE | 3,496.61 | $5.61 | $36.07 | $25.00 |
| 0110 | Mowing (0107-2) | ACRE | 3,391.81 | $5.61 | $5.15 | $21.39 |
| 0115 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $18,980 | $205,467 | $75,000 |
| 0120 | Removal of existing concrete (0110-4-10) | SY | 157 | $114.50 | $16.53 | $28.65 |
| 0125 | Borrow excavation, truck measure (0120-2-2) | CY | 1,120 | $14.08 | $19.35 | $33.42 |
| 0130 | Regular excavation (3-R projects only) (0120-71) | LS | 1 | $1,282.71 | $12,145 | $19,100 |
| 0135 | Type B stabilization (0160-4) | SY | 779 | $25.49 | $29.96 | $17.19 |
| 0140 | Optional base, base group 06 (0285-706) | SY | 718 | $39.53 | $42.35 | $42.98 |
| 0145 | Turnout construction- asphalt/driveway base- asphalt material (0286-2) | TN | 631.30 | $124.89 | $176.00 | $250.00 |
| 0150 | Milling existing asphalt pavement, 1" avg depth (0327-70-1) | SY | 68,901 | $0.50 | $3.54 | $1.24 |
| 0155 | Milling existing asphalt pavement, 2" avg depth (0327-70-5) | SY | 47,606 | $0.50 | $1.32 | $1.38 |
| 0160 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 3,698 | $1.00 | $2.76 | $2.50 |
| 0165 | Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11) | SY | 2,676 | $1.00 | $7.59 | $2.00 |
| 0170 | Milling existing asphalt pavement, 1 1/4" avg depth (0327-70-12) | SY | 42,999 | $0.50 | $0.97 | $1.91 |
| 0175 | Milling existing asphalt pavement, 1 3/4" avg depth (0327-70-13) | SY | 233,396 | $0.50 | $1.73 | $1.34 |
| 0180 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 29,144.20 | $127.06 | $115.92 | $124.00 |
| 0185 | Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25) | TN | 10,991.90 | $169.62 | $186.33 | $165.10 |
| 0190 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 13,705 | $128.03 | $151.18 | $125.33 |
| 0195 | Miscellaneous asphalt (0339-1) | TN | 89.70 | $214.18 | $271.67 | $334.25 |
| 0200 | Pipe liner- spray application, 61" and greater (0431-1299) | LF | 337 | $611.14 | $471.70 | $1,180.00 |
| 0205 | Concrete curb & gutter, type F (0520-1-10) | LF | 164 | $106.79 | $45.16 | $57.30 |
| 0210 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 96 | $199.63 | $188.13 | $112.69 |
| 0215 | Detectable warnings (0527-2) | SF | 155 | $25.49 | $24.73 | $35.20 |
| 0220 | Guardrail -roadway, general (0536-1-1) | LF | 536 | $29.74 | $28.85 | $49.50 |
| 0225 | Guardrail transition to rigid barrier, F&I- index 536- 002, approach TL-3 (0536-8122) | EACH | 4 | $3,972.20 | $3,853.92 | $6,050.00 |
| 0230 | Guardrail removal (0536-73) | LF | 266 | $2.12 | $2.06 | $5.50 |
| 0235 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 4 | $3,717.30 | $3,606.61 | $5,775.00 |
| 0240 | Raised rumble strip set- short term (0546-71-2) | EACH | 16 | $265.52 | $618.28 | $660.00 |
| 0245 | Performance turf, sod (0570-1-2) | SY | 53,687 | $2.66 | $3.82 | $4.00 |
| 0250 | Performance turf, sod and shoulder treatment index (0570-1-3) | SY | 548 | $7.46 | $7.71 | $5.25 |
| 0255 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 4 | $3,186.26 | $3,163.57 | $3,300.00 |
| 0260 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 4 | $3,186.26 | $3,163.57 | $3,300.00 |
| 0265 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 42.29 | $1,062.30 | $1,443.28 | $1,540.00 |
| 0270 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 2.39 | $849.84 | $1,542.05 | $1,650.00 |
| 0275 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 1,040 | $0.11 | $1.55 | $1.65 |
| 0280 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 3,305 | $0.27 | $1.70 | $1.81 |
| 0285 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 1,313 | $1.06 | $2.44 | $2.61 |
| 0290 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 38.32 | $1,274.76 | $618.51 | $660.00 |
| 0295 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 5.43 | $690.49 | $618.29 | $660.00 |
| 0300 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 5 | $37.18 | $46.19 | $49.28 |
| 0305 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 368 | $21.25 | $23.71 | $25.30 |
| 0310 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 36.85 | $1,062.30 | $1,443.24 | $1,540.00 |
| 0315 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 876 | $0.27 | $1.80 | $1.93 |
| 0320 | Painted pavement markings, standard, yellow, skip, 6" (0710-11231) | GM | 0.89 | $1,009.18 | $618.64 | $660.00 |
| 0325 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 1.23 | $690.49 | $616.63 | $660.00 |
| 0330 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $123,791 | $123,791 | $123,791 |
| 0335 | Raised rumble strip set- permanent (0546-71-1) | EACH | 16 | $531.04 | $618.28 | $660.00 |
| 0340 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 22.81 | $2,655.22 | $3,188.66 | $2,400.00 |
| 0345 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 83 | $531.04 | $515.23 | $649.00 |
| 0350 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 18 | $2,336.59 | $2,267.01 | $3,135.00 |
| 0355 | Single column ground sign assembly, relocate (0700-1500) | EACH | 5 | $106.21 | $103.05 | $82.50 |
| 0360 | Single column ground sign assembly, remove (0700-1600) | EACH | 36 | $53.10 | $51.52 | $55.00 |
| 0365 | Multi-column ground sign assembly, F&I ground mount, 30.0 SF (0700-2113) | EACH | 1 | $6,903.56 | $6,697.99 | $4,395.60 |
| 0370 | Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114) | EACH | 1 | $7,965.65 | $7,728.45 | $6,233.70 |
| 0375 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 2 | $1,062.09 | $1,030.46 | $1,320.00 |
| 0380 | Sign panel, remove, 101-200 SF (0700-3606) | EACH | 1 | $1,062.09 | $1,030.46 | $4,950.00 |
| 0385 | Overhead static sign shallow foundation removal, cantilever (0700-4611) | EACH | 1 | $8,496.69 | $10,305 | $9,550.00 |
| 0390 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 73 | $74.35 | $72.13 | $93.50 |
| 0395 | Enhanced highway sign solar powered, F&I ground mount, W/eds, UP to 12 SF of static sign panels (0700-142131) | EACH | 1 | $9,683.47 | $9,395.12 | $10,450 |
| 0400 | Tubular marker, 36" yellow (0704-1-4) | EACH | 31 | $132.76 | $128.81 | $275.00 |
| 0405 | Object marker, type 1 (0705-10-1) | EACH | 34 | $265.52 | $257.62 | $495.00 |
| 0410 | Object marker, type 2 (0705-10-2) | EACH | 58 | $84.97 | $82.44 | $165.00 |
| 0415 | Raised pavement marker, type B (0706-1-3) | EACH | 6,368 | $5.84 | $4.90 | $5.23 |
| 0420 | Painted pavement markings, surface (0710-90) | LS | 1 | $121,078 | $108,261 | $115,500 |
| 0425 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 1,040 | $4.25 | $3.74 | $3.99 |
| 0430 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 3,305 | $5.31 | $5.62 | $6.00 |
| 0435 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 1,313 | $6.90 | $7.10 | $7.58 |
| 0440 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 5.43 | $2,549.01 | $2,267.07 | $2,420.00 |
| 0445 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 5 | $212.42 | $262.92 | $280.50 |
| 0450 | Thermoplastic, standard, arrow (0711-11170) | EACH | 368 | $95.59 | $80.42 | $85.80 |
| 0455 | Thermoplastic, standard, yield line (0711-11180) | LF | 60 | $10.62 | $20.62 | $22.00 |
| 0460 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 876 | $5.31 | $4.77 | $5.09 |
| 0465 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 1.23 | $2,389.70 | $2,260.97 | $2,420.00 |
| 0470 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 10 | $164.62 | $154.66 | $165.00 |
| 0475 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 10 | $106.21 | $154.66 | $165.00 |
| 0480 | Thermoplastic, preformed, 6" white, railroad dynamic envelope (0711-14191) | LF | 27 | $5.31 | $4.34 | $4.63 |
| 0485 | Thermoplastic, preformed, 12" white on asphalt pavement, railroad dynamic envelope (0711-14193) | LF | 151 | $10.62 | $6.55 | $6.99 |
| 0490 | Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101) | GM | 15.84 | $5,735.27 | $4,946.57 | $5,280.00 |
| 0495 | Thermoplastic, standard-open graded asphalt surfaces, solid, 8" (0711-15102) | GM | 0.99 | $5,947.69 | $5,093.45 | $5,445.00 |
| 0500 | Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131) | GM | 16.55 | $2,336.59 | $2,680.75 | $2,860.00 |
| 0505 | Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201) | GM | 10.10 | $5,735.27 | $4,996.67 | $5,335.00 |
| 0510 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 5.31 | $5,310.43 | $4,635.38 | $2,860.00 |
| 0515 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 1.40 | $5,522.85 | $5,342.29 | $5,335.00 |
| 0520 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 2.61 | $2,336.59 | $2,466.00 | $4,950.00 |
| 0525 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 8.33 | $5,310.43 | $4,636.97 | $5,720.00 |
| 0530 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 0.89 | $2,336.59 | $2,474.54 | $2,640.00 |
| 0535 | Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1) | SF | 2,681 | $1.06 | $1.80 | $1.93 |
| 0540 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.16 | $30,269 | $30,550 | $33,000 |
| 0545 | Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181) | GM | 0.16 | $12,745 | $15,275 | $16,500 |
| 0550 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.16 | $30,269 | $30,550 | $33,000 |
| 0555 | Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381) | GM | 0.16 | $12,745 | $15,275 | $16,500 |
| 0560 | Conduit, furnish & install, open trench (0630-2-11) | LF | 790 | $10.62 | $10.55 | $11.00 |
| 0565 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 329 | $37.17 | $36.91 | $38.50 |
| 0570 | Fiber optic cable locator (0633-6) | DA | 500 | $106.21 | $105.45 | $110.00 |
| 0575 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 7 | $1,752.44 | $1,739.96 | $1,815.00 |
| 0580 | Loop assembly- F&I, type A (0660-2101) | AS | 2 | $1,274.50 | $1,265.43 | $1,320.00 |
| 0585 | Loop assembly, F&I, type B (0660-2102) | AS | 8 | $1,593.13 | $1,581.79 | $1,650.00 |
| 0590 | Loop assembly, F&I, type F (0660-2106) | AS | 2 | $3,186.26 | $3,163.58 | $3,300.00 |